About this file

This document provides details for a federal solicitation to rehabilitate Skyline Drive and overlooks in Shenandoah National Park. The solicitation number is 140P2022R0050 and is being issued by the Department of the Interior National Park Service National Office to solicit proposals for the SHEN 312442 Design-Build project. This will be a design/build project to rehabilitate approximately 54 miles of Skyline Drive and 19 overlooks, including design and construction services to perform surface treatments such as crack sealing, chip sealing, and thin asphalt overlays on 54 miles of roadway. The work will also include 2-inch mill and overlay treatment on 19 miles of Skyline Drive, as well as partial and full depth pavement patching and road shoulder stabilization. All pavement will receive new pavement markings as part of the contract.

View the file

Other files for this federal contract opportunity

Other files attached to SHEN 312442 Design-Build, newest first.
File Type Posted
B08_Attachment_15_WD_Rockingham_1-7-22_0003.pdf PDF
B08_Attachment_13_WD_Madison_and_Page_1-7-22_0003.pdf PDF
Page_50_Amended_0003.pdf PDF
B08_Attachment_10_WD_Albemarle_1-7-22_0003.pdf PDF
Sol_140P2022R0050_Amd_0003.pdf PDF
140P2022R0050_A0003_0003.pdf PDF
SHEN_312442_PreProposal_Presentation_1_24_2022_0003.pptx PPTX presentation
QA_1-27-22_0003.pdf PDF
B08_Attachment_16_WD_Warren_1-7-22_0003.pdf PDF
B08_Attachment_14_WD_Rappahannock_1-7-22_0003.pdf PDF
A0003_Site_Visit_Attendee_List_140P20220050_0003.pdf PDF
B08_Attachment_12_WD_Greene_1-7-22_0003.pdf PDF
B08_Attachment_11_WD_Augusta_1-6-22_0003.pdf PDF
140P20220050_A0002_0002.pdf PDF
Sol_140P2022R0050_Amd_0002.pdf PDF
140P2022R0050_A0001_0001.pdf PDF
Sol_140P2022R0050_Amd_0001.pdf PDF
B08_Attachment_14_WD_Rappahannock_11-12-21.pdf PDF
B08_Attachment_11_WD_Augusta_11-12-21.pdf PDF
B08_Attachment_03_Skyline_Specifications.pdf PDF
B08_Attachment_02_Skyline_Drawings.pdf PDF
Sol_140P2022R0050.pdf PDF
B08_Attachment_07_Constructability_Checklist.xlsx XLSX spreadsheet
B08_Attachment_18_SHEN_HQ_Campus_Map.pdf PDF
B08_Attachment_17_Vaccination_Forms.pdf PDF
B08_Attachment_16_WD_Warren_11-12-21.pdf PDF
B08_Attachment_15_WD_Rockingham_11-12-21.pdf PDF
B08_Attachment_13_WD_Madison_and_Page_5-28-21.pdf PDF
B08_Attachment_12_WD_Greene_11-12-21.pdf PDF
B08_Attachment_09_Proposal_Submission_Package.docx DOCX document
B08_Attachment_05_Overlook_Specifications.pdf PDF
B08_Attachment_10_WD_Albemarle_11-12-21.pdf PDF
B08_Attachment_06_Pavement_Evaluation_Report.pdf PDF
B08_Attachment_04_Overlook_Drawings.pdf PDF
B08_RFP_140P2022R0050_SHEN_312442.pdf PDF
B08_Attachment_01_Scope_of_Services.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Template

Submittal List with Review Estimate Template
National Park Service (NPS) - Denver Service Center (DSC) | 06-25-2021
SUBMITTAL LISTACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number:312442(Complete this portion for Architect / Engineer (A/E)
Project Title:Pavement Improvements at Shenandoah National Parkconstruction service task order negotiation.)
SUBMITTALREQUIREMENTSARCHITECT / ENGINEER REVIEW TIME
(Indicate with X)(Indicate in whole or partial hours.)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS OR CALCULATIONS
OR PLANMANUFACTURER DATA
AND INSTRUCTIONSOTHERSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSOTHERARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERPROJECT MANAGER COORDINATIONLANDSCAPE ARCHITECT
011100Summary of Work
0131001.3.ACoordination DrawingsXX
0132161.3.AElectronic CopiesX
0132161.3.BConstruction Baseline ScheduleX
0132161.3.CCPM ReportsX
0132161.3.DConstruction Schedule UpdatesX
0132161.3.EConstruction Schedule Revisions and Time Impact AnalysisX
013323Submittal Procedures
0135231.2.AAccident Prevention Plan (APP)X
0140001.4.AQuality Control PlanX
0140001.4.BQualification DataX
0140001.4.CContractor's Quality Control Daily ReportsX
0140001.4.DTest ReportsX
0140001.4.EAccessibility Inspection ReportXX
0140001.4.FOff-site Inspection ReportX
0140001.4.GDaily ReportsX
0140001.4.HPermits, Licenses and CertificatesX
015000Temporary Facilities and Controls
0157231.3.AStorm Water Protection Plan Permit (SWPPP)X
0157231.3.BInspection ScheduleX
0157231.3.CErosion Control ProductsXX
0167001.3.AEnvironmental DataX
0173401.2.ASurveyor CertificateX
0173401.2.BLandfil ReceiptsX
0173401.2.CQuantity SurveysX
0174191.4.AWaste Management PlanX
0174191.4.BProgress DocumentationX
0174191.4.CWaste Reduction CalculationsX
0174191.4.DRecords of DonationsX
0174191.4.ERecords of SalesX
0174191.4.FRecycling and Processing Facility RecordsX
0174191.4.GLandfil and Incinerator Disposal RecordsX
0174191.4.HLEED SubmitalX
0174191.4.IQualification DataX
0174191.4.JStatement of Refrigerant RecoveryX
0174191.4.KProgress Payment RequirementsX
0174191.4.LCloseout SubmittalsX
0177001.3Closeout SubmittalsX
0241131.3Permits for site demo and clearingX
0241131.3Permits for tranport and disposalX
0241131.3Demo procedure and sequenceX
3100001.3Earthwork material certificateX
3125001.3Methods of operationX
3201131.3.BAsphalt samplesX
3201131.3.CAggregate 80lb sampleX
3201131.4.EChip seal company and foreman experienceX
3201133.2.ASch of Operations, personnel, equipmentX
3201171.3Crack seal/fill treatmentXX
3201172.1.BBlotter cover materialX
320117.613.1.A.1Joint sealant applicationX
320117.721.3AsphaltXX
3211231.2.AAggregate Test ReportsXX
3211231.2.BAggregate 100lb SampleX
3212131.3Asphalt Tack CoatX
3212163.2Asphalt Job Mix Formula (JMF)XXX
3216231.3SidewalkXX
3217231.3Pavement MarkingX
3223231.3.AAggregate Topsoil CourseX
3223231.3.ASeed MixX
3223231.3.AAggregate Topsoil Course 50lb SampleX
3291191.3TopsoilX
3292201.3Seed MixX
3401003.1Traffic Control PlanX
3401003.6.AWeekly Traffic Inspection CertificationX

Total: 0 0 0 0 0 0 0