Attachment No. 01 Scope of Work_Specifications.pdf
PDF 19 MB Posted
- Attached to
- Boiler and Chiller Replacement at Lame Deer, MT
- Solicitation number
- 75H701-20-R-00060
About this file
This document includes a federal contract opportunity for boiler and chiller replacement services. The Indian Health Service is seeking proposals for a project at the Northern Cheyenne Health Center in Lame Deer, Montana. The project magnitude is between $500,000 and $1,000,000. This is a 100% small business set aside solicitation issued under NAICS code 238220. Proposals are due by November 12, 2020. A non-mandatory site visit will be held. Bidders are instructed to direct any questions to the named contract specialist by email no later than October 29.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00001_Boiler-Chiller Site Visit Agenda and Sign-in.docx | DOCX document | |
| A00001_Pre-Proposal Inquiries.xlsx | XLSX spreadsheet | |
| A00001_Page 108 from NCSU - SOW Boiler-Chiller - FINAL.pdf.docx | DOCX document | |
| Amendment 00001 RFP 75H701-20-R-00060.pdf | ||
| RFP-75H701-20-R-00060.pdf | ||
| Attachment No. 05 Company Specialized Experience Form.docx | DOCX document | |
| Attachment No. 06 Past Performance Questionnaire (PPQ) Form PPQ-0.docx | DOCX document | |
| Attachment No. 02 Plans_Drawings.pdf | ||
| Attachment No. 04 Self-Performed Calculation Sheet.docx | DOCX document | |
| Attachment No. 03 Wage Determination MT20200057 08282020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BI18NC202C6 Scope of Work/Specifications
NCSU Boiler and Chiller Replacement Northern Cheyenne Health Center
Lame Deer, MT
SCOPE OF WORK/SUMMARY 011000
SECTION 011000 - SCOPE OF WORK/SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Work by Owner.
4. Access to site.
5. Coordination with occupants.
6. Work restrictions.
7. Boiler Specifications
1.2 PROJECT INFORMATION
A. Project Identification: NCSU Boiler and Chiller Replacement
1. Project Location: Northern Cheyenne Health Center Lame Deer, Montana
B. Owner: Billings Area Indian Health Service 2900 4th Ave. North Billings, MT 59107
Project Officer: Kayla DeVault Facilities Engineer 406-998-7221
COR: Jerry Smith, PE Director Facilities Management 406-247-7091
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
The work is to include all additional work required for a new complete boiler and chiller system up and running. The scope of work for this project include the following:
• Demolition of existing boiler and chiller system components due to the obsolescence of the existing system. Replacement of existing control unit(s) and system components required for compatibility with the existing Building Automation System (BAS).
• The work is to include all additional work required for a new complete boiler and chiller system up and running. Project to include O&M manuals, as-built and training for staff.
• Development of phased approach for the replacement so the existing systems remain in service until the new systems are installed, tested and operational. Any deviation must be approved prior to commencement of work.
• Shop drawings shall be prepared by the contractor prior to the installing of the systems.
• The contractor will provide adequate heat during the construction by utilizing the existing functioning boilers. All work is to conform to the most recent adopted version of the IBC, IPC, NEC, NFPA, and applicable state, county, and local codes.
• The contractor will install three (3) Condensing Hot Water Supply Boilers, manufactured by Thermal Solutions (models number are indicated on the drawings). The contractor may install an equal boiler, however, the equal must be approved by the COR prior to purchase.
• This project shall provide design/build engineering for the replacement of non-condensing boilers to high-efficiency condensing boilers. The existing chillers shall be replaced with ‘like-kind’ high efficiency chillers.
• Electrical upgrades (if required), tie into existing controls, boiler water treatment, glycol feeders (replace existing) and backflow preventers (if required),
• The boilers and chillers can be installed separately, at different times of the year, in order to maximize heating and cooling. The vendor must have an approved schedule prior to commencement of work.
B. Type of Contract:
1. Project will be constructed under a single prime contract.
1.4 WORK BY OWNER
A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work and operations performed by Owner.
1.5 ACCESS TO SITE
A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform operations and normal business.
B. Use of Site: Limit use of Project site to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine construction operations to area of work.
2. Driveways, Walkways and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances by construction operations.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
1.6 COORDINATION WITH OCCUPANTS
A. Partial Owner Occupancy: Owner will occupy the premises during entire construction period.
Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated.
B. The contractor will provide adequate heat during the construction by utilizing the existing functioning boilers.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction.
2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations.
1.7 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 8:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise indicated or approved by the Project Officer. Afterhours work may be required to minimize disruptions.
1. Weekend Hours: Only with prior approval of Project Officer.
2. Hours for Utility Shutdowns: Only with prior approval of Project Officer.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Obtain Owner's written permission before proceeding with utility interruptions.
D. Nonsmoking Campus: Smoking is not permitted within the building or grounds.
E. Employee Identification: Owner will provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times.
F. Employee Screening: Comply with Owner's requirements for screening of Contractor personnel working on Project site.
1. Maintain list of approved screened personnel with Owner's representative.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SCOPE OF WORK
01 – Basis Of Design
The purpose of the Basis of Design Narrative is to document the reasoning and decisions made during the design phase of a project. The Basis of Design Narrative is the Design Team’s implementation of the Program of Requirements (POR).
Basis of Design Construction Document Issued for Construction
Page | 1
BASIS OF DESIGN
Indian Health Service, Northern Cheyenne Service Unit - Lame Deer, MT NCSU Boiler-Chiller Replacement Design
BASIS OF DESIGN
Project General Description
An independent A/E firm was awarded a contract to design and provide construction documents for the replacement of existing boilers and chillers at the Indian Health Service, Northern Cheyenne Service Unit in Lame Deer, Montana. The task order includes design for the replacement of heating and cooling system components on a one-for-one basis, and if necessary, expansion of additional equipment or devices to the system to meet code requirements.
The scope of work for this project include the following:
Demolition of existing boiler and chiller system components due to the obsolescence of the existing system. Replacement of existing control unit(s) and system components required for compatibility with the existing Building Automation System
(BAS).
Development of phased approach for the replacement so the existing systems remain in service until the new systems are installed, tested and operational.
Development of design documents for bidding purposes. Shop drawings shall be prepared by the construction contractor awarded the project and installing the system.
This project shall provide design engineering for the replacement of non-condensing boilers to high-efficiency condensing boilers. The existing chillers shall be replaced with ‘like-kind’ high efficiency chillers.
Reference Codes and Standards
2016 Indian Health Service - Architect / Engineer Design Guide
International Building Code (IBC)
NFPA 101 Life Safety Code
MECHANICAL Narrative - General Description
The existing boiler and chiller equipment were installed in 1998. After 21 years of service the equipment is reaching the end of its usable life. Under this scope of work the boilers and chillers are to be replaced. The existing boilers consist of two (2) 1,430 MBH input Teledyne Laars and one (1) 3,753 MBH input Weil-McLain conventional boilers. These boilers shall be
Issued for Construction
Page | 2
BASIS OF DESIGN
Indian Health Service, Northern Cheyenne Service Unit - Lame Deer, MT NCSU Boiler-Chiller Replacement Design replaced with 97% high efficiency condensing type boilers. The high efficiency condensing type boilers will require new boiler circulating pumps due to a difference in fluid volumetric flow (GPM) and pressure drop through the new boilers. The existing chillers consist of two (2) packaged air cooled Trane nominal 100-ton cooling units. Each chiller is sized for 50% of the total cooling requirements of the facility. The chillers will be replaced with high efficiency packaged air cooled chillers of like kind. The design will describe replacement of all heating and cooling system components for a fully functional heating and cooling system. The design for the replacement of heating and cooling system components will be on a one-to-one basis.
A complete test & balance (T&B) will be required for the new chillers, boilers and pumps. The design does not include design services for upgrades to any new building spaces in the future.
MECHANICAL - Reference Codes and Guidelines
2015 International Building Code 2015 International Mechanical Code 2015 International Plumbing Code National Fire Protection Code ANSI/ASHRAE Standard 90.1-2016 - Energy Standard for Buildings Except Low Rise
Residential Buildings 2014 FGI Guidelines for Design and Construction of Hospitals and Outpatient Facilities
MECHANICAL – Existing HVAC Systems
The existing HVAC system is comprised of two (2) 100-ton packaged air cooled chillers and three (3) standard efficiency hydronic boilers. Chilled water is distributed by two (2) constant speed pumps located in the mechanical room. The chilled water pumps appear to be the original pumps installed with the chillers over twenty years ago. The chilled water pumps are currently functional but will either have to be refurbished to match the new chiller requirements or replaced with new pumps. The heating water system is a primary and secondary system. Primary boiler circulator pumps provide a constant flow through the boiler and a pair of variable frequency driven (VFD) secondary pumps distribute heating water throughout the facility. The existing primary boilers pumps are matched to the performance requirements of their respective boiler.
MECHANICAL – Control Systems
The existing building is controlled by direct digital controls (DDC). The new equipment will be compatible with the existing building automation system (BAS) and will be integrated by the HVAC controls contractor as part of this scope of work.
Issued for Construction
Page | 3
BASIS OF DESIGN
Indian Health Service, Northern Cheyenne Service Unit - Lame Deer, MT NCSU Boiler-Chiller Replacement Design
ELECTRICAL - General Description
The electrical scope consists of the disconnection from power distribution system and the control system of three existing boiler units and two chiller units, and the reconnection to the new boiler/chiller units that shall replace the existing ones that will be installed in the same corresponding locations.
To that purpose, the existing power and control wiring will be preserved to serve the new units as feasible under the following assumptions:
The power demand of the new equipment is equivalent, or less than the equipment to be replaced, and there will not be any effect upstream of the distribution system (*).
The existing power wiring is in acceptable physical condition and NEC compliant.
The existing control wiring is in acceptable physical condition and NEC compliant.
The existing control wiring is self sufficient to meet the control requirements of the new equipment to be installed, and that no new additional control wiring will be required.
(*) It is anticipated that Boiler #3 will require a different system voltage (480V, 3-Phase), a new branch circuit, new disconnect switch, and a new breaker in Panel MDP. It is also anticipated the new Chillers will require the replacement of existing 200A breakers for new ones (225A) in Panel MDP as per manufacturer’s requirements. The existing overcurrent protection devices (OCPD) of the 10.0 HP chilled water pumps will be oversized for the new
7.5 HP pumps and they need to be replaced.
All new equipment shall be grounded and bonded as per NEC and Local Authority Having Jurisdiction (AHJ) requirements.
ELECTRICAL - Reference Codes and Standards
2017 National Electrical Code (NFPA 70) 2014 FGI Guidelines for Design and Construction of Hospitals and Outpatient Facilities NFPA 99 Health Care Facilities Code NFPA 70E Electrical Safety in the Workplace NFPA 72 National Fire Alarm and Signaling Code NFPA 780 Installation of Lighting Protection Systems
ELECTRICAL - Existing Building Electrical Service
There are no plans to modify the Clinic’s existing electrical service.
02 –Specifications
Mechanical and Electrical
DIVISION 22 PLUMBING
22 0523.12 Ball Valves for Plumbing Piping 22 0529 Hangers and Supports for Plumbing Piping and Equipment 22 0553 Identification for Plumbing Piping and Equipment
DIVISION 23 MECHANICAL
23 0529 Hangers and Supports for HVAC Piping and Equipment 23 0548.13 Vibration Controls for HVAC 23 0553 Identification for HVAC Piping and Equipment 23 0593 Testing, Adjusting, and Balancing for HVAC 23 0800 Mechanical Commissioning Requirements 23 0923 Direct Digital Control (DDC) System For HVAC 23 1126 Facility Liquefied-Petroleum Gas Piping
DIVISION 26 ELECTRICAL
26 0519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260523 CONTROL-VOLTAGE ELECTRICAL POWER CABLES
26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 0529 Hangers And Supports For Electrical Systems 260533 Raceways And Boxes For Electrical Systems 260544 Sleeves And Sleeve Seals For Electrical Raceways And Cabling 260553 Identification For Electrical Systems 262419 Motor-Control Centers 262816 Enclosed Switches And Circuit Breakers
IHS NCSU BOILER-CHILLER REPLACEMENT
BALL VALVES FOR PLUMBING PIPING 220523.12 - 1
SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Brass ball valves.
2. Bronze ball valves.
3. Steel ball valves.
4. Iron ball valves.
1.3 DEFINITIONS
A. CWP: Cold working pressure.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of valve.
1. Certification that products comply with NSF 61and NSF 372.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Prepare valves for shipping as follows:
1. Protect internal parts against rust and corrosion.
2. Protect threads, flange faces, and soldered ends.
3. Set ball valves open to minimize exposure of functional surfaces.
B. Use the following precautions during storage:
1. Maintain valve end protection.
2. Store valves indoors and maintain at higher-than-ambient-dew-point temperature. If outdoor storage is necessary, store valves off the ground in watertight enclosures.
C. Use sling to handle large valves; rig sling to avoid damage to exposed parts. Do not use operating handles or stems as lifting or rigging points.
BALL VALVES FOR PLUMBING PIPING 220523.12 - 2
PART 2 - PRODUCTS
2.1 GENERAL REQUIREMENTS FOR VALVES
A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.
B. ASME Compliance:
1. ASME B1.20.1 for threads for threaded end valves.
2. ASME B16.1 for flanges on iron valves.
3. ASME B16.5 for flanges on steel valves.
4. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.
5. ASME B16.18 for solder-joint connections.
6. ASME B31.9 for building services piping valves.
C. NSF Compliance: NSF 61 Annex G for valve materials for potable-water service.
D. Bronze valves shall be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.
E. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.
F. Valve Sizes: Same as upstream piping unless otherwise indicated.
G. Valve Actuator Types:
1. Gear Actuator: For quarter-turn valves NPS 4 and larger.
2. Handlever: For quarter-turn valves smaller than NPS 4.
H. Valves in Insulated Piping:
1. Include 2-inch stem extensions.
2. Extended operating handles of nonthermal-conductive material and protective sleeves that allow operation of valves without breaking vapor seals or disturbing insulation.
3. Memory stops that are fully adjustable after insulation is applied.
2.2 BRASS BALL VALVES
A. One-Piece, Brass Ball Valves:
BALL VALVES FOR PLUMBING PIPING 220523.12 - 3
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. KITZ Corporation.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 400 psig.
c. Body Design: One piece.
d. Body Material: Forged brass or bronze.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Brass or stainless steel.
h. Ball: Chrome-plated brass or stainless steel.
i. Port: Reduced.
B. Two-Piece, Brass Ball Valves with Full Port and Brass Trim:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. American Valve, Inc.
b. KITZ Corporation.
c. NIBCO INC.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Forged brass.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Brass.
h. Ball: Chrome-plated brass.
i. Port: Full.
C. Two-Piece, Brass Ball Valves with Full Port and Stainless-Steel Trim:
BALL VALVES FOR PLUMBING PIPING 220523.12 - 4
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Jomar Valve.
b. KITZ Corporation.
c. Milwaukee Valve Company.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Forged brass.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Stainless steel.
h. Ball: Stainless steel, vented.
i. Port: Full.
D. Two-Piece, Brass Ball Valves with Regular Port and Brass Trim:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Hammond Valve.
b. NIBCO INC.
c. Watts; a Watts Water Technologies company.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Forged brass.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Brass.
h. Ball: Chrome-plated brass.
i. Port: Regular.
E. Two-Piece, Brass Ball Valves with Regular Port and Stainless-Steel Trim:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
BALL VALVES FOR PLUMBING PIPING 220523.12 - 5
a. Jamesbury; Metso.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Brass or bronze.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Stainless steel.
h. Ball: Stainless steel, vented.
i. Port: Regular.
2.3 BRONZE BALL VALVES
A. One-Piece, Bronze Ball Valves with Bronze Trim:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Conbraco Industries, Inc.
b. NIBCO INC.
c. Watts; a Watts Water Technologies company.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 400 psig.
c. Body Design: One piece.
d. Body Material: Bronze.
e. Ends: Threaded.
f. Seats: PTFE.
g. Stem: Bronze.
h. Ball: Chrome-plated brass.
i. Port: Reduced.
B. One-Piece, Bronze Ball Valves with Stainless-Steel Trim:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Conbraco Industries, Inc.
b. NIBCO INC.
c. Watts; a Watts Water Technologies company.
BALL VALVES FOR PLUMBING PIPING 220523.12 - 6
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 600 psig.
c. Body Design: One piece.
d. Body Material: Bronze.
e. Ends: Threaded.
f. Seats: PTFE.
g. Stem: Stainless steel.
h. Ball: Stainless steel, vented.
i. Port: Reduced.
C. Two-Piece, Safety-Exhaust, Bronze Ball Valves:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Conbraco Industries, Inc.
b. Jamesbury; Metso.
c. NIBCO INC.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Bronze, ASTM B 584, Alloy C844.
e. Ends: Threaded.
f. Seats: PTFE.
g. Stem: Stainless steel.
h. Ball: Chrome-plated brass, with exhaust vent opening for pneumatic applications.
i. Port: Full.
2.4 STEEL BALL VALVES
A. Class 150, Steel Ball Valves with Full Port:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Conbraco Industries, Inc.
b. Jamesbury; Metso.
c. NIBCO INC.
BALL VALVES FOR PLUMBING PIPING 220523.12 - 7
2. Description:
a. Standard: MSS SP-72.
b. CWP Rating: 285 psig.
c. Body Design: Split body.
d. Body Material: Carbon steel, ASTM A 216, Type WCB.
e. Ends: Flanged or threaded.
f. Seats: PTFE.
g. Stem: Stainless steel.
h. Ball: Stainless steel, vented.
i. Port: Full.
2.5 IRON BALL VALVES
A. Class 125, Iron Ball Valves:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. American Valve, Inc.
b. KITZ Corporation.
c. Watts; a Watts Water Technologies company.
2. Description:
a. Standard: MSS SP-72.
b. CWP Rating: 200 psig.
c. Body Design: Split body.
d. Body Material: ASTM A 126, gray iron.
e. Ends: Flanged or threaded.
f. Seats: PTFE.
g. Stem: Stainless steel.
h. Ball: Stainless steel.
i. Port: Full.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion.
Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.
BALL VALVES FOR PLUMBING PIPING 220523.12 - 8
B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.
C. Examine threads on valve and mating pipe for form and cleanliness.
D. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.
E. Do not attempt to repair defective valves; replace with new valves.
3.2 VALVE INSTALLATION
A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.
B. Locate valves for easy access and provide separate support where necessary.
C. Install valves in horizontal piping with stem at or above center of pipe.
D. Install valves in position to allow full stem movement.
E. Install valve tags. Comply with requirements in Section 220553 "Identification for Plumbing Piping and Equipment" for valve tags and schedules.
3.3 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS
A. If valves with specified CWP ratings are unavailable, the same types of valves with higher CWP ratings may be substituted.
B. Select valves with the following end connections:
1. For Copper Tubing, NPS 2 and Smaller: Threaded ends except where solder-joint valve-end option is indicated in valve schedules below.
2. For Copper Tubing, NPS 2-1/2 to NPS: Flanged ends except where threaded valve-end option is indicated in valve schedules below.
3. For Copper Tubing, NPS 5 and Larger: Flanged ends.
4. For Steel Piping, NPS 2 and Smaller: Threaded ends.
5. For Steel Piping, NPS 2-1/2 to NPS 4: Flanged ends except where threaded valve-end option is indicated in valve schedules below.
6. For Steel Piping, NPS 5 and Larger: Flanged ends.
3.4 LOW-PRESSURE, COMPRESSED-AIR VALVE SCHEDULE (150 PSIG OR LESS)
A. Pipe NPS 2 and Smaller:
BALL VALVES FOR PLUMBING PIPING 220523.12 - 9
1. Bronze and Brass Valves: May be provided with solder-joint ends instead of threaded ends.
2. Two-piece, brass ball valves with full port and brass trim.
B. Pipe NPS 2-1/2 (DN 65) and Larger:
1. Class 150, steel ball valves with full port.
3.5 DOMESTIC HOT- AND COLD-WATER VALVE SCHEDULE
A. Pipe NPS 2 and Smaller:
1. Bronze and Brass Valves: May be provided with solder-joint ends instead of threaded ends.
2. Two-piece, brass ball valves with full port and brass trim.
B. Pipe NPS 2-1/2 and Larger:
1. Class 150, steel ball valves with full port.
END OF SECTION 220523.12
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 1
SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Metal pipe hangers and supports.
2. Trapeze pipe hangers.
3. Fiberglass pipe hangers.
4. Metal framing systems.
5. Fiberglass strut systems.
6. Thermal-hanger shield inserts.
7. Fastener systems.
8. Pipe stands.
9. Pipe positioning systems.
10. Equipment supports.
B. Related Sections:
1. Section 055000 "Metal Fabrications" for structural-steel shapes and plates for trapeze hangers for pipe and equipment supports.
1.3 DEFINITIONS
A. MSS: Manufacturers Standardization Society of The Valve and Fittings Industry Inc.
1.4 PERFORMANCE REQUIREMENTS
A. Delegated Design: Design trapeze pipe hangers and equipment supports, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.
B. Structural Performance: Hangers and supports for plumbing piping and equipment shall withstand the effects of gravity loads and stresses within limits and under conditions indicated according to ASCE/SEI 7.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 2
1. Design supports for multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system contents, and test water.
2. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.
3. Design seismic-restraint hangers and supports for piping and equipment.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings: Show fabrication and installation details and include calculations for the following; include Product Data for components:
1. Trapeze pipe hangers.
2. Metal framing systems.
3. Fiberglass strut systems.
4. Pipe stands.
5. Equipment supports.
C. Delegated-Design Submittal: For trapeze hangers indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
1. Detail fabrication and assembly of trapeze hangers.
2. Design Calculations: Calculate requirements for designing trapeze hangers.
1.6 INFORMATIONAL SUBMITTALS
A. Welding certificates.
1.7 QUALITY ASSURANCE
A. Structural Steel Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."
B. Pipe Welding Qualifications: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code.
PART 2 - PRODUCTS
2.1 METAL PIPE HANGERS AND SUPPORTS
A. Carbon-Steel Pipe Hangers and Supports:
1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 3
2. Galvanized Metallic Coatings: Pregalvanized or hot dipped.
3. Nonmetallic Coatings: Plastic coating, jacket, or liner.
4. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.
5. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.
B. Stainless-Steel Pipe Hangers and Supports:
1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.
2. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.
3. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel.
C. Copper Pipe Hangers:
1. Description: MSS SP-58, Types 1 through 58, copper-coated-steel, factory-fabricated components.
2. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel.
2.2 TRAPEZE PIPE HANGERS
A. Description: MSS SP-69, Type 59, shop- or field-fabricated pipe-support assembly made from structural carbon-steel shapes with MSS SP-58 carbon-steel hanger rods, nuts, saddles, and U-bolts.
2.3 FIBERGLASS PIPE HANGERS
A. Clevis-Type, Fiberglass Pipe Hangers:
1. Description: Similar to MSS SP-58, Type 1, steel pipe hanger except hanger is made of fiberglass or fiberglass-reinforced resin.
2. Hanger Rods: Continuous-thread rod, washer, and nuts made of fiberglass or stainless steel.
B. Strap-Type, Fiberglass Pipe Hangers:
1. Description: Similar to MSS SP-58, Type 9 or Type 10, steel pipe hanger except hanger is made of fiberglass-reinforced resin.
2. Hanger Rod and Fittings: Continuous-thread rod, washer, and nuts made of stainless steel.
2.4 METAL FRAMING SYSTEMS
A. MFMA Manufacturer Metal Framing Systems:
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 4
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Allied Tube & Conduit; a part of Atkore International.
b. Flex-Strut Inc.
c. Unistrut; Part of Atkore International.
2. Description: Shop- or field-fabricated pipe-support assembly for supporting multiple parallel pipes.
3. Standard: MFMA-4.
4. Channels: Continuous slotted steel channel with in-turned lips.
5. Channel Nuts: Formed or stamped steel nuts or other devices designed to fit into channel slot and, when tightened, prevent slipping along channel.
6. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.
7. Metallic Coating: Hot-dipped galvanized.
8. Paint Coating: Epoxy.
B. Non-MFMA Manufacturer Metal Framing Systems:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. Anvil International.
b. ERICO International Corporation.
c. NIBCO INC.
2. Description: Shop- or field-fabricated pipe-support assembly made of steel channels, accessories, fittings, and other components for supporting multiple parallel pipes.
3. Standard: Comply with MFMA-4.
4. Channels: Continuous slotted steel channel with in-turned lips.
5. Channel Nuts: Formed or stamped steel nuts or other devices designed to fit into channel slot and, when tightened, prevent slipping along channel.
6. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.
7. Coating: Paint.
2.5 FIBERGLASS STRUT SYSTEMS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
1. Allied Tube & Conduit; a part of Atkore International.
2. B-line, an Eaton business.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 5
3. Champion Fiberglass, Inc.
B. Description: Shop- or field-fabricated pipe-support assembly similar to MFMA-4 for supporting multiple parallel pipes.
1. Channels: Continuous slotted fiberglass or other plastic channel with in-turned lips.
2. Channel Nuts: Fiberglass nuts or other devices designed to fit into channel slot and, when tightened, prevent slipping along channel.
3. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel.
2.6 THERMAL-HANGER SHIELD INSERTS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
1. ERICO International Corporation.
2. Pipe Shields Inc.
3. Rilco Manufacturing Co., Inc.
B. Insulation-Insert Material for Cold Piping: ASTM C 552, Type II cellular glass with 100-psig or ASTM C 591, Type VI, Grade 1 polyisocyanurate with 125-psig minimum compressive strength and vapor barrier.
C. Insulation-Insert Material for Hot Piping: Water-repellent treated, ASTM C 533, Type I calcium silicate with 100-psig; ASTM C 552, Type II cellular glass with 100-psig; or ASTM C 591, Type VI, Grade 1 polyisocyanurate with 125-psig minimum compressive strength.
D. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.
E. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.
F. Insert Length: Extend 2 inches beyond sheet metal shield for piping operating below ambient air temperature.
2.7 FASTENER SYSTEMS
A. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
B. Mechanical-Expansion Anchors: Insert-wedge-type, zinc-coated steel anchors, for use in hardened portland cement concrete; with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 6
2.8 PIPE STANDS
A. General Requirements for Pipe Stands: Shop- or field-fabricated assemblies made of manufactured corrosion-resistant components to support roof-mounted piping.
B. Compact Pipe Stand: One-piece plastic unit with integral-rod roller, pipe clamps, or V-shaped cradle to support pipe, for roof installation without membrane penetration.
C. Low-Type, Single-Pipe Stand: One-piece plastic base unit with plastic roller, for roof installation without membrane penetration.
D. High-Type, Single-Pipe Stand:
1. Description: Assembly of base, vertical and horizontal members, and pipe support, for roof installation without membrane penetration.
2. Base: Plastic.
3. Vertical Members: Two or more cadmium-plated-steel or stainless-steel, continuous-thread rods.
4. Horizontal Member: Cadmium-plated-steel or stainless-steel rod with plastic or stainless-steel, roller-type pipe support.
E. High-Type, Multiple-Pipe Stand:
1. Description: Assembly of bases, vertical and horizontal members, and pipe supports, for roof installation without membrane penetration.
2. Bases: One or more; plastic.
3. Vertical Members: Two or more protective-coated-steel channels.
4. Horizontal Member: Protective-coated-steel channel.
5. Pipe Supports: Galvanized-steel, clevis-type pipe hangers.
F. Curb-Mounting-Type Pipe Stands: Shop- or field-fabricated pipe supports made from structural-steel shapes, continuous-thread rods, and rollers, for mounting on permanent stationary roof curb.
2.9 PIPE POSITIONING SYSTEMS
A. Description: IAPMO PS 42, positioning system of metal brackets, clips, and straps for positioning piping in pipe spaces; for plumbing fixtures in commercial applications.
2.10 EQUIPMENT SUPPORTS
A. Description: Welded, shop- or field-fabricated equipment support made from structural carbon-steel shapes.
2.11 MISCELLANEOUS MATERIALS
A. Structural Steel: ASTM A 36/A 36M, carbon-steel plates, shapes, and bars; black and galvanized.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 7
B. Grout: ASTM C 1107, factory-mixed and -packaged, dry, hydraulic-cement, non-shrink and nonmetallic grout; suitable for interior and exterior applications.
1. Properties: Nonstaining, noncorrosive, and nongaseous.
2. Design Mix: 5000-psi, 28-day compressive strength.
PART 3 - EXECUTION
3.1 HANGER AND SUPPORT INSTALLATION
A. Metal Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Install hangers, supports, clamps, and attachments as required to properly support piping from the building structure.
B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89.
Arrange for grouping of parallel runs of horizontal piping, and support together on field-fabricated trapeze pipe hangers.
1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified for individual pipe hangers.
2. Field fabricate from ASTM A 36/A 36M, carbon-steel shapes selected for loads being supported. Weld steel according to AWS D1.1/D1.1M.
C. Fiberglass Pipe-Hanger Installation: Comply with applicable portions of MSS SP-69 and MSS SP-89. Install hangers and attachments as required to properly support piping from building structure.
D. Metal Framing System Installation: Arrange for grouping of parallel runs of piping, and support together on field-assembled metal framing systems.
E. Fiberglass Strut System Installation: Arrange for grouping of parallel runs of piping, and support together on field-assembled fiberglass struts.
F. Thermal-Hanger Shield Installation: Install in pipe hanger or shield for insulated piping.
G. Fastener System Installation:
1. Install powder-actuated fasteners for use in lightweight concrete or concrete slabs less than 4 inches thick in concrete after concrete is placed and completely cured. Use operators that are licensed by powder-actuated tool manufacturer.
Install fasteners according to powder-actuated tool manufacturer's operating manual.
2. Install mechanical-expansion anchors in concrete after concrete is placed and completely cured. Install fasteners according to manufacturer's written instructions.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 8
H. Pipe Stand Installation:
1. Pipe Stand Types except Curb-Mounted Type: Assemble components and mount on smooth roof surface. Do not penetrate roof membrane.
2. Curb-Mounted-Type Pipe Stands: Assemble components or fabricate pipe stand and mount on permanent, stationary roof curb. See Section 077200 "Roof Accessories" for curbs.
I. Pipe Positioning-System Installation: Install support devices to make rigid supply and waste piping connections to each plumbing fixture.
J. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.
K. Equipment Support Installation: Fabricate from welded-structural-steel shapes.
L. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
M. Install lateral bracing with pipe hangers and supports to prevent swaying.
N. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms and install reinforcing bars through openings at top of inserts.
O. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
P. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.
Q. Insulated Piping:
1. Attach clamps and spacers to piping.
a. Piping Operating above Ambient Air Temperature: Clamp may project through insulation.
b. Piping Operating below Ambient Air Temperature: Use thermal-hanger shield insert with clamp sized to match OD of insert.
c. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.
2. Install MSS SP-58, Type 39, protection saddles if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 9
a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.
3. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier.
Shields shall span an arc of 180 degrees.
a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.
4. Shield Dimensions for Pipe: Not less than the following:
a. NPS 1/4 to NPS 3-1/2: 12 inches long and 0.048 inch thick.
b. NPS 4: 12 inches long and 0.06 inch thick.
c. NPS 5 and NPS 6: 18 inches long and 0.06 inch thick.
5. Pipes NPS 8and Larger: Include wood or reinforced calcium-silicate-insulation inserts of length at least as long as protective shield.
6. Thermal-Hanger Shields: Install with insulation same thickness as piping insulation.
3.2 EQUIPMENT SUPPORTS
A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.
B. Grouting: Place grout under supports for equipment and make bearing surface smooth.
C. Provide lateral bracing, to prevent swaying, for equipment supports.
3.3 METAL FABRICATIONS
A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers.
B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations.
C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding; appearance and quality of welds; and methods used in correcting welding work; and with the following:
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. Finish welds at exposed connections so no roughness shows after finishing and so contours of welded surfaces match adjacent contours.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 10
3.4 ADJUSTING
A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.
B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches.
3.5 PAINTING
A. Touchup: Clean field welds and abraded areas of shop paint. Paint exposed areas immediately after erecting hangers and supports. Use same materials as used for shop painting. Comply with SSPC-PA 1 requirements for touching up field-painted surfaces.
1. Apply paint by brush or spray to provide a minimum dry film thickness of 2.0 mils.
B. Touchup: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint on miscellaneous metal are specified in Section 099113 "Exterior Painting", and Section 099123 "Interior Painting."
C. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A 780.
3.6 HANGER AND SUPPORT SCHEDULE
A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.
B. Comply with MSS SP-69 for pipe-hanger selections and applications that are not specified in piping system Sections.
C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.
D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.
E. Use carbon-steel pipe hangers and supports, metal trapeze pipe hangers, and metal framing systems and attachments for general service applications.
F. Use stainless-steel pipe hangers and stainless-steel attachments for hostile environment applications.
G. Use copper-plated pipe hangers and copper attachments for copper piping and tubing.
H. Use padded hangers for piping that is subject to scratching.
I. Use thermal-hanger shield inserts for insulated piping and tubing.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 11
J. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of non-insulated or insulated, stationary pipes NPS 1/2 to NPS 30.
2. Carbon- or Alloy-Steel, Double-Bolt Pipe Clamps (MSS Type 3): For suspension of pipes NPS 3/4 to NPS 36, requiring clamp flexibility and up to 4 inches of insulation.
3. Steel Pipe Clamps (MSS Type 4): For suspension of cold and hot pipes NPS 1/2 to NPS 24 if little or no insulation is required.
4. Pipe Hangers (MSS Type 5): For suspension of pipes NPS 1/2 to NPS 4, to allow off-center closure for hanger installation before pipe erection.
5. Adjustable, Swivel Split- or Solid-Ring Hangers (MSS Type 6): For suspension of non-insulated, stationary pipes NPS 3/4 to NPS 8.
6. Adjustable, Steel Band Hangers (MSS Type 7): For suspension of non-insulated, stationary pipes NPS 1/2 to NPS 8.
7. Adjustable Band Hangers (MSS Type 9): For suspension of non-insulated, stationary pipes NPS 1/2 to NPS 8.
8. Adjustable, Swivel-Ring Band Hangers (MSS Type 10): For suspension of non-insulated, stationary pipes NPS 1/2 to NPS 8.
9. Split Pipe Ring with or without Turnbuckle Hangers (MSS Type 11): For suspension of non-insulated, stationary pipes NPS 3/8 to NPS 8.
10. Extension Hinged or Two-Bolt Split Pipe Clamps (MSS Type 12): For suspension of non-insulated, stationary pipes NPS 3/8 to NPS 3.
11. U-Bolts (MSS Type 24): For support of heavy pipes NPS 1/2 to NPS 30.
12. Clips (MSS Type 26): For support of insulated pipes not subject to expansion or contraction.
13. Pipe Saddle Supports (MSS Type 36): For support of pipes NPS 4 to NPS 36, with steel-pipe base stanchion support and cast-iron floor flange or carbon-steel plate.
14. Pipe Stanchion Saddles (MSS Type 37): For support of pipes NPS 4 to NPS 36, with steel-pipe base stanchion support and cast-iron floor flange or carbon-steel plate, and with U-bolt to retain pipe.
15. Adjustable Pipe Saddle Supports (MSS Type 38): For stanchion-type support for pipes NPS 2-1/2 to NPS 36 if vertical adjustment is required, with steel-pipe base stanchion support and cast-iron floor flange.
16. Single-Pipe Rolls (MSS Type 41): For suspension of pipes NPS 1 to NPS 30, from two rods if longitudinal movement caused by expansion and contraction might occur.
17. Adjustable Roller Hangers (MSS Type 43): For suspension of pipes NPS 2-1/2 to NPS 24, from single rod if horizontal movement caused by expansion and contraction might occur.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 12
18. Complete Pipe Rolls (MSS Type 44): For support of pipes NPS 2 to NPS 42 if longitudinal movement caused by expansion and contraction might occur but vertical adjustment is not necessary.
19. Pipe Roll and Plate Units (MSS Type 45): For support of pipes NPS 2 to NPS 24 if small horizontal movement caused by expansion and contraction might occur and vertical adjustment is not necessary.
20. Adjustable Pipe Roll and Base Units (MSS Type 46): For support of pipes NPS 2 to NPS 30 if vertical and lateral adjustment during installation might be required in addition to expansion and contraction.
K. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers NPS 3/4 to NPS 24.
2. Carbon- or Alloy-Steel Riser Clamps (MSS Type 42): For support of pipe risers NPS 3/4 to NPS 24 if longer ends are required for riser clamps.
L. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches for heavy loads.
2. Steel Clevises (MSS Type 14): For 120 to 450 deg F piping installations.
3. Swivel Turnbuckles (MSS Type 15): For use with MSS Type 11, split pipe rings.
4. Malleable-Iron Sockets (MSS Type 16): For attaching hanger rods to various types of building attachments.
5. Steel Weldless Eye Nuts (MSS Type 17): For 120 to 450 deg F piping installations.
M. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel or Malleable Concrete Inserts (MSS Type 18): For upper attachment to suspend pipe hangers from concrete ceiling.
2. Top-Beam C-Clamps (MSS Type 19): For use under roof installations with bar-joist construction, to attach to top flange of structural shape.
3. Side-Beam or Channel Clamps (MSS Type 20): For attaching to bottom flange of beams, channels, or angles.
4. Center-Beam Clamps (MSS Type 21): For attaching to center of bottom flange of beams.
5. Welded Beam Attachments (MSS Type 22): For attaching to bottom of beams if loads are considerable and rod sizes are large.
6. C-Clamps (MSS…