B08_Attachment_5_QASP_CTDVC_and_LSR.pdf
PDF 464 KB Posted
- Solicitation number
- 140P1423Q0039
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for maintenance services at Grand Teton National Park facilities. The QASP outlines performance standards and monitoring methods for scheduled and unscheduled maintenance tasks at the Craig Thomas Discovery and Visitor Center and Laurance S. Rockefeller Preserve Visitor Center. Key maintenance responsibilities include inspecting and maintaining building systems like HVAC, electrical, plumbing and generators. Seasonal requirements cover opening and closing procedures for buildings and composting toilets. Surveillance will be conducted through methods like direct observation, management reports, inspections and user surveys to ensure standards for tasks like filter replacement and equipment servicing are met. The QASP provides performance assessment procedures, documentation requirements and contact information for contracting officials from the National Park Service responsible for contract oversight.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1423Q0039_Amd_0001.pdf | ||
| B08_Attachment_2_Service_Locations.pdf | ||
| B08_Attachment_1_Performance_Work_Statement_GRTE_Maintenance_Services.docx | DOCX document | |
| B08_Attachment_3_Price_Schedule_.xlsx | XLSX spreadsheet | |
| Sol_140P1423Q0039.pdf | ||
| B08_Attachment_4_Wage_Determination.pdf | ||
| B08_Attachment_6_Limitation_on_Subcontracting_Report.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Version – January 2023
For Grand Teton National Park
Contract Number:
Contract Description: Maintenance Services for Craig Thomas Discovery and Visitor Center and Laurance S. Rockefeller Preserve Visitor Center Contractor’s name: (hereafter referred to as the contractor).
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored.
• How monitoring will take place.
• Who will conduct the monitoring.
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
The following FAR clauses may apply depending on contract type:
52.246-4 Inspection of Services – Fixed-Price,
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
Organization or Agency: National Park Service Telephone:
Email:
c. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.
Assigned COR: Jamey Zimmerman Telephone: 307-739-3637 Email: Jamey_zimmerman@nps.gov
d. Other Key Government Personnel Title: Assistant COR (Inspector) – David Dreger Telephone: 307-739-3637 Email: David_dreger@nps.gov
3. CONTRACTOR REPRESENTATIVES:
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract.
a. Program Manager - Telephone:
Email:
b. Task Manager - Telephone:
Email:
c. Other Contractor Personnel - Title:
Telephone:
Email:
4. PERFORMANCE STANDARDS.
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, below, includes performance standards.
The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Performance Standards Matrix:
Craig Thomas Discovery and Visitor Center
DAILY SCHEDULED
MAINTENANCE ACTIVITIES
Task ID TASK LOCATION FREQUENCY
Inspect fire alarm, fire pump controller and security panels for faults
Security and Alarm Panels Daily
2 Inspect Fire Pumps (Leaks or visible damage) Boiler Room Daily
3 Inspect and Maintain Boilers
Check Glycol levels in hydronic heating system fill tank Boiler Room Daily
5 Fill as necessary, using appropriate mixture Boiler Room As needed
6 Check overall system pressure Boiler Room Daily
Adjust by Adding or removing liquid to maintain pressure around 20 PSI Boiler Room As needed
Inspect propane fired condensing Boilers (Hydrotherm KN10) (1, 2 & 3). Boiler Room Daily
Record Temperature, Pressure, Alarms, Faults, Etc.
Boiler Room Daily
10 Complete all Boiler logs daily Boiler Room Daily
Check (2) hot water and (1) chill water circulation pumps for proper operation Boiler Room Daily
12 Inspect pump couplers, tighten/ adjust as necessary Boiler Room Daily
Visually inspect all floor heat and snow melt circulation pumps Boiler Room Daily
Inspect room for any leaks, excess condensation or any other issues Boiler Room Daily
Maintain Electrical Equipment Electrical
Room
16 Visual inspection of lighting control panel Electrical Room Daily
17 Visual inspection of TUSS Electrical Room Daily
18 Visual inspection of Fan Cooling Unit Electrical Room Daily
19 Inspection and Minor Repair, Main Building
Check building for any noticeable issues: Leaks, drips, unusual noises. Includes all rooms, attic/mechanical/crawl spaces, etc.
Entire Bldg:
All rooms, attics, mechanical spaces
Daily
Check server room, ensure cooling system is operational Server Room Daily
22 Check Building Automation System
Check all system graphics and setpoints Maintenance
Office Daily
Check and verify all alarms Maintenance
Office Daily
Verify building temperatures Maintenance
Office Daily
Verify all component inputs and outputs Maintenance
Office Daily
Troubleshoot any issues and adjust accordingly Maintenance
Office Daily
Reload controllers, back programs up to flash, verify program operation as needed
Maintenance Office Daily
Craig Thomas Discovery and Visitor Center
WEEKLY SCHEDULED MAINTENANCE
ACTIVITIES
29 Inspect propane levels in five underground propane tanks Exterior Weekly
Inspect All Air Handling Units and Energy Recovery Ventilators Weekly
Check Belts, pulley, air filters, electric motors and any other inspection requirements from manufacturer. Weekly
Ensure proper housekeeping in all mechanical rooms (clean and sweep) Weekly
33 Physical inspection of the building crawl space Weekly
34 Inspect all building lighting (to include exit lighting) Weekly
Inspect air filters from all HVAC equipment
Entire Bldg: All rooms, attics, mechanical spaces Weekly
36 Physical test of Generator – Verify output voltage Weekly
Inspect Generator
Generator Room
Check oil level and Battery voltage of propane fired generator. Generator Room Weekly
Verify there are no generator faults, ot faults/alarms for the Automatic Trasnfer Switch Generator Room Weekly
Physical inspection of air cleaner
Generator Room Weekly
Ensure proper room temperature
Generator Room Weekly
Visual inspection of unit heater
Generator Room Weekly
Inspect louvers and actuator motors
Generator Room Weekly
Ensure no ice buildup and clear of obstructions.
Generator Room Weekly
For any faults: Troubleshoot and provide estimate for repairs/ replacement Generator Room As needed
Craig Thomas Discovery and Visitor Center
MONTHLY PLUS SCHEDULED MAINTENANCE ACTIVITIES
Task
ID TASK LOCATION FREQUENCY
Air Handling Units and Energy Recovery Ventilators: Change belts Annually
Air Handling Units and Energy Recovery Ventilators: Change filters every 4 months
48 Inspect Fan Cooling Unit Belt & Filter (x 5 FCU's) Monthly
49 Replace Fan Cooling Unit Belt (x 5 FCU's) Annually
50 Replace Fan Cooling Unit Filter (x 5 FCU's) Twice per year
All Fans and Motors: Check bearings and grease per manufacturer's recommendation Monthly
Maintain proper lubrication of electric motors (refer to manufacturers lubrication recommendations) Boiler Room
Per Manufacturer
53 Replace Lamps 150 x per year
54 Replace Lighting Ballasts 10 x per year
Provide to NPS all Monthly PM/CM logs with any corrections/ adjustments Monthly
Visual and Thermal inspection (with IR Camera) of electric motors Monthly
Visual and Thermal inspection (with IR Camera) of water circulation pumps
Mech Rooms, boiler room, mezzanines & crawl spaces Monthly
Visual and Thermal inspection (with IR Camera) of VAV actuators
Air Handler Mezzanines Monthly
Visual and thermal imaging inspection of all electrical distribution equipment Annually
Tighten electrical connections as necessary according to manufacturer’s torque values Annually
61 Perform regular scheduled maintenance of generator Monthly / Annually
62 Physical inspection and operation of fire pump Monthly
Operate and exercise valves on hydronic heating system, and domestic water pipes Monthly*
Check glycol freeze rating on boiler system and adjust accordingly
Twice per year
65 Inspect and adjust all components of auditorium curtain Monthly
66 Inspect and adjust all blinds in director’s room Monthly
67 Inspect and clean filters in lighting control boxes Monthly
68 Inspect filters in generator room Annually
Clean manifold on all three boilers
Annually
70 Replace 2 floor heat circulating pumps Annually
71 Inspect/ clean filters on cabinet heaters in entry vestibule Annually
72 Repalce filters in Generator Room Intake Annually
73 Clean all heating and cooling coils in building Annually
74 Adjust HVAC equipment based on seasonal setbacks Twice per year
Laurance S. Rockefeller Preserve
DAILY SCHEDULED MAINTENANCE ACTIVITIES
NOTE: LSR WINTER
ACCESS IS OVER
SNOW
Task ID TASK LOCATION FREQUENCY
1 Inspect fire alarm and security panels for faults Security and Alarm Panels Daily in Summer
Task ID TASK LOCATION FREQUENCY
2 Inspect ClimateMaster Heat Pump Main Building Daily in Summer
Maintain Composting Toilets & Plumbing
Visual inspection of Composting Toilet (Building and Complete System)
Composting Toilets
Daily in Summer / Weekly in Winter
4 Inspect all Plumbing Fixtures (All Buildings) All Buildings Daily in Summer
Inspection and Minor Repair
Check building for any noticeable issues: Leaks, drips, unusual noises. Includes all rooms, attic/mechanical spaces, etc.
Entire Bldg: All rooms, crawlspace, mechanical spaces
Daily in Summer / Weekly in Winter
Check all doors for proper operation of door hardware and locks
All Buildings Daily in Summer Only
7 Check building lighting (includes exit lighting) All Buildings Daily in Summer
TASK LOCATION FREQUENCY
Check Building Automation System
Check all system graphics and setpoints
Main Building Daily Year Round
Check and verify all alarms
Main Building Daily Year Round
Verify building temperatures
Main Building Daily Year Round
Verify all component inputs and outputs
Main Building Daily Year Round
Troubleshoot any issues and adjust accordingly
Main Building Daily Year Round
Reload controllers, back programs up to flash, verify program operation as needed Main Building Daily Year Round
WEEKLY SCHEDULED MAINTENANCE ACTIVITIES
NOTE: LSR
WINTER ACCESS
IS OVER SNOW
14 Physical inspection of all air handling equipment Main Building Weekly, Summer Only
15 Visual inspection of all filters Main Building Weekly, Summer Only
16 Inspect and top off fire cistern tank Main Building Weekly, Summer Only
17 Inspect and tighten toilet seats/covers Composting Toilets
Weekly, Summer Only
18 Physical inspection of Phelps Lake restroom (Summer) Phelps Lake Toilet Weekly, Summer Only
19 Inspect water tank and compost tee tanks Phelps Lake Toilet Weekly, Summer Only
20 Inspect PRV system: Batteries, panels, etc.
Composting Toilets
Weekly, Summer Only
Inspect Building Exterior, Check all doors for proper operation of door hardware and locks Main Building
Weekly, Year Round
MONTHLY PLUS SCHEDULED MAINTENANCE ACTIVITIES
Task
ID TASK LOCATION FREQUENCY
Maintain Composting Toilets & Plumbing
23 Replace 2 compost tee pumps per year Composting Toilets Annually
24 Replace 1 composting toilet vent fan per year Composting Toilets Annually
25 Removal of all compost tea Composting Toilets Monthly
26 Stir Compost Composting Toilets Monthly
27 Remove Trash from Compost Tanks Composting Toilets Monthly
28 Add wood chips Composting Toilets Monthly
Task
ID TASK LOCATION FREQUENCY
Inspection and Minor Repair
30 Replace broken toilet seats x 2 All Buildings Annually
31 Repair/ replace broken soap dispensers x 2 All Buildings Annually
32 Replace bulbs as needed – minimum 25 lamps per year All Buildings Monthly
33 Replace ballasts as needed – 5 ballasts per year All Buildings Monthly
34 Replace all air handler filters Main Building Three times per year
Visual and thermal imaging inspection of all electrical distribution equipment All Buildings Annually
36 Inspection and Maintenance of light touch system Main Building Annually
Inspection and Maintenance of Uninterrupted Power Supply System Main Building Annually
38 Spring Opening
Opening of all buildings to be done based on NPS schedule
39 Turning on water to buildings and ensure no leaks All Buildings Annually
40 Charge water line to fire cistern Main Building Annually
Turn on water to compost toilet misters Composting
Toilets Annually
Install Photovoltaic System Batteries at Restrooms Composting
Toilets Annually
Turn on water to boot washing station Composting
Toilets Annually
Turn on water to all faucets
All Buildings Annually
Turn on water to employee restroom and janitors closet in main building Main Building Annually
Fill water heaters
All Buildings Annually
Turn on water to outside water fountain
Main Building Annually
Install all backflow prevention devices (backflow testing by NPS) All Buildings Annually
Seasonal startup of compost toilets & install tea pumps Composting
Toilets Annually
Opening valve to turn on waterfall
Main Building Annually
Opening dampers on HVAC air intake and exhaust
Main Building Annually
Removal of building shutters
Main Building Annually
Initial filling of water tank at Phelps Lake Composting
Toilets Annually
Install pumps and fans for compost toilets, verify proper operation
Composting Toilets Annually
Ensure Phelps Lake PRV is in summer mode and properly charging
Composting Toilets Annually
Install pumps from water tank to compost toilet misters Composting
Toilets Annually
57 Fall Closing
Closing of all buildings to be done based on NPS schedule
58 Turn off and drain water from all buildings All Buildings Annually
Antifreeze all drains
All Buildings Annually
Turn off water to all compost toilets, remove pumps and remove all compost tee
Composting Toilets Annually
Turn off power to all compost toilets Composting
Toilets Annually
Remove batteries from photovoltaic system Composting
Toilets Annually
Turn off water to outside water fountain, drain
Main Building Annually
Drain water heaters, shut off power
All Buildings Annually
Use air compressor to blow out all water lines
All Buildings Annually
Turn of valve to shut down waterfall
Main Building Annually
Drain Lines to fire cisterns
Main Building Annually
Drain water tank at Phelps Lake, and remove all compost Tee Composting
Toilets Annually
Remove Mister pumps at Phelps Lake Restroom Composting
Toilets Annually
Close dampers on HVAC air intake and exhaust
Main Building Annually
Replace all building shutters, all windows on main building
Main Building Annually
Final stirring and cleaning of compost toilet tanks Composting
Toilets Annually
6. METHODS OF QA SURVEILLANCE.
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the COD CS, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL. The following surveillance methods shall be used with their corresponding performance standard requirements listed, by number, following each method. The COR may change surveillance methods after contract award to provide better review of contract compliance with the AQL’s.
a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)
• All unscheduled maintenance items
• CTDVC Items 46-47, 49-50, 70-73
• LSR Items 22-31, 34-72
b. MANAGEMENT INFORMATION SYSTEMS (MIS). (Evaluates outputs through the use of management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.) Contractor shall develop and submit for approval prior to use, a record log for all performance items under this surveillance category. Record all work items on forms at scheduled frequency.
• CTDVC Items 1-45, 48, 51-69
• LSR Items 1-21, 32-33
c. PERIODIC INSPECTION. (Uses a comprehensive evaluation of selected outputs.
Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
• CTDVC Items 1-45, 48, 51-69
• LSR Items 1-21, 32-33
d. USER SURVEY. (Combines elements of validated user complaints and random sampling.
Random survey is conducted to solicit user satisfaction. Appropriate for high quantity activities that have historically been satisfactory. May also generate periodic and 100% inspections.)
• CTDVC Item 74
e. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.)
• CTDVC Item 74
f. 100% INSPECTION. (Evaluates all outputs. Most applicable to small quantity, but highly important services. May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security.)
• All unscheduled maintenance tasks for both CTDVC and LSR
g. PERIODIC SAMPLING. (Variation of random sampling. However, sample is only taken when a deficiency is suspected. Good follow-up to MIS analysis. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.)
• CTDVC Items 46-47, 49-50, 70-73
• LSR Items 22-31, 34-72
i. Progress or status meetings.
• CTDVC Items 68-73 (Items related to season change from summer to winter, etc)
• LSR Items 34-72 (Items related to season change from summer to winter, etc)
Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the KO’s actions.
8. RATINGS.
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
EXCEPTIONAL:
Performance significantly exceeds contract requirements to the Government’s benefit.
SATISFACTORY: Performance meets contractual requirements.
UNSATISFACTORY: Performance does not meet contractual requirements.
9. DOCUMENTING PERFORMANCE.
a. ACCEPTABLE PERFORMANCE.
The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.
All performance requirements shall be rated to the following rating system. Note that most performance items are either unsatisfactory or satisfactory (such as checking fluid levels on boilers, checking for leaks, etc.). These items shall be rated as such, however the exceptional rating shall be used when there are varying levels of performance on those work items (changing lightbulbs and ballasts as soon as they go out, rather than waiting weeks, etc.).
b. UNACCEPTABLE PERFORMANCE.
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the CO.
10. FREQUENCY OF MEASUREMENT.
a. Frequency of Measurement.
During contract/order performance, the COR shall take periodic measurements, on a daily, weekly, or a variable basis- as specified in the AQL summary of the Performance Standards Summary Matrix, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed. Frequency of measurement shall be done to ensure AQL’s are being met, and contract compliance is being met.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor on an annual basis to assess performance and shall provide a written assessment.
Prepared by: Phillip A. Fessler, PE
Signature – Contracting Officer’s Representative
PERFORMANCE REPORT
1. CONTRACT NUMBER:
2. Prepared by: (Name of COR)
3. Date and time of observation:
4. Observation:
Prepared by:
Signature – Contracting Officer’s Representative Date
CONTRACT DISCREPANCY REPORT (CDR)
1. Contract Number:
2. TO: (Contractor Task Manager or on-site representative)
3. FROM: (Name of COR)
4. Date and time observed discrepancy:
5. DISCREPANCY OR PROBLEM:
<Describe in detail. Identify any attachments.>
5. Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than days from receipt of this CDR.
Prepared by:
Signature – Contracting Officer’s Representative Date
Received by:
Signature - Contractor Task Manager or on-site representative Date
< The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects;
anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.>
| Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP. |
| Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the COD CS, ... |
| All unscheduled maintenance items |
| CTDVC Items 46-47, 49-50, 70-73 |
| LSR Items 22-31, 34-72 |
| CTDVC Items 1-45, 48, 51-69 |
| LSR Items 1-21, 32-33 |
| CTDVC Items 1-45, 48, 51-69 |
| LSR Items 1-21, 32-33 |
| CTDVC Item 74 |
| CTDVC Item 74 |
| All unscheduled maintenance tasks for both CTDVC and LSR |
| CTDVC Items 46-47, 49-50, 70-73 |
| LSR Items 22-31, 34-72 |
| CTDVC Items 68-73 (Items related to season change from summer to winter, etc) |
| LSR Items 34-72 (Items related to season change from summer to winter, etc) |
File details come from the government source that posted it. Updated .