This document is an inspection report for an aboveground storage tank (AST) at the A.A.S.F. #1 Lexington fuel storage facility in Lexington, Oklahoma. The report details an inspection of Tank 2 conducted in accordance with STI SP001 standards to evaluate integrity and establish data for future inspections. Significant findings include that the existing catwalk does not allow safe access to all tank appurtenances, thread engagement issues throughout the product piping system, and approximately 500 feet of joint seal deterioration and 135 feet of cracks in the facility containment requiring repair. The engineer recommends repairs and improvements be made to address these issues and fully comply with codes, including extending the catwalk, improving piping connections, removing vegetation from containment joints, and repairing cracks in the containment floor. Ultrasonic thickness readings were taken and shell life calculations determined the tank has over 30 years of remaining life under current conditions. Engineering drawings of the tank and facility layout are provided in the appendices.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

USArmyCorpsofEngineers
OmahaDistrict
STISP001FormalExternalInspection
InspectionReport
A.A.S.F.1Lexington
FacilityLE402

Tank 2

USArmyCorpsofEngineersCenterofExpertiseforPetroleum,Oils,andLubricants
(USACEPOL‐MCX)

12/6/2017

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

TableofContents
ACRONYMSANDABBREVIATIONS ............................................................................................................ 3

GENERAL SUMMARY

STI SP001 INSPECTION DETERMINATION

INSPECTION DATE

STATE REGULATIONS

PREVIOUS INSPECTION DATES

RECOMMENDED FUTURE INSPECTION DATES

A. GENERAL PROJECT INFORMATION

1. STI SP001 Inspection

2. Site Information

B. TANK INSPECTION COMMENTS

1. Tank Construction

2. Tank Foundation

3. Tank Appurtenances

4. Tank Coating

5. Tank Piping System

Thetankhasaboveground4‐inchstainlesssteelreceiptpipingand4‐inchaboveground
stainlesssteelissuepiping.Tanks1,2,3,and4sharethesameissueandreceiptpipingsystem.

6. Fire Protection System

7. Secondary Containment

C. FINDINGS AND RECOMMENDATIONS

1. MANDATORY REPAIRS per STI SP001, UFC 3‐460‐01, NFPA 30, or NFPA 30A

2. REQUIRED REPAIRS to Fully Comply with STI SP001 or Federal, State, and Local Codes . 12

3. RECOMMENDEDREPAIRStoFullyComplywithUFC3‐460‐01andAW78‐24‐27
StandardsorasPartofRegularMaintenance ................................................................................. 17

APPENDIX A: ENGINEERING CALCULATIONS AND DATA

APPENDIX B: ENGINEERING DRAWINGS

APPENDIX C: STI SP001 INSEPCTION CHECKLIST

APPENDIX D: PHOTOGRAPHS

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

ACRONYMS AND ABBREVIATIONS

API American Petroleum Institute

ASME American Society of Mechanical Engineers

ASNT American Society of Non‐Destructive Testing

ATG Automatic Tank Gauge

BBL Barrel

CFR Code of Federal Regulations

CP Cathodic Protection

DFT Dry Film Thickness

HLA High Level Alarm

HLCS High Level Control Shut‐Off

HHLA High‐High Level Alarm

LLA Low Level Alarm

LLLA Low‐Low Level Alarm

MFL Magnetic Flux Leakage

MT Magnetic Particle Testing

NACE National Association of Corrosion Engineers

NDT Non‐Destructive Testing

NFPA National Fire Protection Association

PSI Pounds per Square Inch

PT Penetrant Testing

P/V Pressure/Vacuum

RP Recommended Practice

PST Product Saver Tank

RT Radiography Testing

STI Steel Tank Institute

TML Thickness Measurement Location

TRV Thermal Relief Valve

UFC Unified Facilities Criteria

UFGS Unified Facilities Guide Specifications

ULS Ultra Low Sulfur

UT Ultrasonic Testing

VT Visual Testing

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

GENERALSUMMARY
AnSTISP001FormalExternalinspectionofTank2(FacilityLE402),locatedatA.A.S.F.1Lexington,
OklahomawascompletedonDecember6,2017toevaluatethetank’sintegrity,collectdata,and
establishadatabaseforfutureinspectionsandevaluations.Aservicelifeevaluationperformedon
thetankshowsitashavinggreaterthan30yearsofremainingshelllifeundercurrentconditions.
SignificantFindings:
Theexistingcatwalkdoesnotallowsafeaccesstoalltankappurtenances.
ThereisnoNFPAdiamondonthetankorenteringfuelfarm.
Thetankappurtenancesarenotlabeled.
Thereisimproperthreadengagementthroughouttheproductissueandreceiptpiping

system.

There is vegetation growing through deteriorated expansion joints in the fuel farm containment.

There are approximately 5oo feet of joint sealant deterioration in the facility containment

expansionjoint.
Thereareapproximately135feetofcracksonthefacilitycontainmentfloor.
Productleaking/fueldrippingwasnotedonthe2‐inchmetercontrolvalveneartheTank4
issue.The1‐inchTRVandsightglassonthesightflowindicatoraredrippingontheproduct
returnlinenearTank4.
Thepipesupportforthe1‐inchpressurerelieflineontheproductreceiptsidenearTank4
isnotengagedwiththepipe.
Theproductsavertankhasabrasscheckvalve.
Minorcoatingfailurewasnotedonthetankshell,appurtenances,valves,flangesofflex

connectors, strainers, filter separators, and pumps.

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

STISP001INSPECTIONDETERMINATION
STISP001classifiestanksintothreecategories.AtankisrankedasaCategory1,2,or3depending
ontheriskatankposestotheenvironment.Category1tanksposetheleastamountofriskand
Category3thehighest.Theinspectiontypesandinspectionintervalsarebasedonthetanksizeand
tankcategory.Theriskfactorsincludespillcontrol,releasepreventionbarrier(RPB),continuous
releasedetectionmethod(CRDM),andtankdesignandconfiguration(seedefinitionsbelow).
SPILLCONTROL‐ameansofpreventingareleaseofliquidintotheenvironment,including
adjoiningpropertyandwaterways.Spillcontrolmethodsinclude:1)Remoteimpounding;
2)Secondarycontainmentdike/berm;3)SecondarycontainmentAST;and4)Secondary
containmentsystem.
CONTINUOUSRELEASEDETECTIONMETHOD(CRDM)–ameansofdetectingareleaseof
liquidthroughinherentdesign.CRDMispassivebecauseitdoesnotrequiresensorsor
powertooperate.Liquidreleasesarevisuallydetectedbyfacilityoperators.Thesystem
shallbedesignedinaccordancewithgoodengineeringpractice.Severalacceptableand
commonlyusedCRDMsystemsareasfollows:1)Releasepreventionbarrier(RPB);2)
SecondarycontainmentAST,includingdouble‐wallASTordouble‐bottomAST;and3)
ElevatedAST,withorwithoutreleasepreventionbarrier.
RELEASEPREVENTIONBARRIER(RPB)–aliquidcontainmentbarrierthatisinstalled
undertheAST.ItspurposeistodivertleakstowardtheperimeteroftheAST,wherethey
canbeeasilydetected,aswellastopreventliquidfromcontaminatingtheenvironment.
RPBsarecomposedofmaterialscompatiblewiththeliquidstoredintheASTandmeet
appropriateengineeringstandards.Examplesaresteel(asinsteeldouble‐bottomtanks),
concrete,elastomericliners,orothersuitablematerials,providedtheabovecriteriaare

met.

OVERFILLPREVENTION‐systems,procedures,ordevicesusedtopreventliquidinASTs
fromrunningoverorspillingoutoftheASTduringthefillingprocess.Havingaperson
physicallypresentandincontrolofashutoffdeviceduringtheentiretankfillingprocessis
anacceptableproceduretoachieveoverfillprotection.
Category1tanksareASTswithspillcontrol,withCRDM,andwithoverfillprevention.
Category2tanksareASTswithspillcontrol,withoutCRDM,andwithoverfillprevention.
Category3tanksareASTswithoutspillcontrol,withoutCRDM,and/orwithoutoverfill

prevention.

Note: Any tank not having overfill prevention is classified as a Category 3 tank.

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

Table 1 shows some typical tank types and their corresponding AST categories.

Table 1: Tank Configuration and AST Category

Tank Configuration Tank has

CRDM

Tankhas
SpillControl?

AST

Category

SinglewallASTincontactwithground no no3
SinglewallASTincontactwithground no yes2
Elevatedtankyes yes1
ASTwithRPByes yes1
ASTwithdouble‐bottomyes yes1
Double‐wallASTwithoverfillprevention yes yes1
Double‐wallASTwithoutoverfillprevention yes no3
Verticaltankrestingonconcrete(withRPB) yes yes1
Verticaltankrestingonconcrete(withRPB) yes no3

Table 2 shows the STI SP001 inspection guidance based on tank size and AST category.

Table 2: Table of Inspection Schedules

AST Type and Size (U.S. gallons) Category 1 Category 2 Category 3

Shop‐ Fabricated ASTs

0–1100
(0‐4164liters)PPP,E&L(10)
1101‐5,000
(4168‐18,927liters)
PP,E&L(10)[P,E&L(5),I(10)]or
[P,L(2),E(5)]

5,001 ‐ 30,000 (18,931‐113,562 liters)

P,E(20)
[P,E(10),I(20)]

or [P, E(5), L(10)]

[P,E&L(5),I(10)]or
[P,L(1),E(5)]

30,001 ‐ 50,000 (113,566‐189,271 liters)

P, E(20) P, E&L(5), I(15) P, E&L(5), I(10)

P–PeriodicASTinspection
E–Formalexternalinspectionbycertifiedinspector
I–Formalinternalinspectionbycertifiedinspector
L–Leaktestbyownerorowner’sdesignee
()indicatesmaximuminspectionintervalinyears.Forexample,E(5)indicatesformal
externalinspectionevery5years.

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

INSPECTIONDATE
InspectionDate:6December2017
EquipmentUsed:UltrasonicThicknessMeter
Manufacturer:GeneralElectric
ModelNumber:DMSII
CalibrationMethod:TwoPointCalibration
STATEREGULATIONS
StateRegulationforSTIIn‐ServiceTankInspectionsN/A
StateRegulationforSTIOut‐of‐ServiceTankInspectionsN/A
NOTE:IftherearenostateregulationsfortankinspectionsthenN/Ashallresidein‐placeofthe
numberofyearsbetweeninspections.Ifstateregulationsreside,therecommendedfuture
inspectionsdatesshallbebasedonwhicheverismorestringentbetweentheSTIinspector’s
calculationsandtheStateregulations.
PREVIOUSINSPECTIONDATES
InspectionDate:Unknown/NotProvided
RECOMMENDEDFUTUREINSPECTIONDATES
STIOut‐of‐Service(Internal)InspectionDate:N/A
STIIn‐Service(External)InspectionDate:December2022

Signature(s):

StephenM.Hollenzer,STISP001#1607
InterSpec,LLC.

Stephen M Hollenzer Steve Sig

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

GENERAL TANK INFORMATION

ITEMDESCRIPTION
OwnerU.S.Army
LocationA.A.S.F.1Lexington
FacilityNumberLE402
TankNumberTank#2
State/CountryOklahoma,US
CityLexington
InspectionDateDecember6,2017
TankManufacturerServiceWelding&MachineCO,Inc.
DesignStandardUL‐2085
DateofConstructionCirca2002
TankContentsF‐24JetFuel
TankSerialNumber12362
TankDiameter10’6”
TankLength35’
ProductHeight10,445gallons
TankCapacity20,000gallons
TankFoundationMetallicSaddles
TankConstructionHorizontalCylinder,Lap‐WeldedCourses
InteriorCoatingSystemUnknown
ExteriorCoatingSystemUnknown
LevelGauging
Electronic(FranklinFuelingSystemsTS‐550)/
MorrisonClockGaugewithaudiblealarm

Venting 10 in. primary emergency vent, 6 in. normal vent, 10 in. secondary emergency vent.

StrappingCharts1/8‐inchincrements
Piping(SizeandMaterial)Receipt4‐inchStainlessSteel

Issue 4‐inch Stainless Steel

Water Draw‐Off ¾‐inch Stainless Steel

LevelAlarmsAlarmElectronic (FranklinFueling
systemsTS‐550)Independent

High‐ High

98% (10.29 ft.) None

High95%(9.9975)None
LowNANone
Low‐LowNANone

Secondary Containment Double‐Wall Tank

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

A. GENERAL PROJECT INFORMATION

1. STISP001Inspection
AnSTISP001inspectionwasperformedonthetankinaccordancewiththemostrecent
versionofSTISP001.Additionalconsiderationisgiventofederal,state,andlocal
regulations,aswellasanyapplicablemilitarycriteriaandgeneralindustrystandards.
2. SiteInformation
A.A.S.F.1LexingtonislocatedinLexington,OK.

B. TANK INSPECTION COMMENTS

1. TankConstruction
Tank2(FacilityLE402)isanominal20,000gallon,10‐foot6‐inchdiameterby35‐feet
long,abovegroundhorizontalcylindricalfueltankservicingF‐24jetfuel.Thetankis
constructedtotheUL‐2085standard.ManufacturerandULdataplateswereaffixedto
thetank.As‐builtdrawingsoftheoriginalconstructionwerenotavailableatthetimeof
theinspection.
2. TankFoundation
Thetankrestsontwosteelsaddleswhichrestonaconcretepad.Thesteelsaddleswere
inspectedforcorrosion,coatingfailure,andadherencetotheSTISP001andUL‐142
standards.Theconcreteportionofthefoundationwasinspectedforbrokenconcrete,
spalling,cracks,andvegetationgrowthagainstthebottomofthetank.

3. Tank Appurtenances

a. Venting

Normalventingallowsthereliefofexcessiveinternalpressureorvacuum
duringnormalstorageandoperations.Thenormalventshallbeatleastas
largeasthelargestfillingorwithdrawalconnectionbutinnocase,shallitbe
lessthan1.25in.(32mm)nominalinsidediameter.Thetankisventedfor
normaloperationviaa6‐inchventwithaflamearrestor.Thetankhasa4‐
inchreceiptlinefromthetruckfillstand.Theventisadequatelysizedin
accordancewithNFPA30andAPIStandard2000.
b. EmergencyVenting
Thetankisequippedwithtwo10‐inchMorrisonBros.244seriesemergency
vents(onefortheinnertankandonefortheannularspace).Theventhasa
listedventingcapacityof808,350CFM.Thetankmanufacturerrequires
498,600CFMofemergencyventingcapacityontheinnertank.Thetank
manufacturerrequires517,200CFMofemergencyventingcapacityonthe
annularspace.Therefore,theemergencyventingcapacityissatisfactoryfor
thistank.Theemergencyventwasinspectedforcoatingfailureandfreedom
ofmovement.

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

c. Manways The tank has two 36‐inch manholes located on the top of the tank.

d. WaterDraw‐Off
Thetankhasawater‐drawofflinewithahandcrankpump.
e. HighLevelShut‐OffValve
Thetankhasasolenoidcontrolledhighlevelshutoffvalve(Cla‐Valve

model).

f. LevelAlarms
Thetankhigh,high‐high,low,andlow‐lowlevelalarmsareprovidedbythe
FranklinFuelingsystems.

g. Gauging

ThetankiselectronicallygaugedviatheFranklinFuelingsystems.Thetank
hasaMorrisonmechanicalfuellevelgauge.

h. Pumps

Productisreceivedandissuedviatrucksandtodispensers.Thecentrifugal
pumpwascheckedforleakageandproperprotectionfrommovingparts.
i. StairsandPlatforms
Aladderislocatedadjacenttothetanktoaccessthetopofthetank.
Platforms,grating,andrailingswereinspectedforcoatingfailureand
adherencetoOSHAstandards.Theladderandcatwalkareinsatisfactory

condition.

j. CathodicProtection
Thetankisnotincontactwiththeground,andcathodicprotectionisnot

required.

k. GroundingandBonding
Thetankisgroundedviaagroundingcableandisinsatisfactorycondition.
4. TankCoating
Thetankshellandappurtenancesarecoated.Thecoatingwasevaluatedfordisbonding,
adhesion,deterioration,anddiscoloration.Thetankshellandappurtenanceshave
minorcoatingfailurepresent.
5. TankPipingSystem
Thetankhasaboveground4‐inchstainlesssteelreceiptpipingand4‐inchaboveground
stainlesssteelissuepiping.Tanks1,2,3,and4sharethesameissueandreceiptpiping

system.

6. FireProtectionSystem
Thefiredepartmentprovidesfireprotection.
7. SecondaryContainment
40CFR112.7(c)statesthattheentiresecondarycontainmentsystem,“includingwalls
andfloor,mustbecapableofcontainingoilandmustbeconstructedsothatany
dischargefromaprimarycontainmentsystem...willnotescapecontainmentbefore

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

cleanupoccurs.”40CFR112.8(c)(2)and40CFR112.12(c)(2)statethatdikedareas
mustbe“sufficientlyimpervioustocontainoil.”Thepurposeofthesecondary
containmentrequirementistopreventdischarges,asdescribedin40CFR112.1(b);
therefore,effectivesecondarycontainmentmethodsmustbeabletocontainoiluntilthe
oiliscleanedup.Thetankisadouble‐walledtankwhichisafullyenclosedmetallic
secondarycontainmentstructure.Thesecondarycontainmentisofsufficientsizeto
containatotaltanklossperUFC3‐460‐1,Section8‐14.2.1.Theentiretankrestson
metallicbeamsonaconcretepadtoallowwatertodrainawayfromthetankin
accordancewithNFPA30.
Thetankfarmhasatruckfill/offloadcontainment.Thedimensionsare135feetby150
feet.Itisequippedwithasumpthatleadstoanoilywaterseparator.Theoilywater
separatorwasintheclosedpositionduringtheinspection.Thereisapproximately500
feetofjointsealdeteriorationand135feetofcontainmentcracking.
C. FINDINGSANDRECOMMENDATIONS
Thefollowinginformationidentifiesthesignificantfindingsfoundduringthetankinspection:
1. MANDATORYREPAIRSperSTISP001,UFC3‐460‐01,NFPA30,orNFPA30A
Mandatoryrepairsrepresentitemsthatrequireimmediateattention,inorderto
preventimminentrisktosystemoperators,equipmentintegrity,ortheadjacent
environment.Thetankshouldremainoutofserviceuntiltheserepairsarecompleted.

a None.

2. REQUIRED REPAIRS to Fully Comply with STI SP001 or Federal, State, and Local Codes

Recommendedrepairsrepresentitemsthatshouldbeaddressedinatimelymanner,in
ordertopreventfuturepotentialriskstosystemoperators,equipmentintegrity,orthe
adjacentenvironment.Theseitemsmayberequiredbyfederal,state,andlocalcodes.
a. TheCatwalkdoesnotAllowSafeAccesstoAllTankAppurtenances
OBSERVATION:Theexistingcatwalkdoesnotallowsafeaccesstoalltank

appurtenances.

CODEREFERENCE:UFC3‐460‐01Table8.1(j).
RECOMMENDATION:Extendtheexistingcatwalktorunthelengthofthetankto
allowsafeaccesstoalltankappurtenances.

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

b. NFPALabeling
OBSERVATION:ThetankdoeshaveaDOTlabel,butthetankdoesnothaveaNFPA
labelaffixedtothetank.
CODEREFERENCE:NFPA30andNFPA704.
RECOMMENDATION:InstallaNFPA704diamondlabel.
c. AppurtenanceLabeling
OBSERVATION:Thetankdoesnothaveproperlabelingoneachtankappurtenance.
Someofthelabelinghasbeenpaintedoverorhasdeterioratedduetoweather.
CODEREFERENCE:UL‐142(4.8.1.1).
RECOMMENDATION:InstalllabelsonalltankappurtenancesinaccordancewithUL‐

142.

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

d. ThreadEngagement
OBSERVATION:Theproductreceiptpipingsystemandissuepipingsystemhave
improperthreadengagementandseverallooseboltswithoutwashersonflanged
connectionsthroughoutthesystem.
CODEREFERENCE:ASMEB31(335.2.3).
RECOMMENDATION:Checkandrefastenthehardwareandinstallwashersontheentire
productreceiptpipingsystemandissuepipingsysteminaccordancewithASMEB31.
e. VegetationinFacilityContainment
OBSERVATION:Thepipingcontainmenthasminorvegetationgrowthcomingthrough
thejointsealsinvariouslocations.
CODEREFERENCE:NFPA30,paragraph21.6.6.3.
RECOMMENDATION:RemovethevegetationinaccordancewithNFPA30,paragraph

21.6.6.

f. FacilityContainmentExpansionJointSealant
OBSERVATION:Thereisapproximately500feetofjointsealdeterioration.
CODEREFERENCE:40CFR112.7(c)statesthattheentiresecondarycontainment
system“includingwallsandfloor,mustbecapableofcontainingoilandmustbe
constructedsothatanydischargefromaprimarycontainmentsystem...willnot
escapecontainmentbeforecleanupoccurs.”40CFR112.8(c)(2)and40CFR
112.12(c)(2)statethatdikedareasmustbe“sufficientlyimpervioustocontainoil.”
Thepurposeofthesecondarycontainmentrequirementistopreventdischargesas

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

describedin40CFR112.1(b);therefore,effectivesecondarycontainmentmethods
mustbeabletocontainoiluntiltheoiliscleanedup.
RECOMMENDATION:Removethedamagedjointsealantandinstallnewbackerrods
andsealantwithinthecontainment.Thesealantshallbeadequatetoaccommodate
jointcompressionequalto50percentofthewidthofthejoint.Thebackerrodshallbe
compressiblerodstockofpolyethylenefoam,polyurethanefoam,butylrubberfoam,
orotherflexible,non‐absorptivematerialasrecommendedbythesealant
manufacturer.ThesealantshallconformtoUFGS079200JointSealant(Quantity:
500linearfeet).
g. FacilityContainmentFloorCracks
OBSERVATION:Thereisapproximately135feetofcracksonthefacilitycontainment

floor.

CODEREFERENCE:40CFR112.7(c)statesthattheentiresecondarycontainment
system“includingwallsandfloor,mustbecapableofcontainingoilandmustbe
constructedsothatanydischargefromaprimarycontainmentsystem...willnot
escapecontainmentbeforecleanupoccurs.”40CFR112.8(c)(2)and40CFR
112.12(c)(2)statethatdikedareasmustbe“sufficientlyimpervioustocontainoil.”
Thepurposeofthesecondarycontainmentrequirementistopreventdischargesas
describedin40CFR112.1(b);therefore,effectivesecondarycontainmentmethods
mustbeabletocontainoiluntiltheoiliscleanedup.
RECOMMENDATION:Repairallexposedcracksinthecontainmentfloorbygrindingina
V‐shapepattern,withatleast¼‐inchwidthatthesurfaceandadepthofatleast¼‐
inchandsealingwithflexibleurethane(e.g.Sikaflex1c)orasimilarapprovedsealant.

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

h.Leaking/FuelDrippingatTruckFillStand
OBSERVATION:Leaking/fueldrippingwasnotedonthe2‐inchmetercontrolvalve
neartheTank4issue.The1‐inchTRVandsightglassonthesightflowindicatorare
drippingontheproductreturnlinenearTank4.
CODEREFERENCE:NFPA30,paragraph27.3.2.
RECOMMENDATION:Allsightflowindicatorswithinthepressurereliefpipingshallbe
removedandreplacedwithflangedspoolpieces.
i. PipeSupport
OBSERVATION:Thepipesupportforthe1‐inchpressurerelieflineontheproduct
receiptsidenearTank4isnotengagedwiththepipe.
CODEREFERENCE:NFPA30,paragraph27.6.1,“Pipingsystemsshallbesubstantially
supportedandprotectedagainstphysicaldamageandexcessivestressesarisingfrom
settlement,vibration,expansion,orcontraction.Theinstallationofnonmetallicpiping
shallbeinaccordancewiththemanufacturer’sinstructions.”(Also,seeAPI570‐7.5)
RECOMMENDATION:Repairthepipesupportforthe1‐inchpressurerelieflineonthe
productreceiptsidenearTank4inaccordancewithNFPA30,paragraph27.6.1.

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

j. ProductSaverTank
OBSERVATION:Theproductsavertankhasabrasscheckvalve.Brassisconsidereda
lowmeltingpointmaterial.
CODEREFERENCE:NFPA30,paragraph27.4.3.2
RECOMMENDATION:ReplacethebrasscheckvalveinaccordancewithNFPA30,
paragraph27.4.3.2.

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

3. RECOMMENDEDREPAIRStoFullyComplywithUFC3‐460‐01andAW78‐24‐27
StandardsorasPartofRegularMaintenance
Recommendedrepairsrepresentitemsthatshouldbeaddressedinatimelymanner,in
ordertopreventfuturepotentialriskstosystemoperators,equipmentintegrity,orthe
adjacentenvironment.
a. CoatingFailuresonTank
OBSERVATION:Minorcoatingfailurewasnotedonthetankshell,appurtenances,
valves,flangesofflexconnectors,strainers,filterseparators,andpumps.
CODEREFERENCE:NA
RECOMMENDATION:Abrasiveblastandrecoatareasofcoatingfailureonthetankshell,
appurtenances,valves,flangesofflexconnectors,strainers,filterseparators,and
pumps.Repairsshouldbeaccomplishedusinganepoxybasedcoatingsystemor

equivalent.

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

APPENDIX A: ENGINEERING CALCULATIONS AND DATA

1. RemainingLifeCalculation
2. UltrasonicThicknessData

InterSpec, LLC Rev.21505-2

12/6 2017

Tank #: 2 (LE 402) Plate Specification: Unknown T 55,000 Material: Y 30,000 Manufactured Date: 2002 Circa 23595

Horizontal 25960 Tank Specification Unit 0.80Y 0.429T Diameter (D) 10.500 feet Smaller of 24000 23595 Length (L) 35.000 feet Height (H) the two: 0.88Y 0.472T Volume (V) 20,073 gallon 26400 25960 S.G 0.88 N/A E 1 N/A *Smaller of Two specified minimum or 80,000(lb/in²) Y 15 years

Maximum Previous Current 2, 3 Minimum Next Next Product Allowable Measured Measured Acceptable Corrosion 1 Remaining VT UT Height Stress Joint Thickness Thickness Thickness Rate Life Inspection Inspection

Ft (psi) Efficiency (inches) (inches) (inches) (in./yr) (ca .) (years) (years) (feet) (S ) (E ) (t prev) (t act) (t min) (C r) (years) (I v) (I ut)

10.50 23,595 1 0.313 0.312 0.100 0.00001 >30 5 15

10.50 23,595 1 0.250 0.234 0.100 0.00107 >30 5 15

10.50 23,595 1 0.250 0.228 0.100 0.00147 >30 5 15

10.50 23,595 1 0.313 0.312 0.100 0.00001 >30 5 15

NOTE:

2 Acceptable roof thickness in any 100in. 2 shall not be less than 0.090 in 3 UL-142 Section 17.2.1 , 25.1, and 13.2.1 for Horz./Vertical and rectangular tanks <50,000 gal and >50,000 gal. API 653 Section 4.3.2.1, 4.3.4.1 and 4.4.1 VT and UT Intervals used are from API-653. See STI-SP001 Table 5.5 for inspection intervals for STI tanks.

Carbon Steel Specified minimum yield strength(lb/in ²)

North Head

Course Side

SConfiguration:

Specified minimum tensile strength *(lb/in²)

Shell Life Evaluation : Data Result

Owner/Operator: US Army AASF1 - Lexington; Lexington, OK

Inspection Date :

1 The engineering data used to calculate in-service period of operation (Remaining Life) assumes the tank remains in the same service and all corrosion rates remain constant.

All other

Maximum allowable stress, first and second (lb/in ²)

Maximum allowable stress, for all other (lb/in²)

Bottom and second course

Shell (West Face) South Head

Shell (East Face)

0.000

0.050

0.100

0.150

0.200

0.250

0.300

0.350

North Head Shell (East Face) Shell (West Face) South Head in ch es

Course #

Shell Life Evaluation tprev tact tmin

0.050

0.100

0.150

0.200

0.250

0.300

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 in ch es

Data Points

Shell (West Face)

0.050

0.100

0.150

0.200

0.250

0.300

0.350

1 3 5 7 9 11 13 15 17 19 in ch es

Data Points

South Head

0.050

0.100

0.150

0.200

0.250

0.300

0.350

1 3 5 7 9 11 13 15 17 19 in ch es

Data Points

North Head

0.050

0.100

0.150

0.200

0.250

0.300

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 in ch es

Data Points

Shell (East Face)

InterSpec,LLC Rev.21505-4 DATA Sheet: 1 Tank #:

1 0.332 1 0.239 1 0.237 1 0.327 2 0.332 2 0.241 2 0.240 2 0.328 3 0.331 3 0.241 3 0.228 3 0.329 4 0.331 4 0.241 4 0.252 4 0.328 5 0.329 5 0.240 5 0.256 5 0.329 6 0.331 6 0.241 6 0.254 6 0.328 7 0.329 7 0.238 7 0.253 7 0.330 8 0.332 8 0.235 8 0.254 8 0.329 9 0.331 9 0.237 9 0.254 9 0.330

10 0.331 10 0.237 10 0.254 10 0.330 11 0.332 11 0.239 11 0.250 11 0.330 12 0.332 12 0.234 12 0.235 12 0.329 13 0.332 13 0.238 13 0.237 13 0.330 14 0.332 14 0.237 14 0.237 14 0.330 15 0.331 15 0.236 15 0.238 15 0.328 16 0.331 16 0.256 16 0.237 16 0.330 17 0.329 17 0.255 17 0.237 17 0.329 18 0.331 18 0.253 18 0.241 18 0.332 19 0.333 19 0.255 19 0.238 19 0.331 20 0.333 20 0.254 20 0.237 20 0.334

Average 0.331 21 0.254 21 0.234 Average 0.330 Std.Dev. 0.001164158 22 0.253 22 0.241 Std.Dev. 0.001571958

23 0.256 23 0.233 24 0.235 24 0.246 25 0.237 25 0.235 26 0.239 26 0.235 27 0.242 27 0.242 28 0.240 28 0.244 29 0.239 29 0.246 30 0.236 30 0.234

Average 0.243 Average 0.242 Std.Dev. 0.007573092 Std.Dev. 0.007950204

2 (LE 402)

Owner/Operator:

North Head Shell (West Face) South HeadShell (East Face)

Tank Shell and Bottom/Roof/Heads UT Readings

US Army AASF1 - Lexington; Lexington, OK

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

APPENDIX B: ENGINEERING DRAWINGS

1. TankLayoutDrawing
2. TankFarmLayoutDrawing

Q - 3" PlugK - 4" Electronic A.T.G.

L - 2" Clock Gauge with Audible Alarm M - 3" Plug N - 4" to 2" Product Return O - 36" Manway P - 6" to 4" Product Issue

F - 3" Plug G - 36" Manway with 2" Product Return and 1" Water Draw H - 3" Manual Gauge Well I - 3" Plug J - 10" Emergency Vent

A - 2" Leak Detection B - 3" Plug C - 10" Emergency Vent D - 6" to 4" Product Receipt E - 6" Primary Vent

Tank 2 Layout Tank 2 (LE402)

A.A.S.F. #1 Lexington; Lexington, OK

InterSpec, LLC.

12/6/2017 N/A N/A

ER

-A

.A

.S.F. #1 LEX

IN

G

TO

N

-LEX

IN

G

TO

N , O

K

-TA

N K

2-D

EC

EM

B

ER

/2017Description:

Remarks/Legend:

Drawing Title:

Owner:

Drawn By:

Date: Rev. No.: Scale:

Modified By: InterSpec, LLC.

IN

TER

SPEC

, LLC

-PR

O

PR

IETA

RY

IN

FO

R

M

ATIO

N

-FO

R O

FFIC

IA

L U

SE O

N

LY

AB C D

E

F G H I J

K

LMN O

P Q

Head 1 Head 2

Tank Farm Layout Tank Farm

A.A.S.F. #1 Lexington; Lexington, OK

InterSpec, LLC.

12/6/2017 N/A N/A

ER

-A

.A

.S.F. #1 LEX

IN

G

TO

N

-LEX

IN

G

TO

N , O

K

-TA

N K

FA

R

M -D

EC

EM

B

ER

/2017Description:

Remarks/Legend:

Drawing Title:

Owner:

Drawn By:

Date: Rev. No.: Scale:

Modified By: InterSpec, LLC.

IN

TER

SPEC

, LLC

-PR

O

PR

IETA

RY

IN

FO

R

M

ATIO

N

-FO

R O

FFIC

IA

L U

SE O

N

LY

150'-0"

135'-0"

Cracks and Joint Sealant

Concrete Bollard

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

APPENDIX C: STI SP001 INSPECTION CHECKLIST

1. STI SP001 Inspection Checklist

There is minor cracking and joint seal deterioration

There is minor coating failure on the shell.

Appurtenance tages are coated

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

APPENDIX D: PHOTOGRAPHS

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

D.1: Tank Ground and Steel Saddle D.2: Steel Saddle

D.3: Head 1 D.4: Overall View

D.5: Nozzles A, B, and C D.6: Nozzles D and E

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

D.7: Flame Arrestor D.8: Flame Arrestor

D.9: Nozzle F D.10: Nozzle G

D.11: Water Draw Hand Pump D.12: Nozzle H

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

D.13: Nozzle I D.14: Nozzle J and K

D.15: Electronic ATG D.16: Nozzle L

D.17: Overfill Alarm D.18: Nozzle M

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

D.19: Nozzle M D.20: Nozzle N

D.21: Nozzles O, P, and Q D.22: Nozzles P and Q

D.23: Catwalk Access D.24: Catwalk

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

D.25: Catwalk Access D.26: Receipt Filter Separator

D.27: Receipt Piping D.28: Receipt Piping

D.29: Receipt Piping D.30: Receipt Piping

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

D.31: Receipt Piping D.32: Receipt Piping

D.33: Thread Engagement D.34: Overall View

D.35: Issue Piping D.36: Issue Piping

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

D.37: Issue Piping D.38: Issue Piping

D.39: Issue Piping D.40: Issue Piping

D.41: Issue Piping D.42: Issue Spill Bucket

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

D.43: Issue Piping D.44: Fuel Dripping

D.45: Leaking Sight Flow Indicator D.46: Electronic ATG House

D.47: Electronic ATG Alarm D.48: Electronic ATG Read Out

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

D.49: Electronic ATG Control Panel D.50: Facility Containment

D.51: Facility Containment D.52: Facility Containment

D.53: Facility Containment D.54: Facility Containment

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

D.55: Containment Sump D.56: Containment Sump

D.57: Remote Impounding D.58: Remote Impounding

D.59: Expansion Joint Deterioration D.60: Expansion Joint Deterioration

STI In‐Service Inspection Report A.A.S.F.1 Lexington, OK

D.61: Vegetation D.62: Expansion Joint Deterioration

D.63: Expansion Joint Deterioration D.64: Containment Cracking