Attachment E - GRPS AHERA reports.pdf is a set of documents related to asbestos-containing materials (ACM) inspection reports for various Grand Rapids Public School (GRPS) facilities. The reports were conducted in compliance with the Asbestos Hazard Emergency Response Act (AHERA) and provide detailed information on the location, condition, and recommended actions for managing ACM in each school building.
The reports contain comprehensive asbestos inspections, assessments, and management plans for 58 GRPS facilities, including elementary, middle, and high schools. The documents outline the specific types, quantities, and locations of ACM found within each building, as well as recommended response actions such as removal, encapsulation, or periodic surveillance. The reports were completed between 2016 and 2018 and are intended to assist GRPS in maintaining compliance with federal and state regulations regarding the identification and management of ACM in their facilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
119 West Cass Street P.O. Box 908
Grand Rapids, MI 48838 Phone: 616-302-0819
Web: microairconsulting.com Email: microairconsulting@gmail.com
MicroAir Project No. MA-158-18 Page 1 of 7
January 25th, 2019 Project Number: MA-158-18
Mr. Marc Bennett
Grand Rapids Public Schools 900 Union, NE Grand Rapids, MI 49503
Re: AHERA 3 Year Reinspection Report Grand Rapids Public Schools – Central Innovations
Dear Mr. Bennett:
MicroAir Consulting, LLC (MicroAir) was retained by Grand Rapids Public Schools (GRPS), to conduct an AHERA 3-year reinspection of Central Innovations located at 421 Fountain NE in Grand Rapids, Michigan. The inspection was conducted according to the protocol described in the U.S. Environmental Protection Agency Asbestos Hazard Emergency Response Act of 1986 (40 CFR 763).
CERTIFICATION
The building inspection was conducted on January 2nd, 2019 by Mr. Grant Edgerly, a State of Michigan accredited Asbestos Building Inspector. Mr. Edgerly’s, Accreditation Number is A41792.
REGULATORY BACKGROUND
As a public and commercial building, Central is governed by 29 CFR 1910.1001, Occupational Health Standards for Asbestos in Construction/General Industry and the EPA’s NESHAP for the normal course of business activities by GRPS employees and occupants.
There are three state agencies in Michigan that regulate asbestos in Michigan: the Michigan Department of Environmental Quality (DEQ), the Michigan Department of Licensing and Regulatory Affairs (DLARA) and the Michigan Department of State Police (MSP). The DEQ is concerned about the release of asbestos fibers to the outer air and proper waste disposal, while DLARA focuses on worker protection during renovation and demolition activities, contractor licensing, and worker training.
During construction or renovation activities, the persons performing those activities would be governed by 29 CFR 1926.1101, Occupational Health Standards for Asbestos in Construction. The Asbestos Hazard Emergency Response Act (AHERA), 40 CFR 763, (partial) and/or its associated requirements. However, there are some portions of AHERA that are used as guidelines for compliance with 29 CFR 1910.1001. In particular, 29 CFR 1910.1001(j)(1) requires owners of buildings constructed prior to 1980 to presume that certain types of building materials are asbestos-containing materials (ACM), unless the owner demonstrates that those materials are not
ACM.
40 CFR Part 61, Subpart M (NESHAP) requires that a thorough inspection be conducted prior to all renovations and all demolitions. A thorough inspection for asbestos is required no matter the age of the facility because all uses of asbestos are not banned. The inspection must be completed before the commencement of a subject renovation and/or demolition activity.
BUILDING DESCRIPTION
The Central Innovations building was constructed in 1910 with additions in 1927, 1931 and 1982. Some building renovations have occurred throughout over the years.
PREVIOUS INSPECTION
The most recent inspection was conducted by GRPS in 2018. MicroAir reviewed this report and incorporated the findings of the previous inspection and historical information into the current reinspection data.
In the previous inspection report suspect ACM materials were given a unique identification number (homogeneous material number), MicroAir has changed numbering from previous reports. The reinspection did
MicroAir Project No. MA-158-18 Page 2 of 7 include the collection of bulk samples. Results of the sampling can be found in Appendix A along with locations of remaining ACM in the building.
REINSPECTION PROCEDURES
With the assistance of GRPS maintenance staff, MicroAir re-inspected known and previously identified areas of the building including above suspended ceilings, pipe chases, and inside the tunnels.
It was beyond the scope of this reinspection to locate, identify, or quantify ACM in areas that were concealed and/or inaccessible areas, such as within walls, hard ceilings, or equipment.
2019 REINSPECTION FINDINGS
The following suspect asbestos-containing materials were observed at Central Innovations during the asbestos inspection and the bulk sampling. Materials in bold were found to be greater than 1% ACM.
Drywall, tape and mud Plaster White sink undercoating 12”x12” White w/multi-color vinyl floor tile w/mastic 1910 - 1’x1’ Ceiling tile small holes and glue pods 1’x1’ Ceiling tile large holes and glue pods 2’x2’ Ceiling tile 12”x12” White w/green marks vinyl floor tile w/mastic Brown cove base Black counter tops 12”x12” White vinyl floor tile w/mastic Wood floor Chalkboards Fire doors Transite fume hood Roofing Concrete Grouts Mortars Caulks and sealants Pipe insulation Wire insulation White lab top Troweled on plaster
Some of the materials listed above are assumed to contain asbestos until bulk samples can be collected and analyzed.
Appendix A of this report is a table that identifies the confirmed and suspect ACM homogeneous materials in Central, their corresponding identification number and locations, and the general condition of ACMs identified during the reinspection.
CONCLUSIONS AND RECOMMENDATIONS
MicroAir was retained by Grand Rapids Public Schools to conduct a 3-year asbestos-containing material (ACM) reinspection of Central Innovations located at 421 Fountain NE in Grand Rapids, Michigan. MicroAir completed the reinspection on January 2nd, 2019. The inspection was conducted by a State of Michigan accredited Asbestos Building Inspector.
During the reinspection, MicroAir identified and assessed 24 homogeneous materials remaining in Central Innovations.
Any personnel entering a tunnel or chase area must be notified of ACM locations and explained the requirement to wear personal protective equipment.
MicroAir Project No. MA-158-18 Page 3 of 7
If GRPS plans to conduct any renovation or demolition, the identified ACMs should be removed by a licensed asbestos abatement contractor, as required by current federal, state, and local laws and regulations, should perform any necessary removal and disposal of the identified ACM. MicroAir notes that if suspect ACM other than those identified during this reinspection are encountered during any renovation or demolition, such materials should be sampled and analyzed using PLM to verify presence of asbestos.
We also recommend that visual observations, verification of removal and cleanup, and air monitoring or clearance air monitoring for asbestos fibers be performed by a third party retained by GRPS to demonstrate compliance with applicable regulations, and to confirm the suitability or the area for re-entry. MicroAir can perform these services.
Warning labels should be affixed in all non-public areas where ACM or assumed ACM is present. After completion of repairs or removal of the ACM, fill out an O&M Activities Form and file it in the management plan.
As required by AHERA, GRPS should continue to send the annual notifications including information on planned response actions and reinspections. Copies of the notifications should be kept in the Management Plan.
LIMITATIONS
The conclusions drawn from the observations and sample results are only valid for the time the observations occurred. In the process of gathering the field data included in this report, procedures were followed that represent reasonable and acceptable industrial hygiene practices and procedures in a manner consistent with the level of care and skill ordinarily exercised by other members of this profession currently practicing under similar conditions. However, the information and opinions provided in this report are not to be construed as a warranty of the conditions of this site in any way, implied or explicit. MicroAir accepts no responsibility for the use, interpretation, or reliance by other parties on the information contained herein, nor does this report represent an instrument of regulatory compliance or an asbestos abatement specification.
In conducting the reinspection there are a number of obstacles and limitations that can affect the final outcome of the report. These limitations include but are not limited to the following factors: access concerns, materials that cannot be intrusively sampled or damaged, materials that have been replaced by renovation activities, materials with conflicting laboratory results, and materials that are located in inaccessible and/or concealed areas which limits its quantification. Due to these limitations, the results of this investigation cannot be construed as a certification of the presence or absence of ACM, beyond the materials identified, but rather a diligent and prudent review of available data within an established work scope, and time and budgetary constraints.
If you have any questions or require additional information, please contact me at 616-302-0819 or microairconsulting@gmail.com. Thank you.
Sincerely, MicroAir Consulting, LLC
Christian T. Decker Accredited Building Inspector and Management Planner
MicroAir Project No. MA-158-18 Page 4 of 7
APPENDIX A
TESTED AND SUSPECT ASBESTOS-CONTAINING
MATERIALS
MicroAir Project No. MA-158-18 Page 5 of 7
APPENDIX A- 3 YEAR REINSPECTION
TESTED AND SUSPECT ASBESTOS-CONTAINING MATERIALS
CENTRAL INNOVATIONS
INSPECTION DATE: JANUARY 2nd, 2019
HSA NO. HSA MATERIAL DESCRIPTION ASBESTOS?
MATERIAL
TYPE
F/NF FUNCTIONAL AREA CONDITION
CHS-1 Drywall, tape and mud No SM -- 132(500 SF) --
CHS-2 All Plasters (1910 and 1930) No SM -- 1910’s and 1930’s plaster --
CHS-3 White sink undercoating No MM -- 24(6 SF), 318(6 SF) --
CHS-4
12”x12” White w/multi-color vinyl floor tile w/mastic
Tile-No
Mastic-No
MM -- 24(2700 SF) --
CHS-5
1910 - 1’x1’ Ceiling tile small holes and glue pods
Tile-Yes
Pod-No
MM NF-II
Rooms 10, 17, 19, 29,138, 311, 312. Corridors 66, 67, 68, 70, 153, 161, 158, 157, 230, 231, 232, 234, 336, 337, 338 (35,000 SF total)
Good
CHS-6
1’x1’ Ceiling tile large holes and glue pods
Tile-No
Pod-No
MM -- 17(2500 SF), --
CHS-7 2’x2’ Ceiling tile No MM -- 17(2500 SF) --
CHS-8
12”x12” White w/green marks vinyl floor tile w/mastic
Tile-Yes
Mastic-No MM NF-I 132(1250 SF) Good
CHS-9 Brown cove base No MM -- 132(150 LF) --
CHS-10 Black counter tops Yes MM NF-II Science area Good
CHS-11
12”x12” White vinyl floor tile w/mastic
Tile-Yes
Mastic-Yes MM NF-I 400(1600 SF) Good
CHS-12 Wood floor No MM - 210, 211, 217, 219 --
CHS-13 Chalkboards No MM -- Classrooms --
FRIABILITY: MATERIAL TYPE: CONDITION:
F: Friable TSI: Thermal System Insulation Good: Little or no damage NF-I: Non-friable Category I SM: Surfacing Material Damaged: Less than 10% damage of total surface area, or less than 25% damage in a localized area NF-II: Non-friable Category II MM: Miscellaneous Material Significantly Damaged: Greater than 10% damage of total surface area, or greater than 25% damage in a localized area
SF: Square feet LF: Linear feet FT: Fittings NQ: Not Quantified
MicroAir Project No. MA-158-18 Page 6 of 7
CENTRAL INNOVATIONS
INSPECTION DATE: JANUARY 2nd, 2019
HSA NO. HSA MATERIAL DESCRIPTION ASBESTOS?
MATERIAL
TYPE
F/NF FUNCTIONAL AREA CONDITION
CHS-14 Fire doors Assumed MM MM All tagged doors and frames Good
CHS-15 Transite fume hood Yes MM NF-II Rom 132(70 SF) Good
CHS-16 Roofing Assumed MM NF-I Exterior roof (roof caulk 15%) Good
CHS-17 Concrete Assumed MM NF-II All concrete Good
CHS-18 Grouts Assumed MM NF-I All ceramic tile areas Good
CHS-19 Mortars No MM NF-II All block and brick walls Good
CHS-20 Caulks and sealants Assumed MM NF-II All original caulks and sealants Good
CHS-21 Pipe insulation Yes TSI F Rooms 221, 136, 128C, 5S, 9, 41, 42, 21, east of 21, Gym 101, Gym 001 and hidden in walls Good
CHS-22 Wire insulation Assumed MM NF-II Original wirings Good
CHS-23 White lab top Yes MM NF-II Room 225 (30 SF) Good
CHS-24 Troweled on plaster No SM -- Elevator shaft --
NF-I: Non-friable Category I SM: Surfacing Material Damaged: Less than 10% damage of total surface area, or less than 25% damage in a localized area NF-II: Non-friable Category II MM: Miscellaneous Material Significantly Damaged: Greater than 10% damage of total surface area, or greater than 25% damage in a
This page has been left blank intentionally
MicroAir Project No. MA-158-18 Page 7 of 7
Grand Rapids, MI 48838 Phone: 616-302-0819
MicroAir Project No. MA-158-18 Page 1 of 7
January 25th, 2019 Project Number: MA-158-18
Grand Rapids Public Schools – Ridgemoor Park Montessori
MicroAir Consulting, LLC (MicroAir) was retained by Grand Rapids Public Schools (GRPS), to conduct an AHERA 3-year reinspection of Ridgemoor Park Montessori (RPM) located at 2555 Inverness SE in Grand Rapids, Michigan. The inspection was conducted according to the protocol described in the U.S. Environmental Protection Agency Asbestos Hazard Emergency Response Act of 1986 (40 CFR 763).
The building inspection was conducted on January 3rd, 2019 by Mr. Grant Edgerly, a State of Michigan accredited Asbestos Building Inspector. Mr. Edgerly’s, Accreditation Number is A41792.
As a public and commercial building, Ridgemoor is governed by 29 CFR 1910.1001, Occupational Health Standards for Asbestos in Construction/General Industry and the EPA’s NESHAP for the normal course of business activities by GRPS employees and occupants.
There are three state agencies in Michigan that regulate asbestos in Michigan: the Michigan Department of Environmental Quality (DEQ), the Michigan Department of Licensing and Regulatory Affairs (DLARA) and the Michigan Department of State Police (MSP). The DEQ is concerned about the release of asbestos fibers to the outer air and proper waste disposal, while DLARA focuses on worker protection during renovation and demolition activities, contractor licensing, and worker training.
During construction or renovation activities, the persons performing those activities would be governed by 29 CFR 1926.1101, Occupational Health Standards for Asbestos in Construction. The Asbestos Hazard Emergency Response Act (AHERA), 40 CFR 763, (partial) and/or its associated requirements. However, there are some portions of AHERA that are used as guidelines for compliance with 29 CFR 1910.1001. In particular, 29 CFR 1910.1001(j)(1) requires owners of buildings constructed prior to 1980 to presume that certain types of building materials are asbestos-containing materials (ACM), unless the owner demonstrates that those materials are not ACM.
40 CFR Part 61, Subpart M (NESHAP) requires that a thorough inspection be conducted prior to all renovations and all demolitions. A thorough inspection for asbestos is required no matter the age of the facility because all uses of asbestos are not banned. The inspection must be completed before the commencement of a subject renovation and/or demolition activity.
The Ridgemoor Park Montessori building was constructed in 1972. The old part of the school was demolished in the summer of 2018 after all ACM was removed from the building. In 2017, Ridgemoor underwent a large asbestos abatement. All asbestos was removed from Ridgemoor with the exception of the
The most recent inspection was conducted by GRPS in 2018. MicroAir reviewed this report and incorporated the findings of the previous inspection and historical information into the current reinspection data.
MicroAir Project No. MA-158-18 Page 2 of 7
(homogeneous material number), MicroAir has changed numbering from previous reports. The reinspec-tion did include the collection of bulk samples. Results of the sampling can be found in Appendix A along with locations of remaining ACM in the building.
With the assistance of GRPS maintenance staff, MicroAir re-inspected known and previously identified areas of the building including above suspended ceilings, pipe chases, and inside the tunnels.
It was beyond the scope of this reinspection to locate, identify, or quantify ACM in areas that were concealed
The following suspect asbestos-containing materials were observed at Ridgemoor Park Montessori during the asbestos inspection and the bulk sampling. Materials in bold were found to be greater than 1% ACM.
Roof drain insulation Mudded fittings on cold water lines Mudded fittings on hot water lines Lag cloth Purple/White sink undercoating Cove base w/mastic 1’x2’ white ceiling tile 12”x12” green floor tile w/mastic 12”x12” cream floor tile w/mastic Exterior overhang texture Vibration dampeners on ductwork Drywall Concrete Grouts Mortars Caulks and sealants Asphalt roofing under rubber Asphalt roofing under stones Fire doors
Some of the materials listed above are assumed to contain asbestos until bulk samples can be collected and
Appendix A of this report is a table that identifies the confirmed and suspect ACM homogeneous materials in Ridgemoor, their corresponding identification number and locations, and the general condition of ACMs identified during the reinspection.
MicroAir was retained by Grand Rapids Public Schools to conduct a 3-year asbestos-containing material (ACM) reinspection of Ridgemoor Park Montessori located at 2555 Inverness SE in Grand Rapids, Michigan. MicroAir completed the reinspection on January 3rd, 2019. The inspection was conducted by a State of Michigan accredited Asbestos Building Inspector.
During the reinspection, MicroAir identified and assessed 19 homogeneous materials remaining in Ridgemoor Park Montessori.
Any personnel entering a tunnel or chase area must be notified of ACM locations and explained the requirement to wear personal protective equipment.
If GRPS plans to conduct any renovation or demolition, the identified ACMs should be removed by a licensed asbestos abatement contractor, as required by current federal, state, and local laws and regulations, should perform any necessary removal and disposal of the identified ACM. MicroAir notes that if suspect ACM other
MicroAir Project No. MA-158-18 Page 3 of 7 than those identified during this reinspection are encountered during any renovation or demolition, such
We also recommend that visual observations, verification of removal and cleanup, and air monitoring or clearance air monitoring for asbestos fibers be performed by a third party retained by GRPS to demonstrate compliance with applicable regulations, and to confirm the suitability or the area for re-entry. MicroAir can
Warning labels should be affixed in all non-public areas where ACM or assumed ACM is present. After completion of repairs or removal of the ACM, fill out an O&M Activities Form and file it in the management plan.
As required by AHERA, GRPS should continue to send the annual notifications including information on planned response actions and reinspections. Copies of the notifications should be kept in the Management Plan.
The conclusions drawn from the observations and sample results are only valid for the time the observations occurred. In the process of gathering the field data included in this report, procedures were followed that represent reasonable and acceptable industrial hygiene practices and procedures in a manner consistent with the level of care and skill ordinarily exercised by other members of this profession currently practicing under similar conditions. However, the information and opinions provided in this report are not to be construed as a warranty of the conditions of this site in any way, implied or explicit. MicroAir accepts no responsibility for the use, interpretation, or reliance by other parties on the information contained herein, nor does this report
In conducting the reinspection there are a number of obstacles and limitations that can affect the final outcome of the report. These limitations include but are not limited to the following factors: access concerns, materials that can not be intrusively sampled or damaged, materials that have been replaced by renovation activities, materials with conflicting laboratory results, and materials that are located in inaccessible and/or concealed areas which limits its quantification. Due to these limitations, the results of this investigation cannot be construed as a certification of the presence or absence of ACM, beyond the materials identified, but rather a diligent and prudent review of available data within an established work scope, and time and budgetary constraints.
microairconsulting@gmail.com. Thank you.
MicroAir Project No. MA-158-18 Page 4 of 7
MicroAir Project No. MA-158-18 Page 5 of 7
RIDGEMOOR PARK MONTESSORI
INSPECTION DATE: JANUARY 3RD, 2019
HSA NO. HSA MATERIAL DESCRIPTION ASBESTOS?
MATERIAL
TYPE
F/NF FUNCTIONAL AREA CONDITION
RD-1 Roof drain insulation No TSI -- Pool Area --
MFC-2 Mudded fittings on cold water lines No TSI -- Boiler room and air handler rooms --
MFH-3 Mudded fittings on hot water lines No TSI -- Boiler room and air handler rooms --
LC-4 Lag cloth No TSI -- Boiler room and air handler rooms --
SC-5 Purple/White sink undercoating Yes MM NF-II REMOVED IN 2017 Good
CB-6 Cove base w/mastic No MM -- Interior walls --
CT-7 1’x2’ white ceiling tile No MM -- Center area --
FT-8 12”x12” green floor tile w/mastic Tile- Yes
Mastic- No MM NF-I REMOVED IN 2017 Good
FT-9 12”x12” cream floor tile w/mastic Tile- No
Mastic- No MM -- All cream floor tile --
EO-10 Exterior overhang texture No MM -- Outside overhangs --
VD-11 Vibration dampeners on ductwork No MM -- Boiler room and air handler rooms --
DW-12 Drywall No SM -- Interior walls Good
CO-13 Concrete Assumed MM NF-II All concrete Good
G-14 Grouts Assumed MM NF-I All ceramic tile areas Good
M-15 Mortars Assumed MM NF-II All block and brick walls Good
CS-16 Caulks and sealants Assumed MM NF-II All original caulks and sealants Good
NF-I: Non-friable Category I SM: Surfacing Material Damaged: Less than 10% damage of total surface area, or less than 25% damage in a localized area NF-II: Non-friable Category II MM: Miscellaneous Material Significantly Damaged: Greater than 10% damage of total surface area, or greater than 25% damage in a
MicroAir Project No. MA-158-18 Page 6 of 7
TESTED AND SUSPECT ASBESTOS-CONTAINING MATERIALS
RIDGEMOOR PARK MONTESSORI
INSPECTION DATE: JANUARY 3RD, 2019
HSA NO. HSA MATERIAL DESCRIPTION ASBESTOS?
MATERIAL
TYPE
F/NF FUNCTIONAL AREA CONDITION
RF-1 Asphalt roofing under rubber No MM -- Center area and towards perimeter of building --
RF-2 Asphalt roofing under stones Yes MM NF-I 4 asphalt roofs around the building (525 SF) Good
FD-1 Fire doors -- -- -- REMOVED IN 2017 --
NF-I: Non-friable Category I SM: Surfacing Material Damaged: Less than 10% damage of total surface area, or less than 25% damage in a localized area NF-II: Non-friable Category II MM: Miscellaneous Material Significantly Damaged: Greater than 10% damage of total surface area, or greater than 25% damage in a
TESTED SUSPECT LEAD-CONTAINING PAINTS - 2017
RIDGEMOOR PARK MONTESSORI
SAMPLE
NO.
SAMPLE LOCATION COMPONENT COLOR REPORTING LIMIT
LEAD
CONCENTRATION
RM-1 Custodial area Floor Brown 0.017% <RL%
RM-2 Boiler room Louver Gray 0.0051% 2.5%
RM-3 Interior walls Wall Blue 0.0025% 0.16%
RM-4 Interior walls Wall White 0.0025% 0.14%
MicroAir Project No. MA-158-18 Page 7 of 7
Grand Rapids, MI 48838 Phone: 616-302-0819
MicroAir Project No. MA-117-19 Page 1 of 7
October 31st, 2019 Project Number: MA-117-19
Grand Rapids Public Schools – Congress Elementary School
MicroAir Consulting, LLC (MicroAir) was retained by Grand Rapids Public Schools (GRPS), to conduct an AHERA 3-year reinspection of Congress Elementary School located at 940 Baldwin Street SE in Grand Rapids, Michigan. The inspection was conducted according to the protocol described in the U.S. Environmental Protection Agency Asbestos Hazard Emergency Response Act of 1986 (40 CFR 763).
The building inspection was conducted on October 14th, 2019 by Mr. Ryan Emmons, a State of Michigan accredited Asbestos Building Inspector. Mr. Emmons’s, Accreditation Number is A55220.
As a public and commercial building, Congress is governed by 29 CFR 1910.1001, Occupational Health Standards for Asbestos in Construction/General Industry and the EPA’s NESHAP for the normal course of business activities by GRPS employees and occupants.
There are three state agencies in Michigan that regulate asbestos in Michigan: the Michigan Department of Environmental Quality (DEQ), the Michigan Department of Licensing and Regulatory Affairs (DLARA) and the Michigan Department of State Police (MSP). The DEQ is concerned about the release of asbestos fibers to the outer air and proper waste disposal, while DLARA focuses on worker protection during renovation and demolition activities, contractor licensing, and worker training.
During construction or renovation activities, the persons performing those activities would be governed by 29 CFR 1926.1101, Occupational Health Standards for Asbestos in Construction. The Asbestos Hazard Emergency Response Act (AHERA), 40 CFR 763, (partial) and/or its associated requirements. However, there are some portions of AHERA that are used as guidelines for compliance with 29 CFR 1910.1001. In particular, 29 CFR 1910.1001(j)(1) requires owners of buildings constructed prior to 1980 to presume that certain types of building materials are asbestos-containing materials (ACM), unless the owner demonstrates that those materials are not ACM.
40 CFR Part 61, Subpart M (NESHAP) requires that a thorough inspection be conducted prior to all renovations and all demolitions. A thorough inspection for asbestos is required no matter the age of the facility because
The Congress Elementary School building was constructed in 1920. Some building renovations have occurred throughout over the years as well.
The most recent inspection was conducted by GRPS. MicroAir reviewed this report and incorporated the findings of the previous inspection and historical information into the current reinspection data.
tion did include the collection of bulk samples. Results of the sampling can be found in Appendix A along
MicroAir Project No. MA-117-19 Page 2 of 7
With the assistance of GRPS maintenance staff, MicroAir re-inspected known and previously identified areas of the building including above suspended ceilings, pipe chases, and inside the tunnels.
It was beyond the scope of this reinspection to locate, identify, or quantify ACM in areas that were concealed
The following suspect asbestos-containing materials were observed at Congress Elementary School during the asbestos inspection and the bulk sampling. Materials in bold were found to be greater than 1% ACM.
Vinyl stair tread
1’x1’ ceiling tiles 12”x12” Green floor tile w/mastic Brick mortar Concrete Fire doors and frames Ceramic grout Wood floor underlayment 12”x12” Tan floor tile w/mastic 12”x12” Black floor tile w/mastic Older chalkboards 2’x2’ ceiling tile w/holes and fissures Sink undercoating 2’x2’ ceiling tile w/holes 2’x2’ ceiling tile smooth Drywall, tape and mud Blue cove base w/mastic Black cove base w/mastic 12”x12” Multi-colored floor tile w/mastic 2’x2’ ceiling tile w/pins and fissures 12”x12” Creme floor tile w/mastic Brown cove base w/mastic
EIFS
Decorative concrete Block mortar
Some of the materials listed above are assumed to contain asbestos until bulk samples can be collected and
Appendix A of this report is a table that identifies the confirmed and suspect ACM homogeneous materials in Congress, their corresponding identification number and locations, and the general condition of ACMs
MicroAir was retained by Grand Rapids Public Schools to conduct a 3-year asbestos-containing material (ACM) reinspection of Congress Elementary School located at 940 Baldwin Street SE in Grand Rapids, Michigan.
MicroAir completed the reinspection on October 14th, 2019. The inspection was conducted by a State of Michigan accredited Asbestos Building Inspector.
During the reinspection, MicroAir identified and assessed 26 homogeneous materials remaining in Congress Elementary School.
Any personnel entering a tunnel or chase area must be notified of ACM locations and explained the requirement to wear personal protective equipment.
MicroAir Project No. MA-117-19 Page 3 of 7
If GRPS plans to conduct any renovation or demolition, the identified ACMs should be removed by a licensed asbestos abatement contractor, as required by current federal, state, and local laws and regulations, should perform any necessary removal and disposal of the identified ACM. MicroAir notes that if suspect ACM other than those identified during this reinspection are encountered during any renovation or demolition, such materials should be sampled and analyzed using PLM to verify presence of asbestos.
We also recommend that visual observations, verification of removal and cleanup, and air monitoring or clearance air monitoring for asbestos fibers be performed by a third party retained by GRPS to demonstrate compliance with applicable regulations, and to confirm the suitability or the area for re-entry. MicroAir can
Warning labels should be affixed in all non-public areas where ACM or assumed ACM is present. After completion of repairs or removal of the ACM, fill out an O&M Activities Form and file it in the management plan.
As required by AHERA, GRPS should continue to send the annual notifications including information on planned response actions and reinspections. Copies of the notifications should be kept in the Management Plan.
The conclusions drawn from the observations and sample results are only valid for the time the observations occurred. In the process of gathering the field data included in this report, procedures were followed that represent reasonable and acceptable industrial hygiene practices and procedures in a manner consistent with the level of care and skill ordinarily exercised by other members of this profession currently practicing under similar conditions. However, the information and opinions provided in this report are not to be construed as a warranty of the conditions of this site in any way, implied or explicit. MicroAir accepts no responsibility for the use, interpretation, or reliance by other parties on the information contained herein, nor does this report
In conducting the reinspection there are a number of obstacles and limitations that can affect the final outcome of the report. These limitations include but are not limited to the following factors: access concerns, materials that can not be intrusively sampled or damaged, materials that have been replaced by renovation activities, materials with conflicting laboratory results, and materials that are located in inaccessible and/or concealed areas which limits its quantification. Due to these limitations, the results of this investigation cannot be construed as a certification of the presence or absence of ACM, beyond the materials identified, but rather a diligent and prudent review of available data within an established work scope, and time and budgetary constraints.
microairconsulting@gmail.com.
MicroAir Project No. MA-117-19 Page 4 of 7
MicroAir Project No. MA-117-19 Page 5 of 7
TESTED AND SUSPECT ASBESTOS-CONTAINING MATERIALS
CONGRESS ELEMENTARY SCHOOL
INSPECTION DATE: OCTOBER 13th, 2019
HSA NO. HSA MATERIAL DESCRIPTION ASBESTOS?
MATERIAL
TYPE
F/NF FUNCTIONAL AREA CONDITION
CES-1 Vinyl stair tread Assumed MM NF-I Entrance stairway Good
CES-2 Plaster Yes SM F Interior walls and ceilings Good
CES-3 1’x1’ ceiling tiles Assumed MM NF-II Interior ceilings Good
CES-4 12”x12” Green floor tile w/mastic Assumed MM NF-I Classrooms Good
CES-5 Brick mortar Assumed MM NF-II All brick walls Good
CES-6 Concrete Assumed MM NF-II All concrete Good
CES-7 Fire doors and frames Yes MM NF-II All tagged fire doors Good
CES-8 Ceramic grout Assumed MM NF-I Bathrooms Good
CES-9 Wood floor underlayment Assumed MM NF-I Classrooms and gym Good
CES-10 12”x12” Tan floor tile w/mastic Assumed MM NF-I 3rd floor hallway Good
CES-11 12”x12” Black floor tile w/mastic Assumed MM NF-I Hallway Good
CES-12 Older chalkboards Assumed MM NF-II Classrooms and hallways Good
CES-13 2’x2’ ceiling tile w/holes and fissures Assumed MM NF-II Printing room by office Good
CES-14 Sink undercoating Assumed MM NF-II Under metal sinks Good
CES-15 2’x2’ ceiling tile w/holes Assumed MM NF-II Library Good
CES-16 2’x2’ ceiling tile smooth Assumed MM NF-II Bathrooms Good
CES-17 Drywall, tape and mud No SM -- Lower floor bathrooms and closets --
CES-18 Blue cove base w/mastic Assumed MM NF-II Bathrooms and closets Good
NF-I: Non-friable Category I SM: Surfacing Material Damaged: Less than 10% damage of total surface area, or less than 25% damage in a localized area NF-II: Non-friable Category II MM: Miscellaneous Material Significantly Damaged: Greater than 10% damage of total surface area, or greater than 25% damage in a
MicroAir Project No. MA-117-19 Page 6 of 7
TESTED AND SUSPECT ASBESTOS-CONTAINING MATERIALS
CONGRESS ELEMENTARY SCHOOL
INSPECTION DATE: OCTOBER 13th, 2019
HSA NO. HSA MATERIAL DESCRIPTION ASBESTOS?
MATERIAL
TYPE
F/NF FUNCTIONAL AREA CONDITION
CES-19 Black cove base w/mastic Assumed MM NF-II Lower level hallways Good
CES-20 12”x12” Multi-colored floor tile w/mastic Assumed MM NF-I Music room Good
CES-21 2’x2’ ceiling tile w/pins and fissures Assumed MM NF-II Music room Good
CES-22 12”x12” Creme floor tile w/mastic Assumed MM NF-I Lower level Good
CES-23 Brown cove base w/mastic Assumed MM NF-II Under lockers Good
CES-24 EIFS Assumed MM NF-II Exterior around windows and doors Good
CES-25 Decorative concrete Assumed MM NF-II Exterior façade Good
CES-26 Block mortar Assumed MM NF-II All cinderblock walls Good
NF-I: Non-friable Category I SM: Surfacing Material Damaged: Less than 10% damage of total surface area, or less than 25% damage in a localized area NF-II: Non-friable Category II MM: Miscellaneous Material Significantly Damaged: Greater than 10% damage of total surface area, or greater than 25% damage in a
MicroAir Project No. MA-117-19 Page 7 of 7
Grand Rapids, MI 48838 Phone: 616-302-0819
October 31st, 2019
Grand Rapids Public Schools – Ken-o-sha Elementary School
MicroAir Consulting, LLC (MicroAir) was retained by Grand Rapids Public Schools (GRPS), to conduct an AHERA 3-year reinspection of Ken-o-sha Elementary School located at 1353 Van Auken Street SE in Grand Rapids, Michigan. The inspection was conducted according to the protocol described in the U.S.
Environmental Protection Agency Asbestos Hazard Emergency Response Act of 1986 (40 CFR 763).
The building inspection was conducted on October 14th, 2019 by Mr. Ryan Emmons, a State of
As a public and commercial building, Ken-o-sha is governed by 29 CFR 1910.1001, Occupational Health Standards for Asbestos in Construction/General Industry and the EPA’s NESHAP for the normal course of business activities by GRPS employees and occupants.
There are three state agencies in Michigan that regulate asbestos in Michigan: the Michigan Department of Environmental Quality (DEQ), the Michigan Department of Licensing and Regulatory Affairs (DLARA) and the Michigan Department of State Police (MSP). The DEQ is concerned about the release of asbestos fibers to the outer air and proper waste disposal, while DLARA focuses on worker protection during renovation and demolition activities, contractor licensing, and worker training.
During construction or renovation activities, the persons performing those activities would be governed by 29 CFR 1926.1101, Occupational Health Standards for Asbestos in Construction. The Asbestos Hazard Emergency Response Act (AHERA), 40 CFR 763, (partial) and/or its associated requirements. However, there are some portions of AHERA that are used as guidelines for compliance with 29 CFR 1910.1001. In particular, 29 CFR 1910.1001(j)(1) requires owners of buildings constructed prior to 1980 to presume that certain types of building materials are asbestos-containing materials (ACM), unless the owner demonstrates that those materials are not ACM.
40 CFR Part 61, Subpart M (NESHAP) requires that a thorough inspection be conducted prior to all renovations and all demolitions. A thorough inspection for asbestos is required no matter the age of the facility because
The Ken-o-sha Elementary School building was constructed in 1964 with an addition in 1975. Some building renovations have occurred throughout over the years as well.
tion did include the collection of bulk samples. Results of the sampling can be found in Appendix A along
It was beyond the scope of this reinspection to locate, identify, or quantify ACM in areas that were concealed
The following suspect asbestos-containing materials were observed at Ken-o-sha Elementary School during the asbestos inspection and the bulk sampling. Materials in bold were found to be greater than 1% ACM.
Brick mortar 1’x1’ ceiling tiles w/glue pod 2’x2’ ceiling tile Ceramic grout Fire doors and frames 12”x12” White/specs floor tile w/mastic Sink undercoating Curtains 9”x9” White w/black floor tile w/mastic Wood floor underlayment 2’x2’ ceiling tile smooth white Tall black cove base w/mastic Dark cove base w/mastic 12”x12” Peppered floor tile w/mastic Brown cove base w/mastic Drywall, tape and mud Overhead plaster 2’x2’ ceiling tile w/holes and fissures Roofing
Some of the materials listed above are assumed to contain asbestos until bulk samples can be collected and
Appendix A of this report is a table that identifies the confirmed and suspect ACM homogeneous materials in Ken-o-sha, their corresponding identification number and locations, and the general condition of ACMs
MicroAir was retained by Grand Rapids Public Schools to conduct a 3-year asbestos-containing material (ACM) reinspection of Ken-o-sha Elementary School located at 1353 Van Auken Street SE in Grand Rapids, Michigan.
MicroAir completed the reinspection on October 14th, 2019. The inspection was conducted by a State of
During the reinspection, MicroAir identified and assessed 21 homogeneous materials remaining in Ken-o-sha regulations, should perform any necessary removal and disposal of the identified ACM. MicroAir notes that if suspect ACM other than those identified during this reinspection are encountered during any renovation or demolition, such materials should be sampled and analyzed using PLM to verify presence of
We also recommend that visual observations, verification of removal and cleanup, and air monitoring or clearance air monitoring for asbestos fibers be performed by a third party retained by GRPS to demonstrate compliance with applicable regulations, and to confirm the suitability or the area for re-entry. MicroAir can completion of repairs or removal of the ACM, fill out an O&M Activities Form and file it in the management planned response actions and reinspections. Copies of the notifications should be kept in the Management
The conclusions drawn from the observations and sample results are only valid for the time the observations occurred. In the process of gathering the field data included in this report, procedures were followed that represent reasonable and acceptable industrial hygiene practices and procedures in a manner consistent with the level of care and skill ordinarily exercised by other members of this profession currently practicing under similar conditions. However, the information and opinions provided in this report are not to be construed as a warranty of the conditions of this site in any way, implied or explicit. MicroAir accepts no responsibility for the use, interpretation, or reliance by other parties on the information contained herein, nor does this report
In conducting the reinspection there are a number of obstacles and limitations that can affect the final outcome of the report. These limitations include but are not limited to the following factors: access concerns, materials that cannot be intrusively sampled or damaged, materials that have been replaced by renovation activities, materials with conflicting laboratory results, and materials that are located in inaccessible and/or concealed areas which limits its quantification. Due to these limitations, the results of this investigation cannot be construed as a certification of the presence or absence of ACM, beyond the materials identified, but rather a diligent and prudent review of available data within an established work scope, and time and budgetary constraints.
MicroAir Project No. MA-117-19 Page 5 of 7
TESTED AND SUSPECT ASBESTOS-CONTAINING MATERIALS
KEN-O-SHA ELEMENTARY SCHOOL
INSPECTION DATE: OCTOBER 13th, 2019
HSA NO. HSA MATERIAL DESCRIPTION ASBESTOS?
MATERIAL
TYPE
F/NF FUNCTIONAL AREA CONDITION
KES-1 Plaster No SM -- Interior walls and ceilings --
KES-2 Block mortar Assumed MM NF-II All cinderblock walls Good
KES-3 Brick mortar Assumed MM NF-II All brick walls Good
KES-4 1’x1’ ceiling tiles w/glue pod Assumed MM NF-II Hallways and classrooms Good
KES-5 2’x2’ ceiling tile Assumed MM NF-II Classrooms Good
KES-6 Ceramic grout Assumed MM NF-I Hallways, bathrooms and windowsills Good
KES-7 Fire doors and frames Yes MM NF-II All tagged fire doors Good
KES-8 12”x12” White/specs floor tile w/mastic Assumed MM NF-I Under carpet in classrooms Good
KES-9 Sink undercoating Assumed MM NF-II Under metal sinks Good
KES-10 Curtains Assumed MM NF-II Music room and stage Good
KES-11 9”x9” White w/black floor tile w/mastic Assumed MM NF-I Closets and some rooms Good
KES-12 Wood floor underlayment Assumed MM NF-I Gym and stage Good
KES-13 2’x2’ ceiling tile smooth white Assumed MM NF-II Hallways Good
KES-14 Tall black cove base w/mastic Assumed MM NF-II Library Good
KES-15 Dark cove base w/mastic Assumed MM NF-II Hallways Good
KES-16 12”x12” Peppered floor tile w/mastic Assumed MM NF-I Health office Good
KES-17 Brown cove base w/mastic Assumed MM NF-II Hallways and classrooms Good
KES-18 Drywall, tape and mud Yes SM F Interior drywall walls and ceilings Good
NF-I: Non-friable Category I SM: Surfacing Material Damaged: Less than 10% damage of total surface area, or less than 25% damage in a localized area NF-II: Non-friable Category II MM: Miscellaneous Material Significantly Damaged: Greater than 10% damage of total surface area, or greater than 25% damage in a
MicroAir Project No. MA-117-19 Page 6 of 7
TESTED AND SUSPECT ASBESTOS-CONTAINING MATERIALS
KEN-O-SHA ELEMENTARY SCHOOL
INSPECTION DATE: OCTOBER 13th, 2019
HSA NO. HSA MATERIAL DESCRIPTION ASBESTOS?
MATERIAL
TYPE
F/NF FUNCTIONAL AREA CONDITION
KES-19 Overhead plaster No SM -- Exterior entrances --
KES-20 2’x2’ ceiling tile w/holes and fissures Assumed MM NF-II Classrooms Good
KES-21 Roofing Assumed MM NF-I Exterior asphalt roofing Good
NF-I: Non-friable Category I SM: Surfacing Material Damaged: Less than 10% damage of total surface area, or less than 25% damage in a localized area NF-II: Non-friable Category II MM: Miscellaneous Material Significantly Damaged: Greater than 10% damage of total surface area, or greater than 25% damage in a
MicroAir Project No. MA-117-19 Page 7 of 7
Grand Rapids, MI 48838 Phone: 616-302-0819
November 4th, 2019
Grand Rapids Public Schools – Kent Hills Elementary School
MicroAir Consulting, LLC (MicroAir) was retained by Grand Rapids Public Schools (GRPS), to conduct an AHERA 3-year reinspection of Kent Hills Elementary School located at 1445 Emerald Avenue NE in Grand
The building inspection was conducted on October 17th, 2019 by Mr. Ryan Emmons, a State of
As a public and commercial building, Kent Hills is governed by 29 CFR 1910.1001, Occupational Health Standards for Asbestos in Construction/General Industry and the EPA’s NESHAP for the normal course of business activities by GRPS employees and occupants.
There are three state agencies in Michigan that regulate asbestos in Michigan: the Michigan Department of Environmental Quality (DEQ), the Michigan Department of Licensing and Regulatory Affairs (DLARA) and the Michigan Department of State Police (MSP). The DEQ is concerned about the release of asbestos fibers to the outer air and proper waste disposal, while DLARA focuses on worker protection during renovation and demolition activities, contractor licensing, and worker training.
During construction or renovation activities, the persons performing those activities would be governed by 29 CFR 1926.1101, Occupational Health Standards for Asbestos in Construction. The Asbestos Hazard Emergency Response Act (AHERA), 40 CFR 763, (partial) and/or its associated requirements. However, there are some portions of AHERA that are used as guidelines for compliance with 29 CFR 1910.1001. In particular, 29 CFR 1910.1001(j)(1) requires owners of buildings constructed prior to 1980 to presume that certain types of building materials are asbestos-containing materials (ACM), unless the owner demonstrates that those materials are not ACM.
40 CFR Part 61, Subpart M (NESHAP) requires that a thorough inspection be conducted prior to all renovations and all demolitions. A thorough inspection for asbestos is required no matter the age of the facility because
The Kent Hills building was constructed in 1954 with additions in 1956 and 2008. Some building renovations have occurred throughout over the years as well.
(homogeneous material number), MicroAir has changed numbering from previous reports. The reinspection did include the collection of bulk samples. Results of the sampling can be found in Appendix A along with locations of remaining ACM in the building.
It was beyond the scope of this reinspection to locate, identify, or quantify ACM in areas that were concealed
The following suspect asbestos-containing materials were observed at Kent Hills Elementary School during the asbestos inspection and the bulk sampling. Materials in bold were found to be greater than 1% ACM.
Brick mortar
Roofing Fire doors and frames
EIFS
Concrete Tan cove base w/mastic 12”x12” Brown/Blue floor tile w/mastic 2’x2’ ceiling tile w/pins and fissures Ceramic grout Sink undercoating Brown cove base w/mastic 1’x1’ ceiling tile w/glue pods Leveling compound Green rolled vinyl flooring w/mastic Orange rolled vinyl flooring w/mastic Drywall, tape and mud Dark gray cove base w/mastic 12”x12” Tan floor tile w/mastic Orange cove base w/mastic Blue rolled vinyl flooring w/mastic Rolled vinyl flooring w/mastic Fireplace materials
Some of the materials listed above are assumed to contain asbestos until bulk samples can be collected and
Appendix A of this report is a table that identifies the confirmed and suspect ACM homogeneous materials in Kent Hills Elementary School, their corresponding identification number and locations, and the general condition of ACMs identified during the reinspection.
MicroAir was retained by Grand Rapids Public Schools to conduct a 3-year asbestos-containing material (ACM) reinspection of Kent Hills Elementary School located at 1445 Emerald Avenue NE in Grand Rapids, Michigan.
MicroAir completed the reinspection on October 17th, 2019. The inspection was conducted by a State of
During the reinspection, MicroAir identified and assessed 23 homogeneous materials remaining in Kent Hills
If GRPS plans to conduct any renovation or demolition, the identified ACMs should be removed by a licensed asbestos abatement contractor, as required by current federal, state, and local laws and regulations, should perform any necessary removal and disposal of the identified ACM. MicroAir notes that if suspect ACM other than those identified during this reinspection are encountered during any renovation or demolition, such
We also recommend that visual observations, verification of removal and cleanup, and air monitoring or clearance air monitoring for asbestos fibers be performed by a third party retained by GRPS to demonstrate compliance with applicable regulations, and to confirm the suitability or the area for re-entry. MicroAir can perform these services.
completion of repairs or removal of the ACM, fill out an O&M Activities Form and file it in the management planned response actions and reinspections. Copies of the notifications should be kept in the Management
The conclusions drawn from the observations and sample results are only valid for the time the observations occurred. In the process of gathering the field data included in this report, procedures were followed that represent reasonable and acceptable industrial hygiene practices and procedures in a manner consistent with the level of care and skill ordinarily exercised by other members of this profession currently practicing under similar conditions. However, the information and opinions provided in this report are not to be construed as a warranty of the conditions of this site in any way, implied or explicit. MicroAir accepts no responsibility for the use, interpretation, or reliance by other parties on the information contained herein, nor does this report
In conducting the reinspection there are a number of obstacles and limitations that can affect the final outcome of the report. These limitations include but are not limited to the following factors: access concerns, materials that cannot be intrusively sampled or damaged, materials that have been replaced by renovation activities, materials with conflicting laboratory results, and materials that are located in inaccessible and/or concealed areas which limits its quantification. Due to these limitations, the results of this investigation cannot be construed as a certification of the presence or absence of ACM, beyond the materials identified, but rather a diligent and prudent review of available data within an established work scope, and time and budgetary constraints.
MicroAir Project No. MA-117-19 Page 5 of 7
TESTED AND SUSPECT ASBESTOS-CONTAINING MATERIALS
KENT HILLS ELEMENTARY SCHOOL
INSPECTION DATE: OCTOBER 17th, 2019
HSA NO. HSA MATERIAL DESCRIPTION ASBESTOS?
MATERIAL
TYPE
F/NF FUNCTIONAL AREA CONDITION
KHE-1 Brick mortar Assumed MM NF-II All brick walls Good
KHE-2 Block mortar Assumed MM NF-II All cinderblock walls Good
KHE-3 Roofing Assumed MM NF-I Exterior asphalt roofing Good
KHE-4 Fire doors and frames Yes MM NF-II All tagged fire doors Good
KHE-5 EIFS Assumed MM NF-II Exterior around doors and windows Good
KHE-6 -- -- -- -- -- --
KHE-7 Concrete Assumed MM NF-II All concrete Good
KHE-8 Tan cove base w/mastic Assumed MM NF-II Hallways, office and entrance Good
KHE-9 12”x12” Brown/Blue floor tile w/mastic Assumed MM NF-I Hallways Good
KHE-10 2’x2’ ceiling tile w/pins and fissures Assumed MM NF-II Hallways and classrooms Good
KHE-11 Ceramic grout Assumed MM NF-I Bathrooms and hallways Good
KHE-12 Sink undercoating…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .