B08_Attachment_4__KLGO_248830_CM-16_Submittal_Form.doc

DOC document 105 KB Posted

Attached to
Replace HVAC at Maintenance & Curatorial Bldgs - S Federal contract opportunity
Solicitation number
140P9724R0010
Issued by
Department of the Interior National Park Service Alaska Region

About this file

This document is a Transmittal form (CM-16) for submitting product information and samples to the National Park Service for review and approval as part of a federal contract. The project involves the replacement of the HVAC system at the Maintenance and Curatorial Buildings in Skagway, Alaska. The contract number is not provided. The form requires the contractor to list the specification section, description of the item, and certify that the submittal has been reviewed for accuracy and compliance with contract requirements. The form also includes a submittal log to track the dates of submission and review. This appears to be a standard administrative form used for the submittal and approval process in this federal construction contract.

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC at Maintenance & Curatorial Bldgs - S, newest first.
File Type Posted
B08_Attachment_2_-_Calculations.pdf PDF
B08_Attachment_10_Payment_Bond.pdf PDF
B08_Attachment_6_-_SubmittalList-KLGO_Mech_and_Elect_3_14_24.xls XLS spreadsheet
B08_Attachment_9_Past_Performance_Questionnaire_Aug_2021.doc DOC document
B08_Attachmen_12_-_Subcontracting___Worksheet_1.xlsx XLSX spreadsheet
B08_Attachment_3_-_Curatorial_Photos.pdf PDF
B08_Attachment_1_Combo_Div_1___Specs.pdf PDF
B08_Attachment_7__ITM_Hot_Work_Permit.pdf PDF
Sol_140P9724R0010.pdf PDF
B08_Attachment_13_-_Project_Design_-_Combined.pdf PDF
B08_Attachment_5_-_CloseoutandOM_KLGO_Mech_and_Elect_10_12.xls XLS spreadsheet
B08_Attachment_11_Performance_Bond.pdf PDF
B08_Attachmen_12_-_Subcontracting___Worksheet.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL - NATIONAL PARK SERVICE

Transmittal No.:

Sheet: 1 of:

Park:

Project:

Contract No.:

Pkg. No.:

Date:

Contractor:

Subcontractor/Supplier:

NPS ACTION

Specification

Section No.

Description of Item

(Size, Type, Name, Manufacturer, Use, Etc.)

Contractor Signature
Recommended by
Title, Date
Title
Date

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Review Comments
Action By
Date

Contracting Officer’s Representative

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.

SUBMITTAL LOG DATES: From contractor [__________], To reviewer [__________], From reviewer [__________], To Contractor [__________]

Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim CM-16Rev. 4/00 (Formerly DSC-1(CS)

TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE
Transmittal No.:

Sheet: 1 of:

Park:

Project:

Contract No.:

Pkg. No.:

Date:

Contractor:

Subcontractor/Supplier:

NPS ACTION

Specification

Section No.

Description of Item

(Size, Type, Name, Manufacturer, Use, Etc.)

Review Comments

CM-16 Rev. 4/00 (Formerly DSC-1(CS)

File details come from the government source that posted it. Updated .