This document contains a log of pre-proposal inquiries and responses related to a solicitation for a boiler and chiller replacement project at the Northern Cheyenne Health Center in Lame Deer, Montana. The project includes replacing the existing boilers and chillers with new equipment. The existing building automation system is an Alerton control system installed by ATS Midland Northwest, who is also the representative for Alerton. Facilities management staff will perform standard preventative maintenance on the new boiler and chiller equipment. The solicitation is a 100% small business set-aside with a NAICS code of 238220 and magnitude between $500,000 to $1 million. Proposals are due by November 12, 2020. All questions must be submitted in writing to the contract specialist by October 29, 2020. A non-mandatory site visit will also be held.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 PPI Log Northern Cheyenne Boiler-Chiller Replacement

PPI No.KTR No.QUESTIONRESPONSEAmendment 00001
11Could you provide a heating water sequence of operations?Boilers feed a common supply header out to the building and are enabled on/off by the DDC Building Control System monitoring a supply set point on the HW supply. Boiler logic is controlled by their own on-board controller that stages the individual boiler with a lead/lag arrangement.
21Will there be a BMS which provides the control logic for the boilers or will the boilers control their own on/off, modulation and cascade?See response to RFI #1
31Should the boiler circulating pumps be variable speed?No, constant speed.
42I was inquiring if you have selected a Commissioning Agent as of yet for the project or if that would fall under a mechanical contractor. If it is under a mechanical contractor, I was wondering if you have a list of some potential bidders for the project that I could submit bids to.Section 23800 in the specifications detail the Mechanical System Commissioning. The prime is responsible for commissioning of the system.
53We are currently putting together a proposal for the Lame Deer Mt boiler project and hit a bit of a snag. When we reached out to our bonding company they see that liquidated damages and actual damages are called out in the solicitation but with not further definition then just a mention. (Section E.1. Inspections, A & B) They are concerned that without definition of a daily rate or actual cost then there could be some issues at a later date.The Boiler-Chiller Replacement project does not include liquidated damages. The provision you are referencing pertains to progress payments not liquidated damages.
6Clarification to page 108 of NCSU - SOW Boiler-Chiller - FINALThe specifications state 3 vendors for the building automation system. There should only be one vendor listed, because there is only one software platform controlling the building. It is the intent that installer match the boilers and chillers to use the existing system. The existing system is an Alerton, Incorporated. The attached specification highlights the area of concern on page 108.
74Is there existing service contacts for the ChillerTrane and the Boiler? If so, Who are they?There is not an existing service contract for the boilers and chillers. Facilities Management Staff will do standard PM’s on the boiler and chiller. If they run into issues they cannot handle they reach out to Trane (Billings Location) for the chiller and ATS Midland Northwest for any boiler issues.
84Who monitors the building? Is it JCI?The BAC is Alerton Control System – ATS Midland Northwest is the rep for Alerton.
94I was unable to make the site visit but curious if you have a list of contractors that did make it to the visit?The Site Visit Agenda and Sign-in Sheet are incorporated in Amendment 00001.