Attachment J.1-D – Data Requirements Document.pdf
PDF 383 KB Posted
- Attached to
- Safety and Mission Assurance (SMA) Engineering and Technical Services (SETS) Draft RFP Federal contract opportunity
- Solicitation number
- 80GRC021R0011
About this file
This draft request for proposal and associated documents provide requirements for Safety and Mission Assurance Engineering and Technical Services to be acquired by the National Aeronautics and Space Administration Glenn Research Center. The solicitation includes requirements for administrative support services, communication and professional development services, information technology services, and technical knowledge services. The anticipated release date for the request for proposal is January 3rd, 2022, with an offer due date of February 2nd, 2022. The acquisition is set aside for woman-owned small businesses under North American Industry Classification System code 611430 for professional and management development training with a size standard of $12 million. A virtual industry day will be held on November 17th, 2021 to discuss the draft documents. Questions regarding the draft request for proposal are due by December 3rd, 2021.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S&MA Engineering and Technical Services (SETS) Attachment J.1-D
Attachment J.1-D
DATA REQUIREMENTS DOCUMENT (DRD)
S&MA Engineering and Technical Services
(SETS)
DATA REQUIREMENTS DOCUMENTS LISTING
ITEM NO. TITLE CHANGE STATUS
MS-01 Quarterly Headcount and WYE Report
MS-02 Advance Notification of Workforce Reduction Report MS-03 Annual Planned WYE Report MS-04 Quarterly Employee Training Report MS-05 Annual Accounting Calendar MS-06 533 Monthly/Quarterly MS-07 533 Baseline MS-08 Monthly Contract Status Reviews MS-09 Monthly Property Report MS-10 Supplemental Financial WBS Report MS-11 ODC/Travel Estimate vs. Actuals MS-12 Trip Reports
DRD Instructions
Block C: Organization designated to exercise technical and/or administrative control over the data requirement.
Block D: “Type of Data” code as follows:
Data requiring written approval by the procuring activity prior to implementation into the procurement or development program.
1. Data submitted to the procuring activity for review not later than three weeks prior to project implementation. Data shall be considered approved unless the contractor has been notified of disapproval prior to project implementation.
2. Data submitted to the procuring activity for coordination, surveillance, or information.
3. Data retained by the contractor to be made available to the procuring activity upon request. The contractor shall furnish a list to the procuring activity.
4. Data to be retained by the contractor and reviewed by NASA on request.
Block E: Inspection Acceptance code as follows:
Code Inspection Acceptance
1. Source Source
2. Destination (OPR) Destination (OPR)
3. Source Destination (OPR)
4. Certificate of Conformance (Mandatory)
5. Certificate of Conformance (Optional)
6. No Inspection Required No Acceptance Required
Block F: The frequency of submission codes are as follows:
AD As Directed AN Annual AR As Required MO Monthly QU Quarterly
Block G: Date of initial submittal. If calendar date is not scheduled, the number of days preceding or following the event to which the data requirement is related will be entered (e.g., 90 days prior to launch).
Block H: For “Onetime Only” submittals, a date will be entered. For recurring submittals, the first digit(s) indicate the number of calendar days from the reporting period’s (Block F) start to the data preparation cut off. The second digit(s), after the slash, indicate the number of calendar days from the cut off to the submittal date. Example: If Block F were “MO” and Block H were “30/10”, the data would include the entire month and would be submitted within 10 days thereafter.
Block K: Distribution organizational symbol, number of copies, and type of copy code(s) (in parenthesis) required for each office. Type of copy codes are as follows:
Code Definition D Others (Explained in Block J: Remarks)
DATA REQUIREMENT DOCUMENT-MS-01 - Quarterly Headcount and WYE Report
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-01
A. ITEM NO.
DRD-MS-01
B. LINE ITEM TITLE: Quarterly Headcount and WYE Report
C. OPR.
CFO
D. TYPE
E. INSPECT/
ACCEPT
F. FREQ.
QU
G. INITIAL SUB.
After Contract
Award
H. AS OF DATE
See Block 8
J. REMARKS:
Type D electronic versions shall be compatible with Microsoft Excel. Contractor format is acceptable.
K. DISTRIBUTION TOTALS
CO
COR
NO. TYPE
2 D
DATA REQUIREMENT DESCRIPTION
1. TITLE:
Quarterly Headcount and WYE Report
2. NUMBER
3. USE: 4. DATE
To provide on-site and off-site headcount and WYE data which is used to provide NASA Headquarters for future planning requirements.
5. ORGANIZATION
7. INTERRELATIONSHIP
FAR 52.219-30 Deviation 19-02A
6. REFERENCES
8. PREPARATION INFORMATION
In accordance with G.5, the contractor shall provide headcount and WYE data based on the requirements below. The report shall include:
a. The contract number
b. The Prime contractor's total on-site and off-site headcount and WYE
c. The Sub-contractor's total on-site and off-site headcount and WYE
d. The Prime and Sub-contractor’s percentage of cost performed in compliance with the FAR 52.219-30
The contractor shall provide this information no later than 10 days after the close of each reporting period which ends on March 31st, June 30th, September 30th, and December 31st.
One report must be submitted quarterly based on the following Definition of Terms and in the formats provided:
Report 1: Quarterly Contractor Headcount and WYE Report
8. PREPARATION INFORMATION (CONT.)
DEFINITION OF TERMS:
a. On-site: Personnel who perform on the contract and occupy physical space on NASA HQ or GRC. The on-site headcount also includes personnel who are temporarily absent from their assigned stations (e.g., on leave without pay, annual/sick leave, TDY)
b. Off-site: Personnel who are on the contract but physically located outside the environs of NASA HQ or GRC.
c. Headcount: Represents the total number of employees on the contract during the reporting period, regardless of how many hours they charged.
d. WYE (Work Year Equivalent): Represents the productive hours a Contractor's employee is available to work, not including holidays or paid leave. WYE is calculated by dividing the total number of productive hours in a reporting period by the number of hours available to work in the reporting period. Available hours is calculated by taking the total number of weekdays in the reporting period and multiplying by 8 hours and then subtracting any holidays or paid leave in the period.
Sample Format: (See next page)
QUARTERLY PRIME CONTRACTOR AND SUB-CONTRACTOR
HEADCOUNT AND WYE REPORT
Contract: XXXXXXX Sample Report for Quarter X – Period Ending XX/XX/XXXX
PERSONNEL ON-SITE OFF-SITE TOTAL
TOTAL HEADCOUNT
PRIME CONTRACTOR HEADCOUNT
SUBCONTRACTOR HEADCOUNT
TOTAL WYE
PRIME CONTRACTOR WYE
SUBCONTRACTOR WYE
PERCENTAGE OF COST PERFORMED BY WOSB
PRIME AND SUBCONTRACTOR
DATA REQUIREMENT DOCUMENT-MS-02 - Advance Notification of Workforce Reduction Report
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-02
A. ITEM NO.
DRD-MS-02
B. LINE ITEM TITLE: Advance Notification of Workforce Reduction Report
ACCEPT
AR
After Contract
Contractor format is acceptable.
K. DISTRIBUTION TOTALS
CO NO. TYPE
COR 2 D
Advance Notification of Workforce Reduction Report
2. NUMBER
3. USE: 4. DATE
To provide the Government advance notification of workforce reductions and allow compliance with the Workforce Adjustment and Retraining Notification (WARN) Act.
5. ORGANIZATION
7. INTERRELATIONSHIP
29 U.S.C. 2107(a)
6. REFERENCES
8. PREPARATION INFORMATION
The contractor shall notify in writing the Contracting Officer, with a copy to the Contracting Officer's Representative, at least 15 calendar days in advance of notification to employees of any planned workforce reduction of permanent, full-time, and part-time employees. In addition, if WARN Act notification is required, the contractor shall provide to the CO and COR the information required by the WARN Act, section 639.7(c) and a listing of all organization to be notified including those required by section 639.6(a), (c), and (d), at least five (5) days prior to the issuance of the notification.
The notification shall include the reason for the reduction in workforce, the number of employees impacted, their labor classifications, their physical location, and their location within contract organizational structure.
The notification shall also identify the expected date of the first separation and the anticipated schedule for making separations, as well as the name and telephone number of a company official to contact for further information.
DATA REQUIREMENT DOCUMENT-MS-03 - Annual Planned WYE Report
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-03
A. ITEM NO.
DRD-MS-03
B. LINE ITEM TITLE: Annual Planned WYE Report
ACCEPT
AN/AR
Type D electronic versions shall be compatible with Microsoft Excel software. To be provided in a format acceptable to the COR.
K. DISTRIBUTION TOTALS
Annual Planned WYE Report
2. NUMBER
3. USE: 4. DATE
To provide a breakdown of the number of planned WYEs by labor category and cost center by fiscal year along with average hourly rates per labor category per WYE.
5. ORGANIZATION
7. INTERRELATIONSHIP
FAR 52.219-30 Deviation 19-02A
6. REFERENCES
8. PREPARATION INFORMATION
The contractor shall provide planned WYE and average rate data based on the requirements below. The report shall include:
1. The contract number
2. The Government fiscal year beginning date
3. The number of planned WYEs by labor category and Cost Center for the year
4. The average hourly direct labor rate per WYE
5. The average hourly fully burdened labor rate per WYE
6. Key personnel and contract commitment date
The contractor shall provide this information at contract award, and annually prior to the beginning of each Government fiscal year.
Sample Format: (see next page)
ANNUAL PLANNED WYE REPORT
Sample Report for Fiscal Year Beginning XX/XX/XXXX
Labor Category Cost Center
Annual WYE Plan
Auditor 2
Engineer 3
TOTAL
Labor Category Average Hourly Direct Labor Rate Per WYE
Average Hourly Fully Burdened Labor Rate Per WYE
Auditor 2
Engineer 3
Key Personnel Contract Commitment Date Jane Smith July 1, 2022
DATA REQUIREMENT DOCUMENT-MS-04 - Quarterly Employee Training Report
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-04
A. ITEM NO.
DRD-MS-04
B. LINE ITEM TITLE: Quarterly Employee Training Report
ACCEPT
QU
Type D electronic versions shall be compatible with Microsoft Excel software. To be provided in a format acceptable to the COR.
K. DISTRIBUTION TOTALS
Quarterly Employee Training Report
2. NUMBER
3. USE: 4. DATE
To provide a current status of contractor employee training taken during the past quarter.
5. ORGANIZATION
7. INTERRELATIONSHIP 6. REFERENCES
The contractor shall provide quarterly employee training report. The report shall include:
a. The contract number
b. The quarter end date for each quarter
c. Listing of all training courses completed by contractor and sub employee
(NASA required, NASA certification, contractor, industry standard, etc.)
Quarterly Employee Training Report
Quarter End Date: MM-DD-YYYY
Course Name
NASA
Required
(Y/N)
Training Completion
Date
Company Employee
NASA IT Security Y 3/25/2022 Prime John Doe Annual Security Awareness Training Y 4/27/2022 Sub B Carol Jones Cybersecurity and Privacy Awareness Training
Y 4/28/2022 Sub C Shannon Miller
SMA Professional Development Training N 6/5/2022 Prime Steve Moore
Prime New Employee Training N 7/1/2022 Prime Amy Thompson
DATA REQUIREMENT DOCUMENT-MS-05 - Annual Accounting Calendar
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-05
A. ITEM NO.
DRD-MS-05
B. LINE ITEM TITLE: Annual Accounting Calendar
ACCEPT
AN
Type D electronic versions shall be compatible with Microsoft Excel software. To be provided in a format acceptable to the COR.
K. DISTRIBUTION TOTALS
Annual Accounting Calendar
2. NUMBER
3. USE:
Identify Contractor work schedule to align with Government deadlines and requirements.
4. DATE
5. ORGANIZATION
7. INTERRELATIONSHIP - Parent Contract - G.13 GRC 52.242-96 NASA CONTRACTOR
FINANCIAL REPORTING - SUPPLEMENTAL REQUIREMENTS. (JUN 2021)
The contractor shall provide the accounting calendar for each month of the business accounting year that includes:
1. The contract number
2. The contractor business year beginning and end date
3. Holidays
4. Shutdown Days
5. The number of working days in each month for which financial activity will be counted
The contractor shall provide this information at contract award, and annually prior to the beginning of each business year.
Contractor Name XYZ Corporation Contract/Task Number NNC22ZZZZZZ Fiscal Year End 9/30/2023
*******ALL DATA BELOW FOR EXAMPLE PURPOSES ONLY********
ACCOUNTING CALENDAR 2022 (EXAMPLE)
Accounting Shutdown Working Month Period End Holidays Periods Days
October 10/31/22 10/10 20 November 11/30/22 11/11, 11/24 20 December 12/31/22 12/26 21 January 1/31/23 1/2, 1/16 20 February ********CONTINUE ENTERING DATA********** March ********CONTINUE ENTERING DATA********** April ********CONTINUE ENTERING DATA********** May ********CONTINUE ENTERING DATA********** June ********CONTINUE ENTERING DATA********** July ********CONTINUE ENTERING DATA********** August ********CONTINUE ENTERING DATA********** September 9/29/23 9/4 20
DATA REQUIREMENT DOCUMENT-MS-06 - 533 Monthly and 533 Quarterly Reports
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-06
A. ITEM NO.
DRD-MS-06
B. LINE ITEM TITLE: 533 Monthly and 533 Quarterly Reports
ACCEPT
MO
/QU
Type D electronic versions shall be compatible with Microsoft Excel software. To be provided on NASA Form NF533M and NF533Q or in a format acceptable to the COR and CFO Cost Analyst.
K. DISTRIBUTION TOTALS
As specified in G.13 GRC 52.242-96 NASA CONTRACTOR FINANCIAL REPORTING -
SUPPLEMENTAL REQUIREMENTS. (JUN 2021)
2 D
Financial Management Report (533M and 533Q)
2. NUMBER
3. USE: 4. DATE
To provide quarterly and monthly financial reports for monitoring program costs.
The 533Q and 533M reports are the official cost documents used at NASA for cost type, price redetermination, and fixed price incentive contracts.
5. ORGANIZATION
7. INTERRELATIONSHIP - Parent Contract - G.13 GRC 52.242-96 NASA CONTRACTOR
FINANCIAL REPORTING - SUPPLEMENTAL REQUIREMENTS. (JUN 2021)
SCOPE:
The Financial Management Report (533M and 533Q) provides data on accumulated costs and funding projections for management of the contract.
APPLICABLE DOCUMENTS:
NPR 9501.2E, NASA Contractor Financial Management Reporting (Current Revision)
CONTENTS:
The elements of cost for financial reporting shall be mutually agreed to by both parties. The Financial Management Reports (533M and 533Q) shall be prepared in accordance with the detailed instructions provided on in the NASA Forms 533Q and 533M and the supplementary instructions set forth in NPR 9501.2E, Chapter 3.
a. 533Q Quarterly Report shall include actual cost and cost projections Contract Line Item level. The initial 533Q report shall reflect the original contract value detailed by negotiated reporting categories.
b. 533M Monthly Report shall include actual cost and cost projections at the total contract Line Item level.
Sample worksheet 533 Monthly is solicitation attachment J.1-F 533M Sample.
The sample 533 Quarterly has been provided on the next page.
NF533Q Sample:
National Aeronautics and Quarterly Contractor Financial
Form Approved O.M.B.
2. REPORT FOR QUARTER BEGINNING
Space Administration Management Report No. 2700-0003
Expires: 4/30/2022
TO: FROM: 3. CONTRACT VALUE
a. COST b. FEE
1. DESCRIPTION OF
CONTRACT
a. TYPE b. CONTRACT NO. AND LATEST DEFINITIZED MODIFICATION NO. 4. FUND LIMITATION
c. SCOPE OF WORK d. AUTHORIZED CONTRACTOR REPRESENTATIVE DATE 5. BILLING Type name:
Signature:
a. INVOICE AMTS. BILLED b. TOTAL PYTS. REC'D.
6. REPORTING CATEGORY
7. COST INCURRED/
HOURS WORKED
8. ESTIMATED COST/HOURS TO COMPLETE
9. ESTIMATED
FINAL
COST/HOURS
10.
ESTI-
MATED
COM-
PLETION
DATE
11.
UNFILLE D
ORDERS
OUTSTA
NDING
CUMULATI
VE ACTUAL
THROUGH
PRIOR
MONTH
CURRENT
MONTH
ESTIMATE
CUMULATI
VE
TO DATE
Month
Quarter
Balance of
FY-
g.
Next
FY-
h.
BALANCE OF
TOTAL TO
COMPLETE
CONTRAC
TOR
VALUE
a. b. c. a. b. c. d. e. f. i. j. a. b.
DATA REQUIREMENT DOCUMENT-MS-07 - 533 Baseline
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-07 A. ITEM NO.
DRD-MS-07
B. LINE ITEM TITLE: 533 Baseline
ACCEPT
AD
Type D electronic versions shall be compatible with Microsoft Excel software. To be provided in a format acceptable to the COR.
K. DISTRIBUTION TOTALS
533 Baseline
2. NUMBER
3. USE: 4. DATE
To establish the initial baseline to compare estimated program costs against contract performance.
5. ORGANIZATION
7. INTERRELATIONSHIP - Parent contract G.13 6. REFERENCES
8. PREPARATION INFORMATION
SCOPE:
The 533 baseline provides monthly planned contract costs over the term of the contract.
APPLICABLE DOCUMENTS:
NPR 9501.2E, NASA Contractor Financial Management Reporting (Current Revision)
CONTENTS:
The elements of cost for financial reporting shall be mutually agreed to by both parties.
DATA REQUIREMENT DOCUMENT-MS-08 - Monthly Contract Review
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-08
A. ITEM NO.
DRD-MS-08
B. LINE ITEM TITLE: Monthly Contract Review
NSC
ACCEPT
Type D electronic versions shall be compatible with Microsoft PowerPoint software. To be provided in a format acceptable to the COR.
K. DISTRIBUTION TOTALS
Monthly Contract Review
2. NUMBER
3. USE: 4. DATE
To establish activity reporting for the Contractor’s progress and accomplishments. The Monthly Contract Review packages support the monthly and quarterly management reviews of costs, schedule, and technical performance. The format provides a standardized approach for review of contract status.
7. INTERRELATIONSHIP – Contract SOW Section 5.2 6. REFERENCES
Monthly Contract Report Review data packages document the management review of the cost, schedule, and technical performance on the contract
CONTENTS:
The Monthly Contract Report reviews cost, schedule, and technical performance. Documentation of metrics that effectively indicate the level of success in the execution of contract requirements and the status of the Contractor’s achievements shall be presented at the review.
FORMAT: Electronic format
MAINTENANCE: Contract Status Reports and Management Review Packages shall be updated for monthly reviews
DATA REQUIREMENT DOCUMENT-MS-09 – Monthly Property Reports
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-09
A. ITEM NO.
DRD-MS-09
B. LINE ITEM TITLE: Monthly Property Reports
LTID
ACCEPT
Type D electronic versions shall be compatible with Microsoft Excel software. To be provided in a format acceptable to the GRC Industrial Property Officer (IPO).
K. DISTRIBUTION TOTALS
GRC Industrial Property Officer (IPO), GRC Supply and Equipment Management Officer (SEMO), CO, COR, Property as designated
4 D
Monthly Property Report
2. NUMBER
3. USE: 4. DATE
To provide monthly property reports for monitoring Government Property in the custody of the Contractor.
7. INTERRELATIONSHIP – SOW 3.1.1.3 Property Management
Monitor Government property in the custody of contractors.
APPLICABLE DOCUMENTS:
1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF
CONTRACTORS. (JAN 2011)
CONTENTS:
DATA REQUIREMENT DOCUMENT-MS-10 - Supplemental Financial WBS Report
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-10
A. ITEM NO.
DRD-MS-10
B. LINE ITEM TITLE: Supplemental Financial WBS Report (includes monthly cost by WBS and cumulative hours worked by WBS)
ACCEPT
Contractor format is acceptable.
K. DISTRIBUTION TOTALS
Supplemental Financial WBS Report (includes monthly cost by WBS and cumulative hours worked by WBS)
2. NUMBER
3. USE: 4. DATE
To provide the Government with detailed financial information organized by WBS.
7. INTERRELATIONSHIP
Historically, the supplemental Financial WBS Report includes financial information for contract line items (CLINs) specified and 135 WBS elements detailing at a minimum, WBS, Task Title, Labor and ODC cost by month, Total Cost and Cumulative Hours.
DATA REQUIREMENT DOCUMENT-MS-11 - Other Direct Cost (ODC)/Travel Estimate vs. Actuals
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-11
A. ITEM NO.
DRD-MS-11
B. LINE ITEM TITLE: Other Direct Cost (ODC)/Travel Estimate vs. Actuals
ACCEPT
Contractor format is acceptable.
K. DISTRIBUTION TOTALS
Other Direct Cost (ODC)/Travel Estimate vs. Actuals
2. NUMBER
3. USE: 4. DATE
To provide the Government monthly invoiced ODC and travel costs compared to approved estimates.
7. INTERRELATIONSHIP - SOW
Historically, the ODC/Travel Financial WBS Report includes financial information for contract/task line items (CLINs), WBS, ODC Category, Description, Annual Baseline Estimate, Cost Projection and Actual Cost by Month, Invoiced Amount, Estimate at Completion, Remaining Baseline (including Projection) and Remaining Baseline (Actuals Only).
– FYXX Details monthly invoiced ODC and Travel costs compared to the Approved Estimates
DATA REQUIREMENT DOCUMENT-MS-12 - Trip Reports
CONTRACT APPLICATION INFORMATION FOR DRL: DRD-MS-12
A. ITEM NO.
DRD-MS-12
B. LINE ITEM TITLE: Trip Reports
ACCEPT
Contractor format is acceptable.
K. DISTRIBUTION TOTALS
Trip Reports
2. NUMBER
3. USE: 4. DATE
To provide the Government a report at the end of the travel that supports what was accomplished.
7. INTERRELATIONSHIP
Reports of trips that the cost is invoiced to the government.
CONTENTS:
Travel Start Date Travel End Date Employee Trip Location Trip Purpose Person Contacted Travel notes including information about the trip.
FORMAT: Electronic format