B-53294 Pre-Bid Questions.docx
DOCX document 15 KB Posted
- Attached to
- DMH Small Purchase AMHC Landscaping
- Solicitation number
- 27-444DHS-MENTH-B-53468
- Issued by
- Madison County, Illinois
About this file
This is a Pre-Bid Questions and Answers document for the DMH Small Purchase AMHC Landscaping project in Illinois. The document addresses eight key questions from potential bidders regarding project scope and execution requirements. The work will be performed under prevailing wage requirements and will be limited to the area inside the fence at the facility. The site will be secured during work execution with no patients present in the area. Concrete pads must be removed as part of the project work, and portions of the fence may be temporarily removed to facilitate access, provided they are properly reinstalled upon completion.
Contractors are responsible for providing their own water supply for watering and must use the topsoil type specified in the project's scope of work. The facility will provide an onsite location for disposal of excavated dirt. No other specific pricing terms, contract duration, response deadlines, or award information is included in this pre-bid questions document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B-53468 Pre-Conference Q and A.pdf | ||
| B-53468 Request for Quote.docx | DOCX document | |
| Standard Terms and Conditions V23.2~25.pdf | ||
| Standard Illinois Certifications V26.2~4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Willow Landscape Pre-Bid Question and Answers.
1. Will this job be covered under prevailing wage?
a. Yes
2. Will there be a spot onsite for disposal of dirt?
a. Yes.
3. Is it only the area inside the fence that needs done?
a. Yes.
4. Will there be patients around or will it be a secure area?
a. No patients will be in the area. The area will be secure while the job is taking place.
5. Will water be provided or do we have to bring in our own water for watering?
a. Contractor will need to provide their own water for watering.
6. Does the type of top soil matter?
a. Yes. Whatever is mentioned in the scope of work for the job should be used.
7. Do you want the concrete pads to be removed or keep them in place?
a. The concrete pads will need to be removed.
8. Can parts of the fence be removed for easier access to the area?
a. Yes, as long as it get put back in place correctly when finished