B2604Tabulation.pdf
PDF 11 KB Posted
- Attached to
- Jackson-Lane Memorial Park Pavilion
- Solicitation number
- B-26-04
- Issued by
- Volusia County, Florida
About this file
This is a bid tabulation document for the City of DeLand's Jackson-Lane Memorial Park Pavilion construction project located at 720 N. Frankfort Avenue in DeLand, Florida. The project encompasses construction of a new wood-frame pavilion with concrete masonry unit restrooms totaling 327 gross square feet, including separate men's and women's restroom facilities and a vestibule. Site work includes removal of two existing trees, installation of water and sanitary sewer lines, a 4-inch concrete sidewalk, performance turf, and complete landscaping. The sealed bid deadline was 3:00 p.m. on Thursday, January 29, 2026, with a mandatory pre-bid meeting held on Tuesday, January 13, 2026, at the Utilities Administration Building. The contract duration is 90 business days from the Notice to Proceed, with liquidated damages of $500 per day for failure to achieve substantial completion.
Four contractors submitted bids for the project: MGN Contracting Inc. with a total bid of $519,359.56, Ovation Construction Inc. with $545,327.54, S.A. Casey Construction with $663,981.08, and APD Construction LLC with $432,261.94 (the lowest bid). The City of DeLand noted that the bid will not be awarded due to budgetary constraints. The project is federally assisted through a Community Development Block Grant and is subject to Davis-Bacon prevailing wage requirements. Bidders were required to provide a 5% bid bond, evidence of state contractor licensure, performance and payment bonds equal to 100% of the contract price, and comprehensive insurance coverage including workers' compensation, commercial general liability of $5,000,000 combined single limit, pollution liability of $1,000,000, and builder's risk insurance. The project is exempt from Florida sales and use taxes and includes a 5% contingency allowance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B2604ADD3.pdf | ||
| B2604ADD3Attachment.pdf | ||
| B2604ADD2.pdf | ||
| B2604ADD1.pdf | ||
| B2604Plans.pdf | ||
| B2604Plans.pdf | ||
| B2604Specs.pdf | ||
| B2604Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 101-1 MOBILIZATION LS 1 $4,733.30 $4,733.30 $3,500.00 $3,500.00 $34,800.00 $34,800.00 $47,916.84 $47,916.84 102-1 MAINTENANCE OF TRAFFIC LS 1 $2,958.31 $2,958.31 $0.00 $0.00 $2,900.00 $2,900.00 $6,093.00 $6,093.00
110-1-1 CLEARING & GRUBBING LS 1 $2,952.93 $2,952.93 $6,060.00 $6,060.00 $7,192.00 $7,192.00 $2,771.00 $2,771.00 110-2-1 TREE PROTECTION BARRIER LF 200 $2.96 $592.00 $5.40 $1,080.00 $4.64 $928.00 $2.13 $426.00 120-1 REGULAR EXCAVATION LS 1 $7,632.44 $7,632.44 $8,629.00 $8,629.00 $4,060.00 $4,060.00 $6,485.94 $6,485.94
E580-332 23 TREE REMOVAL EA 2 $3,845.80 $7,691.60 $1,250.00 $2,500.00 $7,540.00 $15,080.00 $3,532.46 $7,064.92 580-1-2 LANDSCAPE COMPLETE - LARGE PLANTS LS 1 $4,496.63 $4,496.63 $1,400.00 $1,400.00 $34,800.00 $34,800.00 $3,507.60 $3,507.60 522-1 CONCRETE SIDEWALK 4" THICK SY 47 $120.25 $5,651.75 $51.06 $2,399.82 $370.21 $17,399.87 $85.82 $4,033.54
570-1-2 PERFORMANCE TURF, SOD FY 368 $49.07 $18,057.76 $12.80 $4,710.40 $87.67 $32,262.56 $5.19 $1,909.92 999-1 CLEANOUT, SCH.40 PVC (F&I) EA 3 $1,117.06 $3,351.18 $2,300.00 $6,900.00 $2,320.00 $6,960.00 $605.75 $1,817.25 999-2 WATER LINE , 1" SCH.40 PVC (F&I) LF 125 $14.52 $1,815.00 $45.63 $5,703.75 $43.50 $5,437.50 $72.10 $9,012.50 999-3 SAN. SEWER LINE, 6" SCH.40 PVC (F&I) LF 145 $89.64 $12,997.80 $85.55 $12,404.75 $208.80 $30,276.00 $75.78 $10,988.10
0337-78-08 ASPHALT CONCRETE FRICTION COURE, TRAFFIC B, FC-9.5 SY 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$72,930.70 $55,287.72 $192,095.93 $102,026.61
ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 1 DIVISION 1: GENERAL REQUIREMENTS LS 1 $71,070.02 $71,070.02 $158,175.00 $158,175.00 $158,500.00 $158,500.00 $93,646.58 $93,646.58 3 DIVISION 3: CONCRETE LS 1 $48,833.75 $48,833.75 $26,600.00 $26,600.00 $22,080.00 $22,080.00 $41,176.56 $41,176.56 4 DIVISION 4: MASONRY LS 1 $69,683.80 $69,683.80 $53,800.00 $53,800.00 $55,000.00 $55,000.00 $25,209.23 $25,209.23 5 DIVISION 5: METALS LS 1 $0.00 $0.00 $13,028.00 $13,028.00 $3,719.00 $3,719.00 $0.00 $0.00 6 DIVISION 6: WOOD & PLASTICS LS 1 $46,060.23 $46,060.23 $19,410.00 $19,410.00 $81,000.00 $81,000.00 $52,911.48 $52,911.48 7 DIVISION 7: THERMAL & MOISTURE PROTECTION LS 1 $8,401.60 $8,401.60 $9,200.00 $9,200.00 $13,000.00 $13,000.00 $8,550.33 $8,550.33 8 DIVISION 8: OPENINGS LS 1 $10,433.12 $10,433.12 $3,342.00 $3,342.00 $9,156.00 $9,156.00 $9,784.65 $9,784.65 9 DIVISION 9: FINISHES LS 1 $27,852.65 $27,852.65 $24,000.00 $24,000.00 $25,000.00 $25,000.00 $4,728.60 $4,728.60 10 DIVISION 10: SPECIALTIES LS 1 $23,554.07 $23,554.07 $13,850.00 $13,850.00 $6,700.00 $6,700.00 $16,761.00 $16,761.00
11 DIVISION 11: EQUIPMENT LS 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
12 DIVISION 12: FURNISHINGS LS 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
13 DIVISION 13: SPECIAL CONSTRUCTION LS 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 15 DIVISION 22: PLUMBING LS 1 $26,601.13 $26,601.13 $9,000.00 $9,000.00 $56,000.00 $56,000.00 $24,952.80 $24,952.80 16 DIVISION 23: HEATING, VENTILATION, & AIR CONDITIONING LS 1 $29,279.93 $29,279.93 $8,500.00 $8,500.00 $0.15 $0.15 $12,609.60 $12,609.60 17 DIVISION 26: ELECTRICAL LS 1 $84,658.56 $84,658.56 $30,500.00 $30,500.00 $41,730.00 $41,730.00 $39,904.50 $39,904.50
$446,428.86 $369,405.00 $471,885.15 $330,235.33
This bid will not be awarded due to City of DeLand budgetary constraints.
B-26-04 Tabulation
$424,692.72 $663,981.08 $432,261.94
$25,967.98 $21,234.64 $33,199.05 $21,613.10
MGN CONTRACTING INC. OVATION CONSTRUCTION INC. S.A. CASEY CONSTRUCTION
MGN CONTRACTING INC. OVATION CONSTRUCTION INC. S.A. CASEY CONSTRUCTION
APD CONSTRUCTION LLC
APD CONSTRUCTION LLC
$519,359.56
$545,327.54
SITE - CIVIL
SUBTOTAL A
ARCHITECTURAL - STRUCTURAL - MECHANICAL - ELECTRICAL - PLUMBING
SUBTOTAL B
BID TOTAL
5% CONTINGENCY
$445,927.36 $697,180.13 $453,875.04
Tabulation represents the lowest-responsive bidder and the recommended awardee of the City of DeLand. Bid tabulations are posted to DemandStar at www.demandstar.com & VendorLink at www.vendorlink.com.
GRAND TOTAL