AttachmentB_-_Revised.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Littleton Circle Drainage & ADA Repairs
- Solicitation number
- B-25-07
- Issued by
- Volusia County, Florida
About this file
The document is a Price Form (Attachment B) for Bid No. B-25-07, issued by the City of DeLand in Volusia County, Florida, for the Littleton Circle Drainage & ADA Repairs project. The bid encompasses a comprehensive infrastructure improvement initiative involving multiple line items, including mobilization, maintenance of traffic, inlet protection, clearing and grubbing, concrete work, tree removal, irrigation repair, and pavement treatments. The project requires removing 13 trees, installing 300 square yards of concrete sidewalk, 850 linear feet of concrete curb, 225 square yards of driveway aprons, and 2,000 square yards of asphalt milling and friction course. The mandatory pre-bid meeting was held on April 15, 2025, with sealed bids due on April 29, 2025, at 2:00 p.m. The contract specifies a sixty (60) business day completion timeline from the Notice to Proceed, with liquidated damages of $500 per day for delays.
The Price Form lists multiple line items with zero-dollar placeholders, indicating that actual pricing will be provided by the bidder. Contractor qualifications include maintaining comprehensive insurance, E-Verify compliance, and submitting various certifications. The project requires a comprehensive approach to infrastructure rehabilitation, with contractors responsible for preparing a schedule of values, submitting monthly payment applications, and providing supporting documentation. Contractors must provide a one-year warranty for materials and workmanship and submit signed and sealed as-built plans by a licensed surveyor. No specific set-aside designations for disadvantaged enterprises were mentioned, and no incumbent vendors were identified. The project involves significant infrastructure work requiring integration with existing municipal systems and coordination with City of DeLand departments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RCA.pdf | ||
| B2507Tabulation.pdf | ||
| B2507ADD2.pdf | ||
| AttachmentB_-_Revised.xlsx | XLSX spreadsheet | |
| B2507ADD1.pdf | ||
| B2507PrebidSignInSheet.pdf | ||
| AttachmentA.pdf | ||
| B2507Final.pdf | ||
| AttachmentC.pdf | ||
| AttachmentB.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| B-25-07 Price Form | |||||
| Pay Item No. | Pay Item Description | Unit | Quantity | Unit Price | Extended Price |
| 101-1 | Mobilization | LS | 1 | $0.00 | |
| 102-1 | Maintenance of Traffic | LS | 1 | $0.00 | |
| 104-18 | Inlet Protection System | EA | 3 | $0.00 | |
| 110-1-1 | Clearing & Grubbing | LS | 1 | $0.00 | |
| 110-4-10 | Removal of Existing Concrete | SY | 700 | $0.00 | |
| 522-1 | Concrete Sidewalk 4" Thick | SY | 300 | $0.00 | |
| 522-2 | Concrete Driveway Apron 6" Thick | SY | 225 | $0.00 | |
| 520-1-10 | Concrete Curb, Type Miami | LF | 850 | $0.00 | |
| 542-70 | Detectable Warning (Preformed Thermoplastic) | SF | 40 | $0.00 | |
| 711-11-123 | Thermoplastic, Standard, White, Solid, 12" for Crosswalk | LF | 120 | $0.00 | |
| 0711-11-125 | Thermoplastic, Standard, White, Solid, 24" for Stop Line | LF | 25 | $0.00 | |
| 0337-78-08 | Asphalt Concrete Friction Course, Traffic B, FC-9.5 | SY | 2000 | $0.00 | |
| 0327-70-6 | Milling Existing Asphalt Pavement, 1 1/2" Avg Depth | SY | 2000 | $0.00 | |
| Removal of Indicated Tree & Grind Stump | EA | 13 | $0.00 | ||
| Removal of Indicated Tree & Remove Stump | EA | 13 | $0.00 | ||
| Repair of Irrigation in Tree Removal Area | EA | 13 | $0.00 | ||
| Total Price | $0.00 | ||||
| Total Price in Words |
Price shall include all labor, materials, delivery/shipping, and equipment to perform all requirements and meet all specifications
File details come from the government source that posted it. Updated .