B08_22R0003_At4_Price_Breakout.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- GAOA GRUB DAM REHABILITATION
- Solicitation number
- 140L0622R0003
About this file
This document contains a price schedule and bid schedule for the GAOA GRUB DAM REHABILITATION solicitation issued by the Department of the Interior Bureau of Land Management National Office. The price schedule lists 19 items related to the dam rehabilitation project with estimated quantities and spaces to provide unit prices and total costs. Major items include mobilization, excavation work, embankment, culverts, impact basin, spillway structures, outlet works, fabric, backfill, riprap, and dewatering. Bidders are instructed to submit their total price using the provided bid schedule format. The solicitation number is 140L0622R0003 and responses are due for the GAOA GRUB DAM REHABILITATION opportunity to rehabilitate an existing dam.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grub Price Sched
| GRUB DAM RECONSTRUCTION |
| Price Schedule |
| 140L0622R0003 |
| Item No. | Description | Quantity* | 0 | Unit Price | Total Cost |
| 1 | Mobilization and Preparatory Work | 1 | LS | ||
| 2 | Topsoil Stripping & Replacement | 1 | LS | ||
| 3 | Outlet Demolition | 1 | LS | ||
| 4 | Common Excavation | 23,820 | CY | ||
| 5 | Muck Excavation | 2,700 | CY | ||
| 6 | Compacted Embankment | 16,696 | CY | ||
| 7 | Filter Sand | 390 | CY | ||
| 8 | Drain Gravel | 87 | CY | ||
| 9 | Road Gravel | 2,240 | Ton | ||
| 10 | Auxiliary Spillway Culverts | 1 | LS | ||
| 11 | Impact Basin | 1 | LS | ||
| 12 | Spillway Tower and Inlet Structure | 1 | LS | ||
| 13 | Outlet Conduit | 1 | LS | ||
| 14 | Stabilization Fabric | 2,500 | SY | ||
| 15 | Lime Amended Backfill | 2,344 | CY | ||
| 16 | Riprap | 3,342 | Ton | ||
| 17 | Riprap Bedding | 430 | Ton | ||
| 18 | Salvage and Stockpile Gabion Rock | 530 | CY | ||
| 19 | Water Control/Dewatering | 1 | LS | ||
| TOTAL PRICE | |||||
| *Quantities are estimates. Measurement and payment for each item is defined in Section 01150, Measurement and Payment. |
&"Arial,Regular"&8&Z&F &"Arial,Regular"&9BID SCHEDULE&"MS Sans Serif,Regular"&8