Attachment C - Final Plans Polk Stream ARA 9.pdf
PDF 23 MB Posted
- Attached to
- Thomas Mitchell Stream Restoration Project
- Solicitation number
- 711-2526
- Issued by
- Polk County, Milton City, Iowa
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 23
BEAVER
TOWNSHIP
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Co ve r S he et _A
RA
-9
.d w g- A.
CO
VE
R
SH
EE
T- 5/
/2
1:
P M
-(t ba lm er
Project No. 0143-0009
CONSTRUCTION PLANS FOR
POLK COUNTY PUBLIC WORKS
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY, IA
MAY 2025
LOCATION MAP
VICINITY MAP
HEI NO. 0143-0009
100 COURT AVENUE
SUITE 202
DES MOINES, IA 50309
P: 515.444.5393 www.houstoneng.com
THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM
FIELD SURVEY INFORMATION, AS-BUILT MAPS AS PROVIDED BY
MUNICIPALITIES OR UTILITY COMPANIES, AND/OR EXISTING
DRAWINGS. THERE IS NO GUARANTEE THAT THE UNDERGROUND
UTILITIES SHOWN INDICATE ALL SUCH UTILITIES IN THE AREA, EITHER IN
SERVICE OR ABANDONED. NOR IS THERE A GUARANTEE THAT THE
UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION
INDICATED. THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION OF ALL EXISTING UTILITIES. THE CONTRACTOR AGREES TO
BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MAY
RESULT FROM THEIR FAILURE TO EXACTLY LOCATE AND PRESERVE ANY
AND ALL UTILITIES.
GOVERNING SPECIFICATIONS:
STANDARD SPECIFICATIONS FOR CONSTRUCTION ADOPTED BY THE
IOWA DEPARTMENT OF TRANSPORTATION AND SUDAS, STANDARD
DRAWINGS CURRENTLY IN EFFECT AND OTHER CONTRACT PROVISIONS
SUBMITTED HEREIN:
UTILITY NOTE:
PROJECT
LOCATION
I-80
ALTOONA
AREA OF WORK
NE 46TH AVE
MITCHELLVILLE
N E
8T
H S
T
THOMAS MITCHELL
PARK
US-163
SHEET INDEX
A.1 COVER SHEET
A.2 NOTES AND QUANTITIES
A.3 SITE PLAN
B.1 CAMP CREEK SOUTH PLAN AND PROFILE (1 OF 4)
B.2 CAMP CREEK SOUTH PLAN AND PROFILE (2 OF 4)
B.3 CAMP CREEK SOUTH PLAN AND PROFILE (3 OF 4)
B.4 CAMP CREEK SOUTH PLAN AND PROFILE (4 OF 4)
B.5 CAMP CREEK NORTH PLAN AND PROFILE (1 OF 2)
B.6 CAMP CREEK NORTH PLAN AND PROFILE (2 OF 2)
B.7 TRIBUTARY PLAN AND PROFILE (1 OF 2)
B.8 TRIBUTARY PLAN AND PROFILE (2 OF 2)
B.9 STOCKPILE MAP
B.10 CAMP CREEK SOUTH CROSS SECTIONS (1 OF 7)
B.11 CAMP CREEK SOUTH CROSS SECTIONS (2 OF 7)
B.12 CAMP CREEK SOUTH CROSS SECTIONS (3 OF 7)
B.13 CAMP CREEK SOUTH CROSS SECTIONS (4 OF 7)
B.14 CAMP CREEK NORTH CROSS SECTIONS (5 OF 7)
B.15 TRIBUTARY CROSS SECTIONS (6 OF 7)
B.16 TRIBUTARY CROSS SECTIONS (7 OF 7)
B.100 DETAILS (1 OF 5)
B.101 DETAILS (2 OF 5)
B.102 DETAILS (3 OF 5)
B.103 DETAILS (4 OF 5)
B.104 DETAILS (5 OF 5)
C.1 CAMP CREEK SOUTH PLANTING PLAN (1 OF 4)
C.2 CAMP CREEK SOUTH PLANTING PLAN (2 OF 4)
C.3 CAMP CREEK SOUTH PLANTING PLAN (3 OF 4)
C.4 CAMP CREEK SOUTH PLANTING PLAN (4 OF 4)
C.5 CAMP CREEK NORTH PLANTING PLAN (1 OF 2)
C.6 CAMP CREEK NORTH PLANTING PLAN (2 OF 2)
C.7 TRIBUTARY PLANTING PLAN (1 OF 2)
C.8 TRIBUTARY PLANTING PLAN (2 OF 2)
C.100 PLANTING DETAILS
S.1 SWPP SITE PLAN
S.2 CAMP CREEK SOUTH SWPP PLAN (1 OF 4)
S.3 CAMP CREEK SOUTH SWPP PLAN (2 OF 4)
S.4 CAMP CREEK SOUTH SWPP PLAN (3 OF 4)
S.5 CAMP CREEK SOUTH SWPP PLAN (4 OF 4)
S.6 CAMP CREEK NORTH SWPP PLAN
S.7 TRIBUTARY SWPP PLAN
S.100 SWPPP DETAILS
T.1 TRAFFIC PLAN
NE DEVOTIE DR
1. ALL COORDINATES LISTED IN THE PLAN ARE NAD83 IOWA RCS
ZONE 8, US FOOT
2. VERTICAL DATUM: NAVD 1988
HORIZONTAL AND VERTICAL CONTROLS:
NE 46TH AVE
N
E 108TH
ST
12/31/2025
ALL SHEETS
I HEREBY CERTIFY THAT THIS ENGINEERING
DOCUMENT WAS PREPARED BY ME OR UNDER MY
DIRECT PERSONAL SUPERVISION AND THAT I AM A
DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF IOWA.
CHARLES IKENBERRY DATE
LICENSE NO: 22051
MY LICENSE RENEWAL DATE IS:
PAGES OR SHEETS COVERED BY THIS SEAL:
05/13/2025
I HEREBY CERTIFY THAT THIS ENGINEERING
DOCUMENT WAS PREPARED BY ME OR UNDER MY
DIRECT PERSONAL SUPERVISION AND THAT I AM A
DULY LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF IOWA.
TED RUD DATE
LICENSE NO: 29069
MY LICENSE RENEWAL DATE IS:
PAGES OR SHEETS COVERED BY THIS SEAL:
TED
RUD
29069
ALL SHEETS
12/31/2025
05/13/2025 h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Co ve r S he et _A
RA
-9
.d w g- A.
N
O
TE
S
AN
D Q
U
AN
TI
TI
ES
-5
/1 3/
:5
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IAAS SHOWN
HEI NO. 0143-0009
A.2
NOTES AND QUANTITIES
GENERAL NOTES:
1. THE LOCATIONS OF ALL AERIAL AND UNDERGROUND UTILITY FACILITIES
ARE APPROXIMATE OR MAY NOT BE INDICATED IN THESE PLANS.
UNDERGROUND FACILITIES, WHETHER INDICATED OR NOT, SHALL BE
LOCATED AND FLAGGED BY THE CONTRACTOR AND UTILITY COMPANIES 48
HOURS BEFORE WORK IS STARTED. VERIFY UTILITY LOCATIONS BY
CONTACTING THE IOWA ONE CALL (ONLINE AT WWW.IOWAONECALL.COM
AND/OR CALL 811). THE CONTRACTOR SHALL BE REQUIRED TO NOTIFY AND
COORDINATE ALL NECESSARY UTILITY SERVICE INTERRUPTIONS WITH THE
OWNERS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
PROTECT ALL EXISTING UTILITIES, PAVEMENT, STRUCTURES, FENCES,
POLES, SIGNS, TREES, IRRIGATION LINES, SPRINKLER HEADS, SUB- DRAINS
AND OTHER IMPROVEMENTS NOT DESIGNATED FOR REMOVAL. ANY
DAMAGE CAUSED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED
BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
2. CONTOURS SHOWN ON THE PLANS ARE 1 FT CONTOURS FROM SURVEYED
LIDAR BY HEI (APRIL 2024). ELEVATIONS CALLED OUT ON THE PLANS ARE
REFERENCED TO NAVD 88 VERTICAL DATUM. HORIZONTAL CONTROL IS
NAD83 IOWA RCS ZONE 8.
3. THE CONTRACTOR SHALL CONDUCT ALL OPERATIONS AND MAINTAIN
CONSTRUCTION WORK AREA IN A SAFE MANNER IN ACCORDANCE WITH
OSHA COMPLIANCE.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL TEMPORARY
MARKERS, LIGHTS, SIGNS, FLAGMEN, BARRICADES AND OTHER PROTECTIVE
DEVICES TO PROVIDE ADEQUATE TRAFFIC CONTROL. THIS SHALL INCLUDE
ANY BARRICADES OR SIGNS NECESSARY FOR PEDESTRIAN TRAIL CLOSURE.
5. ELECTRONIC GRADING FILES AND EXISTING UTILITIES AND WETLANDS CAN
BE PROVIDED BY ENGINEER UPON REQUEST.
6. CONTRACTOR IS RESPONSIBLE FOR REPAIRING DAMAGE TO ROADS,
SIDEWALKS, AND TRAILS USED AS ACCESS ROUTES. CONDITIONS PRIOR TO
CONSTRUCTION TO BE DOCUMENTED BY THE CONTRACTOR AND MUST BE
RESTORED TO ORIGINAL CONDITIONS OR BETTER BY SMOOTHING
COMPACTED SOILS PRIOR TO FINISHED GRADING AND SEEDING WITH
SPECIFIED MIX AND METHODS.
7. ACCESS ROUTES IDENTIFIED TO EACH SITE MUST BE STRICTLY ABIDED TO.
CONTRACTOR MAY PROPOSE ALTERNATE ROUTES FOR APPROVAL BY FIELD
ENGINEER PRIOR TO MOBILIZATION.
8. THE QUANTITIES SHOWN FOR SEEDING INCLUDE ALL AREA SHOWN ON THE
C SHEETS AND DO NOT ACCOUNT FOR ANY AREA THAT IS DISTURBED
OUTSIDE OF THESE AREAS OR THE LIMITS OF CONSTRUCTION. DISTURBED
AREAS OUTSIDE THESE AREAS AND THE LIMITS OF CONSTRUCTION MUST
BE RESTORED, SEEDED, AND MULCHED AND WILL BE CONSIDERED
INCIDENTAL TO THE PROJECT. COUNTY WILL PROVIDE NATIVE SEED MIX
FOR CONTRACTOR'S HYDRAULIC SEEDING OF MESIC PRAIRIE AND RIPARIAN
AREAS. CONTRACTOR WILL PROVIDE TURF GRASS AND TEMPORARY SEED
MIXES PER SPECIFICATION.
9. CONTRACTOR TO HAUL OFF-SITE AND DISPOSE OF EXCESS EXCAVATED
MATERIAL. EXCESS MATERIAL FROM EXCAVATION SHALL BECOME
PROPERTY OF THE CONTRACTOR AND SHALL BE PROPERLY DISPOSED OF
OFF SITE.
10. CLEARING AND GRUBBING TO BE PERFORMED ONLY IN LOCATIONS
NECESSARY TO CONSTRUCT AND ACCESS THE SITE. CONTRACTOR SHALL
CLEAR ALL DEBRIS WITHIN STREAM INSIDE OF THE LIMITS OF
CONSTRUCTION. CLEARING AND GRUBBING MATERIAL MUST BE HAULED
OFFSITE.
11. PROTECT BY WHATEVER MEANS REQUIRED ALL FENCES, SIGNS,
STRUCTURES, DRIVES, SIDEWALKS, STREETS, BUSHES, TREES, ETC.
SHOWN TO REMAIN OUTSIDE OR INSIDE THE LIMITS OF CONSTRUCTION.
12. THE OWNER SHALL RESERVE THE RIGHT TO SALVAGE ANY MATERIALS.
13. REPAIR OR REPLACE ITEMS THAT ARE DAMAGED AS A RESULT OF
DEMOLITION OR CONSTRUCTION TO MATCH OR IMPROVE EXISTING
CONDITIONS.
14. CONTRACTOR TO ATTEND THE PRE-CONSTRUCTION CONFERENCE WITH
OWNER, ENGINEER, AND OTHER PROJECT STAKEHOLDERS.
15. RAMPS AND HAUL ROUTES THAT THE CONTRACTOR CONSTRUCTS FOR
HAULING MATERIAL AND TRANSPORTING EQUIPMENT SHALL BE
CONSIDERED INCIDENTAL TO MOBILIZATION.
16. HEI WILL PROVIDE TEMPORARY CONTROL POINTS AS SHOWN ON SHEET A.3.
CONTRACTOR IS RESPONSIBLE FOR ALL SURVEY AND STAKING
REQUIREMENTS. GPS FILES ARE AVAILABLE UPON REQUEST.
17. WITH APPROVAL FROM PROJECT REPRESENTATIVE, TOEWOOD MAY BE
USED IN LIEU OF ROOTWADS OR ROOTWADS MAY BE USED IN LIEU OF
TOEWOOD TO STABILIZE BANK DEPENDING ON MATERIALS HARVESTED
FROM SITE. TREES FOR TOEWOOD AND ROOTWADS HAVE ALREADY BEEN
STOCKPILED FOR USE (SEE SHEET B.9 FOR STOCKPILE LOCATIONS).
18. DEVOTIE DRIVE BRIDGE WILL BE UNDER CONSTRUCTION CONCURRENT
WITH THE PROJECT. CONTRACTORS WILL COORDINATE TO MINIMIZE
CONFLICTS. THE SEQUENCE PLAN WILL BE DISCUSSED AT
PRE-CONSTRUCTION MEETING.
19. ELECTED CONTRACTOR WILL BE REQUIRED TO SUBMIT A WATER HANDLING
PLAN FOR APPROVAL PRIOR TO COMMENCING WORK FOR DISCUSSION AT
PRE-CONSTRUCTION MEETING.
20. ALL ROLLED EROSION CONTROL PRODUCTS SHALL USE NATURAL FIBERS.
21. NO TREE CLEARING PERMITTED BETWEEN MARCH 31 AND OCTOBER 15.
TREES IN WORK AREAS HAVE ALREADY BEEN REMOVED OR CUT FLUSH
ALONG THE STREAMBANKS, LEAVING ROOTWADS AND STUMPS.
EXCAVATION ALONG BANKS MAY REQUIRE ROOTWAD OR STUMP REMOVAL.
THIS WILL BE INCIDENTAL TO THE CLEARING AND GRUBBING LINE ITEM. DO
NOT REMOVE ANY TREES WITHOUT APPROVAL OF FIELD ENGINEER.
22. CONTRACTOR MUST DEVELOP ALL DOCUMENTATION REQUIRED TO APPLY
FOR AND OBTAIN THE NPDES PERMIT GRANTED BY IOWA DEPARTMENT OF
NATURAL RESOURCES. CONTRACTOR MUST ADHERE TO THE
REQUIREMENTS OF THE NPDES PERMIT AND SWPPP (SHEET S.1).
CONTRACTOR TO IMPLEMENT COVER CROP AND/OR PERMANENT SEEDING
WITH HYDROMULCH WITH BONDED FIBER MATRIX (BFM) ON ALL DISTURBED
AREAS IMMEDIATELY UPON COMPLETION OF GRADING OPERATIONS AT SITE
IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND IN COORDINATION
WITH RPR. COVER CROP MIX WILL COMPLY WITH IOWA DOT 9010.09 TYPE 4
URBAN TEMPORARY EROSION CONTROL MIXTURE
23. CONTRACTOR MUST ADHERE TO THE REQUIREMENTS OF THE 404 PERMIT
GRANTED BY THE UNITED STATES ARMY CORPS OF ENGINEERS FOR THIS
PROJECT. A COPY OF THE REQUIREMENTS WILL BE PROVIDED TO THE
SELECTED CONTRACTOR, OR UPON REQUEST.
24. DELINEATED WETLANDS ARE SHOWN ON THE PLANS. CONTRACTOR SHALL
LIMIT ALL CONSTRUCTION ACTIVITIES FROM ENCROACHING UPON WETLAND
AREAS, EXCEPT LOCATIONS SPECIFICALLY DESIGNATED IN THE
CONSTRUCTION DRAWINGS. WETLAND AREAS THAT ARE TEMPORARILY
DISTURBED DUE TO CONSTRUCTION ACTIVITIES SHALL BE RESTORED AND
RESEEDED WITH THE RIPARIAN SEEDING MIX AS DETAILED IN THE PROJECT
SPECIFICATIONS.
25. CONTRACTOR SHALL AVOID AND PROTECT ENVIRONMENTALLY SENSITIVE
AREAS.
26. CONTRACTOR MUST USE GREAT CAUTION TO NOT DAMAGE VALUABLE
TREES THAT ARE BEING KEPT IN THE PROJECT AREA (MARKED BY PAINT). IF
ANY TREE IS DAMAGED, THE CONSERVATION ECOLOGIST WILL DETERMINE
THE VALUE OF THE DAMAGED TREE USING THE NATIONAL TREE BENEFIT
CALCULATOR (ARBOR DAY FOUNDATION). ASSESSED DAMAGE WILL FALL
INTO THREE CATEGORIES, AND BE REIMBURSED TO PCC IN THE FOLLOWING
AMOUNTS:
LIGHT DAMAGE - 20% OF TREE VALUE
MODERATE DAMAGE - 50% OF TREE VALUE
EXTREME DAMAGE - 100% OF TREE VALUE
CONTROL POINTS:
ABBREVIATIONS:LEGEND:
EXISTING CONTOUR MINOR
EXISTING CONTOUR MAJOR
EXISTING STREAM CENTERLINE
PROPERTY BOUNDARY LINE
GAS UTILITY LINE
OVERHEAD POWER UTILITY LINE
UNDERGROUND POWER UTILITY LINE
STORM SEWER LINE
SANITARY SEWER LINE
OVERHEAD COMMUNICATIONS LINE
UNDERGROUND COMMUNICATIONS
FIBER OPTIC LINE
WATER MAIN LINE
LIMITS OF CONSTRUCTION
STRAW WATTLE
SILT FENCE
FLOATATION SILT CURTAIN
SAFETY FENCE
WETLAND
G
OHP
FO FO
UGE
STS STS
STS STS
OHP
UGC
W W
BIO BIO BIO
ROCK RIPRAP
GRAVEL
FINISH GRADE - CUT
FINISH GRADE - FILL
STAGING AREA
EROSION CONTROL MATTING
RIPARIAN SEED MIX
MESIC PRAIRIE SEED MIX
TREE - DO NOT DISTURB
REMOVE DEBRIS
CONSTRUCTION EXIT
EXISTING MANHOLE
TEMPORARY STREAM CROSSING
XX XX XX
PERMITTING NOTES:
QUANTITIES:
S S S
AC - ACRES
BF - BANKFULL
BFM - BONDED FIBER MATRIX
CL - CENTERLINE
CMP - CORRUGATED METAL PIPE
CMPA - CORRUGATED METAL PIPE ARCH
CY - CUBIC YARD
DIA - DIAMETER
DIP - DUCTILE IRON PIPE
EA - EACH
EL - ELEVATION
FES - FLARED END SECTION
FL - FLOW LINE
FO - FIBER OPTIC
FT - FEET
IDOT - IOWA DEPARTMENT OF TRANSPORTATION
LB - LEFT BANK
LF - LINEAR FOOT
LS - LUMP SUM
MAX - MAXIMUM
MFG - MANUFACTURER
MIN - MINIMUM
NDPES - NATIONAL DISCHARGE POLLUTANT ELIMINATION SYSTEM
RB - RIGHT BANK
RCP - REINFORCED CONCRETE PIPE
RCPA - REINFORCED CONCRETE PIPE ARCH
RECP - ROLLED EROSION CONTROL PRODUCT
SMP - SMOOTH METAL PIPE
SUDAS - STATEWIDE URBAN DESIGN AND SPECIFICATIONS
SWPPP - STORM WATER POLLUTION PREVENTION PLAN
SY - SQUARE YARD
TN - TON
TYP - TYPICAL
POLK COUNTY PUBLIC WORKS
MR. JOHN SWANSON
515.875.5880
JONATHON.SWANSON@POLKCOUNTYIOWA.GOV
5885 NE 14TH ST
DES MOINES, IOWA 50313
HOUSTON ENGINEERING
MR. CHARLES IKENBERRY, PE
515.444.5394
CIKENBERRY@HOUSTONENG.COM
100 COURT AVENUE, SUITE 202
DES MOINES, IOWA 50309
MR. TED RUD, PE
701.499.2079
TRUD@HOUSTONENG.COM
1401 21ST AVENUE N
FARGO, NORTH DAKOTA 58102
POLK COUNTY CONSERVATION
MRS. AMANDA BROWN
515.323.5357
AMANDA.BROWN@POLKCOUNTYIOWA.GOV
11204 NE 118TH AVE
MAXWELL, IOWA 50161
CONTACT INFORMATION:UTILITIES CONTACT INFORMATION:
CENTURYLINK
SADIE HULL
918.547.0147
SADIE.HULL@LUMEN.COM
MID AMERICAN ENERGY
JAIME NEER
515.252.6972
MECDSMDESIGNLOCATES@MIDAMERICAN.COM
SOUTHEAST POLK CSD
JENNIFER COSBY
515.262.7686
LOCATES@GOTOCI.COM
SOUTHEAST POLK RURAL WATER DIS
ED CLARK
515.323.6244
ONECALLMAPS@DMWW.COM
SECTION 23
BEAVER
TOWNSHIP
POLK COUNTY
792223100011
POLK COUNTY
792223300002
POLK COUNTY
792223300004
POLK COUNTY
792223300003
POLK COUNTY
792223300005
POLK COUNTY
792223300006
POLK COUNTY
792223300007
MARCO REYES
792223300008
MICHAEL E SWEENEY
792223300009
POLK COUNTY
792223100008
RICHARD C MEADE
792223401003
RICHARD C MEADE
792223401002
LAURAL L MILLER
792223400001
RICHARD C MEADE
792223401001
DENNIS W KELLER
792223251002
DENNIS W KELLER
792223251001
JULIA A LAVELY
792223200004
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
SENSITIVE AREA
RICHARD C MEADE
792223401004
TIMOTHY HUFFMAN
792223400028
JASON JONS
792223400027
ACCESS ROUTE
STAGING AREA
STAGING AREA
ACCESS ROUTE
ACCESS ROUTE
STAGING AREA
ACCESS ROUTE
N
E 46TH AVE
NE 108TH ST
NE DEVOTIE DR
0+00
5+
10+00
15+00
20+00 25+00
29+00
61+50
50+00
55+00
60+00
100+00 105+00
110+00
3+
CONTRACTOR WILL BE
REQUIRED TO AVOID AREA
DURING CONSTRUCTION
CAMP CREEK
CAMP CREEK
CAMP CREEK NORTH
PLAN & PROFILE (1 OF 2)
CAMP CREEK NORTH
PLAN & PROFILE (2 OF 2)
TRIBUTARY PLAN
& PROFILE (1 OF 2)
TR
IB
UT
AR
Y
PL
AN
P
RO
FI
LE
(2 O
F 2)
CA
M
P
CR
EE
K
SO
UT
H
PL
AN
P
RO
FIL
E (
OF
CAMP CREEK SOUTH
PLAN & PROFILE (3 OF 4)
CAMP CREEK SOUTH
PLA
N & PROFILE
(4
OF 4)
CAMP CREEK SOUTH
PLAN & PROFILE (2 OF 4) CONSTRUCTION EXIT, SEE
SUDAS DETAIL 9040.120 (TYP)
CONSTRUCTION EXIT PER
SUDAS DETAIL 9040.120 (TYP)
THOMAS
MITCHELL
POND
CP# 1
7507643.28
18591447.29
ELEV. 888.54
CP# 2
7507634.43
18592263.31
ELEV. 869.48
CP# 3
7505296.90
18592136.50
ELEV. 859.77
CP# 4
7503982.14
18592784.08
ELEV. 860.41
CP# 5
7505471.74
18592683.46
ELEV. 860.04
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
SI
TE
_P
LA
N _A
RA
-9
.d w g- A.
SI
TE
P
LA
N
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IAAS SHOWN
HEI NO. 0143-0009
A.3
SITE PLAN
N
FeetScale
0 150 300150
S
CONTRACTOR WILL BE REQUIRED TO
AVOID AREA DURING CONSTRUCTION
PROPOSED STREAM CENTERLINE
EXISTING WATER EDGE
ACCESS ROUTE, SEE SHEET A.3
TOE ROCK, SEE
SHEET B.101
FLOODPLAIN BENCH,
SEE DETAIL 2-B.102
LIMITS OF CONSTRUCTION
BOUNDARY OF WOODED AREA
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
CROSS VANE #1
STA 6+59
SEE DETAIL 1-B.102
CAMP CREEK
INSTALL 100 FT OF TEMPORARY
SAFETY FENCE. FENCE SHALL BE
ANCHORED USING T-POSTS
DRIVEN NO DEEPER THAN 1.5 FT.
SENSITIVE AREA
EXISTING TREE, DO
NOT DISTURB (TYP)
TEMPORARY STREAM
CROSSING (SEE NOTE 4)
6 ROOTWADS, CONTRACTOR TO USE FOR TOE WOOD.
SEE SHEET B.9 FOR ALL STOCKPILE LOCATIONS
CONSTRUCT ROCK TIE IN
AND BANK SHAPING (TYP)
BANK SHAPING,
SEE DETAIL 1-B.103
20' FLOATATION SILT CURTAIN
45° FROM BANK
20' FLOATATION SILT CURTAIN
45° FROM BANK
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00
ST
A:
6+
EL
EV
:8
.2
SURVEYED THALWEG
CROSS VANE #1
STA 6+59 SEE DETAIL 1-B.102
CROSS VANE CREST = 847.7
FLOODPLAIN BENCH
SEE DETAIL 2-B.102
ST
A:
6+
EL
EV
:8
.7
TOE ROCK, SEE
SHEETS B.101
SU
RV
EY
ED
T
HA
LW
EG
PR
O
PO
SE
D
BA
N
KF
U
LL
0.
9.
9.
9.
6.
6.
5.
6.
6.
6.
6.
6.
6.
6.
6.
9.
6.
6.
7.
7.
9.
9.
9.
ST
A:
6+
EL
EV
:8
.4
ST
A:
6+
EL
EV
:8
.1
BANK SHAPING, SEE
DETAIL 1-B.103
ST
A:
5+
EL
EV
:8
.3
ST
A:
4+
EL
EV
:8
.2
ST
A:
5+
EL
EV
:8
.2
FeetScale
0 30 6030
CAMP CREEK SOUTH PLAN
AND PROFILE (1 OF 4)
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
CA
M P
CR
EE
K
SO
U
TH
P
LA
N A
N D
PR
O
FI
LE
(1 O
F 4)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
B.1 PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IAAS SHOWN
HEI NO. 0143-0009
N
NOTE:
1. CONTRACTOR RESPONSIBLE FOR LOCATING AND AVOIDING
ALL STORM SEWER OUTLETS AND DRAIN TILES IN CHANNEL
BANKS.
2. EXISTING GROUND SURVEYED BY HEI (APRIL 2024).
3. TOP OF TOE ROCK IN PROFILE VIEW IS SHOWN AT THE
BANKFULL ELEVATION. ACTUAL TOP OF TOE ROCK
ELEVATION VARIES BY LOCATION, SEE CROSS SECTION
SHEETS AND GRADING DETAILS. GRADING AND BANK
SHAPING BEHIND THE TOE ROCK IS NOT SHOWN ON THE
PROFILES AND SHALL BE DONE ACCORDING TO THE
DETAILS AND TABLE ON SHEET B.101.
4. CONTRACTOR TO INSTALL TEMPORARY STREAM
CROSSINGS AS NEEDED PER IOWA DOT SPEC EW-401.
ALLOWABLE CROSSING LOCATIONS SHOWN. CONTRACTOR
NOT REQUIRED TO USE ALL POTENTIAL CROSSING
LOCATIONS.
LEGEND:
FINISH GRADE - FILL
FINISH GRADE - CUT
STAGING AREA
ROCK RIPRAP
TEMPORARY STREAM CROSSING
TREE - DO NOT DISTURB
SAFETY FENCE
FLOATATION SILT CURTAINS S
7+00
8+00
9+00
+0
11+00
12+00
13+00
14+00
15+00
16+00
TEMPORARY STREAM
CROSSING (SEE NOTE 4)
ACCESS ROUTE, SEE SHEET A.3
FLOODPLAIN BENCH, SEE
DETAIL 2-B.102
STAGING AREA, SEE SHEET A.3
REMOVE AND
DISPOSE OF VEHICLES
(APPROXIMATELY 4)
OFF-SITE
PLACE EXCAVATED ISLAND
MATERIAL BEHIND TOE ROCK
SEE SHEET B.101
CROSS VANE #2
STA. 11+95
SEE DETAIL 1-B.102
(SEE NOTE 6)
CONSTRUCT ROCK TIEBACK
AND BANK SHAPING (TYP)
TOE ROCK, SEE
SHEET B.101
PROPOSED STREAM
CENTERLINE
EXISTING WATER EDGE
EXISTING STREAM
CENTERLINE
ROCK RIFFLE #1
STA. 15+10
SEE DETAIL 1-B.100
CAMP CREEK
BOUNDARY OF
WOODED AREA
PLACE EXCAVATED MATERIAL BEHIND
TOE ROCK, GRADE TO DRAIN.
PLACE EXCAVATED MATERIAL BEHIND
TOE ROCK, GRADE TO DRAIN.
TOE WOOD, SEE
DETAIL 1-B.104
EXISTING TREE, DO
NOT DISTURB (TYP)
DO NOT DISTURB TREE
(SEE NOTE 5)
1 ROOTWAD, CONTRACTOR TO USE
FOR TOE WOOD. SEE SHEET B.9 FOR
ALL STOCKPILE LOCATIONS
9 ROOTWADS, CONTRACTOR TO USE
FOR TOE WOOD. SEE SHEET B.9 FOR
ALL STOCKPILE LOCATIONS
2 LOGS, CONTRACTOR TO USE
FOR TOE WOOD. SEE SHEET B.9
FOR ALL STOCKPILE LOCATIONS
CONSTRUCT ROCK TIE IN
AND BANK SHAPING (TYP)
LIMITS OF CONSTRUCTION
7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00
7.
6.
6.
6.
7.
7.
7.
8.
8.
9.
9.
9.
1.
9.
1.
9.
1.
9.
1.
ST
A:
+9
EL
EV
:8
.5
ST
A:
+8
EL
EV
:8
.3
0.
0.
0.
0.
0.
0.
0.
1.
1.
1.
SU
RV
EY
ED
T
HA
LW
EG
PR
O
PO
SE
D
BA
N
KF
U
LL
FLOODPLAIN BENCH
SEE DETAIL 2-B.102
FLOODPLAIN BENCH
SEE DETAIL 2-B.102
FLOODPLAIN BENCH
SEE DETAIL 2-B.102
FLOODPLAIN BENCH
SEE DETAIL 2-B.102
ST
A:
7+
EL
EV
:8
.4
ST
A:
8+
EL
EV
:8
.5
ST
A:
8+
EL
EV
:8
.6
ST
A:
8+
EL
EV
:8
.6
ST
A:
+0
EL
EV
:8
.9
ST
A:
+1
EL
EV
:8
.0
ST
A:
+7
EL
EV
:8
.4
ST
A:
+2
EL
EV
:8
.9
ST
A:
+7
EL
EV
:8
.9
ST
A:
+9
EL
EV
:8
.9
ST
A:
+9
EL
EV
:8
.9
SURVEYED THALWEG
CROSS VANE #2
STA 11+95 SEE DETAIL 1-B.102
CROSS VANE CREST = 849.5
TOE ROCK, SEE SHEET B.101
FeetScale
0 30 6030
CAMP CREEK SOUTH PLAN
AND PROFILE (2 OF 4)
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
CA
M P
CR
EE
K
SO
U
TH
P
LA
N A
N D
PR
O
FI
LE
(2 O
F 4)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
B.2 PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
AS SHOWN
HEI NO. 0143-0009
N
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IA
LEGEND:
FINISH GRADE - FILL
FINISH GRADE - CUT
STAGING AREA
ROCK RIPRAP
TEMPORARY STREAM CROSSING
TREE - DO NOT DISTURB
NOTE:
1. CONTRACTOR RESPONSIBLE FOR LOCATING AND AVOIDING
ALL STORM SEWER OUTLETS AND DRAIN TILES IN CHANNEL
BANKS.
2. EXISTING GROUND SURVEYED BY HEI (APRIL 2024).
3. TOP OF TOE ROCK IN PROFILE VIEW IS SHOWN AT THE
BANKFULL ELEVATION. ACTUAL TOP OF TOE ROCK
ELEVATION VARIES BY LOCATION, SEE CROSS SECTION
SHEETS AND GRADING DETAILS. GRADING AND BANK
SHAPING BEHIND THE TOE ROCK IS NOT SHOWN ON THE
PROFILES AND SHALL BE DONE ACCORDING TO THE
DETAILS AND TABLE ON SHEET B.101.
4. CONTRACTOR TO INSTALL TEMPORARY STREAM
CROSSINGS AS NEEDED PER IOWA DOT SPEC EW-401.
ALLOWABLE CROSSING LOCATIONS SHOWN. CONTRACTOR
NOT REQUIRED TO USE ALL POTENTIAL CROSSING
LOCATIONS.
5. DO NOT DISTURB LARGE TREE. TERMINATE ROCK TIE IN IF
LARGE ROOTS ARE ENCOUNTERED.
6. CROSS VANE IS TO BE USED AS A FUTURE PEDESTRIAN
CROSSING. STONES ARE TO BE PLACED FLAT ACROSS
CHANNEL. VERIFY WITH FIELD ENGINEER BEFORE
PLACEMENT.
OHP
OHP
OHP
OHP
OHP
OHP
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OHP
UGE UGE
UGE
UGE
14+00
15+00
16+00
17+00
18+00 19+00
20+00 21+00
+0
NE 108TH ST
NE DEVOTIE DR
PROPOSED STREAM
CENTERLINE
TOE ROCK, SEE
SHEET B.101
FLOODPLAIN BENCH, SEE
DETAIL 2-B.102 (TYP)
ACCESS ROUTE, SEE SHEET A.3
ROCK RIFFLE #1
STA. 15+10
SEE DETAIL 1-B.100
EXISTING WATER EDGE
CROSS VANE #3
STA. 19+25
SEE DETAIL 1-B.102
PLACE 58 TN OF 2 FT THICK CLASS "E" RIPRAP
AS DRAINAGE REINFORCEMENT, 13 FT MIN
WIDTH OVER 36 FT LENGTH, MATCH EXISTING
GRADE. REQUIRED EXCAVATION SHALL BE
INCIDENTAL TO RIPRAP. SEE DETAIL 3-B.103
ACCESS ROUTE, SEE SHEET A.3
TOE WOOD, SEE
DETAIL 1-B.104
LIMITS OF CONSTRUCTION
CAMP CREEK
BOUNDARY OF WOODED AREA
EXISTING TREE, DO
NOT DISTURB (TYP)
TEMPORARY STREAM
CROSSING (SEE NOTE 4)
13 LOGS & 14 ROOTWADS, CONTRACTOR
TO USE FOR TOE WOOD. SEE SHEET B.9
FOR ALL STOCKPILE LOCATIONS
CONSTRUCT ROCK TIE IN
AND BANK SHAPING (TYP)
DO NOT DISTURB
TREE (SEE NOTE 5)
TEMPORARY STREAM
CROSSING (SEE NOTE 4)
14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00
9.
9.
9.
9.
0.
0.
0.
9.
0.
0.
0.
2.
1.
1.
1.
0.
ST
A:
+1
EL
EV
:8
.6
ST
A:
+9
EL
EV
:8
.6
TOE WOOD, SEE
DETAIL 1-B.104
TOE WOOD,
SEE DETAIL
1-B.104
FLOODPLAIN BENCH
SEE DETAIL 2-B.102
FLOODPLAIN BENCH
SEE DETAIL 2-B.102
ST
A:
+2
EL
EV
:8
.6
ST
A:
+1
EL
EV
:8
.1
2.
2.
1.
2.
DE
VO
TI
E
DR
SU
RV
EY
ED
T
HA
LW
EG
PR
O
PO
SE
D
BA
N
KF
U
LL
1.
2.
2.
2.
2.
2.
4.
ST
A:
+8
EL
EV
:8
.9
ST
A:
+5
EL
EV
:8
.9
ST
A:
+6
EL
EV
:8
.0
ST
A:
+0
EL
EV
:8
.0
SURVEYED THALWEG
CROSS VANE #3
STA 19+25 - SEE DETAIL 1-B.102
CROSS VANE CREST = 851.4
ROCK RIFFLE #1
STA 15+10 - SEE DETAIL 1-B.100
RIFFLE CREST = 850.6
TOE ROCK, SEE
SHEET B.101
NE DEVOTIE DR BRIDGE
LC = 866.0
FeetScale
0 30 6030
CAMP CREEK SOUTH PLAN
AND PROFILE (3 OF 4)
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
CA
M P
CR
EE
K
SO
U
TH
P
LA
N A
N D
PR
O
FI
LE
(3 O
F 4)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
B.3
SHEET
Scale
Drawn by Date
Checked by h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
CA
M P
CR
EE
K
SO
U
TH
P
LA
N A
N D
PR
O
FI
LE
(3 O
F 4)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IAAS SHOWN
HEI NO. 0143-0009
LEGEND:
FINISH GRADE - FILL
FINISH GRADE - CUT
STAGING AREA
ROCK RIPRAP
CONSTRUCTION EXIT
TEMPORARY STREAM CROSSING
TREE - DO NOT DISTURB
N
NOTE:
1. CONTRACTOR RESPONSIBLE FOR LOCATING AND AVOIDING
ALL STORM SEWER OUTLETS AND DRAIN TILES IN CHANNEL
BANKS.
2. EXISTING GROUND SURVEYED BY HEI (APRIL 2024).
3. TOP OF TOE ROCK IN PROFILE VIEW IS SHOWN AT THE
BANKFULL ELEVATION. ACTUAL TOP OF TOE ROCK
ELEVATION VARIES BY LOCATION, SEE CROSS SECTION
SHEETS AND GRADING DETAILS. GRADING AND BANK
SHAPING BEHIND THE TOE ROCK IS NOT SHOWN ON THE
PROFILES AND SHALL BE DONE ACCORDING TO THE
DETAILS AND TABLE ON SHEET B.101.
4. CONTRACTOR TO INSTALL TEMPORARY STREAM
CROSSINGS AS NEEDED PER IOWA DOT SPEC EW-401.
ALLOWABLE CROSSING LOCATIONS SHOWN. CONTRACTOR
NOT REQUIRED TO USE ALL POTENTIAL CROSSING
LOCATIONS.
5. DO NOT DISTURB LARGE TREE. TERMINATE ROCK TIE IN IF
LARGE ROOTS ARE ENCOUNTERED.
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
OH
P
OH
P
OH
P
AVOID MULTI-STEM
20" DIA. BASSWOOD
CONSTRUCT ROCK TIE IN
AND BANK SHAPING (TYP)
PROPOSED STREAM CENTERLINE
EXISTING WATER EDGE
TOE ROCK, SEE
SHEET B.101
21+00
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
LIMITS OF CONSTRUCTION
EXISTING STREAM CENTERLINE
EXCAVATE ISLAND MATERIAL TO
ESTABLISH SINGLE FLOW PATH,
QUANTITIES ARE INCLUDED IN
THE BANK SHAPING QUANTITIES
ACCESS ROUTE, SEE SHEET A.3
CAMP CREEK
BOUNDARY OF WOODED AREA
TOE WOOD, SEE
DETAIL 1-B.104
PLACE 58 TN OF 2 FT THICK CLASS "E" RIPRAP
AS DRAINAGE REINFORCEMENT, 13 FT MIN
WIDTH OVER 36 FT LENGTH, MATCH EXISTING
GRADE. REQUIRED EXCAVATION SHALL BE
INCIDENTAL TO RIPRAP. SEE DETAIL 3-B.103
EXISTING TREE, DO NOT
DISTURB (SEE NOTE 5)
CONSTRUCTION EXIT,
SEE SUDAS DETAIL 9040.120
TEMPORARY STREAM
CROSSING (SEE NOTE 4)
1 LOG, CONTRACTOR TO USE
FOR TOE WOOD. SEE SHEET B.9
FOR ALL STOCKPILE LOCATIONS
1 ROOTWAD & BRANCH PILE,
CONTRACTOR TO USE FOR TOE
WOOD. SEE SHEET B.9 FOR ALL
STOCKPILE LOCATIONS
2 ROOTWAD & 1 LOG, CONTRACTOR
TO USE FOR TOE WOOD. SEE SHEET
B.9 FOR ALL STOCKPILE LOCATIONS
1 ROOTWAD, CONTRACTOR TO
USE FOR TOE WOOD. SEE SHEET
B.9 FOR ALL STOCKPILE LOCATIONS
21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50
0.
1.
1.
1.
1.
1.
1.
1.
4.
1.
4.
1.
5.
1.
5.
1.
5.
2.
2.
2.
2.
SURVEYED THALWEG
TOE ROCK, SEE
SHEET B.101
TOE WOOD, SEE
DETAIL 1-B.105
5.
SU
RV
EY
ED
T
HA
LW
EG
PR
O
PO
SE
D
BA
N
KF
U
LL
ISLAND
EXCAVATION
4.
4.
TOE ROCK, SEE
SHEET B.101
ST
A:
+0
EL
EV
:8
.4
ST
A:
+5
EL
EV
:8
.3
ST
A:
+5
EL
EV
:8
.2
ST
A:
+2
EL
EV
:8
.8
FeetScale
0 30 6030
CAMP CREEK SOUTH PLAN
AND PROFILE (4 OF 4)
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
CA
M P
CR
EE
K
SO
U
TH
P
LA
N A
N D
PR
O
FI
LE
(4 O
F 4)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
B.4
SHEET
Scale
Drawn by Date
Checked by h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
CA
M P
CR
EE
K
SO
U
TH
P
LA
N A
N D
PR
O
FI
LE
(4 O
F 4)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IAAS SHOWN
HEI NO. 0143-0009
NOTE:
1. CONTRACTOR RESPONSIBLE FOR LOCATING AND AVOIDING
ALL STORM SEWER OUTLETS AND DRAIN TILES IN CHANNEL
BANKS.
2. EXISTING GROUND SURVEYED BY HEI (APRIL 2024).
3. TOP OF TOE ROCK IN PROFILE VIEW IS SHOWN AT THE
BANKFULL ELEVATION. ACTUAL TOP OF TOE ROCK
ELEVATION VARIES BY LOCATION, SEE CROSS SECTION
SHEETS AND GRADING DETAILS. GRADING AND BANK
SHAPING BEHIND THE TOE ROCK IS NOT SHOWN ON THE
PROFILES AND SHALL BE DONE ACCORDING TO THE
DETAILS AND TABLE ON SHEET B.101.
4. CONTRACTOR TO INSTALL TEMPORARY STREAM
CROSSINGS AS NEEDED PER IOWA DOT SPEC EW-401.
ALLOWABLE CROSSING LOCATIONS SHOWN. CONTRACTOR
NOT REQUIRED TO USE ALL POTENTIAL CROSSING
LOCATIONS.
5. DO NOT DISTURB LARGE TREE. CONTRACTOR TO GRADE TO
AVOID DAMAGE TO TREE AND ROOT SYSTEM.
LEGEND:
FINISH GRADE - FILL
FINISH GRADE - CUT
ROCK RIPRAP
CONSTRUCTION EXIT
TEMPORARY STREAM CROSSING
TREE - DO NOT DISTURB
N
S
865 870
S
S
S
50+00
51+00
52+00
+0
54+00 55+00
56+00
57+00
58+00
59+00
60+00
STAGING AREA, SEE SHEET A.3
CONSTRUCT ROCK TIE IN
AND BANK SHAPING (TYP)
ACCESS ROUTE, SEE SHEET A.3
ACCESS ROUTE,
SEE SHEET A.3
CROSS VANE #4
STA. 58+26
SEE DETAIL 1-B.102
SEE SHEETS B.7 & B.8 FOR
TRIBUTARY CHANNEL PLAN
EXISTING CONCRETE WEIR,
DO NOT DISTURB
TOE ROCK, SEE
SHEET B.101
LIMITS OF CONSTRUCTION
PROPOSED STREAM CENTERLINE
EXCAVATE POINT BAR
MATERIAL AND PLACE BEHIND
TOE ROCK TO SOFTEN CURVE
EXISTING WATER EDGE
EXISTING STEPS,
DO NOT DISTURB
TOE WOOD, SEE
DETAIL 1-B.105
CAM
P CREEK
BOUNDARY OF WOODED AREA
CONTRACTOR TO USE EXISTING RIFFLE AS
TEMPORARY CROSSING. IF DAMAGED, CONTRACTOR
TO RESTORE EXISTING RIFFLE TO PRECONSTRUCTION
CONDITIONS WITH RIPRAP POST CONSTRUCTION.
THIS IS INCIDENTAL TO MOBILIZATION
EXISTING WETLAND (TYP)
BANK SHAPING, SEE
DETAIL 1-B.103 (TYP)
EXISTING TREE, DO
NOT DISTURB (TYP)
EXISTING WATER
MAIN MANHOLE
DO NOT DISTURB
WETLAND
DO NOT DISTURB
WETLAND
1 ROOTWAD, CONTRACTOR TO
USE FOR TOE WOOD. SEE SHEET
B.9 FOR ALL STOCKPILE LOCATIONS
45' FLOATATION SILT CURTAIN
45° FROM BANK
45' FLOATATION SILT CURTAIN
45° FROM BANK
50+00 50+50 51+00 51+50 52+00 52+50 53+00 53+50 54+00 54+50 55+00 55+50 56+00
7.
7.
8.
8.
7.
7.
7.
8.
8.
9.
9.
0.
TOE WOOD,
SEE DETAIL
1-B.104
ST
A:
+3
EL
EV
:8
.6
SU
RV
EY
ED
T
HA
LW
EG
PR
O
PO
SE
D
BA
N
KF
U
LL
SURVEYED THALWEG EXISTING CONCRETE WEIR
BANK SHAPING,
SEE DETAIL 1-B.103
TOE ROCK, SEE
SHEET B.101
0.
0.
7.
7.
8.
8.
7.
7.
7.
8.
8.
9.
0.
9.
0.
9.
0.
ST
A:
+2
EL
EV
:8
.7
FeetScale
0 30 6030
CAMP CREEK NORTH PLAN
AND PROFILE (1 OF 2)
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
CA
M P
CR
EE
K N
O
RT
H
PL
AN
A
N D
PR
O
FI
LE
(1 O
F 2)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
B.5
N
LEGEND:
FINISH GRADE - FILL
FINISH GRADE - CUT
STAGING AREA
ROCK RIPRAP
CONSTRUCTION EXIT
TREE - DO NOT DISTURB
FLOATATION SILT CURTAIN
NOTE:
1. CONTRACTOR RESPONSIBLE FOR LOCATING AND AVOIDING
ALL STORM SEWER OUTLETS AND DRAIN TILES IN CHANNEL
BANKS.
2. EXISTING GROUND SURVEYED BY HEI (APRIL 2024).
3. TOP OF TOE ROCK IN PROFILE VIEW IS SHOWN AT THE
BANKFULL ELEVATION. ACTUAL TOP OF TOE ROCK
ELEVATION VARIES BY LOCATION, SEE CROSS SECTION
SHEETS AND GRADING DETAILS. GRADING AND BANK
SHAPING BEHIND THE TOE ROCK IS NOT SHOWN ON THE
PROFILES AND SHALL BE DONE ACCORDING TO THE
DETAILS AND TABLE ON SHEET B.101.
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
CA
M P
CR
EE
K N
O
RT
H
PL
AN
A
N D
PR
O
FI
LE
(1 O
F 2)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IAAS SHOWN
HEI NO. 0143-0009
S S
865 870
860 EXCAVATE POINT BAR
MATERIAL AND PLACE BEHIND
TOE ROCK TO SOFTEN CURVE
SEE SHEET B.101
PROPOSED STREAM CENTERLINE
CONSTRUCT ROCK TIE IN
AND BANK SHAPING (TYP)
STAGING AREA, SEE SHEET A.3
ACCESS ROUTE, SEE SHEET A.3
CROSS VANE #4
STA. 58+26
SEE DETAIL 1-B.102
EXISTING WATER EDGE
SEE SHEETS B.7 & B.8
TRIBUTARY CHANNEL PLAN
TOE ROCK, SEE
SHEET B.101 LIMITS OF CONSTRUCTION
ACCESS ROUTE, SEE SHEET A.3
BANK SHAPING, SEE
DETAIL 1-B.103 (TYP)
61+50
55+00
56+00
57+00
58+00
59+00
60+00 61+00
CAMP CREEK
56'X12'X7' RCB
S INV. 859.76
56'X12'X7' RCB'
S INV. 859.79
12'X29"X18" CMP
N INV. 860.91
S INV. 860.81
12'X29"X18" CMP
N INV. 860.92
S INV. 860.96
12'X29"X18" CMP
N INV. 861.00
S INV. 861.21
12'X29"X18" CMP
N INV. 860.79
S INV. 860.81
12'X29"X18" CMP
N INV. 861.07
S INV. 860.97
BOUNDARY OF WOODED AREA
ROCK RIFFLE #2
STA 59+60
SEE DETAIL 1-B.100
105+00
EXISTING WETLAND (TYP)
EXISTING TREE, DO
NOT DISTURB (TYP)
CONSTRUCTION EXIT,
SEE SUDAS DETAIL 9040.120
BRANCH PILE, CONTRACTOR TO
USE FOR TOE WOOD. SEE SHEET
B.9 FOR ALL STOCKPILE LOCATIONS
3 LOGS, CONTRACTOR TO
USE FOR TOE WOOD. SEE
SHEET B.9 FOR ALL
STOCKPILE LOCATION
56+00 56+50 57+00 57+50 58+00 58+50 59+00 59+50 60+00 60+50 61+00 61+50 62+00
9.
9.
9.
7.
0.
8.
1.
8.
8.
9.
0.
1.
0.
SURVEYED THALWEG
CROSS VANE #4
STA 58+26 - SEE DETAIL 1-B.102
CROSS VANE CREST = 859.80
(5) 29"X18" CMPATOE ROCK, SEE SHEETS
B.101 & B.102 (TYP)
EXISTING WATER CROSSING
SU
RV
EY
ED
T
HA
LW
EG
PR
O
PO
SE
D
BA
N
KF
U
LL
ST
A:
+2
EL
EV
:8
.8
ST
A:
+1
EL
EV
:8
.3
0.
0.
DR
IV
E
W
AT
ER
C
RO
SS
IN
G
12'X7' RCB
S INV. 859.76
EXISTING ROAD EMBANKMENT
12'X7' RCB
S INV. 859.79
BANK SHAPING,
SEE DETAIL 1-B.103
ST
A:
+4
EL
EV
:8
.8
ST
A:
+6
EL
EV
:8
.8
ROCK RIFFLE #2
STA 59+60 - SEE DETAIL 1-B.100
RIFFLE CREST = 860.80
ST
A:
+1
EL
EV
:8
.9
ST
A:
+0
EL
EV
:8
.0
ST
A:
+7
EL
EV
:8
.9
2.
FeetScale
0 30 6030
CAMP CREEK NORTH PLAN
AND PROFILE (2 OF 2)
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
CA
M P
CR
EE
K N
O
RT
H
PL
AN
A
N D
PR
O
FI
LE
(2 O
F 2)
-5 /1
3/
:0
PM
-(t ba lm er
B.6
N
LEGEND:
FINISH GRADE - FILL
FINISH GRADE - CUT
STAGING AREA
ROCK RIPRAP
CONSTRUCTION EXIT
TREE - DO NOT DISTURB
NOTE:
1. CONTRACTOR RESPONSIBLE FOR LOCATING AND AVOIDING
ALL STORM SEWER OUTLETS AND DRAIN TILES IN CHANNEL
BANKS.
2. EXISTING GROUND SURVEYED BY HEI (APRIL 2024).
3. TOP OF TOE ROCK IN PROFILE VIEW IS SHOWN AT THE
BANKFULL ELEVATION. ACTUAL TOP OF TOE ROCK
ELEVATION VARIES BY LOCATION, SEE CROSS SECTION
SHEETS AND GRADING DETAILS. GRADING AND BANK
SHAPING BEHIND THE TOE ROCK IS NOT SHOWN ON THE
PROFILES AND SHALL BE DONE ACCORDING TO THE
DETAILS AND TABLE ON SHEET B.101.
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
CA
M P
CR
EE
K N
O
RT
H
PL
AN
A
N D
PR
O
FI
LE
(2 O
F 2)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IAAS SHOWN
SEE SHEETS B.5 & B.6
FOR CHANNEL PLAN
TOE ROCK, SEE
SHEET B.101
EXISTING CHANNEL CUTOFF
(SEE NOTE 6)PROPOSED STREAM CENTERLINE
RECONNECT MEANDER
STEP-POOL STRUCTURE
STA. 102+14
SEE DETAIL 2-B.103
ROCK RIFFLE #3
STA. 109+35
SEE DETAIL 1-B.100
CHANNEL DEBRIS
REMOVAL (SEE NOTE 5)
ACCESS ROUTE,
SEE SHEET A.3
ACCESS ROUTE, SEE SHEET A.3
LIMITS OF CONSTRUCTION50+00
51+00
+0
54+00
55+00
56+00
BOUNDARY OF
WOODED AREA
CAM
P CREEK
100+00
101+00
2+
3+
104+00
105+00
106+00
107+00
108+00
109+00
110+00
111+00
EXISTING WETLAND (TYP)
860860
EXISTING TREE, DO
NOT DISTURB (TYP)
CONTRACTOR TO USE EXISTING RIFFLE AS
TEMPORARY CROSSING. IF DAMAGED, CONTRACTOR
TO RESTORE EXISTING RIFFLE TO PRECONSTRUCTION
CONDITIONS WITH RIPRAP POST CONSTRUCTION.
THIS IS INCIDENTAL TO MOBILIZATION
1 ROOTWAD, CONTRACTOR TO
USE FOR TOE WOOD. SEE SHEET
B.9 FOR ALL STOCKPILE LOCATIONS
BANK SHAPING, SEE
DETAIL 1-B.103
15' FLOATATION SILT CURTAIN
45° FROM BANK
15' FLOATATION SILT CURTAIN
45° FROM BANK
100+00 100+50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 105+00 105+50 106+00 106+50 107+00
8.
8.
9.
9.
0.
0.
1.
1.
1.
2.
6.
2.
6.
3.
4.
3.
4.
STEP-POOL STRUCTURE
STA 102+14 - SEE DETAIL 2-B.103
RIFFLE CREST = 863.2
SURVEYED THALWEG
TOE ROCK, SEE SHEET B.101
ST
A:
2+
EL
EV
:8
.2
ST
A:
1+
EL
EV
:8
.4
ST
A:
1+
EL
EV
:8
.6
ST
A:
1+
EL
EV
:8
.8
2.
5.
SU
RV
EY
ED
T
HA
LW
EG
PR
O
PO
SE
D
BA
N
KF
U
LL
ST
A:
4+
EL
EV
:8
.4
ST
A:
5+
EL
EV
:8
.7
BANK SHAPING,
SEE DETAIL 1-B.103
FeetScale
0 30 6030
TRIBUTARY PLAN AND
PROFILE (1 OF 2)
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
TR
IB
U
TA
RY
P
LA
N A
N D
PR
O
FI
LE
(1 O
F 2)
-5 /1
3/
:0
PM
-(t ba lm er
B.7
NOTE:
1. CONTRACTOR RESPONSIBLE FOR LOCATING AND AVOIDING
ALL STORM SEWER OUTLETS AND DRAIN TILES IN CHANNEL
BANKS.
2. EXISTING GROUND SURVEYED BY HEI (APRIL 2024).
3. TOP OF TOE ROCK IN PROFILE VIEW IS SHOWN AT THE
BANKFULL ELEVATION. ACTUAL TOP OF TOE ROCK
ELEVATION VARIES BY LOCATION, SEE CROSS SECTION
SHEETS AND GRADING DETAILS. GRADING AND BANK
SHAPING BEHIND THE TOE ROCK IS NOT SHOWN ON THE
PROFILES AND SHALL BE DONE ACCORDING TO THE
DETAILS AND TABLE ON SHEET B.101.
4. CONTRACTOR TO INSTALL TEMPORARY STREAM
CROSSINGS AS NEEDED PER IOWA DOT SPEC EW-401.
ALLOWABLE CROSSING LOCATIONS SHOWN. CONTRACTOR
NOT REQUIRED TO USE ALL POTENTIAL CROSSING
LOCATIONS.
5. REMOVE ALL DEBRIS LARGER THAN 12 INCHES IN
DIAMETER OR GREATER THAN 10 FEET IN LENGTH FROM
THE TRIBUTARY STREAM. CONFIRM REMOVAL WITH FIELD
ENGINEER. DEBRIS REMOVAL IS INCLUDED IN CLEARING
AND GRUBBING. SMALLER BRANCHES MAY BE USED FOR
LAYERING BRUSH IN TOE WOOD WITH APPROVAL FROM
ENGINEER.
6. CONTRACTOR SHALL USE ON-SITE EXCESS EXCAVATION
MATERIAL TO CONSTRUCT FEATURES ABOVE EXISTING
GRADE. VERIFY SUITABLE MATERIAL WITH FIELD ENGINEER.
LEGEND:
FINISH GRADE - FILL
FINISH GRADE - CUT
STAGING AREA
ROCK RIPRAP
CONSTRUCTION EXIT
CHANNEL DEBRIS REMOVAL
TREE - DO NOT DISTURB
FLOATATION SILT CURTAIN
N h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
TR
IB
U
TA
RY
P
LA
N A
N D
PR
O
FI
LE
(1 O
F 2)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IAAS SHOWN
S S
55+00
56+00
113+50
103+00
4+
105+00
106+00
107+00
8+
109+00 11 0+
111+00
112+00
113+00
SEE SHEETS B.5 & B.6
FOR CHANNEL PLAN
PROPOSED STREAM CENTERLINE
EXISTING CHANNEL CUTOFF
(SEE NOTE 6)
RECONNECT MEANDER
ROCK RIFFLE #3
STA. 109+35
SEE DETAIL 1-B.100
TOE ROCK, SEE
SHEET B.101
ACCESS ROUTE, SEE SHEET A.3
CHANNEL DEBRIS
REMOVAL (SEE NOTE 5)
LIMITS OF CONSTRUCTION
30" RCP POND OUTLET
W INV. 870.48
PLACE FILL IN
CHANNEL CUTOFF
THOMAS MITCHELL POND
CAM
P CREEK
BOUNDARY OF WOODED AREA
EXISTING WETLAND (TYP)
1 ROOTWAD, CONTRACTOR TO
USE FOR TOE WOOD. SEE SHEET
B.9 FOR ALL STOCKPILE LOCATIONS
107+00 107+50 108+00 108+50 109+00 109+50 110+00 110+50 111+00 111+50 112+00 112+50 113+00 113+50
4.
4.
4.
7.
4.
7.
5.
5.
5.
6.
6.
6.
SU
RV
EY
ED
T
HA
LW
EG
PR
O
PO
SE
D
BA
N
KF
U
LL
ST
A:
9+
EL
EV
:8
.4
ST
A:
9+
EL
EV
:8
.4
9.
9.
9.
9.
ROCK RIFFLE #3
STA 109+35 - SEE DETAIL 1-B.100
RIFFLE CREST = 866.40
SURVEYED THALWEG
30" RCP POND OUTLET
W INV. 870.48
TOE ROCK, SEE
SHEET B.101
TOP OF DAM
STA. 112+95
EL. 896.2
ST
A:
7+
EL
EV
:8
.5
ST
A:
8+
EL
EV
:8
.9
ST
A:
9+
EL
EV
:8
.1
ST
A:
9+
EL
EV
:8
.1
ST
A:
0+
EL
EV
:8
.2
ST
A:
0+
EL
EV
:8
.3
ST
A:
1+
EL
EV
:8
.4
ST
A:
8+
EL
EV
:8
.6
FeetScale
0 30 6030
TRIBUTARY PLAN AND
PROFILE (2 OF 2)
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
TR
IB
U
TA
RY
P
LA
N A
N D
PR
O
FI
LE
(2 O
F 2)
-5 /1
3/
:0
PM
-(t ba lm er
B.8
N
LEGEND:
FINISH GRADE - FILL
FINISH GRADE - CUT
STAGING AREA
ROCK RIPRAP
CONSTRUCTION EXIT
CHANNEL DEBRIS REMOVAL
TREE - DO NOT DISTURB
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
TR
IB
U
TA
RY
P
LA
N A
N D
PR
O
FI
LE
(2 O
F 2)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IAAS SHOWN
HEI NO. 0143-0009
NOTE:
1. CONTRACTOR RESPONSIBLE FOR LOCATING AND AVOIDING
ALL STORM SEWER OUTLETS AND DRAIN TILES IN CHANNEL
BANKS.
2. EXISTING GROUND SURVEYED BY HEI (APRIL 2024).
3. TOP OF TOE ROCK IN PROFILE VIEW IS SHOWN AT THE
BANKFULL ELEVATION. ACTUAL TOP OF TOE ROCK
ELEVATION VARIES BY LOCATION, SEE CROSS SECTION
SHEETS AND GRADING DETAILS. GRADING AND BANK
SHAPING BEHIND THE TOE ROCK IS NOT SHOWN ON THE
PROFILES AND SHALL BE DONE ACCORDING TO THE
DETAILS AND TABLE ON SHEET B.101.
4. CONTRACTOR TO INSTALL TEMPORARY STREAM
CROSSINGS AS NEEDED PER IOWA DOT SPEC EW-401.
ALLOWABLE CROSSING LOCATIONS SHOWN. CONTRACTOR
NOT REQUIRED TO USE ALL POTENTIAL CROSSING
LOCATIONS.
5. REMOVE ALL DEBRIS LARGER THAN 12 INCHES IN
DIAMETER OR GREATER THAN 10 FEET IN LENGTH FROM
THE TRIBUTARY STREAM. CONFIRM REMOVAL WITH FIELD
ENGINEER. DEBRIS REMOVAL IS INCLUDED IN CLEARING
AND GRUBBING. SMALLER BRANCHES MAY BE USED FOR
LAYERING BRUSH IN TOE WOOD WITH APPROVAL FROM
ENGINEER.
6. CONTRACTOR SHALL USE ON-SITE EXCESS EXCAVATION
MATERIAL TO CONSTRUCT FEATURES ABOVE EXISTING
GRADE. VERIFY SUITABLE MATERIAL WITH FIELD ENGINEER.
1 ROOTWAD
3 LOGS
BRANCH PILE
1 ROOTWAD
1 LOG
1 ROOTWAD
BRANCH PILE
2 ROOTWADS
1 LOG
1 ROOTWAD
14 ROOTWADS 13 LOGS
2 LOGS
9 ROOTWADS
1 ROOTWAD
6 ROOTWADS
NE 108TH ST
THOMAS MITCHELL POND
NE DEVOTIE DR
STREAM CENTERLINE
STREAM CENTERLINE
TRIBUTARY CENTERLINE
CAMP CREEK
FeetScale
0 125 250125
STOCKPILE MAP
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
ST
O
CK
PI
LE
M
AP
-5 /1
3/
:0
PM
-(t ba lm er
B.9
N h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Pl an a nd
P ro fil e_
AR
A-
9.
dw g- B.
ST
O
CK
PI
LE
M
AP
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
4+73
0102030405060 0 -10 -20 -30 -40 -50 -60
5+72
0102030405060 0 -10 -20 -30 -40 -50 -60
6+06
0102030405060 0 -10 -20 -30 -40 -50 -60
6+59
0102030405060 0 -10 -20 -30 -40 -50 -60
7+53
0102030405060 0 -10 -20 -30 -40 -50 -60
8+15
0102030405060 0 -10 -20 -30 -40 -50 -60
8+50
0102030405060 0 -10 -20 -30 -40 -50 -60
9+38
0102030405060 0 -10 -20 -30 -40 -50 -60
3:1
2:1 3:1
3:1
2:1 1%
4:1
3:1
2:1
4:1
1%
2:1
3:1
2:1
1% 2:1
3:1
2%
5:1
2:1
1% 4:1
EXISTING GROUND (HEI SURVEY)
PROPOSED TOE ROCK PROPOSED TOE ROCK
PROPOSED FLOODPLAIN BENCH PROPOSED TOE ROCK
PROPOSED TOE ROCKPROPOSED FLOODPLAIN BENCH
PROPOSED FLOODPLAIN BENCH PROPOSED TOE ROCK
PROPOSED CROSS VANE
PROPOSED TOE ROCKPROPOSED FLOODPLAIN BENCH
PROPOSED FLOODPLAIN BENCH
PROPOSED TOE ROCK
PROPOSED BANK SHAPING
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
C
AM
P
CR
EE
K
SO
U
TH
C
RO
SS
S
EC
TI
O
N S
(1 O
F 7)
-5 /1
3/
:0
PM
-(t ba lm er
B.10
CAMP CREEK SOUTH CROSS
SECTIONS (1 OF 7)
NOTES:
1. CROSS SECTIONS ARE LEFT TO RIGHT
LOOKING DOWNSTREAM.
2. EXISTING GROUND (HEI SURVEY) SHOWS
LIDAR ABOVE EXISTING BASEFLOW
WATER SURFACE. EXISTING
BATHYMETRY BELOW BASEFLOW IS NOT
SHOWN.
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
C
AM
P
CR
EE
K
SO
U
TH
C
RO
SS
S
EC
TI
O
N S
(1 O
F 7)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
9+75
0102030405060 0 -10 -20 -30 -40 -50 -60
10+45
0102030405060 0 -10 -20 -30 -40 -50 -60
11+26
0102030405060 0 -10 -20 -30 -40 -50 -60
11+95
0102030405060 0 -10 -20 -30 -40 -50 -60
12+55
0102030405060 0 -10 -20 -30 -40 -50 -60
13+15
0102030405060 0 -10 -20 -30 -40 -50 -60
13+55
0102030405060 0 -10 -20 -30 -40 -50 -60
14+35
0102030405060 0 -10 -20 -30 -40 -50 -60
1%
4:1
2:1
3:1
2:1
3:1
1%
5:1
3:1
2:1
1%4:1
3:1
2:1
1%
4:1 3:1
2:1
2:1
3:1
1%
5:1
2:1
3:1
PROPOSED FLOODPLAIN BENCHPROPOSED TOE ROCK
PROPOSED FLOODPLAIN BENCH
PROPOSED TOE ROCK
PROPOSED FLOODPLAIN BENCH
PROPOSED TOE ROCK
PROPOSED CROSS VANE
PROPOSED TOE ROCK
PROPOSED FLOODPLAIN BENCH PROPOSED TOE ROCK
PROPOSED TOE ROCK
PROPOSED FLOODPLAIN BENCH
PROPOSED TOE ROCK
EXISTING GROUND (HEI SURVEY)
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
C
AM
P
CR
EE
K
SO
U
TH
C
RO
SS
S
EC
TI
O
N S
(2 O
F 7)
-5 /1
3/
:0
PM
-(t ba lm er
B.11
Date CAMP CREEK SOUTH CROSS
SECTIONS (2 OF 7)
NOTES:
1. CROSS SECTIONS ARE LEFT TO RIGHT
LOOKING DOWNSTREAM.
2. EXISTING GROUND (HEI SURVEY) SHOWS
LIDAR ABOVE EXISTING BASEFLOW
WATER SURFACE. EXISTING
BATHYMETRY BELOW BASEFLOW IS NOT
SHOWN.
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
C
AM
P
CR
EE
K
SO
U
TH
C
RO
SS
S
EC
TI
O
N S
(2 O
F 7)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
15+10
0102030405060 0 -10 -20 -30 -40 -50 -60
15+90
0102030405060 0 -10 -20 -30 -40 -50 -60
17+35
0102030405060 0 -10 -20 -30 -40 -50 -60
17+75
0102030405060 0 -10 -20 -30 -40 -50 -60
18+85
0102030405060 0 -10 -20 -30 -40 -50 -60
19+20
0102030405060 0 -10 -20 -30 -40 -50 -60
21+20
0102030405060 0 -10 -20 -30 -40 -50 -60
24+50
0102030405060 0 -10 -20 -30 -40 -50 -60
2:1
3:1
1%
5:1
2:1
3:1
4:1 1%
4:11%
2:1
3:1
PROPOSED ROCK RIFFLE
PROPOSED TOE ROCK
PROPOSED FLOODPLAIN BENCH
PROPOSED FLOODPLAIN BENCHPROPOSED TOE ROCK
PROPOSED FLOODPLAIN BENCH
PROPOSED CROSS VANE
PROPOSED TOE ROCK
EXISTING GROUND (HEI SURVEY)
PROPOSED TOE WOOD
PROPOSED TOE WOOD
3:1
3:1
10'
10' h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
C
AM
P
CR
EE
K
SO
U
TH
C
RO
SS
S
EC
TI
O
N S
(3 O
F 7)
-5 /1
3/
:0
PM
-(t ba lm er
B.12
CAMP CREEK SOUTH CROSS
SECTIONS (3 OF 7)
NOTES:
1. CROSS SECTIONS ARE LEFT TO RIGHT
LOOKING DOWNSTREAM.
2. EXISTING GROUND (HEI SURVEY) SHOWS
LIDAR ABOVE EXISTING BASEFLOW
WATER SURFACE. EXISTING
BATHYMETRY BELOW BASEFLOW IS NOT
SHOWN.
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
C
AM
P
CR
EE
K
SO
U
TH
C
RO
SS
S
EC
TI
O
N S
(3 O
F 7)
-5 /1
3/
:0
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
25+65
0102030405060 0 -10 -20 -30 -40 -50 -60
27+00
0102030405060 0 -10 -20 -30 -40 -50 -60
27+80
0102030405060 0 -10 -20 -30 -40 -50 -60
2:1
3:1
3:1 1%
3:1
2:1
PROPOSED TOE ROCK
PROPOSED TOE ROCK
EXISTING GROUND (HEI SURVEY)
PROPOSED ISLAND EXCAVATION
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
C
AM
P
CR
EE
K
SO
U
TH
C
RO
SS
S
EC
TI
O
N S
(4 O
F 7)
-5 /1
3/
:1
PM
-(t ba lm er
B.13
CAMP CREEK SOUTH CROSS
SECTIONS (4 OF 7)
NOTES:
1. CROSS SECTIONS ARE LEFT TO RIGHT
LOOKING DOWNSTREAM.
2. EXISTING GROUND (HEI SURVEY) SHOWS
LIDAR ABOVE EXISTING BASEFLOW
WATER SURFACE. EXISTING
BATHYMETRY BELOW BASEFLOW IS NOT
SHOWN.
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
C
AM
P
CR
EE
K
SO
U
TH
C
RO
SS
S
EC
TI
O
N S
(4 O
F 7)
-5 /1
3/
:1
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
53+80
0102030405060 0 -10 -20 -30 -40 -50 -60
55+40
0102030405060 0 -10 -20 -30 -40 -50 -60
57+50
010203040 0 -10 -20 -30 -40 -50 -60 -70 -80
58+26
0102030405060 0 -10 -20 -30 -40 -50 -60
59+60
0102030405060 0 -10 -20 -30 -40 -50 -60
56+62
0102030405060 0 -10 -20 -30 -40 -50 -60
3:1
4:1 2:1
2:14:1 3:1
3:1
2:1
PROPOSED TOE ROCK
PROPOSED TOE ROCK
PROPOSED CROSS VANE
PROPOSED ROCK RIFFLE
EXISTING GROUND (HEI SURVEY)
PROPOSED TOE WOOD
PROPOSED BANK SHAPING
PROPOSED TOE ROCKPROPOSED BANK SHAPING
3:1
10'
56+04
0102030405060 0 -10 -20 -30 -40 -50 -60
PROPOSED TOE ROCK
2:1 1% h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
C
AM
P
CR
EE
K
N O
RT
H
CR
O
SS
S
EC
TI
O N
S (5
O F
7) -5
/1 3/
:1
PM
-(t ba lm er
B.14
CAMP CREEK NORTH CROSS
SECTIONS (5 OF 7)
NOTES:
1. CROSS SECTIONS ARE LEFT TO RIGHT
LOOKING DOWNSTREAM.
2. EXISTING GROUND (HEI SURVEY) SHOWS
LIDAR ABOVE EXISTING BASEFLOW
WATER SURFACE. EXISTING
BATHYMETRY BELOW BASEFLOW IS NOT
SHOWN.
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
C
AM
P
CR
EE
K
N O
RT
H
CR
O
SS
S
EC
TI
O N
S (5
O F
7) -5
/1 3/
:1
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS MITCHELL PARK
POLK COUNTY PUBLIC WORKS
101+63
0102030405060 0 -10 -20 -30 -40 -50 -60
101+78
0102030405060 0 -10 -20 -30 -40 -50 -60
101+90
0102030405060 0 -10 -20 -30 -40 -50 -60
102+14
0102030405060 0 -10 -20 -30 -40 -50 -60
104+45
0102030405060 0 -10 -20 -30 -40 -50 -60
105+00
0102030405060 0 -10 -20 -30 -40 -50 -60
107+68
0102030405060 0 -10 -20 -30 -40 -50 -60
107+94
0102030405060 0 -10 -20 -30 -40 -50 -60
3:1 2:1
3:1
3:1
2:1
3:1
2:1
3:1
2:1
2:1 2:1
PROPOSED STEP POOL
PROPOSED STEP POOL
PROPOSED STEP POOL
PROPOSED TOE ROCK
PROPOSED TOE ROCK
PROPOSED TOE ROCK
PROPOSED STEP POOL
PROPOSED BANK SHAPING
PROPOSED BANK SHAPING
PROPOSED TOE ROCK
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
T
RI
BU
TA
RY
C
RO
SS
S
EC
TI
O
N S
(6 O
F 7)
-5 /1
3/
:1
PM
-(t ba lm er
ByDateRevisionNo.
B.15 PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
TRIBUTARY CROSS SECTIONS
(6 OF 7)5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9 THOMAS
MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IAAS SHOWN
HEI NO. 0143-0009
NOTES:
1. CROSS SECTIONS ARE LEFT TO RIGHT
LOOKING DOWNSTREAM.
2. EXISTING GROUND (HEI SURVEY) SHOWS
LIDAR ABOVE EXISTING BASEFLOW
WATER SURFACE. EXISTING
BATHYMETRY BELOW BASEFLOW IS NOT
SHOWN.
108+70
0102030405060 0 -10 -20 -30 -40 -50 -60
109+35
0102030405060 0 -10 -20 -30 -40 -50 -60
110+55
0102030405060 0 -10 -20 -30 -40 -50 -60
111+00
0102030405060 0 -10 -20 -30 -40 -50 -60
2:1
2:1
3:1 2:1
2:1 3:1
3:1
PROPOSED TOE ROCK
PROPOSED ROCK RIFFLE
PROPOSED TOE ROCK
PROPOSED TOE ROCK
PROPOSED TOE ROCK
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
Cr os s S ec tio ns
_A
RA
-9 .d w g-
B.
T
RI
BU
TA
RY
C
RO
SS
S
EC
TI
O
N S
(7 O
F 7)
-5 /1
3/
:1
PM
-(t ba lm er
ByDateRevisionNo.
B.16 PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
TRIBUTARY CROSS SECTIONS
(7 OF 7)5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9 THOMAS
MITCHELL PARK
POLK COUNTY PUBLIC WORKS
POLK COUNTY, IAAS SHOWN
HEI NO. 0143-0009
NOTES:
1. CROSS SECTIONS ARE LEFT TO RIGHT
LOOKING DOWNSTREAM.
2. EXISTING GROUND (HEI SURVEY) SHOWS
LIDAR ABOVE EXISTING BASEFLOW
WATER SURFACE. EXISTING
BATHYMETRY BELOW BASEFLOW IS NOT
SHOWN.
EXISTING CHANNEL ELEV. "C"
VA
RI
ES
SLO
PE
SLOPE
SLOPE
SLO
PE
FLOW
FLOW
FL
O
W
BOTTOM OF RIFFLE ELEV. "B"
30°
BA
N
KF
U
LL
L
O
CA
TI
O
N
30°
4H:1V 4H :1
V
5H :1
V
5H:1V
℄ CHANNEL
BANKFULL WIDTH "E"
5% S
LO
PE
O R
FL
AT
TE
R
TOP OF RIFFLE ELEV. "A"
50H:1V 50H:1V
VARIES10' MIN VARIES 10' MIN
5'5'
INTERSECTION OF
SIDESLOPE AND RIFFLE
(LOCATION VARIES)
INTERSECTION OF
SIDESLOPE AND RIFFLE
(LOCATION VARIES)
VA
RI
ES
AR
C
HE
IG
HT
"H
BA
N
KF
U
LL
L
O
CA
TI
O
N
OR FLATTER OR FLATTER
A A
EXISTING GROUND
(VARIES)
10' MIN TIE-IN
(NOTE 7)
VARIESDIMENSION "I"CHANNEL SIDE
WIDTH "G"
CHANNEL BOTTOM
WIDTH "F"
CHANNEL SIDE
WIDTH "G"
DIMENSION "I"VARIES10' MIN TIE-IN
(NOTE 7)
2' (M
IN
PROPOSED RIFFLE
BA
N
KF
U
LL
D
EP
TH
"D
CHANNEL
SEAL VOIDS IN
RIPRAP (NOTE 8)
2 FT THICK ROUNDED
CLASS "E" RIPRAP
FLOW
5% SLOPE OR FLATTER
EXISTING CHANNEL
ELEV "C"
EXCESS EXCAVATED
MATERIAL (NOTE 4)
4H:1V
5H:1V
℄ OF CHANNEL BOTTOM
OF RIFFLE ELEV "B"
℄ OF CHANNEL TOP
OF RIFFLE ELEV "A"
VARIES
VARIES
SECTION A-A
2 FT THICK CLASS "E" RIPRAPEXISTING GROUND
NOTE:
1. CHANNEL EXCAVATION MAY BE REQUIRED TO PLACE THE REQUIRED 2' MINIMUM THICKNESS OF IOWA ROUNDED CLASS "E" RIPRAP.
ALL CHANNEL EXCAVATION IS INCIDENTAL TO THE PRICE OF IOWA ROUNDED CLASS "E" RIPRAP.
2. IOWA ROUNDED CLASS "E' RIPRAP WILL BE USED AS NECESSARY TO CONSTRUCT A SUB-BASE TO A GRADE EQUAL TO THE BOTTOM OF THE IOWA ROUNDED CLASS "E" RIPRAP. IOWA ROUNDED CLASS "E" RIPRAP WILL BE PAID ON A PER CUBIC YARD BASIS UNDER THE
ROUNDED CLASS "E" RIPRAP BID ITEM.
3. IOWA ROUNDED CLASS "E" RIPRAP AT THE DOWNSTREAM END OF RIFFLE MUST BE SUBCUT INTO THE EXISTING CHANNEL TO A DEPTH
OF 2'.
4. EXCAVATED MATERIAL TO BE TEMPORARILY PLACED WITHIN THE WORKING EXTENTS. AFTER CONSTRUCTION OF THE ROCK RIFFLE, EXCESS MATERIAL WILL THEN BE PLACED IMMEDIATELY UPSTREAM OF THE RIFFLE ALONG THE 4H:1V UPSTREAM SLOPE.
5. ANY DISTURBED VEGETATED AREAS ARE REQUIRED TO BE SEEDED.
6. CLEARING AND GRUBBING WILL ONLY BE CONDUCTED AS NECESSARY TO CONSTRUCT THE RIFFLES. CLEARING AND GRUBBING IS
SUBSIDIARY TO MEASURED BID ITEMS.
7. TIE-IN TO BE CONSTRUCTED A MINIMUM 10 FEET HORIZONTALLY INTO THE EXISTING BANK. DISTURBED AREAS ALONG THE EXISTING BANK ARE TO BE RESTORED TO THE EXISTING CONDITION. ALL WORK ASSOCIATED WITH RESTORING THE EXISTING BANK WILL NOT BE
MEASURED FOR PAYMENT, RATHER WILL BE SUBSIDIARY TO MEASURED BID ITEMS.
8. VOIDS IN THE PLACED RIPRAP SHALL BE FILLED WITH CHINKING ROCK COMPRISED OF A WELL GRADED MIX OF LOCALLY HARVESTED AGGREGATE VARYING FROM THE NO. 40 SIEVE UP TO 3-INCH STONES. EXCESS CHANNEL EXCAVATION CAN BE USED FOR LOCALLY HARVESTED AGGREGATE WITH ENGINEER’S APPROVAL. THE CHINKING ROCK SHOULD FILL VOIDS TO KEEP FLOW ON TOP OF THE RIPRAP AND SHOULD NOT BE BLOWN OUT OF THE VOIDS. CHINKING ROCK QUANTITY IS ESTIMATED TO BE APPROXIMATELY 1 CY PER 1
CY OF RIPRAP. ENGINEER MAY REQUIRE ADDITIONAL AGGREGATE MIX TO BE INSTALLED.
9. CONTRACTOR MAY USE PARTIALLY CONSTRUCTED ROCK RIFFLE AS STREAM CROSSING UNTIL THE RIFFLE IS FULLY CONSTRUCTED. ANY
ADDITIONAL MATERIAL REQUIRED DUE TO CROSSING WILL BE INCIDENTAL.
h:
\J
BN
\0
0\
\0
3_ p ol k co un ty st re am s\
CA
D\ Pl an s\
AR
A
9\
_0
9_
De ta ils _A
RA
-9
.d w g- B.
DE
TA
IL
S
(1 O
F 5)
-5 /1
3/
:1
PM
-(t ba lm er
ByDateRevisionNo.
PROJECT NO. 0143-0009
SHEET
Scale
Drawn by Date
Checked by
TCB
CDI
5-13-2025
THOMAS MITCHELL STREAM RESTORATION PROJECT - ARA 9
THOMAS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .