Page_50_Amended_0003.pdf

PDF 198 KB Posted

Attached to
SHEN 312442 Design-Build Federal contract opportunity
Solicitation number
140P2022R0050
Issued by
Department of the Interior National Park Service National Office

About this file

This solicitation requests proposals for a design-build project to rehabilitate approximately 54 miles of Skyline Drive and 19 overlooks in Shenandoah National Park. Offerors will provide design and construction services including surface treatments of crack sealing, chip sealing, or thin asphalt overlays on 54 miles of Skyline Drive as well as full and partial depth pavement patching. An additional 19 miles will receive a 2-inch mill and asphalt overlay. All pavement will be re-striped and road shoulders stabilized. Phase 1 proposals are due by the date specified in the SF1442. Phase 1 evaluation will assess offerors' technical qualifications, key personnel, and technical and safety approaches. Phase 2 will be by invitation only and involve more detailed proposals assessed across these same factors.

View the file

Other files for this federal contract opportunity

Other files attached to SHEN 312442 Design-Build, newest first.
File Type Posted
B08_Attachment_15_WD_Rockingham_1-7-22_0003.pdf PDF
B08_Attachment_13_WD_Madison_and_Page_1-7-22_0003.pdf PDF
A0003_Site_Visit_Attendee_List_140P20220050_0003.pdf PDF
B08_Attachment_12_WD_Greene_1-7-22_0003.pdf PDF
B08_Attachment_11_WD_Augusta_1-6-22_0003.pdf PDF
B08_Attachment_10_WD_Albemarle_1-7-22_0003.pdf PDF
Sol_140P2022R0050_Amd_0003.pdf PDF
140P2022R0050_A0003_0003.pdf PDF
SHEN_312442_PreProposal_Presentation_1_24_2022_0003.pptx PPTX presentation
QA_1-27-22_0003.pdf PDF
B08_Attachment_16_WD_Warren_1-7-22_0003.pdf PDF
B08_Attachment_14_WD_Rappahannock_1-7-22_0003.pdf PDF
140P20220050_A0002_0002.pdf PDF
Sol_140P2022R0050_Amd_0002.pdf PDF
140P2022R0050_A0001_0001.pdf PDF
Sol_140P2022R0050_Amd_0001.pdf PDF
B08_Attachment_14_WD_Rappahannock_11-12-21.pdf PDF
B08_Attachment_10_WD_Albemarle_11-12-21.pdf PDF
B08_Attachment_06_Pavement_Evaluation_Report.pdf PDF
B08_Attachment_04_Overlook_Drawings.pdf PDF
B08_RFP_140P2022R0050_SHEN_312442.pdf PDF
B08_Attachment_01_Scope_of_Services.pdf PDF
B08_Attachment_11_WD_Augusta_11-12-21.pdf PDF
B08_Attachment_03_Skyline_Specifications.pdf PDF
B08_Attachment_02_Skyline_Drawings.pdf PDF
Sol_140P2022R0050.pdf PDF
B08_Attachment_07_Constructability_Checklist.xlsx XLSX spreadsheet
B08_Attachment_08_Submittal_List_Estimate.xlsx XLSX spreadsheet
B08_Attachment_18_SHEN_HQ_Campus_Map.pdf PDF
B08_Attachment_17_Vaccination_Forms.pdf PDF
B08_Attachment_16_WD_Warren_11-12-21.pdf PDF
B08_Attachment_15_WD_Rockingham_11-12-21.pdf PDF
B08_Attachment_13_WD_Madison_and_Page_5-28-21.pdf PDF
B08_Attachment_12_WD_Greene_11-12-21.pdf PDF
B08_Attachment_09_Proposal_Submission_Package.docx DOCX document
B08_Attachment_05_Overlook_Specifications.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 12/06/21

Document No.

140P2022R0050

Document Title

SHEN 312442 – Rehabilitate Skyline Drive *Design-Build*

b. Phase 2: The Government will notify the selected Phase 2 offerors and request submission of a Phase 2 proposal that addresses the phase 2 evaluation criteria. The Government will only accept proposals from offerors selected to proceed on to Phase 2.

B. QUESTIONS

Pre-proposal questions shall be submitted a minimum of 7 days prior to the due date and time for proposals.

Submit questions only though email to both of the following:

Contracting Officer, Jeremiah Rogers, Jeremiah_rogers@nps.gov

Contract Specialist, Damon Griffin, damon_griffin@nps.gov

C. OFFER DUE DATE AND LOCATION

1. To be considered for award, proposals must be received no later than the date and time noted in Block 13.a of the SF1442 contained in this solicitation.

CI. SUBMISSION REQUIREMENTS

1. Proposals shall be submitted via email. Proposals submitted via any means other than email shall not be accepted.

2. Proposals shall be sent to all of the following:

a. Contracting Officer, Jeremiah Rogers, Jeremiah_rogers@nps.gov

b. Contract Specialist, Damon Griffin, damon_griffin@nps.gov

c. CS_DSC_Proposal_Submission@nps.gov

3. Title subject line for all proposal submissions shall contain the solicitation number, Park-PMIS, and number of total emails, per the following example:

Subj: 140P2021R0159, SHEN-312442, email 1 of 3

4. Submit Phase 1 proposal as one volume. Submit Phase 2 proposals in separate volumes (I and II) in the FORMATS specified, containing CONTENTS required. Each volume shall be submitted in separate email attachments. Submit only Phase 1 requirements. Phase 2 will be by invitation only at a later date.

5. Size limits:

a. Individual email attachments shall be no larger than 38 MB.

b. Each email shall be no larger than 100 MB

c. Technical Proposal Total Page Count: 30 pages for phase I, 40 pages for phase II.

i. The following are not included in the total page count:

1. Gant Chart

2. Project Experience Questionnaires

3. Resumes

4. Past Performance Questionnaires/CPARS

5. SF 330

6. Offerors shall verify receipt of proposals.

PHASE 1, TECHNICAL PROPOSAL – FORMAT, ORGANIZATION, CONTENTS

1. FORMAT: Submit (1) one electronic copy. No hard copies shall be submitted.

2. ORGANIZATION: Include folders and files for electronic formats named as follows:

FACTOR 1 – TECHNICAL QUALIFIACTIONS: 1A) TECHNICAL COMPETENCE 1B) KEY

PERSONNEL

FACTOR 2 – TECHNICAL APPROACH, GENERAL

FACTOR 3 – SAFETY