Attachment_D_-_Bid_Response_Table_(Repair_Scenarios).xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- RFP-TH-0143
- Issued by
- Los Angeles County, California
About this file
This is a Bid Response Table for On-Call Pump and Motor Repairs, Rebuilds, and Replacement Services solicited by West Basin Municipal Water District in California. The document serves as the proposal rate schedule that offerors must complete and submit with their bids. The solicitation encompasses repair services for six specific equipment scenarios: a Horizontal Split-Case Pump (2,100 gpm/30 ft TDH), a 7-Stage Centrifugal Pump (2,050 gpm/730 ft TDH), a 2-Stage Vertical Turbine Pump (14,000 GPM/185 ft TDH), a US Motors Type TVCS4 75 HP Motor, a TECO-Westinghouse AMRK-EC 700 HP Motor, and a US Motors Type JUE 500 HP Motor. The anticipated agreement term is two years, with all proposals required to remain valid for a minimum of six months from the solicitation closing date.
All proposed rates must be fully burdened and firm/fixed throughout the contract term. Offerors must provide cost breakdowns for each repair scenario including equipment rental fees, disconnection and removal fees, materials costs with a 10% markup, repair fees, delivery and reinstallation fees, freight charges, and sales tax at 9.5% applied to materials only. The rate schedule requires offerors to indicate hourly labor costs or lump sum costs depending on the line item, with notation that repair work is subject to prevailing wages. Additionally, offerors must provide an expediting charge based on a one-week turnaround assumption versus a standard two-week turnaround, and must disclose their in-shop labor rate, field labor rate, and materials handling burden markup percentage for contractor-supplied replacement parts and subcontractor costs.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Exhibit D - Proposal Rate Schedule Scenario Table | |
| Offeror shall refer to Exhibit "C" (Pump and Motor Repair Scenarios), to complete this Proposal Rate Schedule and return it with their proposal submittal. All proposed rates shall be “fully burdened” and firm/fixed though out the two (2) year term of the anticipated agreement. All proposals must be valid for a period of at least six (6) months from the closing date and time of this solicitation. | |
| Horizontal Split-Case Pump |
2,100 gpm / 30 ft TDH Scenario P1 7-Stage Centrifugal Pump 2,050 gpm / 730 ft TDH Scenario P2 2-Stage Vertical Turbine Pump 14,000 GPM/ 185 ft TDH Scenario P3 US Motors Type TVCS4 75 HP Motor Scenario M1 TECO-Westinghouse AMRK-EC 700 HP Motor Scenario M2 US Motors Type JUE 500 HP Motor Scenario M3
| Cost per Hour | No. of Hours (for items 1, 2, 4, & 5) | Total or Lump Sum Cost | Cost per Hour | No. of Hours (for items 1, 2, 4, & 5) | Total or Lump Sum Cost | Cost per Hour | No. of Hours (for items 1, 2, 4, & 5) | Total or Lump Sum Cost | Cost per Hour | No. of Hours (for items 1, 2, 4, & 5) | Total or Lump Sum Cost | Cost per Hour | No. of Hours (for items 1, 2, 4, & 5) | Total or Lump Sum Cost | Cost per Hour | No. of Hours (for items 1, 2, 4, & 5) | Total or Lump Sum Cost | |
| 1. Equipment Fee/Rental Fee (i.e. crane, manlift, etc)* | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| 2. Disconnection & Removal Fee* | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| 3. Pump and/or Motor Materials (includes 10% markup) | ||||||||||||||||||
| 4. Repair Fee* | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| 5. Delivery and Reinstallation Fee* | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| 7. Freight on Pump and/or Motor Material (if applicable) | ||||||||||||||||||
| 8. Sales Tax of 9.5% (on Material Only) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| 9. Total Cost (Items 1 through 7) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| 10. Expediting Charge** | ||||||||||||||||||
| 11. Total Cost with Expediting Charge (Items 8 plus 9) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| * This work is subject to prevailing wages | ||||||||||||||||||
| ** Expediting Charge: Assume a turn-around request time of 1 week. Regular work assumes turn-around time of 2 weeks. |
In-Shop Labor Rate (For Information Only): __________
Field Labor Rate (For Information Only): ___________
Materials handing burden (mark-up % above contractor's actual cost) applicable to contractor supplied replacement parts and any sub-tier subcontractor costs: ___________
Offeror has thoroughly read this RFP and agrees to all the terms and conditions stipulated herein.
Offeror's Signature
Printed Name and Title
Company Name
Date
Sheet2
Sheet3
File details come from the government source that posted it. Updated .