This document outlines technical specifications for the construction of a new maintenance shop at the Bureau of Land Management's Litchfield Wild Horse and Burrow Facility in California. Key requirements include furnishing all labor, materials, and equipment to construct a pre-engineered metal building, install associated concrete foundations and slabs, and connect utilities for gas, electric, water, and fuel systems. The contractor must submit engineered shop drawings and coordinate utility connections. Additional specifications cover site work, earthwork, trenching, concrete, and metal building erection. The contractor will be responsible for performance testing and providing operation and maintenance documentation upon completion of the 260-day project.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit 2
Technical Specifications
Litchfield Maintenance Shop Litchfield Wild Horse & Burrow Facility
Eagle Lake Field Office Northern California District
U.S. Department of the Interior Bureau of Land Management
U.S. Bureau of Land Management NorCal Eagle Lake Field Office March 2022 Litchfield Maintenance Shop TOC-1 Table of Contents
Table of Contents
Division 1 - General Requirements Section
Summary of Work Mobilization Project Records and Submittals Reference Standards and Abbreviations Delivery, Storage and Handling Operation and Maintenance Data Warranties and Bonds Preservation and Cleanup Project Commissioning and Closeout
Division 2 - Site Construction
Demolition, Clearing, Grubbing and Stripping Earthwork Trench Excavation and Backfill
Division 3 - Concrete
Concrete Precast Concrete
Division 4 – 9 (Not Used) Division 10 - Specialties
Pre-Engineered Metal Buildings
Division 11-12 (Not used) Division 13 – Special Construction
Propane Service and Appliances Fuel Tank Relocation
Division 14 (Not used) Division 15 - Mechanical
Water Service
Division 16 - Electrical
General Electrical
Litchfield Maintenance Shop 01100-1 Summary of Work
SECTION 01100 – SUMMARY OF WORK
PART 1 - GENERAL
1.01 PROJECT DESCRIPTION
A. Location
The project is located on the U.S. Bureau of Land Management administrative facility called the Litchfield Wild Horse and Burrow (WH&B) Facility, which is located 21 miles east of Susanville, California, on U.S. Highway 395 in Lassen County. The facility address information is as follows:
Address: 474-000 Hwy 395 East, Litchfield, CA, 96117
Latitude/Longitude: 40.2306.54; -120.1831.34
Lassen County parcel number: 119-90-008
The WH&B Facility covers approximately 80-acres with numerous pastures and corrals. The corrals serve as the regional preparation center for wild horses and burrows gathered from public lands in northern California and northwestern Nevada.
There is an existing administrative building and other structures used in the operation of the facility. The proposed maintenance shop building is going to be placed on a flat, undeveloped area located approximately 100 feet northwest of the existing administrative building. There is sufficient area surrounding the building site for the Contractor to store material and equipment staging for construction activities. Access to the construction site is through the main facility entrance consisting of flat gravel roads. The WH&B facility is surrounded by a chain link fence for security.
B. Description of Work
The work to be completed under this contract consists of furnishing all materials, labor, engineering, equipment, fuel, and tools required to construct the new Litchfield Maintenance Shop as illustrated on the Drawings, and as detailed in these Specifications. The project consists of a pre-engineered metal building supported by engineered foundations, concrete slabs, associated building appurtenances, and installation of building utilities.
Preliminary building layout and details provided in the Drawings are for bidding purposes only to establish a basis for the contract. Final building and foundations designs shall be provided by the Pre-Engineered Metal Building manufacturer and shall be stamped by a Structural or Civil Engineer licensed in the State of California. The contractor shall submit the complete engineered design for approval, as required in these Specifications.
Litchfield Maintenance Shop 01100-2 Summary of Work
All measurements and figures listed in this contract are approximate. The Offeror shall field verify dimensions prior to bid submission. An opportunity for verification will be provided during the site visit.
Offerors shall submit with their proposal the name of the Pre-Engineered Metal Building manufacturer selected for this project.
The work required under this contract relating to the Litchfield Maintenance Shop includes, but is not limited to the following:
1. Furnishing submittals for approval of all materials and equipment to be furnished under this contract, including but not limited to, the engineered shop drawings for the pre-engineered metal building, foundations and slabs. Drawings shall be submitted to the Government for approval prior to release for fabrication.
2. Preparation and maintenance of a baseline project schedule to be provided to the Government at the pre-construction conference.
3. Setting of construction stakes to establish corners and elevations of the building, slabs, driveways and walkways.
4. Installation and coordination of gas and electric utilities on the site that include electrical service from Lassen Municipal Utilities District (LMUD) and a 1,000 gallon propane tank from the local propane gas company (Ed Staub and Sons Petroleum, 702-190 Johnstonville Rd, Susanville, CA 96130, Phone: 530-257-3416). See further information about Utilities Installation and Coordination in this Section, below.
5. General clearing and grading the area around the new building site. This work is to be accomplished prior to construction of the building, and all underground facilities.
6. Construct temporary security fence around designated work area to protect any materials stored by the Contractor. The Government will not be responsible for any damaged or stolen materials stored on the facility premises during construction. Contractor will be responsible to provide and install site gravel as needed to maintain an all-weather access to the site.
7. Trenching, installation of backfill, and compaction of all required underground piping, drains or electrical conduits.
8. Mass grading and subgrade preparation beneath foundations and slabs in accordance with the recommendation of the Geotechnical Report (Exhibit 3). Contractor shall employ a soils testing company perform Special Inspection of mass grading, subgrade preparation and compaction testing. See further requirements below under 1.10 INSPECTION AND
TESTING.
Litchfield Maintenance Shop 01100-3 Summary of Work
9. The design and construction of concrete foundations, slabs, and structures for the building, electric utility transformer pad, driveways, walkways, propane tank, and Convault fuel tank. Contractor shall employ at its own expense a testing company for all Special Inspections required per the California Building Code, which include: concrete compressive testing, concrete formwork and rebar, and concrete placement,
10. The design and erection of the metal building, which is 50 feet wide x 60 feet long, with insulated steel frames, 16-foot walls, and 4/12 roof pitch, with sectional bay doors, mandoors, and windows, as shown on the Drawings.
11. Installation of building gas plumbing and heaters, electrical conduits and wires, lighting and receptacles for the building.
12. Install all door jambs, frames, knobs, and other related hardware to make all building entry ways complete and operable.
13. Relocation of an existing 500-gallon Convault above ground fuel storage tank to the new location shown on the site, including installing new foundations and electrical service as shown on the Drawings. See further information in this Section under Utilities, below.
14. Finish grading of the exterior with Caltrans Class 2 base rock around concrete parking aprons, sidewalks, fuel tank slab, propane tank slab, and transformer pad as shown on drawings.
15. Restoration and clean-up of the site after project completion.
16. Performance testing of all components. Upon completion, all building and utility systems shall be tested in the presence of the COR to ensure all components and systems are functioning properly. Provide the COR with a 3-business day advanced notice.
17. Record keeping of submittals, as-builts, and performance testing.
18. Submission operation and maintenance manuals for all equipment.
19. Submission of two (2) 11x17 paper copies of as-built drawings for the civil, structural, mechanical, and electrical work at the end of construction.
C. Utilities Installation and Coordination
1. Locating and Protecting Existing Utilities:
Contractor shall be responsible for locating and protecting above and below ground utilities in the project area. See Drawing Package for location of existing utility tie-in points.
Litchfield Maintenance Shop 01100-4 Summary of Work
2. New Electrical Utility Services:
Contractor shall coordinate the installation of electric service from Lassen Municipal Utilities District (LMUD). The service will be a 240-volt, single phase, 3-wire service and a 200 amp, single phase panel. The Government has initiated an electrical service application with LMUD. The commitment letter from LMUD is attached showing the installation requirements (Exhibit 5).
The Contracting Officer shall sign off on the meter panel installation once it is installed by the Contractor and LMUD will pull the primary and secondary conductors, set the transformer, install the meter, and energize the site. The Contractor’s scope for electrical installation shall include:
a. Coordinate directly with LMUD regarding the installation.
b. Trench and install primary and secondary conduits at locations shown or otherwise approved by LMUD. Both conduits shall be buried a minimum 36 inches in depth with properly compacted 4-inches sand bedding above and below, and compacted native backfill material. An LMUD approved pull string shall be installed inside conduit. Warning tape shall be installed 12” above conduit. The top 6” of the trench shall be compacted with Caltrans Class 2 base rock. Conduit installation shall be coordinated with and approved by LMUD.
1. Primary Power: Provide materials and labor to install approximately 370 LF of underground 3” Sch 80 PVC conduit from new utility pole to new ground mounted transformer.
2. Secondary Power: Provide materials and labor to install approximately 20 LF of underground 3” Sch 80 PVC conduit from new ground mounted transformer to service entrance panel on new building.
c. Install Transformer Pad for single phase, Model # LM-PD4448-1, per
LMUD requirements (Exhibit 5), at location shown on drawings.
d. Install Meter Main Circuit Breaker Panel per LMUD service requirements. Provide a new LMUD approved 200 Amp service entrance panel, Square D SC3042M200PS Homeline 200 Amp 30- Space 42-Circuit Outdoor Ring-Type Surface Mount, or approved equal, on building exterior wall. At the completion of project, all circuits shall be labeled.
Litchfield Maintenance Shop 01100-5 Summary of Work
3. New Propane Service:
Contractor shall install concrete slab and coordinate installation for new 1,000 propane tank and from the local gas company (Ed Staub and Sons Petroleum, 702- 190 Johnstonville Rd, Susanville, CA 96130, Phone: 530-257-3416). BLM will pay directly for any installation costs from the gas company, but the Contractor shall conduct all coordination. The gas company will do an initial Drop Site Check to verify the proposed location of the tank. The gas company will install the approximate 80 LF of underground propane service from new propane tank to new building and install the gas regulators. The Contractor shall contact the gas company to coordinate the service. The Contractor shall also install all building gas plumbing to the locations of the heaters shown on the plans. Above ground gas lines shall be ¾” black steel pipe as required in the specifications Section 15025.
4. Existing Fuel Tank Relocation:
Contractor shall relocate the existing 500-gallon fuel storage (Convault) located on the site. Install a new concrete foundation as show on the Drawings and install new electrical service for fuel pump to support the new Convault location.
Existing Convault is 500 gallons, 18,000 lbs (empty weight). Dimensions are available from Convault. Typical dimension sheet is attached for reference (Exhibit 6). Installation shall conform to Convault installation guidelines.
Installation (convault.com).
5. Water Service and Yard Hydrants:
a. Contractor shall install approximately 420 LF of 2” x 300 psi HDPE pipe from existing yard hydrant to new yard hydrants. Pipe shall be buried to a minimum depth of 36”, or deeper to cross beneath electrical service, and shall have fusion welded joints and stainless-steel fittings.
Waterline shall be buried with properly compacted bedding and backfill material. Traceable warning tape shall be installed 12” above waterline.
See Section 15025 for further piping material and installation standards.
b. Provide 3 Woodford model Y34 0.75-inch (3/4”) yard hydrants or approved equal at locations shown on drawings. Install hydrants according to manufacturer’s requirements
D. Project Constraints
The WH&B Facility is an actively functioning facility. BLM operations will be occurring adjacent to the work site throughout construction, which involves transporting horses and burrows to and from corrals. The Contractor shall coordinate with the BLM staff during construction to establish a designated area for staging and construction and logistics for access to the work site.
Litchfield Maintenance Shop 01100-6 Summary of Work
1.02 QUALIFICATIONS OF THE CONTRACTOR
A. All bidders and subcontractors shall hold a valid California Contractor’s License for the Work as specified, or as required elsewhere in the specifications.
a. Prime Contractor shall be either Class A or B
b. Electrical Contractor shall be Class C-10
c. Other trades shall possess the applicable specialty licenses or a Class A
B. As part of the bid package, Offerors shall provide at least five (5) or more prior projects, which the Contractor has installed of similar size and capacity. Projects shall have been completed within the last five (5) years. Failure to submit prior project list, shall be grounds for rejection of the bid.
1.03 REFERENCE STANDARDS
A. The Contract Documents also contain references to various Standard Specifications, code practices, and requirements for materials, Work quality, installation, inspections, and tests, which are published and issued by the organizations, societies, and associations. Such references are hereby made a part of the Contract Documents to the extent required. See
SECTION 01420 – REFERENCE STANDARDS, DEFINITIONS AND ABBREVIATIONS.
1.04 PRE-CONSTRUCTION CONFERENCE
A. A pre-construction conference shall be held prior to the commencement of Work in the field, for the purpose of discussing with the Contractor the scope of Work, Drawings, and Specifications, and the Contractor’s schedule. Unless otherwise approved by the Contracting Officer, the Contractor’s proposed superintendent shall be present and one representative from each listed subcontractor. The Contracting Officer will schedule the time and date for said conference. The Contractor shall document the existing condition of the site by taking digital pre-construction photographs of the site directly after the pre-construction meeting. An electronic copy of the photos shall be submitted to the Contracting Officer prior to the start of Construction.
1.05 BEGINNING OF WORK, TIME OF COMPLETION, LIQUIDATED DAMAGES
A. Contractor shall conform to these special provisions.
1. Beginning of Work The Contractor shall begin Work within three (3) calendar days from the Notice to Proceed and shall diligently prosecute the same to completion. Contractor may begin work immediately after receiving Notice to Proceed.
2. Time of Completion The Contractor shall complete the Work 260 Calendar Days of receipt of the Notice to Proceed.
Litchfield Maintenance Shop 01100-7 Summary of Work
3. Liquidated Damages The Contractor shall pay to the Government the sum of $604 per day, for each and every calendar day delay in finishing the Work in excess of the number of working days prescribed above.
1.06 MATERIALS FURNISHED BY CONTRACTOR
A. All materials furnished by the Contractor shall be new, in first-class condition and subject to the approval of the Contracting Officer.
1.07 CONTRACTOR’S TEMPORARY FACILITIES
A. Project Office The Contractor may use any temporary or permanent facility to serve as the Contractor’s project office, as long as it is of sufficient size and features to allow the Contractor to perform the functions associated with the Work and these Contract Documents. The Contractor or his authorized representative shall be present in the project office at all times while work is in progress. Instructions received there from the Contracting Officer shall be considered as delivered to the Contractor.
B. Use of Electricity and Water Contractor may use the onsite electric service and water during construction. There is no guarantee that the capacity of power and water will be sufficient for the contractor’s operations. Contractor shall make any arrangements for power and water beyond what can be provided from onsite facilities, at no additional cost to the Government.
C. Sanitary Facilities The Contractor shall make arrangements for providing sanitary facilities in compliance with laws and regulations for their personnel. Locations of sanitary facilities, storage areas, parking and other Contractor installations shall be subject to the prior approval of the Contracting Officer. Service, clean and maintain facilities and enclosures.
D. Air and Steam Contractor shall provide all air and steam, including temporary piping and appurtenances required for cleaning and testing pipelines and equipment necessary for Contractor's and subcontractor's work. Remove temporary piping and appurtenances upon approval of equipment being tested.
1.08 WORK HOURS
A. Work may be performed between the hours of 7:00 a.m. and 5:00 p.m. Monday through Friday and no work on Weekends or Federal Holidays. If work is planned to be performed outside of these hours the Contractor shall obtain permission from the Contracting Officer prior.
Litchfield Maintenance Shop 01100-8 Summary of Work
B. The Contractor shall not Work on Federal Holidays unless prior approval is obtained from the Contracting Officer.
1.09 SAFETY AND PRECAUTIONS
A. General The Contractor shall conduct operations in accordance with the rules and regulations of the Local Government, California Division of Industrial Safety, and the current requirements of the Occupational Safety and Health Administration (Cal. OSHA). Contractor is responsible for site conditions, including public safety, dust control, and sediment control, continually and not limited to normal working hours. Contractor shall provide contact information for representatives available during working hours and during after-hours, weekends, and holidays.
B. Dust Prevention Contractor shall use water to prevent abnormal dust conditions due to construction operations, as deemed necessary by Contracting Officer. Contractor shall keep down dust from construction activity to the maximum extent possible. Contractor shall clean all existing streets, curbs, gutters, and sidewalks affected by the project at the end of each working day.
1.10 PRESERVATION, RESTORATION, AND CLEANUP
A. Preservation and Cleanup At all times during the Work, keep the premises clean and orderly, and upon completion of the Work, repair all damage caused by equipment and leave the project free of rubbish or excess materials of any kind. Refer to SECTION 01740 – PRESERVATION AND CLEANUP for project preservation and cleanup requirements.
B. Erosion and Sediment Control The Contractor shall exercise care and diligence to limit damage caused by erosion and sediment loosened by the Contractor’s operation and shall take all precautions necessary to sustain adjacent properties. Refer to SECTION 01740 – PRESERVATION AND CLEANUP for erosion control requirements.
1.11 INSPECTION AND TESTING ROLES
A. Government Observation: The Government will assign a Contracting Officer (CO) and a Contracting Officer’s Representative (COR) to monitor the work and verify it is performed in accordance with the Contract Documents. The Contractor shall not cover, or allow to be covered, any of the Work installed under this Contract before it has been inspected by the COR and approved by the CO. Should any of the Work be covered prior to such approval, the CO shall have the authority to require the Work to be uncovered for inspection and approval, recovered, and all resultant damage repaired, at the Contractor’s expense.
B. Contractor Furnished Special Inspection: The Contractor will employ and pay for services
Litchfield Maintenance Shop 01100-9 Summary of Work of an independent material testing laboratory and inspection company to approve earthwork and foundations are constructed in accordance with the recommendations of the Geotechnical Report, the final stamped building design, and the contract documents.
1. Special inspections furnished by the contractor shall include, at a minimum, the following:
Soils Inspection Verify suitable native material at base of excavation Soils Inspection Acceptance for foundation fill and compaction Soils Inspection Acceptance for subgrade preparation Concrete Inspection Inspect formwork for shape, location and dimensions Concrete Inspection Inspect reinforcement steel and placement Concrete Inspection Verify required mix design Concrete Inspection Inspect concrete placement Concrete Testing Slump test and compressive strength (3 samples/pour/day) Anchoring Inspection Inspect anchor bolt dimensions, locations, and installation
2. Structural backfill requirements from the Federal Highway Administration’s "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units" of the U.S. Department of Transportation, Federal Highway Administration apply to this project.
3. The special inspection company shall submit written reports to the CO/COR, in duplicate, indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents.
4. The Contractor shall cooperate with the laboratory; furnish samples of materials, design mix, equipment, tools, storage and assistance as requested.
5. The Contractor shall make arrangements with the laboratory and pay for any additional samples and tests required for Contractor’s use.
6. Re-testing or re-inspection required because of non-conformance to specified requirements shall be performed by the same laboratory on instructions by the CO. Payment for re-testing or re-inspection will be the responsibility of the Contractor.
PART 2 – MATERIALS (Not Used)
PART 3 – EXECUTION (Not Used)
PART 4 – MEASUREMENT AND PAYMENT
No separate payment will be made for Summary of Work. Payment for work in this section shall be included as part of the applicable Lump Sum or Unit Prices stated in other sections.
-END OF SECTION-
Litchfield Maintenance Shop 01200-1 Mobilization
SECTION 01200 – MOBILIZATION
Bid Item No. 1
PART 1 – GENERAL
1.01 SCOPE
A. This section covers mobilization which shall consist of preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies and incidentals to the project site; for the establishment of all offices, buildings, sanitation and other facilities necessary for work on the project; and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items at the project site, complete.
PART 2 – MATERIALS (Not used)
PART 3 – EXECUTION (Not used)
3.01 MOBILIZATION
A. Location of sanitary facilities, storage areas, parking areas and other Contractor installations shall be subject to the prior approval of the CO/COR. The following principle items shall be included in the Contractor’s mobilization.
1. The Contractor shall move all of the necessary plant and equipment that will be required for the first month of operation onto the job site.
2. The Contractor shall provide any needed temporary construction power and lighting facilities.
3. The Contractor shall comply with all fire protection requirements.
4. The Contractor shall provide on-site sanitary facilities.
5. The Contractor shall obtain all necessary permits.
6. The Contractor shall comply with all OSHA required notices and establish safety programs.
7. The Contractor shall have the construction superintendent on the job site full time.
PART 4 – MEASUREMENT AND PAYMENT
A. When the monthly progress payment estimate of the amount earned, not including the amount earned for mobilization, is five percent (5%) or more of the original contract amount, fifty
Litchfield Maintenance Shop 01200-2 Mobilization percent (50%) of the contract item price for mobilization shall be included in said estimate for payment.
B. When the monthly progress payment estimate of the amount earned, not including the amount earned for mobilization is fifty percent (50%) or more of the original contract amount, the total amount earned for mobilization shall be one hundred percent (100%) of the contract item price for mobilization and said amount shall be included in said estimate for payment.
C. The contract lump sum price paid for mobilization shall include full compensation for furnishing all labor, material, tools, equipment, and incidentals for doing all the work involved in mobilization as specified herein.
D. No adjustment shall be made what-so-ever to the original lump sum item price of mobilization.
If other contract items are adjusted, and if the costs applicable to such item work include mobilization cost, such mobilization will be deemed to have been recovered by the payments made for mobilization, and will be excluded from consideration in determining compensation.
E. The retention provisions contained in this contract shall apply to the lump sum item price of mobilization.
F. All work as specified herein, satisfactorily completed, shall be paid for on a Lump Sum basis as stated in Bid Item Schedule for the item listed below and shall be no more than five percent (5%) of the Bid Total:
Bid Item No. 1 – MOBILIZATION
Litchfield Maintenance Shop 01330-1 Project Records and Submittals
SECTION 01330 - PROJECT RECORDS AND SUBMITTALS
Bid Item No. 2
PART 1 - GENERAL
1.01 SCOPE
A. This Section specifies the general methods, requirements and procedures of Contractor submissions applicable to Shop Drawings, Product Data, Samples, Calculations, Mock Ups, Construction Photographs, Construction or Submittal Schedules, Schedule of Values, and other documentation required for material approval to be submitted by the Contractor during the project and following completion of the work. Detailed submittal requirements are specified in the technical provisions in this section.
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION
3.01 CONTRACTOR’S RESPONSIBILITIES
A. Submittal Review Review Shop Drawings, product data and samples, including those by Subcontractors, prior to submission to determine and verify the following:
1. Field measurements
2. Field construction criteria
3. Catalog numbers and similar data
4. Conformance with related Sections
B. Certification Statement Each shop drawing, sample and product data submitted by the Contractor shall have affixed to it the following Certification Statement including the Contractor’s Company name and signed by the Contractor:
"Certification Statement: by this submittal, I hereby represent that I have determined and verified all field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved Shop Drawings and all Contract requirements."
Shop Drawings and product data sheets 11-inch x 17-inch and smaller shall be bound together in an orderly fashion and bear the above Certification Statement on the cover sheet. The cover sheet shall fully describe the packaged data and include a listing of all items within the package.
Provide to the Resident Project representative a copy of each transmittal sheet for Shop Drawings, product data and samples at the time of submittal to the CO/COR.
Litchfield Maintenance Shop 01330-2 Project Records and Submittals
C. Notify the CO/COR in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents.
D. The review and approval of Shop Drawings, samples or product data by the CO/COR shall not relieve the Contractor from the responsibility for the fulfillment of the terms of the Contract.
The Contractor assumes all risks of error and omission in submittals - the CO/COR will have no responsibility for Contractor mistakes.
E. No portion of the work requiring a shop drawing, sample, or product data shall be started nor shall any materials be fabricated or installed prior to the approval or qualified approval of such item. Fabrication performed, materials purchased or onsite construction accomplished which does not conform to approved Shop Drawings and data shall be at the Contractor’s risk. The Government will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity.
3.02 SUBMITTAL REQUIREMENTS
A. Submittals shall be delivered promptly in accordance with approved schedule and in such sequence as to cause no delay in the work or in the work of any other Contractor. Contractor shall submit all submittals to CO/COR. Submittals shall include:
1. The date of submission and the dates of any previous submissions.
2. The Project title and number.
3. Submittal Number: Utilize a standard submittal identification numbering system throughout the project. The numbering system shall have a sequential numbering for each submittal in chronological order (01….99), a Letter indicating initial submission or any recurring re-submissions for the same submittal (A, B, C…), and the applicable Specification Section.
4. The names of:
a. Contractor
b. Sub-Contractor
c. Supplier
d. Manufacturer
5. Identification of the product, with the section number, page and paragraph(s). Where catalog or cut sheets contain more than one model or option(s) for the product, the specific model or option(s) proposed shall be highlighted, circled, or otherwise clearly indicated within the submittal.
6. Field dimensions, clearly identified as such.
Litchfield Maintenance Shop 01330-3 Project Records and Submittals
7. Relation to adjacent or critical features of the Work or materials.
8. Applicable standards, such as ASTM, IBC, NEC, NFPA, AWWA or Federal Standards.
9. Identification by colored highlighting of deviations from Contract Documents.
10. Identification by colored highlighting of revisions on resubmittals.
11. A 5-inch x 3-inch blank space for CO/COR review stamp.
12. Where calculations are required to be submitted by the Contractor, the calculations shall have been checked by a qualified individual other than the preparer. The submitted calculations shall clearly show the names of the preparer and of the checker.
B. At least ten (10) working days prior to the need for approval, the Contractor shall forward to the CO/COR, for approval, all submittals required by the individual sections of the specifications.
No extension of time will be authorized because of the Contractor’s failure to transmit submittals sufficiently in advance of the work.
C. All submittals shall be transmitted to the CO/COR by electronic files (e-mail or Sharepoint created for the project). Any hard copies desired by the Contractor shall be submitted in the mail or in person with the letter of transmittal included in these documents.
D. The CO/COR will return all reviewed submittals to the Contractor within ten (10) working days.
E. Contractor shall coordinate all such drawings, and review them for legibility, accuracy, completeness, and compliance with contract requirements, and shall indicate approval thereon as evidence of such coordination and review.
F. Supervisory Personnel Within ten (10) calendar days after receiving the Notice to Proceed and before any work has begun, the Contractor shall submit a list of supervisory personnel who will be responsible for the performance of the Contract. The Contractor shall designate one (1) person who will have full decision-making authority to represent the Contractor on a daily basis at the project site. The list shall include phone numbers where the CO/COR may reach the Contractor’s personnel.
G. Shop Drawings The term "shop drawings" includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions of the work required by the Contract.
1. Shop drawings as specified in individual Sections include, custom-prepared data such as fabrication and erection/installation (working) drawings, scheduled information, setting diagrams, actual shop work manufacturing instructions, custom templates, special wiring diagrams, coordination drawings, individual system or equipment inspection and test reports
Litchfield Maintenance Shop 01330-4 Project Records and Submittals including performance curves and certifications, as applicable to the work.
2. All shop drawings submitted by subcontractors and vendors for approval shall be sent directly to the Contractor for checking. The Contractor shall be responsible for their submission at the proper time so as to prevent delays in delivery of materials.
3. The Contractor shall check all subcontractors’ and vendors’ shop drawings regarding measurements, size of members, materials and details to make sure that they conform to the intent of the Drawings and related Sections. Return shop drawings found to be inaccurate or otherwise in error to the subcontractors for correction before submission thereof.
4. All details on shop drawings shall show clearly the relation of the various parts to the main members and lines of the structure and where correct fabrication of the work depends upon field measurements, such measurements shall be made and noted on the drawings before being submitted.
H. Product Data Product data as specified in individual Sections include, standard prepared data for manufactured products (sometimes referred to as catalog data), such as the manufacturer’s product specification and installation instructions, availability of colors and patterns, manufacturer’s printed statements of compliances and applicability, roughing-in diagrams and templates, catalog cuts, product photographs, standard wiring diagrams, printed performance curves and operational-range diagrams, production or quality control inspection and test reports and certifications, mill reports, product operating and maintenance instructions and recommended spare-parts listing and printed product warranties, as applicable to the work.
I. Certificates When called for in individual sections, the Contractor must furnish certificates from manufacturers, suppliers, or others certifying that materials or equipment being furnished under the Contract comply with the requirements of these specifications. Certificates of compliance from the Contractor, suppliers, and/or manufacturers, shall clearly indicate that the material to be delivered to the jobsite will meet all requirements of the specifications. A certificate of compliance shall include, but not be limited to the project title, delivery location, date (or approximate date) of delivery, name of the material with appropriate classification or model numbers, quantity, name of the manufacturer, statement of compliance with all requirements of the specifications, and certifier’s name, title and signature. In addition, a factory or mill certification (laboratory test report), if required by the specifications, shall be submitted with certificate of compliance. The factory or mill shall not substitute the certificate of compliance, unless it contains all information required for a certificate of compliance as described above.
Insufficient, incomplete, or unclear certificates shall be rejected and shall be resubmitted. The Contractor shall be responsible for all delays caused by the re-submittals.
J. Samples Samples specified in individual Sections include, physical examples of the work such as sections of manufactured or fabricated work, small cuts or containers of materials, complete units of
Litchfield Maintenance Shop 01330-5 Project Records and Submittals repetitively-used products, color/texture/pattern swatches and range sets, specimens for coordination of visual effect, graphic symbols and units of work to be used by the CO/COR for independent inspection and testing, as applicable to the work.
K. Photographs The Contractor shall thoroughly document the construction process by taking digital photographs throughout the project. The Contractor shall submit an electronic copy on CD to the CO/COR upon request.
3.03 CO/COR’S APPROVAL
A. The CO/COR will indicate approval or disapproval of each submittal, and the reasons for disapproval.
1. If no corrections are required, the copies will be returned marked “NO EXCEPTIONS TAKEN” and work may begin immediately on incorporating the material and equipment covered by the submittal into the project.
2. If limited corrections are required, the copies will be returned marked “MAKE CORRECTIONS NOTED.” Work may begin immediately on incorporating the material and equipment covered by the corrected submittal into the project.
3. If insufficient or incorrect data has been submitted, the copies will be returned marked “AMEND & RESUBMIT.” No work incorporating the material and equipment covered by this submittal into the project may begin until the submittal has been revised, resubmitted, and returned marked either “NO EXCEPTIONS TAKEN” or “MAKE CORRECTIONS
NOTED.”
4. If the submittal is unacceptable, the copies will be returned marked “REJECTED” No work incorporating the material and equipment covered by this submittal into the project may begin until a new submittal has been made and returned marked either “NO EXCEPTIONS TAKEN” or “MAKE CORRECTIONS NOTED.”
5. The Contractor shall not change any drawing after it has been marked “NO EXCEPTIONS TAKEN” or “MAKE CORRECTIONS NOTED”, or change any approved equipment or material without written permission of the CO/COR.
6. Resubmittals will be handled in the same manner as first submittals. The Contractor shall identify all revisions made to the original submittals in the resubmittal, either in writing on the letter of transmittal or on the shop drawings by the use of color highlighting, and by use of revision triangles or other similar methods. The resubmittal shall clearly respond to each comment made by the CO/COR on the previous submission. Additionally, the Contractor shall direct specific attention to any revisions made other than the corrections requested by the CO/COR on previous submissions.
Litchfield Maintenance Shop 01330-6 Project Records and Submittals
7. Partial submittals may not be reviewed. The CO/COR will be the only judge as to the completeness of a submittal. Submittals not complete will be returned to the Contractor and will be considered "Not Approved" until resubmitted. The CO/COR may at his option provide a list or mark the submittal directing the Contractor to the areas that are incomplete.
8. Approval by the CO/COR shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with requirements of this Contract. At the time of submission, the Contractor shall provide on the submittal coversheet specific written notice of all variations, if any, that the submittal may have from the Contract Documents and the reasons therefore. In addition, the Contractor shall provide a specific notation on each item submitted for the CO/COR’s review and approval of each variation. All such variations must be approved by the CO/COR.
3.04 NOTIFICATIONS
A. The Contractor shall notify the CO/COR at least two (2) working days prior to commencement of the construction in writing and shall give the CO/COR at least one (1) working day notice when inspections are required.
B. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, the Contractor shall give written notice thereof to the CO/COR at least seven (7) working days prior to release for manufacture.
3.05 AS-BUILT DRAWINGS
A. The Contractor shall maintain a separate, neat, and legible set of construction drawings showing as-built conditions of all constructed facilities as specified herein and in SECTION 01750 – PROJECT CLOSEOUT. Changes shall be shown to scale in red on the appropriate Drawings.
The locations of installed underground and hidden utilities will be shown and dimensioned to appropriate reference points. No work shall be permanently concealed until the required information has been recorded. Relevant change orders shall be noted on the Drawings by number and date.
B. Where the Drawings are not of sufficient size, scale, or detail, the Contractor’s own drawings shall be submitted for incorporation of details and dimension. In such cases, the Contractor shall provide a reproducible set of drawings, suitability cross referenced to the Contract Drawings.
C. The As-Built drawings shall be maintained at least weekly. Prior to any progress payments, the CO/COR shall review the status of the as-built construction drawings. The CO/COR shall withhold approval of progress payments until the as-built drawings are up to date.
D. Upon completion of the Contract, the Contractor shall furnish two (2) satisfactory sets of As- Built construction drawings prior to or simultaneously with the Contractor’s request for final payment. The Contractor shall certify that the As-Built drawings show the existing conditions correctly. Final payment shall be withheld until the As-Built construction drawings are received
Litchfield Maintenance Shop 01330-7 Project Records and Submittals and approved by the CO/COR.
PART 4 - MEASUREMENT AND PAYMENT
All work as specified herein, satisfactorily completed, shall be paid for on a Lump Sum basis as stated in Bid Item Schedule for the item listed below:
Bid Item No. 2 – PROJECT RECORDS AND SUBMITTALS
U.S. Bureau of Land Management March 2022 NorCal Eagle Lake Field Office Reference Standards Litchfield Maintenance Shop 01420-1 and Abbreviations
SECTION 01420 – REFERENCE STANDARDS AND ABBREVIATIONS
PART 1 – GENERAL
1.01 REFERENCE STANDARDS
A. The Contract Documents contain references to various standard specifications, code practices, and requirements for materials, work quality, installation, inspections, and tests, which are published and issued by various organizations, societies, and associations. Such references are hereby made a part of the Contract Documents to the extent required.
B. When such references are specified, and the effective dates are not given, it shall be understood that the current edition or latest revision thereof and any amendments or supplements in effect on the date that the work is advertised for Bids shall govern the work.
C. Reference standards are not furnished with the Contract Documents since the Contractor, subcontractors, manufacturers, and the trades involved are assumed to be familiar with their requirements. The Engineer will furnish, upon request, information as to how copies of specified standards may be obtained.
1.02 INTERPRETATION OF SPECIFICATIONS AND DRAWINGS
A. The Special Provisions, Description of Work, Construction Details, Drawings, Shop Drawings, Contract Change Orders, and all other supplementary documents are essential parts of the Contract Documents, and a requirement occurring in one is as binding as though occurring in all. They are intended to be complementary and to describe and provide for complete work.
In resolving conflicts resulting from errors or discrepancies in any of the Contract Documents, the order of precedence shall be as follows:
1. Applicable Building Code, environmental permits (i.e., NEPA), or permits from other agencies as may be required by law.
2. Addenda, Supplemental Agreements and Change Orders (with those of later date having preference over those of earlier date).
3. The Contract Agreement
4. Contract Solicitation and Contractor’s Bid or Proposal
5. Technical Specifications (All Divisions)
6. Shop Drawings
7. Drawings
Litchfield Maintenance Shop 01420-2 and Abbreviations
B. With reference to the Drawings the order of precedence is as follows:
1. Figures govern over scaled dimensions
2. Detail or Shop Drawings govern over General Drawings.
3. General Drawings govern over standard drawings.
4. Addenda/Change Order Drawings govern over any other Drawings
5. Specifications shall govern over Drawings, except where items are shown on the Drawings are not specifically included in the Specifications, then the Drawings shall govern.
C. The provisions or the Contract Documents shall take precedence over any Laws or Regulations applicable to the performance of the work unless such an interpretation of the provisions of the Contract Documents would result in a violation of such Law or Regulation.
D. Where specified requirements differ from the requirements of applicable codes, ordinances and standards, the more stringent requirements shall take precedence. Where Drawings or Specifications require or describe products or execution of better quality, higher standard or greater size than required by applicable codes, ordinances and standards, Drawings and Specifications shall take precedence so long as such increase is legal.
E. Should it appear that the work to be done or any of the matters relative to the project are not sufficiently detailed or explained in the Contract Documents, the Bidder or Contractor shall apply in writing to the CO/COR for further explanations as may be necessary.
1.03 LAWS, CODES AND REGULATIONS
A. All materials, installation, and construction shall comply with the applicable provisions of current laws, safety rules and regulations of the Lassen County, the State of California, the Bureau of Land Management, the Federal Government, and any other applicable authority. In this connection, the Contractor’s special attention is directed to the following:
AASHTO - American Association of State Highway and Transportation Officials ACI - American Concrete Institute AISC - American Institute of Steel Construction ASTM - American Society for Testing and Materials AWWA - American Water Works Association CBC - California Building Code EPA - Environmental Protection Agency FP-14 - FHA Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects NEPA - National Environmental Policy
Litchfield Maintenance Shop 01420-3 and Abbreviations
NFPA - National Fire Protection Association NEC - National Electric Code OSHA - Occupational Safety and Health Administration RCRA - Resource Conservation and Recovery Act UBC - Uniform Building Code UFC - Uniform Fire Code UMC - Uniform Mechanical Code UPC - Uniform Plumbing Code
B. Whenever reference is made to “FP-14” it shall be understood to be the most recent addition of the Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units.
C. If any of these laws and standards should conflict with any of the Specifications contained herein, the Contractor shall notify the CO/COR in writing and the CO/COR shall resolve the conflict.
1.04 REGULATIONS RELATED TO HAZARDOUS MATERIALS
A. The Contractor shall comply with all EPA, OSHA, RCRA, NFPA, CAL-EPA and any other
Federal, State, County, City, and other local regulations governing the storage and conveyance of hazardous materials, including petroleum products, for all work included in the Contract Documents.
1.05 ABBREVIATIONS
A. Whenever the following abbreviations are used in these Specifications, the intent and meaning shall be interpreted as follows:
AA - Aluminum Association AAMA - Architectural Aluminum Manufacturer’s Association AAR - Association of American Railroads AASHTO - American Association of State Highway and Transportation Officials AATCC - American Association of Textile Chemists and Colorists ACI - American Concrete Institute AFBMA - Anti-Friction Bearing Manufacturer’s Association, Inc.
AFPA - American Forest Products Association AGA - American Gas Association AGMA - American Gear Manufacturers Association AHA - American Hardboard Association AHAM - Association of Home Appliance Manufacturers AI - The Asphalt Institute AIA - American Institute of Architects AISC - American Institute of Steel Construction AISI - American Iron and Steel Institute
Litchfield Maintenance Shop 01420-4 and Abbreviations
AITC - American Institute of Timber Construction AMCA - Air Moving and Conditioning Association ANS - American Nuclear Society ANSI - American National Standards Institute, Inc.
APA - American Plywood Association or American Parquet Association, Inc.
API - American Petroleum Institute APWA - American Public Works Association ARI - Air-Conditioning and Refrigeration Institute ASA - Acoustical Society of America ASAE - American Society of Agricultural Engineers ASCE - American Society of Civil Engineers ASHRAE - American Society of Heating, Refrigerating, and Air Conditioning Engineers ASLE - American Society of Lubricating Engineers ASME - American Society of Mechanical Engineers ASNT - American Society of Nondestructive Testing ASQC - American Society for Quality Control ASSE - American Society of Sanitary Engineers ASTM - American Society for Testing and Materials AWCI - American Wire Cloth Institute AWPA - American Wood Preservers Association AWPI - American Wood Preservers Institute AWS - American Welding Society AWWA - American Water Works Association BBC - Basic Building Code, Building Officials and Code Administrators International BHMA - Builders Hardware Manufacturer’s Association CABO - Council of American Building Officials CBM - Certified Ballast Manufacturers CDA - Copper Development Association CEMA - Conveyor Equipment Manufacturer’s Association CGA - Compressed Gas Association CLPCA - California Lathing and Plastering Contractors Association CLFMI - Chain Link Fence Manufacturer’s Institute CMA - Concrete Masonry Association CRSI - Concrete Reinforcing Steel Institute DCDMA - Diamond Core…
This is the start of the file's text. The full file is on GovTribe.