NATIONAL AIRPORT PAVEMENT TESTING FACILITY
WILLIAM J. HUGHES TECHNICAL CENTER
ATLANTIC CITY AIRPORT, NEW JERSEY
02/15/2022
NAPTF BUILDING KEY PLAN
0+50 1+50 2+50 3+50 4+50 5+50 6+50 7+50 8+500+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00
NORTH WALL
SOUTH WALL
AERIAL VIEW OF THE NAPTF BUILDING N.T.S.
NAPTF
PROJECT LOCATION MAP N.T.S.VICINITY MAP N.T.S.NEW JERSEY STATE MAP N.T.S.
ATLANTIC CITY
AIRPORT
NAPTF
NAPTF
WESCOAT ROAD
REFLECTIVE CRACKING INDOORS PHASE VII
CONTRACT NUMBER: 692M15-21-D-00004
CONSTRUCTION PLAN 100% DESIGN DRAWINGS
PROJECT LOCATION
PREPARED BY:
SHEET 1 OF 16
APPLIED RESEARCH ASSOCIATES, INC
2628 FIRE ROAD, SUITE 300
EGG HARBOR TOWNSHIP, NJ 08234
PHONE: (609) 380-4240
PREPARED FOR:
DRAWING NUMBER: G-001
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
R
N
NNNN
GENERAL NOTES & AND
@ AT
ABC AGGREGATE BASE COURSE
AC ASPHALT CONCRETE OR ASPHALT CEMENT
ADJ ADJACENT
AIP ABANDON IN PLACE
ALT ALTERNATE
AGG AGGREGATE
APPOX APPROXIMATE
ASR ALKALI-SILICA REACTIVITY
CL or ℄ CENTERLINE
CLSM CONTROLLED LOW STRENGTH MATERIAL
CO CLEAN OUT OR CONTRACTING OFFICER
COMM or C COMMUNICATIONS
COMP COMPACTION
CONT CONTINUOUS
COR CONTRACTING OFFICER'S REPRESENTATIVE
CP CONTROL POINT
CU CUBIC
DI DROP INLET or DRAIN INLET
DIA DIAMETER
DH DRILL HOLE
E EAST or EASTING
EA EACH
ECP ENTRY CONTROL POINT
ELEC ELECTRIC
EL or ELEV ELEVATION
EMH ELECTRICAL MAN HOLE
EXIST or EX. EXISTING
FOD FOREIGN OBJECT DEBRIS
GA GAUGE
GCAB GRADED CRUSHED AGGREGATE BASE
GOVT GOVERNMENT
HH HANDHOLE
HMA HOT MIX ASPHALT
IAW IN ACCORDANCE WITH
LBS POUNDS
LF LINEAR FOOT
LT LEFT
MAX MAXIMUM
MIN MINIMUM
MH MANHOLE
MPH MILES PER HOUR
MW MONITORING WELL
N NORTH or NORTHING NO or # NUMBER
NOTAM NOTICE TO AIRMEN
NTP NOTICE TO PROCEED
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
P POWER
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
PI POINT OF INTERSECTION
POV PRIVATELY OWNED VEHICLE
PT POINT OF TANGENCY
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORINE
PVMT PAVEMENT
R RADIUS/REMOVE/ REINFORCED
RCP REINFORCED CONCRETE PIPE
REF REFERENCE
REINF REINFORCED
REQ'D REQUIRED
RI RIGHT
RW or R/W RUNWAY
S SOUTH
SCH SCHEDULE
SD STORM DRAIN
SF SILT FENCE
SHT SHEET
SPA SPACES
SPECS SPECIFICATIONS
SPU SIGNAL PROCESSING UNIT
SQ SQUARE
STA STATION
STD STANDARD
SWPPP STORM WATER POLLUTION PREVENTION PLAN
T THICKNESS
TBR TO BE REMOVED
T/L TAXILANE
T/W TAXIWAY
TMP/TEMP TEMPORARY
TYP TYPICAL
UD UNDERDRAIN
W/ WITH
W WEST
WWF WELDED WIRE FABRIC
WJHTC WILLIAM J. HUGHES TECHNICAL CENTER
ABBREVIATIONS
1. LOCATION OF INSTRUMENTATION AND UNDERGROUND UTILITIES AS INDICATED ON THE PLANS HAVE BEEN OBTAINED FROM EXISTING RECORDS AND FIELD SURVEYS. NEITHER THE FAA NOR
THE ENGINEER ASSUMES ANY RESPONSIBILITY WHATEVER WITH RESPECT TO THE ACCURACY, COMPLETENESS, OR SUFFICIENCY OF THE INFORMATION. THERE IS NO GUARANTEE, EITHER
EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE, AND TYPE OF EXISTING UNDERGROUND ITEMS INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED IN THE
CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE ACTUAL LOCATION OF ALL SUCH FACILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND
UTILITIES, PRIOR TO DIGGING. THE CONTRACTOR SHALL NOTIFY THE FAA OF HIS OPERATIONAL PLANS. THE CONTRACTOR SHALL MAKE ARRANGEMENTS FOR DETAILED INFORMATION AND
ASSISTANCE IN LOCATING UTILITIES WITH FAA OR THEIR DESIGNATED REPRESENTATIVES. IN THE EVENT AN UNEXPECTED UTILITY IS ENCOUNTERED DURING CONSTRUCTION, THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE FAA. ANY UTILITIES OR SERVICES DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED IMMEDIATELY AT THE
CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE FAA.
2. THE SITE LAYOUT IS BASED ON THE CONTROL POINTS AS INDICATED. SURVEY CONTROL IS DEFINED BY BENCHMARKS IDENTIFIED ON G-102.
3. ITEMS NOT MARKED FOR REMOVAL SHALL BE PROTECTED FROM DAMAGE BY THE CONTRACTOR.
4. ITEMS NOT MARKED FOR REMOVAL THAT ARE DAMAGED SHALL BE REPAIRED OR REPLACED IN KIND AT NO COST TO THE FAA.
5. THE CONTRACTOR WILL BE REQUIRED TO COORDINATE HIS OPERATIONS WITH ANY OTHER CONTRACTORS WORKING IN THE FACILITY AND WITH FACILITY OPERATIONS.
6. THE CONTRACTOR SHALL CHECK ALL EXISTING GRADES AND DIMENSIONS IN THE FIELD PRIOR TO COMMENCEMENT OF ANY WORK ON THIS PROJECT. THE CONTRACTOR SHALL REPORT ANY
DISCREPANCIES TO THE FAA IMMEDIATELY.
7. EXISTING PAVEMENT THICKNESSES SHOWN IN THESE PLANS ARE BASED ON CONSTRUCTION RECORDS; ACTUAL THICKNESSES MAY VARY.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE , LOCAL, AND INSTALLATION CODES, LAWS, AND REGULATIONS.
9. NOTHING IN THE GENERAL NOTES OR CONSTRUCTION DOCUMENTS SHALL RELIEVE THE CONTRACTOR FROM HIS RESPONSIBILITIES TOWARD THE SAFETY AND CONVENIENCE OF THE
GENERAL PUBLIC AND THE TENANTS OF THE INSTALLATION.
10. THE CONTRACTOR WILL PROVIDE ALL NECESSARY PROTECTIVE MEASURES TO SAFEGUARD EXISTING UTILITIES FROM DAMAGE DURING CONSTRUCTION OF THIS PROJECT. IN THE EVENT
THAT SPECIAL EQUIPMENT IS REQUIRED TO WORK OVER AND AROUND THE UTILITIES, THE CONTRACTOR SHALL FURNISH SUCH EQUIPMENT. THE COST OF PROTECTING UTILITIES FROM
DAMAGE AND FURNISHING SPECIAL EQUIPMENT SHALL BE INCLUDED IN THE CONTRACTOR'S BID.
11. BEFORE BEGINNING ANY WORK, THE CONTRACTOR SHALL VERIFY THE EXACT ROUTING AND LOCATION OF ALL EXISTING UTILITIES TO BE DEMOLISHED AND TO REMAIN.
12. BACK FLOW PREVENTION DEVICES ARE REQUIRED ON ALL CONTRACTOR CONNECTIONS TO FACILITY WATER SUPPLIES INCLUDING TEMPORARY AND FIRE HYDRANT CONNECTIONS, EXCEPT
FOR EXPRESSLY DESIGNATED WATER LINE CONNECTIONS.
13. CONTRACTOR SHALL PROPERLY DISPOSE OF ALL WASTE MATERIALS OFF GOVERNMENT PROPERTY.
14. UNDERMINING IN AC PAVEMENT IS DEFINED AS LOSS OF MATERIAL GREATER THAN 3" IN DEPTH AT ANY POINT ALONG THE FACE OF THE PAVEMENT.
15. INTERRUPTION TO UTILITIES BY THIS PROJECT SHALL BE COORDINATED WITH THE FAA.
16. ALL COST RELATING TO THE CONTRACTOR'S ACCESS AND SECURITY SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, EXCEPT AS NOTED.
17. UTILITIES ARE DEFINED TO INCLUDE GAUGES, OTHER INSTRUMENTATION, AND RELATED APPURTENANCES.
18. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DRAINAGE. GRADING, EROSION CONTROL STABILIZATION AND UTILITY CONNECTIONS IN STAGING AREAS AND SHALL RESTORE SITE
TO ORIGINAL CONDITIONS UPON COMPLETION OF THE WORK.
19. ALL CONSTRUCTION AREAS SHALL BE CONSIDERED LAND DISTURBANCE AREAS.
20. OVERHEAD UTILITIES AND POLES BELONG TO FAA.
21. CONTRACTOR MUST VERIFY UTILITY CAPACITY IS ADEQUATE FOR PROJECT NEEDS. IF CAPACITY IS INSUFFICIENT. CONTRACTOR IS RESPONSIBLE FOR UPGRADES OR NEW LINES.
22. CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONNECTIONS, CONNECTION REQUIREMENTS, AND COORDINATION WITH UTILITY OWNERS.
SHEET OF
GENERAL NOTES
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
G-002
SHEET LIST TABLE
DRAWING
NUMBER TITLE SHEET
G-001 COVER SHEET 1
G-002 GENERAL NOTES 2
G-101 TESTING AREA EXISTING CONDITIONS PLAN 3
G-102 SITE ACCESS HAULING AND STAGING AREA 4
G-103 BUILDING PLAN AND SURVEY CONTROL 5
G-104 DEMOLITION PLAN 6
G-201 TEST ITEM PLAN AND PROFILE 7
Q-201 INSTRUMENTATION PLAN AND PROFILE 8
Q-601 INSTRUMENTATION ONE-LINE DIAGRAM 9
Q-602 INSTRUMENTATION WIRING SCHEDULE cRIO
9035 CHASSIS 10
Q-603 INSTRUMENTATION WIRING SCHEDULE cRIO
9035 CHASSIS 11
Q-604 INSTRUMENTATION WIRING SCHEDULE NI 9149
EXPANSION 12
Q-605 INSTRUMENTATION WIRING SCHEDULE NI 9149
EXPANSION 13
Q-606 INSTRUMENTATION SENSOR DETAIL 14
Q-607 INSTRUMENTATION SENSOR DETAIL 15
Q-608 INSTRUMENTATION SENSOR DETAIL 16
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-GNRL.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
95% FOR REVIEW 01/06/2022 __ C.T.
100% FOR REVIEW 02/15/2022 __ C.T.
9+008+508+50 9+008+50 8+75
22.5' LONG X 12.6' WIDE
SAMPLING AREA
9" THICK 4000 PSI CONCRETE OVER
8" THICK DENSE GRADED
AGGREGATE
4' HIGH PROTECTIVE FENCING
4' HIGH PROTECTIVE FENCING
TRENCH DRAIN
0.25' WIDE GAP
EXPOSED PIPING
1'± ABOVE THE SLAB
TEST PIT WALL
TEST PIT WALL
REFLECTIVE
CRACKING
TEST SLAB
(UNDERLAY)
REFLECTIVE
CRACKING RIG
PIT
REFLECTIVE
CRACKING RIG
PIT
MAINTENANCE
PIT
(3) Ø1" RGS CONDUITS
Ø2" PVC CONDUIT
Ø1" RGS CONDUIT
Ø1" RGS CONDUITS
(2) Ø3" CONDUITS
TRACKS
1.
0'
1.
4'
.0
1.
4' 1.
0'
5.6'±
PAVING
OVERRUN
AREA
ANCHORS
PREVENTING
LATITUDINAL
MOTION
ANCHORS
PREVENTING
LONGITUDINAL
MOTION
ANCHORS
PREVENTING
LONGITUDINAL
MOTION
250 MIL NOTCH
8"
12"
8"
6"
0'-6' 6'-1' 1'
0.25' 0.25'
6"
57.58'
46.00'
56.55'
55.86'
55.36'
56.58'
56.53'
EXISTING P-501
EXISTING 3/8"
STEEL PLATE
EXISTING
1/4" TEFLON
EXISTING
P-501
EXISTING D.G.A.
EXISTING
SUBGRADE
-9.33' 9.33'
100 1500 5050
GRAPHIC SCALE
1" = 50'
REFLECTIVE CRACKING RIG PLAN VIEW
SCALE: 1"=5'
SECTION A-A SECTION B-B
EXISTING TEST AREA UNDERLAY DETAIL
HORIZONTAL SCALE: 1"=5' VERTICAL SCALE: 1"=0.5'
B
B
A A
REFLECTIVE CRACKING TEST AREA
LOOKING EAST VIEW
REFLECTIVE CRACKING TEST AREA
LOOKING WEST VIEW
N
LEGEND:
P-501 CONCRETE PAVEMENT
(PORTLAND CEMENT CONCRETE)
DENSE GRADED AGGREGATE (D.G.A.)
SUBGRADE
P-401
SHEET OF
TESTING AREA EXISTING CONDITIONS PLAN
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
G-101
0+50 1+50 2+50 3+50 4+50 5+50 6+50 7+50 8+500+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00
NORTH WALL
SOUTH WALL
DAQ CABINET
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-CONS.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
FENCE
NAPTF BUILDING
SUBGRADE PROCESSING
BUILDING 207A
N O
AC
C
ESS
BUILDING
ACCESSCONSTRUCTION
SITE
GATE 12B
SEE NOTE 1
STAGING
AREA
GATE 12B
GATE 12A
SEE NOTE 1
WESCOAT ROAD
GATE 12A
PAN
G
BO
R
N R
O
AD
WORKER
PARKING
ONLY
160' 240'0 80'80'
GRAPHIC SCALE
1" = 80'
ATLANTIC CITY RESERVOIR
VISITOR
CENTER
MAIN
GATE
PERIMETER ROAD
WESCOAT ROAD COUNTY ROUTE 685
SAFETY TECHNOLOGY
NAPMRC
DELILAH ROAD
WAWA
AMELIA EARHEART
296 - NAPTF
MAIN GATE ACCESS MAP
WORKER ACCESS AND HAUL ROUTE
FENCE
HAUL ROUTE WITH FAA PERMISSION SEE NOTE 1
CONSTRUCTION SITE
STAGING AREA
WORKER PARKING
LEGEND:NOTES:
EMPLOYEES ENTER
THROUGH MAIN GATE
ALTERNATE SITE
ACCESS.
SEE NOTES ON THIS
SHEET.
1. THE CONTRACTOR'S PRIMARY ACCESS WILL BE THROUGH THE MAIN GATE. HOWEVER. ACCESS THROUGH GATE 12A OR 12B CAN BE REQUESTED FOR PAVING AND DEMOLITION ACTIVITIES BY CONTACTING RICHARD JI IN WRITING AT LEAST 72 HOURS IN ADVANCE.
2. LOCATION OF THE CONTRACTOR'S STAGING AREA SHOWN IS APPROXIMATE. THE EXACT LOCATION WILL BE DETERMINED IN THE FIELD BY THE ENGINEER.
3. CONTRACTOR PARKING AVAILABLE IN THE STAGING OR DESIGNATED WORKER PARKING AREA. CONTRACTOR STAGING AREA CAN BE UTILIZED FOR THE CONTRACTOR'S FIELD OFFICE, PARKING OF COMPANY VEHICLES AND FOR STORAGE OF MATERIALS. MULTIPLE PROJECTS MAY BE ONGOING AT THE SAME
TIME.
4. TRACKED CONSTRUCTION EQUIPMENT MAY BE PARKED OVERNIGHT IN THE CONSTRUCTION AREA. ALL OTHER PARKING AND ALL EQUIPMENT STORAGE SHALL BE IN THE STAGING AREA, UNLESS OTHERWISE APPROVED IN WRITING BY THE ENGINEER.
5. THE ENTIRE HAUL ROUTE MUST BE KEPT CLEAN OF CONSTRUCTION DEBRIS AND AVAILABLE FOR USE BY FACILITY VEHICLES.
6. THE CONTRACTOR SHALL KEEP ALL PAVED SURFACES CLEAN AND FREE OF MUD AND DEBRIS.
7. THE CONTRACTOR MUST KEEP TEST PAVEMENTS USED AS HAUL ROUTES CLEAR OF FOREIGN OBJECT DEBRIS (FOD) AT ALL TIMES. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN A VACUUM SWEEPER TRUCK OR OTHER APPROVED METHOD FOR REMOVAL OF FOD. THE CONTRACTOR SHALL THOROUGHLY CLEAN ALL TEST PAVEMENTS USED AS HAUL ROUTES THROUGHOUT THE CONSTRUCTION AND IMMEDIATELY AFTER COMPLETION OF HAULING.
8. DUMP TRUCKS SHALL USE LOAD COVERS AND SHALL BE LOADED BY THE CONTRACTOR SUCH THAT NO SPILLAGE OCCURS.
9. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT ITS MOVEMENT BY WIND OR WATER FROM ANY SOURCE.
10. ANY AND ALL DAMAGE BY THE CONTRACTOR TO EXISTING AC OR PCC PAVEMENT, INCLUDING HAUL ROUTES OR STRUCTURES WHICH ARE DESIGNATED TO REMAIN, SHALL BE REPLACED WITH LIKE MATERIALS AND ITEMS AT THE CONTRACTOR'S EXPENSE AND TO THE SATISFACTION OF THE FAA. THE CONTRACTOR MUST IDENTIFY AND DOCUMENT ANY PRE-EXISTING DAMAGE TO ANY PAVEMENTS TO REMAIN PRIOR TO STARTING ANY WORK. THE PRE-EXISTING DAMAGE MUST BE REPORTED TO THE FAA IN WRITING BEFORE ANY WORK IS STARTED. IF NO DEFICIENCIES ARE DOCUMENTED AND REPORTED, THEN THE PAVEMENTS
WILL BE CONSIDERED TO BE IN GOOD CONDITION AND COMPLETELY UNDAMAGED.
11.CONTRACTOR AND SUBCONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT AND MATERIALS ARE NOT PERMITTED TO LEAVE THE LIMITS OF CONSTRUCTION
SITE OR APPROVED HAUL ROUTES.
12.CONTRACTOR AND SUBCONTRACTOR PERSONNEL MUST BE ESCORTED AT ALL TIMES, AND MUST MEET REQUIREMENTS FOR ENTRY TO WJHTC, INCLUDING, BUT NOT LIMITED TO, POSSESSION OF A VALID PHOTO IDENTIFICATION FROM A US STATE GOVERNMENT.
BOULE
VARD
SHEET OF
SITE ACCESS, HAULING AND STAGING AREA
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
G-102
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-GNRL.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
W W W W W W W W W W W
W W W W W W W W W W
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+000+50 1+50 2+50 3+50 4+50 5+50 6+50 7+50 8+50 9+500+50 1+50 2+50 3+50 4+50 5+50 6+50 7+50 8+50 9+500+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+000+25 0+50 0+75 1+25 1+50 1+75 2+25 2+50 2+75 3+25 3+50 3+75 4+25 4+50 4+75 5+25 5+50 5+75 6+25 6+50 6+75 7+25 7+50 7+75 8+25 8+50 8+75 9+25 9+50 9+75
3/4" HOSE BIB (MALE) 3/4" HOSE BIB
(MALE)
3/4" HOSE BIB
(MALE)
3/4" HOSE BIB
(MALE)
3/4" HOSE BIB (MALE)1" PIPE THREAD
HOSE
CONNECTION
(MALE)
1" PIPE THREAD
HOSE
CONNECTION
(MALE)
3/4" HOSE BIB (MALE) 3/4" HOSE BIB (MALE) 11
2" QUICK
CAM LOCK
(MALE)
3/4" HOSE BIB
(MALE)
1" PIPE
THREAD
HOSE
(FEMALE)
2" QUICK
CAM LOCK
(MALE)
3/4" HOSE BIB
(MALE)
3/4" HOSE BIB
(MALE)
2" QUICK
CAM LOCK
(MALE)
3/4" HOSE BIB
(MALE)
2" QUICK CAM
LOCK (MALE)
BU
IL
D
IN
G E
N
TR
AN
C
E/
EX
IT
.5 ' W
ID
E
R O
LL
-U
P D
O O
R
BU
IL
D
IN
G E
N
TR
AN
C
E/
EX
IT
.5 ' W
ID
E
R O
LL
-U
P D
O O
R
SH
O
P/ O
FF
IC
E O
FF
IC
E
PH
O
TO
M
ET
R
IC
LA
B
ELEV. 58.000'
ELEV. 57.990'
ELEV. 57.986'
ELEV. 57.970' 204
ELEV. 57.987'
ELEV. 58.000'
ELEV. 58.034' 207
ELEV. 58.015'
ELEV. 57.951'
ELEV. 57.996'
ELEV. 57.992'
ELEV. 58.000'
ELEV. 58.016'
ELEV. 58.015'
ELEV. 58.034'
ELEV. 58.008'
ELEV. 58.004' CL-STA.0+00
10000
CL-STA.10+00
10001
CL-STA.-1-30
10002
CL-STA.0-30
10003 CL-STA.2+98
10004 CL-STA.9+00
10005
BUILDING'S NORTH WALL
BUILDING'S SOUTH WALL
Y
X
FAA
MANHOLES
MAINTENANCE PIT
SCALE
(0,0)
N O
A C
C
ES
S
AREA TO BE PROTECTED.
DO NOT STORE NOR STAGE
EQUIPMENT AND MATERIALS.
WATER SUPPLY LINE
CONNECTIONS AS SHOWN ON PLAN
W W W W W W W W W W W
W W W W W W W W W W
SH
EL
VE
S
REFLECTIVE CRACKING DAQ
NAPTF BUILDING PLAN VIEW
SCALE: 1"=40'
80' 120'0 40'40'
GRAPHIC SCALE
1" = 40'
LEGEND
NOTES:
1. THE PROJECT AREA IS LOCATED INSIDE OF THE NATIONAL AIRPORT
PAVEMENT TESTING FACILITY, BUILDING NUMBER 296, WILLIAM J.
HUGHES TECHNICAL CENTER, LOCATED AT THE ATLANTIC CITY
INTERNATIONAL AIRPORT, EGG HARBOR TOWNSHIP, NEW JERSEY
08234.
2. THE HORIZONTAL CONTROL NETWORK IS REFERENCED TO A LOCAL
COORDINATE SYSTEM ALIGNED WITH THE NAPTF TESTING AREA
CENTER LINE. THE VERTICAL CONTROL NETWORK IS ALSO
REFERENCED TO A LOCAL ASSUMED DATUM.
CONTROL POINTS
NUMBER STATION
[FEET]
OFFSET
[FEET]
ELEVATION
[FEET]
MARKER
DESCRIPTION
200 0 + 2.352 46.209 L 58.000 MAG AND
WASHER
201 1 + 49.673 46.634 L 57.990 MAG AND
WASHER
202 2 + 80.029 47.236 L 57.986 MAG AND
WASHER
203 4 + 26.822 47.441 L 57.970 MAG AND
WASHER
204 5 + 81.880 47.034 L 57.987 MAG AND
WASHER
205 7 + 30.901 47.054 L 58.000 MAG AND
WASHER
CONTROL POINTS
NUMBER STATION
[FEET]
OFFSET
[FEET]
ELEVATION
[FEET]
MARKER
DESCRIPTION
206 8 + 91.088 46.481 L 58.034 MAG AND
WASHER
207 10 + 47.423 38.858 L 58.015 MAG AND
WASHER
208 10 + 07.640 45.426 R 57.951 MAG AND
WASHER
209 9 + 07.144 47.198 R 57.996 MAG AND
WASHER
210 7 + 56.728 46.194 R 57.992 MAG AND
WASHER
211 6 + 03.298 46.091 R 58.000 MAG AND
WASHER
CONTROL POINTS
NUMBER STATION
[FEET]
OFFSET
[FEET]
ELEVATION
[FEET]
MARKER
DESCRIPTION
212 4 + 56.998 45.992 R 58.016 MAG AND
WASHER
213 3 + 04.791 45.889 R 58.015 MAG AND
WASHER
214 1 + 60.140 45.350 R 58.034 MAG AND
WASHER
215 -0 - 00.315 46.085 R 58.008 MAG AND
WASHER
216 -1 - 48.287 4.082 R 58.004 MAG AND
WASHER
CENTER LINE MARKER LOCATIONS
NUMBER
STATION
[FEET]
OFFSET
[FEET]
LOCATION
DESCRIPTION
MARKER
DESCRIPTION
10000 0+00.000 0.000 ON CENTER LINE STA.
0+00
MAG AND
WASHER
10001 10+00.000 0.000 ON CENTER LINE STA.
10+00
MAG AND
WASHER
10002 -1-30.000 0.000 ON CENTER LINE STA.
-1-30
MAG AND
WASHER
10003 -0-30.000 0.000 ON CENTER LINE STA.
0-30
MAG AND
WASHER
10004 2+98.000 0.000 ON CENTER LINE STA.
2+98
MAG AND
WASHER
10005 9+00.000 0.000 ON CENTER LINE STA.
9+00
MAG AND
WASHER
SIGNAL PROCESSING UNIT
LOCATIONS
NUMBER STATION
[FEET]
OFFSET
[FEET] DESCRIPTION
SPU 1-S 0 + 50 51.198 R CABINET
SPU 1-N 1 + 30 51.323 L CABINET
SPU 2-S 1 + 95 51.198 R CABINET
SPU 2-N 2 + 85 51.323 L CABINET
SPU 3-S 3 + 95 51.198 R CABINET
SPU 3-N 4 + 70 51.323 L CABINET
SPU 4-S 5 + 55 51.198 R CABINET
SPU 4-N 6 + 05 51.323 L CABINET
SPU 5-S 6 + 75 51.198 R CABINET
SPU 5-N 7 + 25 51.323 L CABINET
SPU 6-S 8 + 15 51.198 R CABINET
SPU 6-N 9 + 20 51.323 L CABINET
SHEET OF
BUILDING PLAN AND SURVEY CONTROL
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
G-103
N
CENTER LINE MARKER - MAG NAIL
CONTROL POINT - MAG NAIL
HANDHOLE
MANHOLE
SPU (SIGNAL PROCESSING UNIT)
WATER LINE CONNECTION
WATER SHUT-OFF VALVE
LIGHT CAN
WATER SUPPLY LINE
PROJECT EXTENTS
W
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-GNRL.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
B B
A A5.00'
2.00'
5.00'
EXISTING
NORTH STRIP
EXISTING
SOUTH STRIP
EXISTING 22.5' LONG X 12.6'
WIDE SAMPLING AREA (SEE
SHEET G-101 FOR DETAILS)
(SEE NOTE 2)
PROVIDE TEMPORARY
BRIDGING TO PREVENT
AGGREGATES FROM
ENTERING THE GAP.
TO BE REMOVED
POST-PAVING
30.00'
PAVEMENT
OVERRUN
AREA
5"
P-401
(SEE NOTE 1)
5"
EXISTING TEST AREA UNDERLAY
(SEE DETAIL ON SHEET G-101)
5"
TACK COAT
PROVIDE TEMPORARY BRIDGING TO PREVENT
AGGREGATES FROM ENTERING THE GAP.
TO BE REMOVED POST-PAVING
EXISTING PROTECTIVE
BRIDGING TO REMAIN
0.25'
EXISTING TEST AREA UNDERLAY
(SEE DETAIL ON SHEET G-101)
TACK COAT
PROVIDE TEMPORARY BRIDGING TO PREVENT
AGGREGATES FROM ENTERING THE GAP.
TO BE REMOVED POST-PAVING
EXISTING PROTECTIVE
BRIDGING TO REMAIN
0.25'
5"
EXISTING TEST AREA UNDERLAY
(SEE DETAIL ON SHEET G-101)
LEGEND:
REMOVE EXISTING P-401 PLANT MIX BITUMINOUS PAVEMENT
PLAN VIEW
SCALE: 1"=5'
SECTION C-C
HORIZONTAL SCALE: 1"=3'
VERTICAL SCALE: 1"=0.3'
N
SECTION A-A (NORTH STRIP)
HORIZONTAL SCALE: 1"=3'
VERTICAL SCALE: 1"=0.3'
SECTION B-B (SOUTH STRIP)
HORIZONTAL SCALE: 1"=3'
VERTICAL SCALE: 1"=0.3'
C
C
NOTES:
1. P-401 TO BE MILLED DOWN TO THE CONCRETE SURFACE.
2. EXISTING SAMPLING AREA TO BE MILLED BEFORE TEST STRIPS TO VERIFY
THE MILL TEETH ARE CUTTING EVENLY. ENTIRE SAMPLING AREA TO BE
MILLED THREE INCHES DEEP.
3. REFER TO P-101MR SPECIFICATION DOCUMENT FOR ADDITIONAL
REQUIREMENTS.
NOTE: SEE SHEET G-101 FOR EXISTING TEST RIG DETAILS
SHEET OF
DEMOLITION PLAN
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
G-104
DEMOLITION MILLING EXTENTS
0+50 1+50 2+50 3+50 4+50 5+50 6+50 7+50 8+500+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00
NORTH WALL
SOUTH WALL
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-CONS.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
B B
C
C
A A5.00'
2.00'
5.00'
PROPOSED
NORTH STRIP
PROPOSED
SOUTH STRIP
EXISTING 22.5' LONG X 12.6'
WIDE SAMPLING AREA (SEE
SHEET G-101 FOR DETAILS)
(SEE NOTE 4)
PROVIDE TEMPORARY
BRIDGING TO PREVENT
AGGREGATES FROM
ENTERING THE GAP.
TO BE REMOVED
POST-PAVING
30.00'
PAVEMENT
OVERRUN
AREA
6"
NORTH STRIP
(SEE NOTE 1)
SOUTH STRIP
(SEE NOTE 2)
P-401
EXISTING TEST AREA UNDERLAY
(SEE DETAIL ON SHEET G-101)
3"
FORM SIDES TO PROVIDE
CLEAN VERTICAL FACES,
NOT TO BE SAW CUT
(TYPICAL FOR ALL)
3"
P-401 (SEE NOTE 1)
TACK COAT (SEE NOTE 3)
PROVIDE TEMPORARY BRIDGING TO PREVENT
AGGREGATES FROM ENTERING THE GAP.
TO BE REMOVED POST-PAVING
EXISTING PROTECTIVE
BRIDGING TO REMAIN
0.25'
EXISTING TEST AREA UNDERLAY
(SEE DETAIL ON SHEET G-101)
6"
EXISTING TEST AREA UNDERLAY
(SEE DETAIL ON SHEET G-101)
P-401 (SEE NOTE 2)
250 MIL OPENING GASKET TO BE
INSTALLED BY THE ENGINEER
TACK COAT (SEE NOTE 3)
PROVIDE TEMPORARY BRIDGING TO PREVENT
AGGREGATES FROM ENTERING THE GAP.
TO BE REMOVED POST-PAVING
EXISTING PROTECTIVE
BRIDGING TO REMAIN
0.25'
PLAN VIEW
SCALE: 1"=5'
SECTION C-C
HORIZONTAL SCALE: 1"=3'
VERTICAL SCALE: 1"=0.3'
N
SECTION A-A (NORTH STRIP)
HORIZONTAL SCALE: 1"=3'
VERTICAL SCALE: 1"=0.3'
SECTION B-B (SOUTH STRIP)
HORIZONTAL SCALE: 1"=3'
VERTICAL SCALE: 1"=0.3'
C
C
NOTE: SEE SHEET G-101 FOR EXISTING TEST RIG DETAILS
LEGEND:
P-401 PG 64-22 (GRADATION 2) ASPHALT PAVEMENT
NOTES:
1. PLACE THE NORTH SIDE TEST STRIP IN ONE 3" COMPACTED LIFT.
2. PLACE THE SOUTH SIDE TEST STRIP IN TWO 3" COMPACTED LIFTS.
3. NEAT ASPHALT BINDER (I.E., PG 64-22) SHALL BE APPLIED BETWEEN LIFTS
AND ON TOP OF THE CONCRETE AS A TACK COAT, AT AN APPLICATION RATE
OF 0.05 – 0.10 GAL/YD2.
4. CLEAN MILLED SURFACE AND PLACE 3" P-401 PG 64-22 (GRADATION 2)
ASPHALT PAVEMENT USING CONSTRUCTION PRACTICES ANTICIPATED FOR
NORTH AND SOUTH TEST STRIPS.
SHEET OF
TEST ITEM PLAN AND PROFILE
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
G-201
0+50 1+50 2+50 3+50 4+50 5+50 6+50 7+50 8+500+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00
NORTH WALL
SOUTH WALL
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-CONS.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
C
C
5.00'
2.00'
5.00'
PROPOSED
NORTH STRIP
PROPOSED
SOUTH STRIP
30.00'
PAVEMENT
OVERRUN
AREA
T
SG6N0.0, SG6N1.5, SG6N3.0
POT3-N
LVDT1-NW LVDT2-NE
JDG6N
ECS6-N
T0N, T1N, T2N, T3N
LVDT2-SELVDT1-SW
JDG6S
ECS6-S
POT3-S
JDG1S
JDG1N
T T0S, T1S, T2S, T3S, T4S, T5S, T6S
SG6S0.0, SG6S1.5, SG6S3.0, SG6S4.5, SG6S6.0
SG4.8N3.0
EG5.2N0.5
SG4.8S6.0
SG3.5N3.0
SG3.5S6.0
SG2.3N3.0
SG2.3S6.0
EG1.8S0.5, EG1.8S3.0
SG1N0.0, SG1N1.5, SG1N3.0
SG1S0.0, SG1S1.5, SG1S3.0, SG1S4.5, SG1S6.0
REFLECTIVE CRACKING DAQ CABINET
EG4.3N1.5
EG3.5N0.5
EG2.6N1.5
EG1.8N0.5
EG2.6S1.5
EG3.5S0.5, EG3.5S3.0
EG4.3S1.5
EG5.2S0.5, EG5.2S3.0
6"
NORTH STRIP SOUTH STRIPP-401
EXISTING TEST AREA UNDERLAY
3"
T6S
T5S
T4S
T3S
T2S
T1S
T0SSG1S0.0
SG1S1.5
SG1S3.0
SG1S4.5
SG1S6.0
SG2.3S6.0 SG3.5S6.0 SG4.8S6.0
SG6S0.0
SG6S1.5
SG6S3.0
SG6S4.5
SG6S6.0
EG1.8S0.5 EG3.5S0.5
EG5.2S0.5
EG4.3S1.5EG2.6S1.5
EG5.2S3.0
EG3.5S3.0EG1.8S3.0
SG1N0.0
SG1N1.5
SG1N3.0SG2.3N3.0SG3.5N3.0SG4.8N3.0
SG6N0.0
SG6N1.5
SG6N3.0
EG1.8N0.5EG3.5N0.5
EG5.2N0.5
EG4.3N1.5 EG2.6N1.5
T3N
T2N
T1N
T0N
POT3-SPOT3-N
LVDT2-SE, LVDT2-SELVDT1-NE, LVDT1-NW
JDG1SJDG1NJDG6N JDG6S
ECS6-S
ECS6-N
T
T
T
T
T
T
T
T
T
T
T
INSTRUMENT KEY
JDG JOINT DISPLACEMENT GAUGE T TERMOCOUPLE
SG SURFACE STRAIN GAUGE EG EMBEDDED STRAIN GAUGE
POT POTENTIOMETER LVDT LINEAR VARIABLE TRANSDUCER
ECS EDDY CURRENT SENSOR
T
NOTE:
SG = SURFACE STRAIN GAUGE
EG = EMBEDDED STRAIN GAUGE
T = THERMOCOUPLE
POT = POTENTIOMETER
LVDT = LINEAR VARIABLE DISPLACEMENT
TRANSDUCER
JDG = JOINT DISPLACEMENT GAUGE
ECS = EDDY CURRENT SENSOR
PLAN VIEW
SCALE: 1"=3'
SECTION C-C
HORIZONTAL SCALE: 1"=3'
VERTICAL SCALE: 1"=0.3'
N
LEGEND:
SHEET OF
INSTRUMENTATION PLAN AND PROFILE
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
Q-201
0+50 1+50 2+50 3+50 4+50 5+50 6+50 7+50 8+500+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00
NORTH WALL
SOUTH WALL
EXISTING INSTRUMENTATION
SENSOR ID SENSOR LOCATION SENSOR TYPE X STA, FT Y OFFSET, FT ELEVATION, FT DEPTH FROM SURFACE, IN STATUS
POT1-N NORTH POTENTIOMETER 8+76.07 -16.44 57.42 4.88 N/WORKING
POT2-N NORTH POTENTIOMETER 8+76.07 -18.94 57.42 4.88 N/WORKING
POT3-N NORTH POTENTIOMETER 8+76.07 -20.44 57.42 4.88 WORKING
LVDT1-NW NORTHWEST DISPLACEMENT 8+61.07 -22.44 57.41 8.00 WORKING
LVDT2-NE NORTHEAST DISPLACEMENT 8+91.07 -22.44 57.41 8.00 WORKING
JDG1N NORTH JOINT DISPLACEMENT GAUGE 8+76.07 -16.44 57.58 3.00 TBD
JDG6N NORTH JOINT DISPLACEMENT GAUGE 8+76.07 -21.44 57.58 3.00 TBD
ECS6-N NORTH DISPLACEMENT MEASUREMENT 8+76.07 -21.44 57.58 3.00 TBD
POT1-S SOUTH POTENTIOMETER 8+76.07 -14.44 57.42 7.88 N/WORKING
POT2-S SOUTH POTENTIOMETER 8+76.07 -11.94 57.42 7.88 N/WORKING
POT3-S SOUTH POTENTIOMETER 8+76.07 -10.44 57.42 7.88 WORKING
LVDT1-SW SOUTHWEST DISPLACEMENT 8+61.07 -8.44 57.41 8.00 WORKING
LVDT2-SE SOUTHEAST DISPLACEMENT 8+91.07 -8.44 57.41 8.00 WORKING
JDG1S SOUTH JOINT DISPLACEMENT GAUGE 8+76.07 -14.44 57.58 6.00 TBD
JDG6S SOUTH JOINT DISPLACEMENT GAUGE 8+76.07 -9.44 57.58 6.00 TBD
ECS6-S SOUTH DISPLACEMENT MEASUREMENT 8+76.07 -9.44 57.58 6.00 TBD
NEW INSTRUMENTATION
SENSOR ID SENSOR LOCATION SENSOR TYPE X STA, FT Y OFFSET, FT ELEVATION, FT DEPTH FROM SURFACE, IN
SG1N0.0 NORTH SURFACE STRAIN GAUGE 8+76.07 -16.44 57.60 3.00
SG1N1.5 NORTH SURFACE STRAIN GAUGE 8+76.07 -16.44 57.71 1.50
SG1N3.0 NORTH SURFACE STRAIN GAUGE 8+76.07 -16.44 57.83 0.00
SG2.3N3.0 NORTH SURFACE STRAIN GAUGE 8+76.07 -17.69 57.83 0.00
SG3.5N3.0 NORTH SURFACE STRAIN GAUGE 8+76.07 -18.94 57.83 0.00
SG4.8N3.0 NORTH SURFACE STRAIN GAUGE 8+76.07 -20.19 57.83 0.00
SG6N0.0 NORTH SURFACE STRAIN GAUGE 8+76.07 -21.44 57.60 3.00
SG6N1.5 NORTH SURFACE STRAIN GAUGE 8+76.07 -21.44 57.71 1.50
SG6N3.0 NORTH SURFACE STRAIN GAUGE 8+76.07 -21.44 57.83 0.00
EG1.8N0.5 NORTH EMBEDDED STRAIN GAUGE 8+76.07 -16.27 57.62 2.50
EG2.6N1.5 NORTH EMBEDDED STRAIN GAUGE 8+76.07 -17.11 57.71 1.50
EG3.5N0.5 NORTH EMBEDDED STRAIN GAUGE 8+76.07 -17.94 57.62 2.50
EG4.3N1.5 NORTH EMBEDDED STRAIN GAUGE 8+76.07 -18.77 57.71 1.50
EG5.2N0.5 NORTH EMBEDDED STRAIN GAUGE 8+76.07 -19.61 57.62 2.50
T0N NORTH THERMOCOUPLE 8+77.07 -20.44 57.58 3.00
T1N NORTH THERMOCOUPLE 8+77.07 -20.44 57.66 2.00
T2N NORTH THERMOCOUPLE 8+77.07 -20.44 57.75 1.00
T3N NORTH THERMOCOUPLE 8+77.07 -20.44 57.83 0.00
SG1S0.0 SOUTH SURFACE STRAIN GAUGE 8+76.07 -14.44 57.60 6.00
SG1S1.5 SOUTH SURFACE STRAIN GAUGE 8+76.07 -14.44 57.71 4.50
SG1S3.0 SOUTH SURFACE STRAIN GAUGE 8+76.07 -14.44 57.83 3.00
SG1S4.5 SOUTH SURFACE STRAIN GAUGE 8+76.07 -14.44 57.96 1.50
SG1S6.0 SOUTH SURFACE STRAIN GAUGE 8+76.07 -14.44 58.08 0.00
SG2.3S6.0 SOUTH SURFACE STRAIN GAUGE 8+76.07 -13.19 58.08 0.00
SG3.5S6.0 SOUTH SURFACE STRAIN GAUGE 8+76.07 -11.94 58.08 0.00
SG4.8S6.0 SOUTH SURFACE STRAIN GAUGE 8+76.07 -10.69 58.08 0.00
SG6S0.0 SOUTH SURFACE STRAIN GAUGE 8+76.07 -9.44 57.60 6.00
SG6S1.5 SOUTH SURFACE STRAIN GAUGE 8+76.07 -9.44 57.71 4.50
SG6S3.0 SOUTH SURFACE STRAIN GAUGE 8+76.07 -9.44 57.83 3.00
SG6S4.5 SOUTH SURFACE STRAIN GAUGE 8+76.07 -9.44 57.96 1.50
SG6S6.0 SOUTH SURFACE STRAIN GAUGE 8+76.07 -9.44 58.08 0.00
EG1.8S0.5 SOUTH EMBEDDED STRAIN GAUGE 8+76.07 -14.61 57.62 5.50
EG2.6S1.5 SOUTH EMBEDDED STRAIN GAUGE 8+76.07 -13.77 57.71 4.50
EG1.8S3.0 SOUTH EMBEDDED STRAIN GAUGE 8+76.07 -14.61 57.83 3.00
EG3.5S0.5 SOUTH EMBEDDED STRAIN GAUGE 8+76.07 -12.94 57.62 5.50
EG4.3S1.5 SOUTH EMBEDDED STRAIN GAUGE 8+76.07 -12.11 57.71 4.50
EG3.5S3.0 SOUTH EMBEDDED STRAIN GAUGE 8+76.07 -12.94 57.83 3.00
EG5.2S0.5 SOUTH EMBEDDED STRAIN GAUGE 8+76.07 -11.27 57.62 5.50
EG5.2S3.0 SOUTH EMBEDDED STRAIN GAUGE 8+76.07 -11.27 57.83 3.00
T0S SOUTH THERMOCOUPLE 8+77.07 -10.44 57.58 6.00
T1S SOUTH THERMOCOUPLE 8+77.07 -10.44 57.66 5.00
T2S SOUTH THERMOCOUPLE 8+77.07 -10.44 57.75 4.00
T3S SOUTH THERMOCOUPLE 8+77.07 -10.44 57.83 3.00
T4S SOUTH THERMOCOUPLE 8+77.07 -10.44 57.91 2.00
T5S SOUTH THERMOCOUPLE 8+77.07 -10.44 58.00 1.00
T6S SOUTH THERMOCOUPLE 8+77.07 -10.44 58.08 0.00
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-INST.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
LEGEND:
ETHERNET CABLE
PHYSICAL ENCLOSURE
REFLECTIVE CRACK DAQ
NI CHASSIS
CONTROL ROOM
DAQ
COMPUTER
NETWORK
SWITCH
NI9235 X 8
NI9237 X 3
NI EXPANSION
NI9235 X 1
NI9214 X 1
NI9239 X 3
NETWORK
SWITCH
HMA-NORTH
POT (X3)
JDG (X2)
SG (X9)
EG (X6)
T (X4)
ECS (X1)
LVDT (X2)
HMA-SOUTH
POT (X3)
JDG (X2)
SG (X13)
EG (X9)
T (X7)
ECS (X1)
LVDT (X2)
MODULE INPUT CHANNELS
NI9214 TEMPERATURE 16
NI9235 QUARTER BRIDGE 8
NI9237 FULL BRIDGE 4
NI9239 ANALOG 4
NOTE:
SG = SURFACE STRAIN GAUGE
EG = EMBEDDED STRAIN GAUGE
T = THERMOCOUPLE
POT = POTENTIOMETER
LVDT = LINEAR VARIABLE DISPLACEMENT
TRANSDUCER
JDG = JOINT DISPLACEMENT GAUGE
ECS = EDDY CURRENT SENSOR
SHEET OF
INSTRUMENTATION ONE-LINE DIAGRAM
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
Q-601
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-INST.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
SHEET OF
INSTRUMENTATION WIRING SCHEDULE
CRIO 9035 CHASSIS
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
Q-602
TEST
STRIP SENSOR
WIRE
COLOR TERMINAL BLOCK (TEST STRIP)
TRUNK
LINE
WIRE
COLOR TERMINAL BLOCK (DAQ)
WIRE
COLOR CHANNEL PIN LABEL MODULE
SOUTH
EG2S0.0
BLK
P1
A A
J1
#1 SOUTH
WHT/BLK
P1
A A
J1
RD
1 EX0
BLU B B WHT/BRN B B GRN 2 AI0
BRN C C BLK C C WHT 3 RC0
EG2S1.5
BLK D D WHT/RD D D RD
13 EX1
BLU E E BRN E E GRN 14 AI1
BRN F F RD F F WHT 15 RC1
EG2S3.0
BLK G G WHT/ORG G G RD
4 EX2
BLU H H WHT/YEL H H GRN 5 AI2
BRN J J ORG J J WHT 6 RC2
EG3S0.0
BLK K K WHT/GRN K K RD
16 EX3
BLU L L YEL L L GRN 17 AI3
BRN M M GRN M M WHT 18 RC3
EG3S1.5
BLK N N WHT/BLU N N RD
7 EX4
BLU P P WHT/VIO P P GRN 8 AI4
BRN R R BLU R R WHT 9 RC4
EG3S3.0
BLK S S WHT/GRY S S RD
19 EX5
BLU T T VIO T T GRN 20 AI5
BRN U U GRY U U WHT 21 RC5
EG4S0.0
BLK V V WHT/BLK V V RD
10 EX6
BLU W W WHT/PNK W W GRN 11 AI6
BRN X X WHT X X WHT 12 RC6
EG4S1.5
BLK Y Y WHT/TAN Y Y RD
22 EX7
BLU Z Z PNK Z Z GRN 23 AI7
BRN a a TAN a a WHT 24 RC7
ALL
SHIELDS SH SH SH SH SH
EG4S3.0
BLK b b
#2 SOUTH
WHT/BLK b b RD
1 EX0
BLU c c WHT/BRN c c GRN 2 AI0 BRN d d BLK d d WHT 3 RC0
SG1S0.0
BLU STRIPE e e WHT/RD e e RD
13 EX1
MIDDLE f f BRN f f GRN 14 AI1 END g g RD g g WHT 15 RC1
SG1S1.5
BLU STRIPE h h WHT/ORG h h RD
4 EX2
MIDDLE i i WHT/YEL i i GRN 5 AI2 END j j ORG j j WHT 6 RC2
SG1S3.0
BLU STRIPE k k WHT/GRN k k RD
16 EX3
MIDDLE m m YEL m m GRN 17 AI3 END n n GRN n n WHT 18 RC3
SG1S4.5
BLU STRIPE p p WHT/BLU p p RD
7 EX4
MIDDLE q q WHT/VIO q q GRN 8 AI4 END r r BLU r r WHT 9 RC4
SG1S6.0
BLU STRIPE s s WHT/GRY s s RD
19 EX5
MIDDLE t t VIO t t GRN 20 AI5 END u u GRY u u WHT 21 RC5
SG2S6.0
BLU STRIPE v v WHT/BLK v v RD
10 EX6
MIDDLE w w WHT/PNK w w GRN 11 AI6 END x x WHT x x WHT 12 RC6
SG3S6.0
BLU STRIPE y y WHT/TAN y y RD
22 EX7
MIDDLE z z PNK z z GRN 23 AI7
END AA AA TAN AA AA WHT 24 RC7
ALL
SHIELDS SH SH SH SH SH
TEST
STRIP SENSOR
WIRE
COLOR TERMINAL BLOCK (TEST STRIP)
TRUNK
LINE
WIRE
COLOR TERMINAL BLOCK (DAQ)
WIRE
COLOR CHANNEL PIN LABEL MODULE
SOUTH
SG4S6.0
BLU STRIPE
P2
A A
J2
#3 SOUTH
WHT/BLK
P2
A A
J2
RD
1 EX0
MIDDLE B B WHT/BRN B B GRN 2 AI0
END C C BLK C C WHT 3 RC0
SG5S0.0
BLU STRIPE D D WHT/RD D D RD
13 EX1
MIDDLE E E BRN E E GRN 14 AI1
END F F RD F F WHT 15 RC1
SG5S1.5
BLU STRIPE G G WHT/ORG G G RD
4 EX2
MIDDLE H H WHT/YEL H H GRN 5 AI2
END J J ORG J J WHT 6 RC2
SG5S3.0
BLU STRIPE K K WHT/GRN K K RD
16 EX3
MIDDLE L L YEL L L GRN 17 AI3
END M M GRN M M WHT 18 RC3
SG5S4.5
BLU STRIPE N N WHT/BLU N N RD
7 EX4
MIDDLE P P WHT/VIO P P GRN 8 AI4
END R R BLU R R WHT 9 RC4
SG5S6.0
BLU STRIPE S S WHT/GRY S S RD
19 EX5
MIDDLE T T VIO T T GRN 20 AI5
END U U GRY U U WHT 21 RC5
TBD1
V V WHT/BLK V V RD
10 EX6
W W WHT/PNK W W GRN 11 AI6
X X WHT X X WHT 12 RC6
TBD2
Y Y WHT/TAN Y Y RD
22 EX7
Z Z PNK Z Z GRN 23 AI7
a a TAN a a WHT 24 RC7
ALL
SHIELDS SH SH SH SH SH
TBD3
b b
#4 SOUTH
WHT/BLK b b RD
1 EX0
c c WHT/BRN c c GRN 2 AI0 d d BLK d d WHT 3 RC0
TBD4
e e WHT/RD e e RD
13 EX1
f f BRN f f GRN 14 AI1 g g RD g g WHT 15 RC1
TBD5
h h WHT/ORG h h RD
4 EX2
i i WHT/YEL i i GRN 5 AI2 j j ORG j j WHT 6 RC2
TBD6
k k WHT/GRN k k RD
16 EX3
m m YEL m m GRN 17 AI3 n n GRN n n WHT 18 RC3
TBD7
p p WHT/BLU p p RD
7 EX4
q q WHT/VIO q q GRN 8 AI4 r r BLU r r WHT 9 RC4
TBD8
s s WHT/GRY s s RD
19 EX5
t t VIO t t GRN 20 AI5 u u GRY u u WHT 21 RC5
TBD9
v v WHT/BLK v v RD
10 EX6
w w WHT/PNK w w GRN 11 AI6 x x WHT x x WHT 12 RC6
TBD10
y y WHT/TAN y y RD
22 EX7
z z PNK z z GRN 23 AI7
AA AA TAN AA AA WHT 24 RC7
ALL
SHIELDS SH SH SH SH SH
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-INST.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
SHEET OF
INSTRUMENTATION WIRING SCHEDULE
CRIO 9035 CHASSIS
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
Q-603
TEST STRIP SENSOR WIRE COLOR TERMINAL BLOCK (TEST STRIP) TRUNK LINE WIRE COLOR TERMINAL BLOCK
(DAQ) WIRE COLOR CHANNEL PIN LABEL MODULE
SOUTH
TBD12
P3
A A
J3 #5 SOUTH
WHT/BLK
P3
A A
J3
RD
1 EX0
B B WHT/BRN B B GRN 2 AI0
C C BLK C C WHT 3 RC0
TBD13
D D WHT/RD D D RD
13 EX1
E E BRN E E GRN 14 AI1
F F RD F F WHT 15 RC1
TBD14
G G WHT/ORG G G RD
4 EX2
H H WHT/YEL H H GRN 5 AI2
J J ORG J J WHT 6 RC2
TBD15
K K WHT/GRN K K RD
16 EX3
L L YEL L L GRN 17 AI3
M M GRN M M WHT 18 RC3
TBD16
N N WHT/BLU N N RD
7 EX4
P P WHT/VIO P P GRN 8 AI4
R R BLU R R WHT 9 RC4
TBD17
S S WHT/GRY S S RD
19 EX5
T T VIO T T GRN 20 AI5
U U GRY U U WHT 21 RC5
TBD18
V V WHT/BLK V V RD
10 EX6
W W WHT/PNK W W GRN 11 AI6
X X WHT X X WHT 12 RC6
TBD19
Y Y WHT/TAN Y Y RD
22 EX7
Z Z PNK Z Z GRN 23 AI7
a a TAN a a WHT 24 RC7
ALL SHIELDS SH SH SH SH SH
NORTH
EG1.8N0.5
BLK
P4
A A
J4 #11 NORTH
WHT/BLK
P4
A A
J4
RD
1 EX0
BLU B B WHT/BRN B B GRN 2 AI0
BRN C C BLK C C WHT 3 RC0
EG2.6N1.5
BLK D D WHT/RD D D RD
13 EX1
BLU E E BRN E E GRN 14 AI1
BRN F F RD F F WHT 15 RC1
EG3.5N0.5
BLK G G WHT/ORG G G RD
4 EX2
BLU H H WHT/YEL H H GRN 5 AI2
BRN J J ORG J J WHT 6 RC2
EG4.3N1.5
BLK K K WHT/GRN K K RD
16 EX3
BLU L L YEL L L GRN 17 AI3
BRN M M GRN M M WHT 18 RC3
EG5.2N0.5
BLK N N WHT/BLU N N RD
7 EX4
BLU P P WHT/VIO P P GRN 8 AI4
BRN R R BLU R R WHT 9 RC4
SG1N0.0
BLU STRIPE S S WHT/GRY S S RD
19 EX5
GRY-MIDDLE T T VIO T T GRN 20 AI5
GRY-END U U GRY U U WHT 21 RC5
SG1N1.5
BLU STRIPE V V WHT/BLK V V RD
10 EX6
GRY-MIDDLE W W WHT/PNK W W GRN 11 AI6
GRY-END X X WHT X X WHT 12 RC6
SG1N3.0
BLU STRIPE Y Y WHT/TAN Y Y RD
22 EX7
GRY-MIDDLE Z Z PNK Z Z GRN 23 AI7
GRY-END a a TAN a a WHT 24 RC7
ALL SHIELDS SH SH SH SH SH
TEST STRIP SENSOR WIRE COLOR TERMINAL BLOCK (TEST STRIP) TRUNK LINE WIRE COLOR TERMINAL BLOCK
(DAQ) WIRE COLOR CHANNEL PIN LABEL MODULE
NORTH
SG2.3N3.0
BLU STRIPE
P4 b b
J4 #12 NORTH
WHT/BLK
P4 b b
J4
RD
1 EX0
GRY-MIDDLE c c WHT/BRN c c GRN 2 AI0 GRY-END d d BLK d d WHT 3 RC0
SG3.5N3.0
BLU STRIPE e e WHT/RD e e RD
13 EX1
GRY-MIDDLE f f BRN f f GRN 14 AI1 GRY-END g g RD g g WHT 15 RC1
SG4.8N3.0
BLU STRIPE h h WHT/ORG h h RD
4 EX2
GRY-MIDDLE i i WHT/YEL i i GRN 5 AI2 GRY-END j j ORG j j WHT 6 RC2
SG6N0.0
BLU STRIPE k k WHT/GRN k k RD
16 EX3
GRY-MIDDLE m m YEL m m GRN 17 AI3 GRY-END n n GRN n n WHT 18 RC3
SG6N1.5
BLU STRIPE p p WHT/BLU p p RD
7 EX4
GRY-MIDDLE q q WHT/VIO q q GRN 8 AI4 GRY-END r r BLU r r WHT 9 RC4
SG6N3.0
BLU STRIPE s s WHT/GRY s s RD
19 EX5
GRY-MIDDLE t t VIO t t GRN 20 AI5 GRY-END u u GRY u u WHT 21 RC5
TBD1
v v WHT/BLK v v RD
10 EX6
w w WHT/PNK w w GRN 11 AI6 x x WHT x x WHT 12 RC6
TBD2
y y WHT/TAN y y RD
22 EX7
z z PNK z z GRN 23 AI7
AA AA TAN AA AA WHT 24 RC7
ALL SHIELDS SH SH SH SH SH
NORTH
TBD3
P5
A A
J5 #13 NORTH
WHT/BLK
P5
A A
J5
RD
1 EX0
B B WHT/BRN B B GRN 2 AI0
C C BLK C C WHT 3 RC0
TBD4
D D WHT/RD D D RD
13 EX1
E E BRN E E GRN 14 AI1
F F RD F F WHT 15 RC1
TBD5
G G WHT/ORG G G RD
4 EX2
H H WHT/YEL H H GRN 5 AI2
J J ORG J J WHT 6 RC2
TBD6
K K WHT/GRN K K RD
16 EX3
L L YEL L L GRN 17 AI3
M M GRN M M WHT 18 RC3
TBD7
N N WHT/BLU N N RD
7 EX4
P P WHT/VIO P P GRN 8 AI4
R R BLU R R WHT 9 RC4
TBD8
S S WHT/GRY S S RD
19 EX5
T T VIO T T GRN 20 AI5
U U GRY U U WHT 21 RC5
TBD9
V V WHT/BLK V V RD
10 EX6
W W WHT/PNK W W GRN 11 AI6
X X WHT X X WHT 12 RC6
TBD10
Y Y WHT/TAN Y Y RD
22 EX7
Z Z PNK Z Z GRN 23 AI7
a a TAN a a WHT 24 RC7
ALL SHIELDS SH SH SH SH SH
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-INST.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
TEST
STRIP SENSOR WIRE
COLOR TERMINAL BLOCK (TEST STRIP) TRUNK
LINE
WIRE
COLOR
TERMINAL BLOCK
(DAQ)
WIRE
COLOR CHANNEL PIN LABEL MODULE
NORTH
LVDT1-NW
RD
P6
A A
J6
#15 NORTH
BLK
P6
A A
J6
RD
EXC0+
GRN B B BRN B B GRN AI0+
BLK C C WHT/BLK C C BLK EX0-
WHT D D WHT/BRN D D WHT AI0-
RD E E RD E E BLU RS0+
BLK F F WHT/RD F F BRN RS0-
LVDT2-NE
RD G G ORG G G RD
EXC1+
GRN H H YEL H H GRN AI1+
BLK J J WHT/ORG J J BLK EX1-
WHT K K WHT/YEL K K WHT AI1-
RD L L GRN L L BLU RS1+
BLK M M WHT/GRN M M BRN RS1-
JDG1N
RD N N BLU N N RD
EXC2+
GRN P P VIO P P GRN AI2+
BLK R R WHT/BLU R R BLK EX2-
WHT S S WHT/VIO S S WHT AI2-
RD T T GRY T T BLU RS2+
BLK U U WHT/GRY U U BRN RS2-
JDG6N
RD V V WHT V V RD
EXC3+
GRN W W PNK W W GRN AI3+
BLK X X WHT/BLK X X BLK EX3-
WHT Y Y WHT/PNK Y Y WHT AI3-
RD Z Z TAN Z Z BLU RS3+
BLK a a WHT/TAN a a BRN RS3-
ALL
SHIELDS SH SH SH SH SH
SOUTH
TBD 1-S
RD b b
#7 SOUTH
BLK b b RD
EXC0+
GRN c c BRN c c GRN AI0+ BLK d d WHT/BLK d d BLK EX0- WHT e e WHT/BRN e e WHT AI0- RD f f RD f f BLU RS0+ BLK g g WHT/RD g g BRN RS0-
TBD 2-S
RD h h ORG h h RD
EXC1+
GRN i i YEL i i GRN AI1+ BLK j j WHT/ORG j j BLK EX1- WHT k k WHT/YEL k k WHT AI1- RD m m GRN m m BLU RS1+ BLK n n WHT/GRN n n BRN RS1-
ALL
SHIELDS SH SH SH SH SH
NORTH
TBD 1-N
RD
P7 p p
J7 #16 NORTH
BLU
P7 p p
J7
RD
EXC2+
GRN q q VIO q q GRN AI2+ BLK r r WHT/BLU r r BLK EX2- WHT s s WHT/VIO s s WHT AI2- RD t t GRY t t BLU RS2+ BLK u u WHT/GRY u u BRN RS2-
NO SENSOR
CONNECTION
RD v v WHT v v RD
EXC3+
GRN w w PNK w w GRN AI3+ BLK x x WHT/BLK x x BLK EX3- WHT y y WHT/PNK y y WHT AI3- RD z z TAN z z BLU RS3+
BLK AA AA WHT/TAN AA AA BRN RS3-
ALL
SHIELDS SH SH SH SH SH
TEST
STRIP SENSOR WIRE
COLOR TERMINAL BLOCK (TEST STRIP) TRUNK
LINE
WIRE
COLOR
TERMINAL BLOCK
(DAQ)
WIRE
COLOR CHANNEL PIN LABEL MODULE
NORTH
TBD7
P5 b b
J5 #14 NORTH
WHT/BLK
P5 b b
J5
RD
1 EX0
c c WHT/BRN c c GRN 2 AI0 d d BLK d d WHT 3 RC0
TBD8
e e WHT/RD e e RD
13 EX1
f f BRN f f GRN 14 AI1 g g RD g g WHT 15 RC1
TBD9
h h WHT/ORG h h RD
4 EX2
i i WHT/YEL i i GRN 5 AI2 j j ORG j j WHT 6 RC2
TBD10
k k WHT/GRN k k RD
16 EX3
m m YEL m m GRN 17 AI3 n n GRN n n WHT 18 RC3
TBD11
p p WHT/BLU p p RD
7 EX4
q q WHT/VIO q q GRN 8 AI4 r r BLU r r WHT 9 RC4
TBD12
s s WHT/GRY s s RD
19 EX5
t t VIO t t GRN 20 AI5 u u GRY u u WHT 21 RC5
TBD13
v v WHT/BLK v v RD
10 EX6
w w WHT/PNK w w GRN 11 AI6 x x WHT x x WHT 12 RC6
TBD14
y y WHT/TAN y y RD
22 EX7
z z PNK z z GRN 23 AI7
AA AA TAN AA AA WHT 24 RC7
ALL
SHIELDS SH SH SH SH SH
SOUTH
LVDT1-SW
RD
P6
A A
J6 #6 SOUTH
BLK
P6
A A
J6
RD
EXC0+
GRN B B BRN B B GRN AI0+
BLK C C WHT/BLK C C BLK EX0-
WHT D D WHT/BRN D D WHT AI0-
RD E E RD E E BLU RS0+
BLK F F WHT/RD F F BRN RS0-
LVDT2-SE
RD G G ORG G G RD
EXC1+
GRN H H YEL H H GRN AI1+
BLK J J WHT/ORG J J BLK EX1-
WHT K K WHT/YEL K K WHT AI1-
RD L L GRN L L BLU RS1+
BLK M M WHT/GRN M M BRN RS1-
JDG1S
RD N N BLU N N RD
EXC2+
GRN P P VIO P P GRN AI2+
BLK R R WHT/BLU R R BLK EX2-
WHT S S WHT/VIO S S WHT AI2-
RD T T GRY T T BLU RS2+
BLK U U WHT/GRY U U BRN RS2-
JDG6S
RD V V WHT V V RD
EXC3+
GRN W W PNK W W GRN AI3+
BLK X X WHT/BLK X X BLK EX3-
WHT Y Y WHT/PNK Y Y WHT AI3-
RD Z Z TAN Z Z BLU RS3+
BLK a a WHT/TAN a a BRN RS3-
ALL
SHIELDS SH SH SH SH SH
SHEET OF
INSTRUMENTATION WIRING SCHEDULE
NI 9149 EXPANSION
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
Q-604
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-INST.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
TEST
STRIP SENSOR
WIRE
COLOR TERMINAL BLOCK (TEST STRIP)
TRUNK
LINE
WIRE
COLOR
TERMINAL BLOCK
(DAQ)
WIRE
COLOR CHANNEL PIN LABEL MODULE
SOUTH
POT1-S
RD
P8
A A
J8 #8 SOUTH
BLK
P8
A A
J8
RD
12VDC
BLK B B WHT/BLK B B BLK
DC
GND
ORG C C BRN C C GRN AI0+
BLK D D WHT/BRN D D WHT AI0-
POT2-S
RD E E RD E E RD
12VDC
BLK F F WHT/RD F F BLK
DC
GND
ORG G G ORG G G GRN AI1+
BLK H H WHT/ORG H H WHT AI1-
POT3-S
RD J J YEL J J RD
12VDC
BLK K K WHT/YEL K K BLK
DC
GND
ORG L L GRN L L GRN AI2+
BLK M M WHT/GRN M M WHT AI2-
TBD1-S
RD N N BLU N N RD
12VDC
BLK P P WHT/BLU P P BLK
DC
GND
GRN R R VIO R R GRN AI3+
WHT S S WHT/VIO S S WHT AI3-
ALL
SHIELDS SH SH SH SH SH
NORTH
POT1-N
RD
P9
A A
J9 #17 NORTH
BLK
P9
A A
J9
RD
12VDC
BLK B B WHT/BLK B B BLK
DC
GND
ORG C C BRN C C GRN AI0+
BLK D D WHT/BRN D D WHT AI0-
POT2-N
RD E E RD E E RD
12VDC
BLK F F WHT/RD F F BLK
DC
GND
ORG G G ORG G G GRN AI1+
BLK H H WHT/ORG H H WHT AI1-
POT3-N
RD J J YEL J J RD
12VDC
BLK K K WHT/YEL K K BLK
DC
GND
ORG L L GRN L L GRN AI2+
BLK M M WHT/GRN M M WHT AI2-
TBD1-N
RD N N BLU N N RD
12VDC
BLK P P WHT/BLU P P BLK
DC
GND
GRN R R VIO R R GRN AI3+
WHT S S WHT/VIO S S WHT AI3-
ALL
SHIELDS SH SH SH SH SH
SOUTH
LC-S
BRN
P8
T T
J8 #8 SOUTH
GRY
P8
T T
J8
RD
12VDC
BLU U U WHT/GRY U U BLK
DC
GND
WHT V V WHT V V GRN AI0+
BLU W W WHT/BLK W W WHT AI0-
ECS6-S
BRN X X PNK X X RD
12VDC
BLU Y Y WHT/PNK Y Y BLK
DC
GND
WHT Z Z TAN Z Z GRN AI1+
BLU a a WHT/TAN a a WHT AI1-
ALL
SHIELDS SH SH SH SH SH
NORTH
LC-N
BRN
P9
T T
J9 #17 NORTH
GRY
P9
T T
J9
RD
12VDC
BLU U U WHT/GRY U U BLK
DC
GND
WHT V V WHT V V GRN AI2+
BLU W W WHT/BLK W W WHT AI2-
ECS6-N
BRN X X PNK X X RD
12VDC
BLU Y Y WHT/PNK Y Y BLK
DC
GND
WHT Z Z TAN Z Z GRN AI3+
BLU a a WHT/TAN a a WHT AI3-
ALL
SHIELDS SH SH SH SH SH
TEST
STRIP SENSOR
WIRE
COLOR TERMINAL BLOCK (TEST STRIP)
TRUNK
LINE
WIRE
COLOR
TERMINAL BLOCK
(DAQ)
WIRE
COLOR CHANNEL PIN LABEL MODULE
SOUTH
T0S
P12
1 1
J12 #9 SOUTH
BLU
P12
1 1
J12
TC0+
2 2 RD 2 2 TC0-
T1S
3 3 BLU 3 3
TC1+
4 4 RD 4 4 TC1-
T2S
5 5 BLU 5 5
TC2+
6 6 RD 6 6 TC2-
T3S
7 7 BLU 7 7
TC3+
8 8 RD 8 8 TC3-
T4S
9 9 BLU 9 9
TC4+
10 10 RD 10 10 TC4-
T5S
11 11 BLU 11 11
TC5+
12 12 RD 12 12 TC5-
T6S
13 13 BLU 13 13
TC6+
14 14 RD 14 14 TC6-
TBD1
15 15 BLU 15 15
TC7+
16 16 RD 16 16 TC7-
ALL
SHIELDS SH SH SH SH SH
NORTH
T0N
P13
1 1
J13 #18 NORTH
BLU
P13
1 1
J13
TC0+
2 2 RD 2 2 TC0-
T1N
3 3 BLU 3 3
TC1+
4 4 RD 4 4 TC1-
T2N
5 5 BLU 5 5
TC2+
6 6 RD 6 6 TC2-
T3N
7 7 BLU 7 7
TC3+
8 8 RD 8 8 TC3-
TBD1
9 9 BLU 9 9
TC4+
10 10 RD 10 10 TC4-
TBD2
11 11 BLU 11 11
TC5+
12 12 RD 12 12 TC5-
TBD3
13 13 BLU 13 13
TC6+
14 14 RD 14 14 TC6-
TBD4
15 15 BLU 15 15
TC7+
16 16 RD 16 16 TC7-
ALL
SHIELDS SH SH SH SH SH
SHEET OF
INSTRUMENTATION WIRING SCHEDULE
NI 9149 EXPANSION
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
Q-605
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-INST.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
N.T.S.
A B C
A B C
BLK
WHT/BLK
BRN
RD
GRN
WHT
RD
GRN
WHT
P4 J4
TRUNK LINE
EXC0
AI0
RC0
(CH0)
(CH0)
(CH0)
NI 9235
A B C
BLK A
B C
BLU
BRN
SENSOR LINE
EMBEDDED STRAIN GAUGE
P4 J4
BLK
BLU
BRN
EMBEDDED STRAIN GAUGE
D E F
RD
GRN
WHT
RD
GRN
WHT
EXC1
AI1
RC1
(CH0)
(CH0)
(CH0)
RD
WHT/BRN
WHT/RD
D E F
D E F
D E F
N.T.S.
RD
GRN
WHT
RD
GRN
WHT
P1 J1
(CH0)
(CH0)
(CH0)
NI 9235
b c d
EXC0
AI0
RC0
RD
GRN
WHT
RD
GRN
WHT
(CH0)
(CH0)
(CH0)
3e f g
EXC0
AI0
RC0
BLK
WHT/BLK
BRN
TRUNK LINE
RD
WHT/BRN
WHT/RD
b c d e f g b c d e f g b c d e f g
BLUE
STRIPE
MIDDLE
END
SENSOR LINE
SURFACE STRAIN GAUGE
P1 J1
BLUE
STRIPE
MIDDLE
END
SURFACE STRAIN GAUGE
SHEET OF
INSTRUMENTATION SENSOR DETAIL
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
Q-606
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-INST.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
BRN T
V U
WHT
BLU
WHT/GRY
GRY
RD
GRN
BLK
12 VDC TERMINAL
GRN
DC GROUND
P8 J8
TRUNK LINESENSOR LINE
AI0+
(CH0)
NI 9239
P8 J8
BLU WHT
WHT AI0-
(CH0)
WHT/BLK
BLK
W
T V U
W
T V U
W
T V U
W
1 2 3
ANCHOR PLATE
N.T.S.
EDDY
CURRENT
A B C
RD A
B C
A B C
A B C
GRN
BLK
WHT/BLK
BLK
RD
GRN
BLK
RD
GRN
BLK
P6 J6
TRUNK LINESENSOR LINE
EXC0+
AI0+
EX0-
(CH0)
(CH0)
(CH0)
NI 9237
P6 J6
D E F
WHT
RD
BLK
WHT/RD
RD
WHT
BLU
BRN
WHT
BLU
BRN
AI0-
RS0+
RS0-
(CH0)
(CH0)
(CH0)
WHT/BRN
BRN
D E F
D E F
D E F
OSCILLATION
OUTPUT
INPUT
OUTPUT
LINEAR VARIABLE DISPLACEMENT TRANSDUCER
SHIELD
RD N
P R
GRN
BLK
WHT/BLU
BLU
RD
GRN
BLK
RD
GRN
BLK
P6 J6
TRUNK LINESENSOR LINE
EX2+
AI2+
EX2-
(CH2)
(CH2)
(CH2)
NI 9237
P6 J6
WHT
RD
BLK
WHT/GRY
GRY
WHT
BLU
BRN
WHT
BLU
BRN
AI2-
RS0+
RS0-
WHT/VIO
VIO
S T U
(CH2)
(CH2)
(CH2)
N P R
S T U
N P R
S T U
N P R
S T U
JOINT DISPLACEMENT GAUGE
N.T.S.
N.T.S.
SHEET OF
INSTRUMENTATION SENSOR DETAIL
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
Q-607
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-INST.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
A B C
RD A
B C
A B C
A B C
GRN
BLK
WHT/BLK
BLK
RD
GRN
BLK
12 VDC TERMINAL
GRN
DC GROUND
P8 J8
TRUNK LINESENSOR LINE
AI0+
(CH0)
NI 9239
P8 J8
DWHT WHT
WHT AI0-
(CH0)
WHT/BRN
BRN
D D D
POTENTIOMETER
BLU
RED
TRUNK LINE
8 PAIR CABLE
SENSOR LINE
TC0+
NI 9214
P12 P12
TC0-
2THERMOCOUPLE
P12 P12
N.T.S.
SHEET OF
INSTRUMENTATION SENSOR DETAIL
NAPTF REFLECTIVE CRACKING INDOORS PHASE VII2022-02-15
Q-608
FOR
NO. REVISIONS DATE BY CHK APR
NAME DATE
DRAWN
CHECKED
FILE: REFL-CRACK-PHAVII-INST.DWG SIZE: ANSI D SCALE: AS NOTED
NATIONAL
AIRPORT PAVEMENT
TEST FACILITY
ATLANTIC CITY
AIRPORT
NEW JERSEY 08234
DRAWING NUMBER:
ARA
C.TOMLINSON
APPLIED RESEARCH ASSOCIATES, INC.
2628 FIRE ROAD, SUITE 200
EGG HARBOR TOWNSHIP
NEW JERSEY 08234
PHONE: (609) 380-4240
10% FOR REVIEW 10/13/2021 __ C.T.
30% FOR REVIEW 11/12/2021 __ C.T.
60% FOR REVIEW 12/17/2021 __ C.T.
| 1 REFL-CRACK-PHAVII-GNRL-COVER SHEET |
| Sheets and Views |
| COVER SHEET |
| 2 REFL-CRACK-PHAVII-GNRL-GENERAL NOTES |
| Sheets and Views |
| GENERAL NOTES |
| 3 REFL-CRACK-PHAVII-CONS-TESTING AREA EXISTING CONDITIONS PLAN |
| Sheets and Views |
| TESTING AREA EXISTING CONDITIONS PLAN |
| 4 REFL-CRACK-PHAVII-GNRL-SITE ACCESS HAULING AND STAGING AREA |
| Sheets and Views |
| SITE ACCESS HAULING AND STAGING AREA |
| 5 REFL-CRACK-PHAVII-GNRL-BUILDING PLAN AND SURVEY CONTROL |
| Sheets and Views |
| BUILDING PLAN AND SURVEY CONTROL |
| 6 REFL-CRACK-PHAVII-CONS-DEMOLITION PLAN |
| Sheets and Views |
| DEMOLITION PLAN |
| 7 REFL-CRACK-PHAVII-CONS-TEST ITEM PLAN AND PROFILE |
| Sheets and Views |
| TEST ITEM PLAN AND PROFILE |
| 8 REFL-CRACK-PHAVII-INST-INSTRUMENTATION PLAN AND PROFILE |
| Sheets and Views |
| INSTRUMENTATION PLAN AND PROFILE |
| 9 REFL-CRACK-PHAVII-INST-INSTRUMENTATION ONE-LINE DIAGRAM |
| Sheets and Views |
| INSTRUMENTATION ONE-LINE DIAGRAM |
| 10 REFL-CRACK-PHAVII-INST-INSTRUMENTATION WIRING SCHEDULE cRIO 9035 CHASSIS |
| Sheets and Views |
| INSTRUMENTATION WIRING SCHEDULE cRIO 9035 CHASSIS |
| 11 REFL-CRACK-PHAVII-INST-INSTRUMENTATION WIRING SCHEDULE cRIO 9035 CHASSIS_ |
| Sheets and Views |
| INSTRUMENTATION WIRING SCHEDULE cRIO 9035 CHASSIS_ |
| 12 REFL-CRACK-PHAVII-INST-INSTRUMENTATION WIRING SCHEDULE NI 9149 EXPANSION |
| Sheets and Views |
| INSTRUMENTATION WIRING SCHEDULE NI 9149 EXPANSION |
| 13 REFL-CRACK-PHAVII-INST-INSTRUMENTATION WIRING SCHEDULE NI 9149 EXPANSION_ |
| Sheets and Views |
| INSTRUMENTATION WIRING SCHEDULE NI 9149 EXPANSION_ |
| 14 REFL-CRACK-PHAVII-INST-INSTRUMENTATION SENSOR DETAIL |
| Sheets and Views |
| INSTRUMENTATION SENSOR DETAIL |
| 15 REFL-CRACK-PHAVII-INST-INSTRUMENTATION SENSOR DETAIL_ |
| Sheets and Views |
| INSTRUMENTAION SENSOR DETAIL_ |
| 16 REFL-CRACK-PHAVII-INST-INSTRUMENTATION SENSOR DETAIL__ |
| Sheets and Views |
| INSTRUMENTATION SENSOR DETAIL__ |