Attachment_C_-_Pump_and_Motor_Repair_Scenarios.pdf
PDF 1 MB Posted
- Solicitation number
- RFP-TH-0143
- Issued by
- Los Angeles County, California
About this file
This is an Exhibit C attachment detailing pump and motor repair scenarios for an on-call pump and motor repair services contract with West Basin Municipal Water District in California. The document outlines six specific repair scenarios—three pump repairs (P1, P2, P3) and three motor maintenance scenarios (M1, M2, M3)—that serve as the technical basis for contractor proposals. The pump scenarios include a Goulds horizontal split-case pump rated at 2,100 GPM, a Johnston 7-stage centrifugal pump rated at 2,050 GPM and 730' total dynamic head, and a Floway vertical turbine pump rated at 14,000 GPM. The motor scenarios encompass a 75 HP US Motors vertical duty motor, a 700 HP TECO-Westinghouse weather-protected motor, and a 500 HP US Motors TEFC motor. All scenarios require comprehensive repair, rebuild, or replacement work including disassembly, inspection, fabrication of new components, sandblasting, epoxy coating, reassembly, transportation via flatbed truck, crane arrangements, reinstallation, and performance testing with vibration analysis reporting.
The scope of work for each scenario establishes detailed requirements for materials, workmanship, testing standards, and documentation. All materials must meet or exceed manufacturer specifications, and field installations must comply with manufacturer recommendations. Motor maintenance work includes specialized processes such as vacuum pressure impregnation, stator core testing, rotor balancing to 4W/N specification, and performance testing with vibration analysis. Pump repair work requires fabrication of new shafts, impellers, wear rings, and mechanical seals, with specific material requirements such as 316 stainless steel for certain pumps and 416 stainless steel for others. Contractors are responsible for all ancillary services including crane service, flatbed transportation to and from West Basin facilities, and delivery of comprehensive repair reports documenting final clearances and test results. The contractor must provide consumable materials and furnish all necessary components such as bearings, gaskets, O-rings, and couplings, with the requirement that old bearings be returned to the customer upon completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| On-Call_Pump_and_Motor_Repairs,_Rebuilds,_and_Replacement_Services.pdf | ||
| Attachment_B_-_Examples_of_Critical_Pumps_&_Motors.pdf | ||
| Sample_Agreement_-_Form_7_-_General_Services.pdf | ||
| Attachment_D_-_Bid_Response_Table_(Repair_Scenarios).xlsx | XLSX spreadsheet | |
| Attachment_A_-_Scope_of_Services.pdf | ||
| Vendor_Information_Request_Form_.pdf | ||
| Form_1_-_Engineering_Service_-_102618.docx | DOCX document | |
| Sample_Agreement_-_Form_4_-_Non-Pro_Consultant.docx | DOCX document | |
| Form_3_-_Pro-Svc_Non-Tech_-_102618.docx | DOCX document | |
| Sample_Agreement_-_Form_8_-_Transportation_Services.docx | DOCX document | |
| Sample_Agreement_-_Form_9_-_Supply.docx | DOCX document | |
| Sample_Agreement_-_Form_5_-_On-Call_Engineering_Service.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit C – Pump and Motor Repair Scenarios
Scenarios
P1 – Horizontal Split-Case Pump (Goulds) P2 – 7-Stage Centrifugal Pump (Johnston) P3 – 2-Stage Vertical Turbine Pump (Floway)
M1 – 75 HP US Motor Type TVCS4 M2 – 700 HP TECO-Westinghouse Motor Type AMRK-EC M3 – 500 HP US Motor Type JUE
General Notes:
1. Contractor(s) assume that all scenarios shown herein require crane arrangements, transportation from/to West Basin Facilities via flatbed truck, and any other necessary tasks to complete the removal and re-installation of the pump/motor assembly.
2. All material used in the repair, rebuild, or replacement of pump or motor equipment shall meet or exceed all manufacturer specifications.
3. Field pump installation(s) shall meet or exceed pump manufacturers’ recommendations.
Scenario P1
Pump Information Horizontal Split-Case Pump Goulds Pump Model 3410 Impeller Dia: 10.25 X 9.75 Material: 316 SS S/N: 237C693-2
2,100 GPM
30’ TDH
1200 RPM
Pump Repair – Scope of Work:
• Disconnect mechanically and electrically
• Disconnect Pump from base
• Lift/Remove existing pump
• Transport to shop
• Disassemble, clean, and inspect pump
• Provide clearances, and as-found conditions in a report document
• Fabricate new shaft and impeller(s) with 316 stainless steel material
• Fabricate new wear rings and bushings
• Sandblast and 2-part epoxy coat discharge head, volute, and casing
• Assemble complete pump with new couplings, mechanical seal, bearings, gaskets, and O-rings
• Transport pump to West Basin facility and Reinstall Pump
• Perform pump testing with motor alignment as per manufacturer recommendations
• Perform an operational test with vibration analysis as installed
• Furnish a complete report of repairs/replacement and final clearances with vibration results as a part of the report.
Scenario P2
Centrifugal 7-Stage Pump Johnston Pump Model 15GMC
S/N: 93JB1348
2,050 GPM
600 BHP
730’ TDH
1800 RPM
Pump Repairs – Scope of Work
• Disconnect Pump from base
• Lift/Remove existing pump
• Transport to shop
• Disassemble, clean, and inspect pump
• Provide clearances, and as found conditions in a report document
• Overhaul Pump and replace/fabricate:
o Wear Rings – bowls o Wear Rings – Impellers o Thrust Rings o O-ring, nuts and coupling o Shaft o Impeller(s) o Mechanical Seal assembly including bearing and bearing’s stuffing box o Bowl bearings o Sandblast and 2-part epoxy coat bowls, discharge head, columns, and housing
• Transport pump to West Basin facility
• Reinstall Pump
• Perform pump with motor alignment as per manufacturer recommendations
• Perform an operational test.
• Furnish a complete report of repairs/ replacement and final clearances as a part of the report.
Scenario P3
Vertical Turbine Pump (2-Stage) Floway Pump Model 28FKM S/N: 37694-1-1
14,000 GPM
800 BHP
185’ TDH
1190 RPM
Pump Repairs – Scope of Work
• Disconnect Pump from base
• Lift/Remove existing pump
• Transport to shop
• Disassemble, clean, and inspect pump
• Provide clearances, and as found conditions in a report document
• Fabricate new head and bowl shaft with 416 stainless steel material
• Fabricate new bowl, suction bell, packing box, and line shaft bronze bearings
• Fabricate new bowl wear rings
• Supply and install two new impellers
• Sandblast and epoxy coat discharge head, column, and bowls
• Assemble complete pump with new shaft couplings, mechanical seal, shaft bearings, gaskets, and O-rings
• Transport pump to West Basin facility
• Reinstall Pump and perform operational test
• Perform pump with motor alignment as per manufacturer recommendations
• Furnish a complete report of repairs/ replacement and final clearances as a part of the report.
Scenario M1
Motor Information Make: US Motors – Type TVCS4
75 HP, 1780 RPM
ID#: D 10 99083715-001R-02
Rated Voltage: 460V, Rated Amps: 86A Phase: 3, Frequency: 60 Hz Enclosure: TE, Frame: 444VP Configuration: Vertical Duty: Continuous, Insulation Class: F Service Factor: 1.15 Upper Bearing: 7320-BEM Lower Bearing: 6218-JC3 Oil Cap. Upper Bearing: 4.62 Qts.
Approximate Weight: 2,000 lbs
Motor Maintenance Scope of Work:
• Mechanically and electrically disconnect motor
• Arrange for crane service to remove motor from pump
• Load to vendor provided truck
• Dismantle Motor, visually inspect, and report any findings
• Steam clean / bake out / prep all parts
• Inspect all machine fits for proper tolerance and report
• Burn out stator in temperature controlled burnout oven
• Strip and sandblast stator
• Computer core test stator laminations and report
• Take data on AC Stator
• Make coils utilizing quad core inverter duty wire for AC stator
• Insulate and wind AC stator
• Install and connect RTD’s
• Furnish Consumable Rewind Materials
• Connect AC Stator Winding & Test
• Prep for Vacuum Pressure Impregnation
• Perform Vacuum Pressure Impregnation with epoxy
• Bake out stator and clean
• Dynamically balance rotor to 4W/N specification.
• Check heaters for proper operation
• Furnish and install bearings (Old bearings must be returned with motor).
• Assemble Motor
• Test run and perform vibration analysis and report
• Paint to customer specification
• Provide repair report
• Deliver unit back to customer site
• Provide crane for installation of motor to pump
• Furnish Consumable Job Material
• Bump motor for rotation
• Mechanically and electrically connect motor and heaters
• Perform vibration analysis onsite to compare with shop vibration
Scenario M2
Make: TECO-Westinghouse Type AMRK-EC
700 HP, 1189 RPM
Rated Voltage: 4000V, Rated Amps: 89.8A Phases: 3, Frequency: 60 Hz Enclosure: WPII : NEMA Weather Protected Type II Frame # 6806 Duty: Continuous, Insulation Class: F Service Factor: 1.15 Upper Bearing: 29334+6032 (Insulated) Lower Bearing: 6224C3 (Uninsulated) Oil Cap. Upper Bearing: 12.7 gal Approximate Weight: 8,820 lbs
Motor Maintenance Scope of Work:
• Mechanically and electrically disconnect motor
• Arrange for crane service to remove motor from pump
• Load to vendor provided truck
• Dismantle Motor and visually inspect and report any detrimental findings
• Steam clean / bake out / prep all parts
• Growler test rotor assembly and provide report
• Inspect all machine fits for proper tolerance and report
• Burn out stator in over temperature controlled burnout oven
• Strip and sandblast stator
• Computer core test stator laminations and report
• Take data on AC Stator
• Make coils utilizing quad core inverter duty wire for AC stator
• Insulate with double class F insulation & wind
AC stator
• Install and connect RTD’s
• Furnish Consumable Rewind Materials
• Connect AC Stator Winding & Test
• Prep for Vacuum Pressure Impregnation.
• Perform Vacuum Pressure Impregnation with epoxy
• Bake out stator and clean
• Chico leads
• Dynamically balance rotor to 4W/N specification.
• Check heaters for proper operation
• Furnish and install bearings (Old bearings must be returned with motor).
• Assemble Motor
• Test run and perform vibration analysis and report
• Paint to customer specification
• Provide repair report
• Deliver unit back to customer site
• Provide crane for installation of motor to pump
• Furnish Consumable Job Material
• Bump motor for rotation
• Mechanically and electrically connect motor and heaters
Scenario M3
Make: US MOTORS – Type JUE
ID# G68574
500 HP, 1190 RPM
Frame: 5811P TEFC Rated Volts: 4160V, Rated Amps: 65A S/N: W04W0210528R-1 Phases: 3, Frequency: 60Hz Duty: Continuous, 40 Deg. C Amb.
Insulation Class: F Service Factor: 1.15 Lower End Bearing: 7228BACB-2 Upper End Bearing: 6226-J/C3 Oil Cap. Upper bearing: 37 Qts.
Oil Cap. Lower bearing: 4 Qts.
Motor Maintenance Scope of Work:
• Mechanically and electrically disconnect motor
• Arrange for crane service to remove motor from pump
• Load to vendor provided truck
• Dismantle Motor and visually inspect and report any detrimental findings
• Steam clean / bake out / prep all parts
• Growler test rotor assembly and provide report
• Inspect all machine fits for proper tolerance and report
• Burn out stator in over temperature controlled burnout oven
• Strip and sandblast stator
• Computer core test stator laminations and report
• Take data on AC Stator
• Make coils utilizing quad core inverter duty wire for
AC stator
• Insulate with double class F insulation & wind AC stator
• Install and connect 6 platinum RTD’s
• Furnish Consumable Rewind Materials
• Connect AC Stator Winding & Test
• Prep for Vacuum Pressure Impregnation
• Perform Vacuum Pressure Impregnation with epoxy
• Bake out stator and clean
• Chico leads
• Dynamically balance rotor to 4W/N specification
• Check heaters for proper operation
• Furnish and install bearings (Old bearings must be returned with motor).
• Assemble Motor
• Test run and perform vibration analysis and report
• Paint to customer specification
• Provide repair report
• Deliver unit back to customer site
• Provide crane for installation of motor to pump
• Furnish Consumable Job Materials
• Bump motor for rotation
• Mechanically and electrically connect motor and heat
File details come from the government source that posted it. Updated .