About this file
This is a specifications document for a storage tank installation project for the Louisiana Department of Corrections. The project involves the installation of storage tanks with specific technical requirements and performance standards. The document outlines detailed specifications for tank materials, dimensions, installation procedures, and quality assurance measures. The specifications establish minimum requirements for all bidders to meet, ensuring consistency and compliance with state standards. Site visits are recommended to allow bidders to assess installation conditions and project scope. The contract term and specific response deadlines are not detailed within this specifications attachment.
The specifications document emphasizes strict adherence to industry standards and regulatory compliance, including requirements for materials certification, pressure testing, and inspection protocols. Bidders must demonstrate capability to meet all technical specifications, including tank capacity, construction materials, corrosion resistance, and installation methodology. The document serves as a binding component of the procurement package and establishes the minimum acceptable quality and performance standards that any awarded contractor must achieve. Pricing proposals should account for full compliance with all detailed specifications to ensure competitive and compliant bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3000026474-1.pdf | ||
| Addendum No. 1 - Specification Revisions.docx | DOCX document | |
| Revised Attachment C - Specifications - Pages 1-3.docx | DOCX document | |
| Attachment B - Job Site Verification Form - Page 1.docx | DOCX document | |
| Attachment A - Special Terms and Conditions Pages 1-13.docx | DOCX document | |
| 3000026474.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C – Specifications RFx 3000026474
**If bidding other than specified, please provide manufacturer’s specs for “or equal” items. ** Scope of Work The Contractor shall supply all labor, rentals, permits and materials to remove and install a double wall fire-protected aboveground storage tank for the Department of Corrections (DOC).
Location:
Louisiana Correctional Institute for Women 6923 Highway 74 St. Gabriel, LA 70776
Site Visit Contact:
Clarence Bourgeois; (225) 354-6949 Jeff Ridgel; (985) 269-4160
Specifications:
The Contractor shall be responsible for the following:
· Supply and install one 6,000-gallon 96” Fireguard or Equal
Specify Brand/Model Bidding: _______________________
· The tank shall have steel outer walls to provide low cost maintenance and protection.
· Primary storage tank and secondary containment shall be compatible with a wide range of fuels and chemicals, including biodiesel & ethanol
· There shall be thermal insulation material that exceeds the UL 2-hour fire test.
· The approximate diameter is 102" and length is 198".
· The Contractor shall install a 20' x 24' slab with bollards for tank installation along with proper equipment to offload the tank from the delivery truck.
· The Contractor shall include all required electrical piping required for the project.
The Contractor shall supply and install the following:
· One 2-product remote fill box with all necessary piping
· Two FE Petro or Equal 1-1/2 hp submerged motors with leak detectors
Specify Brand/Model Bidding: _______________________
· 2" black iron product piping with all necessary solenoid valve, ball valves, pressure relief valves and any other required valves.
· Two dispenser pedestals under dispenser containment sumps with all necessary shear valves Morrison Bros. CO 434 Series dispenser pedestal or Equal
Specify Brand/Model Bidding: _______________________
· The pedestal shall be 12-gauge steel, black powder coated
· Pre-drilled anchor holes
· The dispenser mounting platform shall overhang the pedestal base minimizing the ability for water penetration.
· The stabilizer bar kit shall be included by the Contractor.
· Connection boots available
Single Remote Dispenser:
Brand: Wayne Select or Equal
Specify Brand/Model Bidding: _______________________
· Flow Control Valve: proportional 7/8'' (2.2 cm). allows setting max. flow rate. SHC uses two valves.
· Inlet Connection: 1 1/2'' (3.8 cm) male. NPT. (e85 option - 1 1/2'' (3.8 cm) fem. NPT. no riser).
· Discharge: 1'' female NPT w/ 3/4'' adapter.
· DEF: w/ 1'' male BSPP adapter.
· Hose Hanger: Keeps hose off ground when idle.
· Electrical: 120 vac 60 Hz
· Motors: 120/240 vac 50/60 Hz
· Pressure: Working pressure up to 50 psi.
· Cabinet finish: powder-coated metallic silver sides, top, and base
· Doors powder-coated blue.
· Charcoal gray bezel with matching decal with white lettering.
· Cabinet Construction: All exterior panels are fabricated from heavy gauge galvannealed steel for superior weather and corrosion resistance.
· Hinged doors for convenient service access.
· Totalizer: 7-digit electromechanical non-resettable totalizer per hose.
· Motor: 1-hp continuous duty with thermal overload protection. adjustable v-link belt connects to pump pulley.
· Fuel control system interfaces: Wayne protocol. optional pulse output.
· Nozzle boot: fits UL interchangeable nozzles and Emco Wheaton 4015 and Husky V short spout balance vapor recovery nozzles.
· Actual Dimensions: 32.25'' w x 19.38'' d x 63.3'' h (81.9 cm w x 49.2 cm d x 160.8 cm h)
· One Ultimate Automatic Tank Gauging System Maglink LX or Equal:
Specify Brand/Model Bidding: _______________________
Shall Include:
· Display
· Printer
· Two 101” inventory only tank probes with floats
· Two sump sensors
· One interstice sensor
· One overfill alarm
General Terms:
· The Contractor shall be responsible for delivery and pickup of materials/supplies needed to complete project.
· Disposal of all materials and debris shall be the responsibility of the Contractor.
· The Contractor shall be responsible for providing any lifting capability to complete all new installations and repairs.
· The Contractor shall take all precautions necessary to prevent damages when making repairs. This includes movement and parking of equipment on grass or unimproved areas surrounding site.
· The Contractor shall contact, prior to mobilization and demobilization, the Project Manager for staging and for satisfactory completion.