R1 Vehicle Access Prevention Package 2

Solicitation # S7300000012707
Posted 2/21/25, 3:23 PM
No Updates
Due 3/11/25, 5:00 PM
State
Oregon
Source
View
Similar Opportunities
The Oregon Department of Transportation (ODOT) has issued an Invitation to Bid (ITB) for a Vehicle Access Prevention Package 3 project, specifically focused on placing riprap boulder rows with gated openings to restrict motor vehicle access to non-roadway areas owned by ODOT. The procurement is a competitive bidding process with a posted date of March 6, 2025, and a bid submission deadline of March 20, 2025. The project involves strategic placement of physical barriers to prevent unauthorized...
The Oregon Department of Transportation (ODOT) is soliciting competitive quotes for the Barrier Gate Pilot Project, a transportation infrastructure initiative located in Multnomah County. The project requires constructing asphalt concrete pavement and installing barrier gates along the Columbia River Highway, specifically at mile posts 11.38, 29.32, and 47.55. Contractors must submit comprehensive bids through the OregonBuys web-based eProcurement system by March 25, 2025, and are required to...
The Oregon Department of Transportation (ODOT) is seeking a qualified contractor to execute a comprehensive roadway infrastructure project on OR22 in Polk County, spanning from Rickreall Road to Doaks Ferry Road NW. The Invitation to Bid (ITB/Bid Solicitation No. S-73000-00012819) requires a contractor to perform extensive paving, signing, and traffic infrastructure improvements, including stripe removal, cold plane pavement removal, thermoplastic markings, sign installations, and marker...
The Oregon Department of Transportation (ODOT) has issued an Invitation to Bid (ITB) for a highway pavement repair project on OR 213 from I-205 to Redland Road in Clackamas County. The procurement seeks a contractor to perform comprehensive roadway improvements, including furnishing and placing Level 3, 1/2" Dense Asphalt Concrete Pavement mixture, 2-inch cold plane pavement removal, bridge joint work, tack coat application, and installation of temporary and permanent pavement markings....
The Oregon Department of Transportation (ODOT) is soliciting bids for a pavement preservation project on Interstate 5 between mileposts 34-36 in Jackson County, involving a two-inch deep inlay and comprehensive roadway surface improvement. This Invitation to Bid (ITB) is for a public works contract requiring specialized highway construction services, with specific technical requirements including grinding, paving, road marker placement, and pavement striping. Bidders must be licensed with the...

The Oregon Department of Transportation (ODOT) is soliciting bids for the R1 Vehicle Access Prevention Package 2 project, located in Multnomah County, focusing on restricting motor vehicle access to non-roadway areas through strategic infrastructure installation. The procurement involves placement of riprap boulders and concrete barriers, specifically including 27,760 square feet of keyed riprap (Class 700), 17,940 square feet of grouted riprap, 720 feet of CL-6R fencing, 1.5 acres of clearing and grubbing, and eight 16-foot single Forest Service gates. The project requires comprehensive construction services encompassing labor, materials, transportation, equipment, and incidental services to complete the work as outlined in contract documents. Bids must be submitted through the OregonBuys eProcurement system prior to the bid opening date of March 11, 2025, with project substantial completion required by April 7, 2025, and final completion by April 14, 2025. Bidders must comply with prevailing wage requirements per BOLI rates dated January 5, 2025, and adhere to domestic preference requirements mandating steel, iron, coatings, and manufactured products be produced in the United States.

The solicitation does not explicitly mention specific set-aside designations or restrictions for disadvantaged enterprises. Contractors must provide a performance bond and payment bond, each equal to 100% of the contract price, and maintain specific insurance coverages including Commercial General Liability Insurance with $1,000,000 per occurrence and $2,000,000 annual aggregate limits, and Commercial Automobile Liability Insurance with a $1,000,000 combined single limit per occurrence. Liquidated damages of $800 per calendar day will be assessed for failure to achieve substantial completion by the specified date. While no specific contract value is mentioned in the documents, the comprehensive nature of the project involving multiple infrastructure elements suggests a significant investment. The project will involve detailed coordination with ODOT, including a required pre-construction meeting within 5 days of notice to proceed, and contractors must submit a comprehensive work plan detailing project sequencing and duration with their bid submission.

Generated 2/24/25, 3:46 PM