B-53294 Pre-Bid Questions.docx
DOCX document 15 KB Posted
- Contract number
- 27-444DHS-MENTH-P-101131
- Issued by
- Illinois
About this file
This document is a pre-bid questions and answers record for a Willow Landscape project identified as B-53294. The document captures clarifications provided by the contracting entity to prospective bidders regarding project requirements and conditions prior to bid submission.
The project involves landscape work to be performed within a fenced area, subject to prevailing wage requirements. Key service specifications include removal of concrete pads, installation of topsoil as detailed in the scope of work, and watering of landscaped areas. The contractor is responsible for providing their own water supply for the project. The contracting entity will provide onsite disposal for excavated dirt. The work area will be secured during performance with no patients present. Temporary fence removal is permitted for access purposes provided that fencing is properly reinstalled upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Standard Terms and Conditions V23.2~25.pdf | ||
| B-53468 Pre-Conference Q and A.pdf | ||
| B-53468 Request for Quote.docx | DOCX document | |
| B-53468 Q and A.docx | DOCX document | |
| B-53468 Q and A - Updated.docx | DOCX document | |
| B-53468 Request for Quote - Updated.docx | DOCX document | |
| Standard Illinois Certifications V26.2~4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Willow Landscape Pre-Bid Question and Answers.
1. Will this job be covered under prevailing wage?
a. Yes
2. Will there be a spot onsite for disposal of dirt?
a. Yes.
3. Is it only the area inside the fence that needs done?
a. Yes.
4. Will there be patients around or will it be a secure area?
a. No patients will be in the area. The area will be secure while the job is taking place.
5. Will water be provided or do we have to bring in our own water for watering?
a. Contractor will need to provide their own water for watering.
6. Does the type of top soil matter?
a. Yes. Whatever is mentioned in the scope of work for the job should be used.
7. Do you want the concrete pads to be removed or keep them in place?
a. The concrete pads will need to be removed.
8. Can parts of the fence be removed for easier access to the area?
a. Yes, as long as it get put back in place correctly when finished
File details come from the government source that posted it. Updated .