About this file
This document contains detailed figures and tables showing riprap boulder installation locations and specifications for the I-5 Victory Blvd Interchange project. The document includes eight separate riprap boulder runs (A through H) with precise measurements, coordinates, and installation requirements for Class 700 riprap boulders along various sections of the interchange, including ramps, barriers, and fence lines. The work involves installing two rows of Class 700 riprap boulders (both grouted and keyed-in types) at specified offsets from fog lines, concrete barriers, and other reference points.
The specifications detail the installation of approximately 33,000 SF of riprap boulder runs across all sections, with individual runs ranging from 80 SF to 6,880 SF. The work also includes the installation of several access gates and 720 feet of CL-6R fence replacement along one section. Key reference points are provided through detailed aerial photo diagrams and tables listing precise measurements and offsets for each installation point. The document provides comprehensive technical specifications through both visual mapping and detailed coordinate tables for contractor reference.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment E - Standard Drawings.pdf | ||
| 00012708 PreBidSignInSheet.docx | DOCX document | |
| Attachment B - Special Provisions~21.pdf | ||
| Preliminary Bid Results~40.xlsx | XLSX spreadsheet | |
| Attachment C - Bid Pricing Form~37.xlsx | XLSX spreadsheet | |
| 00012707_Invitation to Bid.docx | DOCX document | |
| Attachment A - Plans~44.pdf | ||
| 00012707_Addendum One.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Point # Point Number Location Description Point to Point Work Description
A1 25' prior to end of and 4' behind back of existing concrete barrier A1 to A2 - Construct 2 rows Class 700 Grouted Riprap Boulders - 200 SF
A2 End of existing concrete barrier and 16' offset from fog line A2 to A3 - Construct 2 rows Class 700 Grouted Riprap Boulders - 3000 SF
A3 375' from point A2 and 16' offset from fog line A3 to A4 - Construct 2 rows Class 700 Grouted Riprap Boulders - 80 SF
A4 10' from point A3 and 16' offset from face of curb A4 to A5 - Construct 2 rows Class 700 Grouted Riprap Boulders - 1200 SF
A5 150' from point A4 and 16' offset from face of curb A5 to A6 - Construct gate - 1 each (see gate plans)
A6 25' from point A5 and 16' offset from face of curb A6 to A7 - Construct 2 rows Class 700 Grouted Riprap Boulders - 800 SF
A7 100' from point A6 and 16' offset from face of curb
Point # Point Number Location Description Point to Point Work Description
B1 30' offset from NB Interstate to Victory Blvd Ramp fog line and 20' offset from NB Interstate Ave fog line B1 to B2 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 1280 SF
B2 160' from point B1 and 30' offset from NB Interstate to Victory Blvd ramp fog line
Run A - Class 700 Riprap Boulders Rows
Run B - Class 700 Riprap Boulders Rows
TABLE B
TABLE A
C1 14' offset from Victory Blvd to NB Interstate ramp fog line and 20' offset from NB Interstate Ave fog line
C1 to C2 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 480 SF C2 60' from point C1 and 14' offset from Victory Blvd to NB Interstate ramp fog line
C2 to C3 - Construct gate - 1 each (see gate plans) C3 25' from point C2 and 14' offset from Victory Blvd to NB Interstate ramp fog line
C3 to C4 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 800 SF C4 100' from point C3 and 14' offset from Victory Blvd to NB Interstate ramp fog line
Point # Point Number Location Description Point to Point Work Description
D1 4' behind end of NB Interstate Ave concrete barrier D1 to D2 - Construct 2 rows Class 700 Grouted Riprap Boulders - 300 SF
D2 3' offset from edeg of SUV pavement at end of NB Interstate concrete barrier D2 to D3 - Construct 2 rows Class 700 Grouted Riprap Boulders - 160 SF
D3 20' from point D2 and offset 3' from edge of SUV pavement D3 to D4 - Construct gate - 1 each (see gate plans)
D4 25' from point D3 and offset 3' from edge of SUV pavement D4 to D5 - Construct 2 rows Class 700 Grouted Riprap Boulders - 1920 SF
D5 Offset 3' from edge of SUV pavement and offset 11' behind Victory Blvd to NB Interstate ramp concrete barrier
Run C - Class 700 Riprap Boulders Rows
Run D - Class 700 Riprap Boulders Rows
TABLE C
TABLE D
E1 Edge of I-5 bridge concrete slope and offset 16' from Victory Blvd. face of curb E1 to E2 - Construct 2 rows Class 700 Grouted Riprap Boulders - 680 SF
E2 E2 to E3 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 200 SF
E3 E3 to E4 - Construct 2 rows Class 700 Keyed In Riprap Boulders - (200 SF)
E4 E4 to E5 - Construct gate - 1 each (see gate plans)
E5 E5 to E6 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 1200 SF
E6
25' from point E4 and 24' offset from fog line
150' from point E5 and 60' offset from fog line
TABLE E
Run E - Class 700 Riprap Boulders Rows
West edge of sidewalk and offset 3' from back of sidewalk
East edge of sidewalk and offset 3' from back of sidewalk
25' from point E3 and 24' offset from NB Off-Ramp fog line
F1 4' behind end of existing concrete barrier F1 to F2 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 160 SF
F2 20' from point F1 and 14' offset from NB on-ramp fog line F2 to F3 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 1760 SF
F3 220' from point F2 and 14' offset behind NB on-ramp fog line F3 to F4 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 80 SF
F4 10' from point F3 at 90 degrees from line F2 to F3 F4 to F5 - Construct gate - 1 each (see gate plans)
F5 25' from point F4 in line with F3 to F4 F5 to F6 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 80 SF
F6 10' from point F5 in line with F4 to F5 F6 to F7 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 480 SF
F7 South end of existing fence between NB on-ramp and Denver Ave.
F7 to F8 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 5760 SF Remove Existing Fence - 720 Feet Construct CL-6R Fence - 720 Feet
F8 North 720' along existing fence line between NB on-ramp and Denver Ave.
Run F - Class 700 Riprap Boulders Rows & Fence
TABLE F
G1 End of OR99E (MLK Blvd) concrete barrier and 16' offset from fog line G1 to G2 - Construct 2 rows Class 700 Grouted Riprap Boulders - 2400 SF
G2 300' from point G1 and 16' offset from fog line G2 to G3 - Construct gate - 1 each (see gate plans)
G3 25' from point G2 and 16' offset from fog line G3 to G4 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 3680 SF
G4 460' from point G3 and 16' offset from fog line
Point # Point Number Location Description Point to Point Work Description
H1 100' along fog line from OR99E gore point and 30' offset from fog line H1 to H2 - Construct 1 row Class 700 Grouted Riprap Boulders - 320 SF
H2 80' from point H1 and 30' offset from fog line H2 to H3 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 640 SF
H3 80' from point H2 and 14' offset from fog line H3 to H4 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 5000 SF
H4 625' from point H3 and 14' offset from fog line H4 to H5 - Construct gate - 1 each (see gate plans)
H5 25' from point H4 and 14' offset from fog line H5 to H6 - Construct 2 rows Class 700 Keyed In Riprap Boulders - 5960 SF
H6 745' from point H5 and 14' offset from fog line H6 to H7 - Construct gate - 1 each (see gate plans)
H7 25' from point H6 and 14' offset from fog line H7 to H8 - Construct 2 rows Class 700 Grouted Riprap Boulders - 6880 SF
H8 860' from point H7 and 14' offset from fog line
TABLE H
Run H - Class 700 Riprap Boulders Rows
TABLE G
Run G - Class 700 Riprap Boulders Rows
| temp |
| Attachment D - Figures and Tables |
| P2-F1&2 |
| P2-F3 |
| P2-Tbls A-B |
| P2-Tbls C-D |
| P2-F4 |
| P2-F5 |
| P2-Tbl F |
| P2-F7 |
| P2-Tbls G-H |
P2-Tbl E
P2-F6
File details come from the government source that posted it. Updated .