About this file

This document is a Submittal List template for a mechanical and electrical renovation project at the Gold Rush National Historical Park. The template lists the detailed submittal requirements for various specification sections, including plumbing, HVAC, and electrical systems. It indicates whether each submittal is an informational or action submittal, and the expected review time for the architect, civil, structural, mechanical, electrical, project manager, and landscape architect disciplines. The related federal contract opportunity is for the replacement of HVAC systems at the Maintenance and Curatorial buildings in Skagway, Alaska, issued by the Department of the Interior National Park Service Alaska Region. The template provides a detailed listing of the expected submittals for this project, which the contracting officer can use to estimate the review effort required by the design team.

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC at Maintenance & Curatorial Bldgs - S, newest first.
File Type Posted
B08_Attachment_2_-_Calculations.pdf PDF
B08_Attachment_10_Payment_Bond.pdf PDF
Sol_140P9724R0010.pdf PDF
B08_Attachment_13_-_Project_Design_-_Combined.pdf PDF
B08_Attachment_5_-_CloseoutandOM_KLGO_Mech_and_Elect_10_12.xls XLS spreadsheet
B08_Attachment_11_Performance_Bond.pdf PDF
B08_Attachmen_12_-_Subcontracting___Worksheet.xlsx XLSX spreadsheet
B08_Attachmen_12_-_Subcontracting___Worksheet_1.xlsx XLSX spreadsheet
B08_Attachment_3_-_Curatorial_Photos.pdf PDF
B08_Attachment_4__KLGO_248830_CM-16_Submittal_Form.doc DOC document
B08_Attachment_1_Combo_Div_1___Specs.pdf PDF
B08_Attachment_7__ITM_Hot_Work_Permit.pdf PDF
B08_Attachment_9_Past_Performance_Questionnaire_Aug_2021.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal List Template

SUBMITTAL LIST

Note: See tab below for Samples and Instructions. Attach to end of Specification Section 01 33 23 when complete.

KLGO/217933C/GOLD RUSH MECHANICAL RENNOVATION
SUBMITTALREQUIREMENTS (indicate with an "X")
Spec. Sec.Par. No.DescriptionINFORMATIONALACTION
CERT./LAB TESTREPORT/CALC.
OR PLANMfg. DATA
& INSTRUCTIONSSHOP DRAWINGSAMPLEMfg. DATA

& INSTRUCTIONS

22 05 001.6COMMON WORK RESULTS FOR PLUMBING
SUBMITTAL SPECIFICATIONSX
CATALOG CUT SHEET SUBMITTAL SPECIFICATIONSX
22 05 001.6HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
PRODUCT DATAX
22 05 001.6VIBRATION AND SEISMIN CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
CALCULATIONS FOR SEISMIC/WIND RESTRAINTSX
SHOP DRAWINGS AND SEISMIC CALCULATIONSX
CATALOG CUTS, TEMPLATES, ERECTION AND INSTALLATION DETAILX
22 05 001.6IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
PRODUCT DATAX
22 05 191.4METERS AND GAUGES FOR PLUMBING PIPING
PRODUCT DATAX
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
22 07 001.4PLUMBING INSULATION
PRODUCT DATAX
PRODUCT DESCRIPTION, THICKNESS FOR EACH SERVICE, AND LOCATIONX
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
22 10 001.4PLUMBING PIPING
PRODUCT DATAX
PIPE MATERIAL, FITTINGS, VALVES, AND ACCESSORIESX
3.4, 3.5TEST REPORTSX
22 30 001.5PLUMBING EQUIPMENT
PRODUCT DATAX
WATER HEATER DRAWINGSX
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
23 05 001.6COMMON WORK RESULTS FOR HVAC
SUBMITTAL REQUIREMENTSX
23 05 001.6HANGERS AND SUPPORTS FOR HAVC PIPING AND EQUIPMENT
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
23 05 001.6VIBRATION AND SEISMIC CONTROLS FOR HVAC
SHOP DRAWING AND MANUFACTURER'S DATAX
CALCULATIONS FOR SEISMIC/WIND RESTRAINTSX
SHOP DRAWINGS SEISMIC CALCULATIONSX
CATALOG CUTS, TEMPLATES, ERECTION AND INSTALLATION DETAILX
23 05 001.6INDENTIFICATION FOR HVAC PIPING, DUCTWORK, AND EQUIPMENT
PRODUCT DATAX
23 05 191.4METERS AND GAUGES FOR PLUMBING PIPING
PRODUCT DATAX
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
23 05 931.8TESTING, ADJUSTING, AND BALANCING FOR HVAC
BALANCING AGENCY QUALIFICATIONS AND SAMPLE BALANCING FORMSX
LIST OF EQUIPMENT TO BE USED AND DATE IF LAST CALIBRATIONX
PRELIMINARY BALANCE REPORTX
23 07 001.4HVAC INSULATION
PRODUCT DATAX
PRODUCT DESCRIPTION, THICKNESS FOR EACH SERVICE, AND LOCATIONX
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
MANUFACTURER'S DATA ON CONTENT OF VOLATILE ORGANIC COMPOUNDSX
23 09 001.4INSTRUMENTATION AND CONTROL FOR HVAC
SHOP DRAWINGSX
PRODUCT DATA (INCLUDED 1.4C)X
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
23 11 131.4FACILITY FUEL-OIL PIPING
PRODUCT DATAX
PIPE MATERIAL, FITTINGS, VALVES, AND ACCESSORIESX
23 21 131.5HYDRONIC PIPING
PRODUCT DATAX
PIPE MATERIAL, FITTINGS, VALVES, AND ACCESSORIESX
PRESSURE TESTING RESULTSX
CLEANING PROCEDURESX
23 21 161.5HYDRONIC SPECIALTIES
PRODUCT DATAX
GLYCOL SOLUTION TEST RESULTSXX
23 21 231.5HYDRONIC PUMPS
PRODUCT DATAX
PUMP CURVESX
23 31 001.6HVAC DUCTS AND CASINGS
GENERAL CONDITIONS AND GENERAL REQUIREMENTSX
SHOP DRAWINGSX
PRODUCT DATAX
TEST REPORTSX
1.7PROJECT RECORD DOCUMENTSX
23 33 001.4AIR DUCT ACCESSORIES
SHOP DRAWINGSX
PRODUCT DATAX
MANUFACTURER'S CERTIFICATEX
1.5PROJECT RECORD DOCUMENTSX
23 37 001.5AIR OUTLETS AND INLETS
PRODUCT DATAX
23 45 501.4VENTILATION SYSTEM CLEANING
WORK PLAN AND REPORTX
23 45 511.4VENTILATION SYSTEMS CLEANING ACCESSORIES
PRODUCT DATAX
23 51 001.8BREECHINGS, CHIMNEYS, AND STACKS
SHOP DRAWINGSX
PRODUCT DATAX
ENGINEERING DATAX
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
23 52 231.4CAST IRON BOILERS
PRODUCT DATAX
23 72 001.4INDOOR CENTRAL AIR HANDLING UNITS
SHOP DRAWINGSX
PRODUCT DATAX
FAN CURVESX
SOUND POWER LEVELSX
ELECTRICAL REQUIREMENTS AND WIRE DIAGRAMSX
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
23 81 231.5AIR-SOURCE HEAT PUMPS
PRODUCT DATAX
SHOP DRAWINGSX
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
23 81 431.5COMPUTER-ROOM AIR-CONDITIONERS
PRODUCT DATAX
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
23 82 001.4CONVECTION HEATING AND COOLING UNITS
PRODUCT DATAX
EQUIPMENT SCHEDULESX
MECHANICAL AND ELECTRIC SERVICE LOCATIONS AND REQUIREMENTSX
23 82 161.4AIR COILS
PRODUCT DATAX
MANUFACTURER'S INSTALLATION INSTRUCTIONSX
23 84 131.4HUMIDITY CONTROL EQUIPMENT
PRODUCT DATAX
LOAD CALCULATION INPUTS AND CALCULATED HUMIDITY VALUESX
26 01 261.3MAINTENANCE TESTING OF ELECTRICAL SYSTEMS
PRODUCT DATAXX
26 05 001.6COMMON WORK RESULTS FOR ELECTRICAL
SUBMITTAL REQUIREMENTSX
26 05 191.4LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
PRODUCT DATAX
26 05 261.5GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
PRODUCT DATAX
26 05 291.4HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
PRODUCT DATAX
26 05 331.6RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
PRODUCT DATAX
26 05 481.5VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SHOP DRAWINGSX
26 05 531.3IDENTIFICATION FOR ELECTRICAL SYSTEMS
PRODUCT DATAX
26 05 831.4WIRING CONNECTIONS
PRODUCT DATAX
26 28 161.4ENCLOSED SWITCHES AND CIRCUIT BREAKERS
PRODUCT DATAX
SHOP DRAWINGSX
26 29 131.4ENCLOSED CONTROLLERS
PRODUCT DATAX
SHOP DRAWINGSX

Review Estimate Template

SUBMITTAL LIST AND REVIEW ESTIMATE
SUBMITTALS LISTACTION SUBMITTAL REVIEW ESTIMATE
Park/PMIS/Project Title(Complete this portion for AE Const. Serv. task order negotiation.)
SUBMITTALREQUIREMENTS
(indicate with an "X")A/E REVIEW TIME

(indicate number of hours)

Spec. Sec.Par. No.DescriptionINFORMATIONALACTIONARCH (hrs)CE (hrs)SE (hrs)ME (hrs)EE (hrs)PM - Coor. (hrs)LA (hrs)
CERT./LAB TESTREPORT/CALC.
OR PLANMfg. DATA
& INSTRUCTIONSSHOP DRAWINGSAMPLEMfg. DATA

& INSTRUCTIONS

Total 0 0 0 0 0 0 0

Template Instructions

SUBMITTAL LIST AND REVIEW ESTIMATE

INSTRUCTIONS

PHASE OF WORKRESPONSIBLE PARTYDESCRIPTION OF TASKS
DESIGN SERVICES
(CONSTRUCTION DOCUMENTS PHASE)Design A/E1. Fill out Park/PMIS/Project Title cell with project reference information.
2. Use this form to record construction submittal requirements for the project. Fill out the Specification Section, Paragraph number, Description columns on the left side of the form. Insert Additional rows, as required for sections containing multiple submittals.
3. In the columns designated "REQUIREMENTS", indicate the submittal requirement(s) by placing an "X" in the appropriate box(es). Insert additional columns as necessary under the headings of Informational or Action to correctly show the type of submittal. Refer to Specification Section 01 33 23 for clarification on what are Informational submittals or Action submittals. (Action submittals require Government responsive action and informational do not.) All Division 01 Specification Submittals should be shown as Informational Submittals.
4. Attach a black and white version to the end of Specification Section 01 33 23 in the project manual. Delete instructional note on the top of the page.
CONSTRUCTION SERVICES
(CONSTRUCTION PHASE)Construction COR1. Utilize the "Submittal List" form submitted with the Final Construction Documents. Copy/paste submittal information into the Submittal List and review estimate. If amendments have been issued, make adjustments to the submittal requirements if necessary.
2. Attach this form to the "A/E Construction Services" Scope of Services.
3. Utilize this form to the generate the estimated time required for the A/E to accomplish the Action submittal reviews by inserting your estimated number of hours per discipline under corresponding column headings.
4. Add discipline heading columns, as required.
5. Use the total number of hours per discipline at the bottom of the form and apply the hourly rates listed in the IDIQ contract (using appropriate option period rates) to formulate the Government estimate for submittal reviews. Refer to the sample by selecting an appropriate tab below.
6. Use the information contained within this form to negotiate the submittal review portion of the A/E Construction Services task order.
7. Provide this form to the CMR so they have an understanding of which submittals they are responsible for and which are to be forwarded to the A/E.

All Informational submittals will be reviewed by the CMR.

A/E1. Indicate level of effort required for each Action submittal review by inserting the number of hours for each discipline under the "A/E Review Time (indicate number of hours)" column.
2. All Informational submittals will be reviewed by the CMR.
3. Use the total number of hours indicated for each discipline and apply the appropriate rates from the IDIQ contract (using the appropriate option period rates) to formulate your estimate. Refer to the sample by selecting an appropriate tab below.
4. Use this estimate to negotiate the submittals review portion of the A/E Construction Services portion of the task order.

Submittal List Sample

SUBMITTAL LIST
Death Valley National Park, PMIS 06660, Rehabilitate Maintenance Facilities
SUBMITTALREQUIREMENTS

(indicate with an "X")

INFORMATIONALACTION
Spec. Sec.Par. No.DescriptionCERT./LAB TESTREPORT/CALC.
OR PLANMfg. DATA
& INSTRUCTIONSSHOP DRAWINGSAMPLEMfg. DATA

& INSTRUCTIONS

21101.3Excavation safety planX
21201.4Signed copies of manifestX
23201.2Procedures for trench dewateringX
25011.3Water and sewer test accuracy cert.X
25021.2Water line marking tape sampleX
25171.2Fire Hydrants
Manufactures information: x-sectionX
Certification with AWWA C502-94X
27251.2Aggregate base courseX
27781.2Walks, curbs and gutters, mix designXX
33001.3Cast in-Place Concrete
Steel placement shop drawingX
Batching and hauling planX
Rebar certificationX
41001.2Mortar
Cured mortar sampleX
Material certification & test reportsX
42011.3Masonry Work
Shop drawingsX
Masonry unit sampleX
Mfg. information on admixturesX
51201.4Structural steelX
53111.3Steel roof deck shop drawingsX
54001.3Cold Formed Metal Framing
Shop drawings and erection diagramsX
Mill certificatesX
Welder certificatesX
64021.3Interior architectural woodworkXXX
71001.4Cold Fluid Applied Waterproofing
Product dataX
Shop drawingsX
Installer certificationX
Product test reportsX
72601.2Vapor retarder mfg. installation instructionsX
76101.3Sheet metal roofingXXX
81101.3Steel Doors and Frames
Shop drawingsX
Catalog cuts and install instructionsX
Door scheduleX
85201.3Aluminum windowsXX
87101.2Finish hardware scheduleX
93101.6Ceramic Tile
SampleX
Mfg. literatureX
CertificationX
99011.4Painting
Mfg. color chartX
Paint sample applied to like materialX
Mfg. informationX
108001.7Toilet and bath acc.mfg.infoX
114521.2Kitchen appliances, product dataX
125001.3Horizontal louver blindsX
150601.4Piping and accessoriesXXX
158001.3DuctworkXX
164701.4Panel boardsXXX

Review Estimate Sample

SUBMITTAL LIST AND REVIEW ESTIMATE
SUBMITTAL LISTSUBMITTAL REVIEW ESTIMATE
Death Valley National Park, PMIS 06660, Rehabilitate Maintenance Facilities(Complete this portion for AE Const. Serv. task order negotiation)
SUBMITTALREQUIREMENTS
(indicate with an "X")A/E REVIEW TIME

(indicate number of hours)

INFORMATIONALACTIONARCH (hrs)CE (hrs)SE (hrs)ME (hrs)EE (hrs)PM - Coor. (hrs)LA (hrs)
Spec. Sec.Par. No.DescriptionCERT./LAB TESTREPORT/CALC.
OR PLANMfg. DATA
& INSTRUCTIONSSAMPLESHOP DRAWINGMfg. DATA

& INSTRUCTIONS

21101.3Excavation safety planX
21201.4Signed copies of manifestX
23201.2Procedures for trench dewateringX
25011.3Water and sewer test accuracy cert.X
25021.2Water line marking tape sampleX2
25171.2Fire Hydrants
Manufactures information: x-sectionX
Certification with AWWA C502-94X
27251.2Aggregate base courseX
27781.2Walks, curbs and gutters, mix designXX32
33001.3Cast in-Place Concrete
Steel placement shop drawingX12
Batching and hauling planX1
Rebar certificationX
41001.2Mortar
cured mortar sampleX11
Material certification & test reportsX
42011.3Masonry Work
Shop drawingsX4
Masonry unit sampleX1
Mfg. information on admixturesX1
51201.4Structural steelX4
53111.3Steel roof deck shop drawingsX4
54001.3Cold Formed Metal Framing
Shop drawings and erection diagramsX4
Mill certificatesX
Welder certificatesX
64021.3Interior architectural woodworkXXX6
71001.4Cold Fluid Applied Waterproofing
Product dataX
Shop drawingsX2
Installer certificationX
Product test reportsX
72601.2Vapor retarder mfg. installation instructionsX
76101.3Sheet metal roofingXXX32
81101.3Steel Doors and Frames
Shop drawingsX3
Catalog cuts and install instructionsX
Door scheduleX
85201.3Aluminum windowsXX6
87101.2Finish hardware scheduleX
93101.6Ceramic Tile
SampleX2
Mfg. literatureX
CertificationX
99011.4Painting
Mfg. color chartX3
Paint sample applied to like materialX2
Mfg. informationX
108001.7Toilet and bath acc.mfg.infoX
114521.2Kitchen appliances, product dataX
125001.3Horizontal louver blindsX
150601.4Piping and accessoriesXXX3
158001.3DuctworkXX3
164701.4Panel boardsXXX3
Total297246300