Attachment B2 - Reference Previous 95_ Design Plans as Basis of Design.pdf

PDF 25 MB Posted

Attached to
C1DZ--36C77621R0194 - Construct Eye Clinic Minor Design - Mather
Solicitation number
36C77621R0194
Issued by

About this file

This announcement is for an Architect-Engineering services contract to design an eye clinic expansion project at a Veterans Affairs medical center in California. The scope of work includes using previous 95% design plans as a basis to construct 11,500 square feet of new eye clinic space including administrative areas and modifying the plans for relocation to a new site, along with demolition of an existing building. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses. The submission deadline is December 1, 2021 and award is expected by March 30, 2022. The design completion period is 400 calendar days with construction period services optional after project award. Evaluation will be a two-phase process with initial SF-330 evaluations followed by interview presentations for the top firms to determine selection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN CRITERIA

100SN002-1

CODES AND STANDARDS

2015 INTERNATIONAL BUILDING CODE (IBC)

ASCE 7-10

ACI 318-14

AISC 360-10, 341-10, 358-10

TMS 402-11/ACI 530-13/ASCE 5-11

TMS 602-08/ACI 530.1-08/ASCE 6-08

2012 NDS, 2008 SDPWS

VA H-18-8 SEISMIC DESIGN REQUIREMENTS

VERTICAL LOADS

SOILS VALUES

ALLOWABLE SOILS PRESSURE

DL 2500 PSF

DL + LL 2500 PSF

DL + LL + SEISMIC 3333 PSF

SPREAD FOOTING

MINIMUM DEPTH = 24"

MINIMUM WIDTH = 24"

ROOF LIVE LOAD = 20 PSF

FLOOR LIVE LOAD = 60 PSF

FLOOR PARTITION LIVE LOAD = 15 PSF

CORRIDORS = 80 PSF

LIVE LOADS ARE REDUCED WHERE

PERMITTED BY CODE.

LATERAL LOADS

SEISMIC:

SITE CLASS D

Ss = 0.5448 ; S = 0.4998 S = 0.261 ; S = 0.327 R = 6 ; I = 1.5 Ωo = 2.0 ; Cd = 5.0

I = 1.0 TYPICAL

I = 1.5 PER ASCE 7-10 SECT 13.1.3

RISK CATEGORY: IV

SEISMIC DESIGN CATEGORY: D

SEISMIC BASE SHEAR

= 130 KIPS

SEISMIC FORCE RESISTING SYSTEM:

SPECIAL CONCENTRIC BRACED FRAMES

ANALYSIS PROCEDURE:

EQUIVALENT LATERAL FORCE

PROCEDURE

WIND:

V = 110 MPH

RISK CATEGORY: II

EXPOSURE CATEGORY: C

GCPI = ±0.18

4.

A.

B.

C.

P

P

DS

1 D1

E

ULT

1.

2.

3.

CONTINUOUS FOOTING

MINIMUM DEPTH = 18"

MINIMUM WIDTH = 18"

FOUNDATIONS

200SN001-1

ALL FOUNDATION WORK SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS REPORT # 73222.000 BY PBS ENGINEERING AND ENVIRONMENTAL, INC DATED DECEMBER 12, 2016.

FOUNDATIONS SHALL BEAR ON COMPACTED NATIVE SOIL OR ENGINEERED FILL PER THE SOILS REPORT

SEE NOTES AND DETAILS ON SHEET SS003 .

ALL FILLING, BACKFILLING AND COMPACTION SHALL BE DONE UNDER THE OBSERVATION OF A

REPRESENTATIVE OF THE SOILS ENGINEER AND MUST BE COMPACTED TO THE MINIMUM DENSITY

SPECIFIED IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN THE SOILS REPORT.

BUILDING PAD CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE SOILS REPORT.

THE EXTENT AND DEPTH OF OVEREXCAVATION AND PLACEMENT OF ENGINEERED FILL SHALL AT A MINIMUM BE AS SHOWN ON THE PLANS. FINAL DEPTH AND EXTENT OF EXCAVATION AND FILL SHALL

BE DETERMINED AT TIME OF CONSTRUCTION BY A REPRESENTATIVE OF THE SOILS ENGINEER.

FOUNDATION DEPTHS INDICATED ON PLANS ARE FOR ESTIMATING PURPOSES ONLY.

BOTTOMS OF ALL FOUNDATIONS SHALL BE LEVEL. CHANGES IN BOTTOM OF FOUNDATION

ELEVATION SHALL BE MADE ACCORDING TO STEPPED FOOTING DETAIL ON THE TYPICAL DETAIL

SHEET.

FOUNDATION CONCRETE MAY BE PLACED DIRECTLY INTO NEAT

EXCAVATIONS PROVIDED THE EXCAVATIONS ARE STABLE (AS

DETERMINED BY A REPRESENTATIVE OF THE SOILS ENGINEER).

OTHERWISE, FOUNDATIONS SHALL BE FULLY FORMED. USE

MINIMUM PLANKING SHOWN TO PROTECT AGAINST SLOUGHING,

AS REQUIRED. PLANKING DOES NOT REPLACE FORMWORK

REQUIRED TO STABILIZE EXCAVATION.

THE SURFACE OF ALL HORIZONTAL CONSTRUCTION JOINTS SHALL BE CLEANED & ROUGHENED BY

EXPOSING CLEAN AGGREGATE SOLIDLY EMBEDDED IN MORTAR MATRIX.

NOTIFY THE STRUCTURAL ENGINEER 48 HOURS BEFORE CASTING FOUNDATIONS.

A REPRESENTATIVE OF THE SOILS ENGINEER SHALL ADVISE THE VA IN WRITING THAT:

THE BUILDING PAD WAS PREPARED IN ACCORDANCE WITH THE SOILS REPORT.

THE UTILITY TRENCHES HAVE BEEN PROPERLY BACKFILLED AND COMPACTED AND;

THE FOUNDATION EXCAVATION DEPTH AND MATERIAL ARE ADEQUATE TO ACHIEVE DESIGN

BEARING CAPACITY; AND FORMING COMPLY WITH THE SOILS REPORT AND APPROVED PLAN.

2x12 2x121x8

PLAN

FOOTING

WIDTH

1.

2.

3.

4.

5.

6.

7.

8.

9.

A.

B.

C.

CONCRETE

300SN001-1

STRUCTURAL CONCRETE SHALL ATTAIN 28 DAY COMPRESSIVE STRENGTH AS REQUIRED IN NOTE #28.

MAXIMUM SLUMP SHALL NOT EXCEED 3 INCHES.

CONCRETE MIX DESIGNS SHALL BE PREPARED BY A REGISTERED CIVIL ENGINEER, REVIEWED BY

VA'S TESTING LABORATORY AND SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW.

CEMENTITIOUS MATERIALS:

CEMENT SHALL CONFORM TO ASTM C-150 TYPE II OR V.

FLY ASH SHALL CONFORM TO ASTM C-618. MAX. QUANTITY OF FLY ASH SHALL BE AS GIVEN IN SPECS.

CONCRETE AGGREGATES SHALL CONFORM TO ASTM C-33 FOR NORMAL WEIGHT CONCRETE AND

ASTM C-330 FOR LIGHTWEIGHT CONCRETE.

NON-SHRINK GROUT OR DRYPACK SHALL CONSIST OF A PREMIXED NONMETALLIC FORMULA.

REINFORCING STEEL SHALL CONFORM TO ASTM A-615 GRADE 60 FOR #3 AND LARGER, EXCEPT

REINFORCING STEEL TO BE WELDED SHALL CONFORM TO ASTM A-706. CONTRACTOR SHALL

SUBMIT REBAR MILL CERTIFICATES.

ALL PREHEATING AND WELDING OF REINFORCING BARS SHALL BE DONE IN ACCORDANCE WITH AWS D1.4 LATEST EDITION AND SHALL BE CONTINUOUSLY INSPECTED BY A QUALIFIED LABORATORY.

CONTRACTOR SHALL FURNISH WPS FOR ALL REBAR WELDING TO THE LABORATORY.

REINFORCING STEEL SHALL BE FABRICATED ACCORDING TO "MANUAL OF STANDARD PRACTICE FOR

REINFORCED CONCRETE CONSTRUCTION".

WIRE FABRIC SHALL CONFORM TO ASTM A-185.

DIMENSIONS SHOWN FOR LOCATION OF REINFORCING ARE TO THE FACE OF BARS LISTED AND

DENOTE CLEAR COVERAGE. NON-PRESTRESSED, CAST-IN-PLACE CONCRETE COVERAGE SHALL BE

AS FOLLOWS, UNO:

CONCRETE DEPOSITED DIRECTLY AGAINST GROUND (EXCEPT SLABS)--- 3"

CONCRETE EXPOSED TO GROUND OR WEATHER BUT PLACED IN FORMS:

#5 AND SMALLER---------------------------- 1-1/2"

#6 AND LARGER----------------------------- 2"

BEAMS & COLUMNS (TIES)------------------------ 1-1/2"

BEAMS & COLUMNS (MAIN REINFORCING)---------------- 2"

CAST-IN-PLACE WALLS (EXTERIOR FACE & SOIL SIDE)--------- SEE ABOVE

CAST-IN-PLACE WALLS (INTERIOR FACE-#11 & SMALLER)------- 3/4"

TILT-UP WALLS------------------------------- SEE DETAILS

SLABS (ON FORMS)---------------------------- 3/4"

SLABS (ON GROUND)------------------- 2" CLEAR FROM TOP UNO

SPLICES IN CONTINUOUS REINFORCEMENT SHALL BE LAPPED UNO, SEE SCHEDULE THIS SHEET.

SPLICES IN ADJACENT BARS SHALL BE GREATER THAN 5'-0" APART. SPLICE CONTINUOUS BARS IN SOIL-BEARING GRADE BEAMS, STRUCTURAL SLABS ON GRADE AND MAT FOUNDATIONS AS FOLLOWS UNO: TOP BARS AT CENTERLINE OF SUPPORT; BOTTOM BARS AT MID-SPAN. SPLICE CONTINUOUS BARS IN ELEVATED SLABS AND BEAMS, ETC. AS FOLLOWS UNO: TOP BARS AT MID-SPAN; BOTTOM BARS AT CENTERLINE OF SUPPORT. ALL BARS SIZE #14 AND LARGER SHALL BE CONTINUOUS FOR FULL LENGTH SHOWN OR SPLICED WITH MECHANICAL COUPLERS AS NOTED IN DETAILS. SPLICES IN

WWF SHALL BE 1-1/2 MESHES WIDE.

THE MINIMUM CLEAR SPACING BETWEEN PARALLEL BARS IN A LAYER SHALL NOT BE LESS THAN THE LARGER OF BAR DIAMETER, 1", OR 33% GREATER THAN THE MAXIMUM AGGREGATE SIZE (NOMINAL), WHICHEVER IS GREATEST. THIS REQUIREMENT ALSO APPLIES TO THE CLEAR SPACING BETWEEN DIFFERENT LAYERS OF PARALLEL BARS AND TO THE CLEAR DISTANCE BETWEEN A CONTACT LAP

SPLICE AND ADJACENT SPLICES OR BARS.

ALL HOOKS SHALL BE STANDARD HOOKS UNLESS OTHERWISE SHOWN OR NOTED. AT WALLS,

PROVIDE HOOKS AT ENDS OF ALL REINFORCING AT ENDS, CORNERS AND INTERSECTIONS, UNO.

CONSTRUCTION JOINTS SHALL BE MADE ROUGH AND ALL LAITANCE REMOVED FROM THE

SURFACE. CONCRETE MAY BE ROUGHENED BY CHIPPING THE ENTIRE SURFACE, SAND BLASTING, OR RAKING THE SURFACE TO PROVIDE 1/4" DEEP DEFORMATIONS.

REMOVE ALL DEBRIS FROM FORMS BEFORE CASTING ANY CONCRETE.

REINFORCING, DOWELS, BOLTS, ANCHORS, SLEEVES, ETC. TO BE EMBEDDED IN CONCRETE SHALL

BE SECURELY POSITIONED BEFORE PLACING CONCRETE.

ANCHOR BOLTS (AB'S) CAST IN CONCRETE OR MASONRY FOR WALL SILL AND LEDGER\APPLICATIONS

SHALL BE HEADED BOLTS WITH CUT THREADS CONFORMING TO ASTM A307, UNO. REFER TO

"WOOD" NOTES FOR ADDITIONAL REQUIREMENTS FOR BOLTS IN CONTACT WITH PRESSURE

TREATED OR FIRE RETARDANT MATERIAL. REFER TO 'STRUCTURAL STEEL' NOTE FOR

REQUIREMENTS FOR ANCHOR RODS (AR'S) CAST IN CONCRETE FOR COLUMN BASE PLATE AND

STEEL EMBED APPLICATIONS.

WALLS SHALL BE CAST IN HORIZONTAL LAYERS OF 2'-0" MAXIMUM DEPTH.

CONCRETE IN WALLS, PIERS OR COLUMNS SHALL SET AT LEAST 2 HOURS BEFORE PLACING

CONCRETE IN BEAMS, SPANDRELS, OR SLABS SUPPORTED THEREON.

HORIZONTAL WALL BARS IN MULTI-CURTAIN CAST IN PLACE WALLS SHALL BE STAGGERED.

DOWEL ALL VERTICAL REINFORCING IN WALLS AND COLUMNS FROM FOUNDATION WITH SAME SIZE

BAR.

CONSOLIDATE CONCRETE PLACED IN FORMS BY MECHANICAL VIBRATING EQUIPMENT

SUPPLEMENTED BY HAND-SPADING, RODDING OR TAMPING. USE EQUIPMENT AND PROCEDURES

FOR CONSOLIDATION OF CONCRETE IN ACCORDANCE WITH THE RECOMMENDED PRACTICES OF ACI

309 TO SUIT THE TYPE OF CONCRETE AND PROJECT CONDITIONS. CONCRETE SHALL NOT BE

DROPPED THROUGH REINFORCING STEEL (AS IN WALLS) SO AS TO CAUSE SEGREGATION OF

AGGREGATES. IN SUCH CASES HOPPERS AND CHUTES OR TRUNKS OF VARIABLE LENGTHS SHALL

BE USED SO THAT THE FREE UNCONFINED FALL OF CONCRETE SHALL NOT EXCEED 6 FEET.

NO WOOD SPREADERS ALLOWED. NO WOOD STAKES ALLOWED IN AREAS TO BE CONCRETED.

ADDITIONAL REINFORCING IN PRECAST OR TILT-UP PANELS REQUIRED FOR LIFTING STRESSES

SHALL BE SUPPLIED BY CONTRACTOR.

PROVIDE #5 X 4'-0" DIAGONAL REINFORCING AT TOP AND BOTTOM OF SLAB AT ALL RE-ENTRANT

CORNERS TYPICAL. THIS APPLIES TO SLAB ON GRADE, CONCRETE OVER METAL DECK, AND

ELEVATED STRUCTURAL SLAB CONDITIONS.

ALL SAW CUTTING SHALL BE DONE AFTER INITIAL SET HAS OCCURRED TO AVOID TEARING OR

DAMAGE BY THE SAW BLADE, BUT BEFORE INITIAL SHRINKAGE HAS OCCURRED.

NOTIFY STRUCTURAL ENGINEER A MINIMUM OF 48 HOURS BEFORE PLACING ANY CONCRETE.

CONCRETE STRENGTHS & MIX PROPERTIES:

FOUNDATIONS, ELEVATOR PITS,

TIE BEAMS

SLAB ON GRADE

COLUMNS, BEAMS, WALLS,

ELEVATED SLABS, PILE CAPS

NW CONC FILL OVER DECK

SITE AND MISCELLANEOUS

3000 PSI

3500 PSI

4000 PSI

3500 PSI

1-1/2"

1" 1"

3/4"

NW

NW

NW

NW

0.58

0.45 0.50

0.52

MAX W/CM*

RATIO

* W/CM = WATER : CEMENTITIOUS MATERIAL RATIO

WEIGHT

MAX AGGR.

SIZEF'C @ 28 DAYSITEM

- SEE CIVIL OR ARCH'L DRAWINGS

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

28.

A.

B.

C.

D.

27.

SPLICE

CLASS LOCATION

REINF #3

OTHER

TOP

B

NOTES:

#4 #5 #6 #7 #8 #9 #10 #11

OTHER

TOP

SPLICE

LOCATIONCLASS

REINF #3 #4

#7#6#5 #8 #9 #10 #11

ACI 318

IBC

(ALL LENGTHS SHOWN ARE IN INCHES.)

TOP REINFORCEMENT IS HORIZONTAL REINFORCEMENT LOCATED SUCH THAT MORE THAN 12

INCHES OF FRESH CONCRETE IS CAST IN THE MEMBER BELOW THE SPLICE.

WHEN LIGHTWEIGHT CONCRETE IS USED, MULTIPLY LAP LENGTHS BY 1.30.

WHERE CLEAR SPACING OF BARS BEING SPLICED IS LESS THAN 2 BAR DIA. OR WHERE CLEAR COVER OF BARS BEING SPLICED IS LESS THAN 1 BAR DIA., MULTIPLY LAP LENGTHS BY 1.50, UNO.

SCHEDULE APPLIES TO NORMAL WEIGHT CONCRETE WITH UNCOATED, GRADE 60 REINFORCING

STEEL FOR #4 BARS AND LARGER (VALUES FOR #3 BARS BASED ON GRADE 40).

WHERE NOTES #3 AND #4 OCCUR, MULTIPLY LAP LENGTHS BY 2.00, UNO.

WHERE CLASS A LAP SPLICE IS NOTED IN DETAIL, DIVIDE LENGTHS ABOVE BY 1.30.

B

B

#11#10#9#8#5 #6 #7

#4#3REINF

CLASS LOCATION

SPLICE

TOP

OTHER

B

#11#10#9#8#5 #6 #7#4REINF

CLASS LOCATION

SPLICE

TOP

OTHER 22

#3

FC' = 3000 PSI CONC

FC' = 4000 PSI CONC

REINFORCEMENT LAP SPLICE SCHEDULE

FC' = 3500 PSI CONC

FC' = 5000 PSI CONC

300SN002-1

1.

2.

3.

4.

5.

6.

STRUCTURAL STEEL

500SN001-1

FABRICATION, ERECTION AND MATERIALS SHALL CONFORM WITH THE AISC SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, THE AISC SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS, AND THE INTERNATIONAL BUILDING CODE, LATEST EDITIONS UNO IN THE DESIGN CRITERIA NOTES.

STRUCTURAL STEEL WIDE FLANGE SHAPES SHALL CONFORM WITH ASTM A992. ALL OTHER

STRUCTURAL STEEL ROLLED SHAPES (CHANNELS, ANGLES, ETC) AND PLATES SHALL CONFORM

WITH ASTM A36, UNO.

STEEL PIPE SHALL CONFORM TO ASTM A53, TYPES E OR S, GRADE B.

ALL HOLLOW STRUCTURAL SECTIONS (HSS) SHALL CONFORM TO ASTM A500, GRADE B.

ALL STRUCTURAL STEEL SHALL RECEIVE A MINIMUM OF ONE SHOP COAT OF RED PRIMER PAINT.

DO NOT PAINT AREAS TO BE FIELD WELDED, FIREPROOFED, GALVANIZED, TO RECEIVE SLIP-

CRITICAL HIGH STRENGTH BOLTS, OR TO BE EMBEDDED IN CONCRETE. PROVIDE ADDITIONAL

PAINTING AS NOTED IN THE SPECIFICATIONS.

ALL STRUCTURAL STEEL SHALL BE ERECTED PLUMB AND TRUE TO LINE. TEMPORARY BRACING

SHALL BE INSTALLED AND SHALL BE LEFT IN PLACE UNTIL OTHER MEANS ARE PROVIDED TO

ADEQUATELY BRACE THE STRUCTURE. CONTRACTOR RESPONSIBLE FOR REVIEWING ALL BASE

PLATE AND SUPPORT CONDITIONS DURING ERECTION AND BRACING AS REQUIRED. SEE AISC AND

OSHA REQUIREMENTS.

PLACE NON-SHRINK GROUT UNDER ALL BASE PLATES BEFORE ADDING VERTICAL LOAD.

STRUCTURAL STEEL BELOW GRADE SHALL HAVE 3 INCHES MINIMUM OF CONCRETE COVER.

BOLTED CONNECTIONS SHALL CONSIST OF UNFINISHED BOLTS CONFORMING TO ASTM A307 UNO.

WHERE HIGH STRENGTH BOLTS ARE INDICATED, BOLTS CONFORMING TO ASTM A325 OR ASTM A490

AS SPECIFIED SHALL BE PROVIDED. ANCHOR RODS CAST IN CONCRETE OR MASONRY SHALL BE

HEADED BOLTS WITH CUT THREAD, FULL DIAMETER BODY STYLE CONFORMING TO ASTM F1554 GR.

36, 55 (WELDABLE PER S1 SUPPLEMENTARY REQUIREMENTS), OR 105 AS INDICATED ON DRAWINGS.

IN LIEU OF HEADED ANCHOR BOLTS, THREADED ROD CONFORMING TO THE ABOVE SPECIFICATION

MAY BE USED WITH A SINGLE NUT WELDED TO THE ROD OR DOUBLE NUTS TIGHTENED TO

PREVENT ROTATION. ANCHOR ROD PROJECTION ABOVE TOP OF FOUNDATION SHALL BE AS NOTED

ON THE DRAWINGS.

BOLTED CONNECTIONS SHALL HAVE WASHERS CONFORMING TO ASTM F436 UNO. WASHERS MAY

BE OMITTED AT SNUG-TIGHTENED AND SLIP-CRITICAL CONNECTIONS, EXCEPT WHERE REQUIRED

BY THE RCSC SPECIFICATION FOR STRUCTURAL JOINTS, LATEST EDITION.

BASE PLATES SHALL HAVE NUTS AND WASHERS AT TOP AND BOTTOM OF PLATE. WASHERS FOR

BASE PLATES SHALL BE A36 SQUARE OR CIRCULAR PLATE UNLESS ASTM F844 WASHERS ARE

PERMITTED. SEE BASE PLATE DETAILS FOR PLATE SIZE AND PERMISSIBLE WASHER TYPE.

ADDITIONAL REQUIREMENTS FOR "SLIP-CRITICAL" BOLTED CONNECTIONS:

PROVIDE 3/4" DIAMETER STITCH BOLTS AND RING FILLS, SPACED AT NOT MORE THAN 2'-0" ON

CENTER FOR ALL DOUBLE ANGLE MEMBERS UNO.

AT WOOD TO STEEL PARALLEL CONTACT, BOLT WITH 1/2" DIAMETER BOLTS AT MAXIMUM 24"CC.

HOLES FOR UNFINISHED BOLTS SHALL BE OF THE SAME NOMINAL DIAMETER OF THE BOLT PLUS

1/16". USE STANDARD AISC GAGE AND PITCH FOR BOLTS EXCEPT AS NOTED OTHERWISE.

WELDING SHALL BE DONE BY THE ELECTRIC ARC PROCESS IN ACCORDANCE WITH AMERICAN

WELDING SOCIETY STANDARDS, USING ONLY CERTIFIED WELDERS. ALL GROOVE WELDS SHALL

HAVE COMPLETE PENETRATION UNLESS NOTED OTHERWISE. ALL EXPOSED WELDS SHALL BE

GROUND SMOOTH. ALL ELECTRODES FOR WELDING SHALL COMPLY WITH AWS CODE, E70 SERIES

MINIMUM.

WELD LENGTHS CALLED FOR ON PLANS ARE THE NET EFFECTIVE LENGTHS REQUIRED.

MINIMUM FILLET WELDS:

WELDING PROCEDURE SPECIFICATIONS (WPS) FOR SHOP AND FIELD PREQUALIFIED WELD JOINTS AND WELD JOINTS QUALIFIED BY TEST SHALL BE PREPARED FOR REVIEW PRIOR TO FABRICATION.

ALL WELDING PROCEDURE ITEMS SUCH AS BASE METALS, WELDING PROCESSES, FILLER METALS

AND JOINT DETAILS THAT MEET THE REQUIREMENTS OF AWS D1.1 SECTION 3 SHALL BE

CONSIDERED AS PREQUALIFIED. ANY CHANGE OR SUBSTITUTION THAT IS BEYOND THE RANGE OR TOLERANCE OR REQUIREMENTS FOR PREQUALIFICATION SHALL BE QUALIFIED BY TEST PER AWS D1.1 SECTION 4 PART B. QUALIFICATION TESTING IS REQUIRED FOR PARTIAL PENETRATION AND

COMPLETE PENETRATION WELDS.

FOR NONDESTRUCTIVE TESTING OF WELDED CONNECTIONS EXCLUDING PRIMARY MEMBERS OF

MOMENT RESISTING FRAMES:

BASE METAL THICKER THAN 1-1/2 INCH WHEN SUBJECT TO THROUGH THICKNESS WELD

SHRINKAGE STRAINS.

ALL COMPLETE JOINT PENETRATION GROOVE OR BUTT WELDS.

ALL PARTIAL JOINT PENETRATION GROOVE WELDS WHEN USED IN COLUMN SPLICES.

1.

THE SPECIAL INSPECTOR MUST BE PRESENT DURING INSTALLATION AND TIGHTENING

OPERATION OF "SLIP-CRITICAL" CONNECTIONS.

WELDED CONNECTIONS SHALL BE TESTED BY NONDESTRUCTIVE METHODS FOR

COMPLIANCE WITH AISC N5.5, AND JOB SPECIFICATIONS. ULTRASONIC TESTING SHALL

BE IN ACCORDANCE WITH AWS D1.1, ASTM E164 AND ASME SECTION V.

RADIOGRAPHY SHALL BE IN ACCORDANCE WITH AWS D1.1, ASTM E94 AND E99,

AND ASME SECTION V. THIS TESTING SHALL BE PART OF THE SPECIAL INSPECTION

REQUIREMENTS OF IBC SECTION 1705 PERFORMED BY AN APPROVED INDEPENDENT

TESTING LABORATORY AS FOLLOWS:

ANY MATERIAL DISCONTINUITIES SHALL BE ACCEPTED OR REJECTED ON THE BASIS OF

DEFECT RATING IN ACCORDANCE WITH THE (LARGER REFLECTOR) CRITERIA OF AISC N5.5.

A. "SLIP-CRITICAL" CONNECTIONS (A325SC DESIGN VALUES WITH SPECIAL INSPECTION) ARE

REQUIRED AT ALL BRACED FRAME CONNECTIONS, AT ALL CONNECTIONS ALONG CHORD LINES

AND DRAG LINES (AS NOTED ON PLANS), AND UNO, AT ALL BOLTS IN OVERSIZED OR SLOTTED

HOLES.

3/16" @ T < 1/2" 1/4" @ T < 3/4" 5/16" @ T > 3/4"

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

BOLTED CONNECTIONS:

A.

B.

C.

B.

A.

1.

2.

3.

B.

INTERPRETATION OF DRAWINGS & SPECIFICATIONS

IN GENERAL, THE WORKING DETAILS WILL INDICATE DIMENSIONS, POSITION AND KIND OF

CONSTRUCTION, AND THE SPECIFICATIONS, QUALITIES AND METHODS. ANY WORK INDICATED ON THE WORKING DETAILS AND NOT MENTIONED IN THE SPECIFICATIONS, OR VICE VERSA, SHALL BE

FURNISHED AS THOUGH FULLY SET FORTH IN BOTH. WORK NOT PARTICULARLY DETAILED,

MARKED OR SPECIFIED, SHALL BE IDENTICAL OR SIMILAR TO LIKE CASES OF CONSTRUCTION

THAT ARE DETAILED, MARKED OR SPECIFIED. IF CONFLICTS OCCUR ON DRAWINGS AND/OR

SPECIFICATIONS, THE MOST EXPENSIVE MATERIALS OR METHODS WILL PREVAIL.

SHOULD AN ERROR APPEAR IN THE WORKING DETAILS OR SPECIFICATIONS OR IN WORK DONE

BY OTHERS AFFECTING THIS WORK, THE CONTRACTOR SHALL NOTIFY THE VA AT ONCE AND IN

WRITING. IF THE CONTRACTOR PROCEEDS WITH THE WORK SO AFFECTED WITHOUT HAVING

GIVEN SUCH WRITTEN NOTICE AND WITHOUT RECEIVING THE NECESSARY APPROVAL,

DECISION OR INSTRUCTIONS IN WRITING FROM THE VA, THEN HE SHALL HAVE NO VALID CLAIM

AGAINST THE VA, FOR THE COST OF SO PROCEEDING AND SHALL MAKE GOOD ANY RESULTING

DAMAGE OR DEFECT. NO VERBAL APPROVAL, DECISION, OR INSTRUCTION SHALL BE VALID OR

BE THE BASIS FOR ANY CLAIM AGAINST THE VA, ITS OFFICERS, EMPLOYEES OR AGENTS. THE

FOREGOING INCLUDES TYPICAL ERRORS IN THE SPECIFICATIONS OR NOTATIONAL ERRORS IN

THE WORKING DETAILS WHERE THE INTERPRETATION IS DOUBTFUL OR WHERE THE ERROR IS

SUFFICIENTLY APPARENT AS TO PLACE A REASONABLY PRUDENT CONTRACTOR ON NOTICE

THAT, SHOULD HE ELECT TO PROCEED, HE IS DOING SO AT HIS OWN RISK.

CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE CODES AND REGULATIONS.

SHOP DRAWING NOTE:

WHEN NOT ADDRESSED BY DIVISION 1 OF THE SPECIFICATIONS, PAPER FORMAT STRUCTURAL

SHOP DRAWINGS SHALL BE SUBMITTED IN THE FORM OF THREE COPIES MINIMUM OF EACH

SHEET. WHERE SUBMITTALS ARE ELECTRONIC, FORMAT SHALL BE PDF.

THE PURPOSE OF SHOP DRAWING SUBMITTALS BY THE CONTRACTOR IS TO DEMONSTRATE TO

THE STRUCTURAL ENGINEER THAT HE UNDERSTANDS THE DESIGN CONCEPT BY INDICATING

WHICH MATERIAL HE INTENDS TO FURNISH AND INSTALL, AND BY DETAILING THE FABRICATION

AND INSTALLATION METHODS HE INTENDS TO USE ON A STAND ALONE SET OF DOCUMENTS.

DUPLICATION OF DESIGN DOCUMENTS FOR THE PURPOSE OF SHOP DRAWINGS IS NOT

ACCEPTABLE.

PRIOR TO FABRICATION, SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW BY THE

STRUCTURAL ENGINEER. SHOP DRAWING SUBMITTALS SHALL INCLUDE, BUT ARE NOT

NECESSARILY LIMITED TO, STRUCTURAL STEEL, REINFORCING STEEL, & GLUE-LAMINATED

BEAMS.

PRIOR TO SUBMISSION THE CONTRACTOR SHALL REVIEW ALL SUBMITTALS FOR

CONFORMANCE WITH THE CONTRACT DOCUMENTS AND SHALL STAMP SUBMITTALS AS BEING

"REVIEWED FOR CONFORMANCE".

SHOP DRAWING SUBMITTALS PROCESSED BY THE STRUCTURAL ENGINEER ARE NOT CHANGE

ORDERS.

ANY DETAIL ON THE SHOP DRAWINGS THAT DEVIATES FROM THE CONTRACT DOCUMENTS

SHALL CLEARLY BE MARKED WITH THE NOTE "THIS IS A CHANGE".

SHOP DRAWINGS OR CALCULATIONS SUBMITTED FOR REVIEW THAT REQUIRE RESUBMITTAL

FOR RE-REVIEW SHALL BE BILLED HOURLY FOR SUCH TIME TO THE GENERAL CONTRACTOR.

RE-REVIEW WILL NOT PROCEED WITHOUT WRITTEN APPROVAL FROM THE GENERAL

CONTRACTOR FOR ADDITIONAL ENGINEERING REVIEW SERVICES.

SAFETY NOTE:

THE CONTRACTOR SHALL NOTIFY THE VA WHERE A CONFLICT OR DISCREPANCY OCCURS BETWEEN

THE STRUCTURAL DRAWINGS AND ANY OTHER PORTION OF THE CONTRACT DOCUMENTS OR

EXISTING FIELD CONDITIONS. SUCH NOTIFICATION SHALL BE GIVEN IN DUE TIME SO AS NOT TO

AFFECT THE CONSTRUCTION SCHEDULE. IN CASE OF A CONFLICT BETWEEN STRUCTURAL

DRAWINGS AND SPECIFICATIONS THE MORE RESTRICTIVE CONDITION SHALL TAKE PRECEDENCE

UNLESS WRITTEN APPROVAL HAS BEEN GIVEN FOR THE LEAST RESTRICTIVE. CONTRACTOR SHALL

VERIFY ALL DIMENSIONS WITH ARCHITECTURAL PRIOR TO COMMENCING ANY WORK.

WHEN CONSTRUCTION ATTACHES TO OR IS WITHIN AN EXISTING BUILDING, A COMPLETE SET OF DRAWINGS OF THE EXISTING BUILDING SHALL BE KEPT ON THE JOB SITE. CONTRACTOR TO OBTAIN

THESE DRAWINGS FROM THE VA (IF THEY ARE AVAILABLE).

ANY SUBSTITUTIONS FOR STRUCTURAL MEMBERS, HARDWARE OR DETAILS SHALL BE REVIEWED BY THE VA, ARCHITECT AND STRUCTURAL ENGINEER. SUCH REVIEW WILL BE BILLED ON A TIME AND MATERIALS BASIS TO THE GENERAL CONTRACTOR WITH NO GUARANTEE THAT THE SUBSTITUTION

WILL BE ALLOWED.

DO NOT SCALE DRAWINGS. CONTACT THE VA FOR ANY DIMENSIONS NOT SHOWN.

THESE DRAWINGS ARE NOT COMPLETE UNTIL REVIEWED AND ACCEPTED BY VA AND SIGNED BY THE

STRUCTURAL ENGINEER.

GENERAL NOTES

100SN001-1

IT IS THE CONTRACTORS RESPONSIBILITY TO COMPLY WITH THE PERTINENT SECTIONS, AS

THEY APPLY TO THIS PROJECT, OF THE "CONSTRUCTION SAFETY ORDERS" ISSUED BY THE

STATE OF CALIFORNIA LATEST EDITION, AND ALL OSHA REQUIREMENTS.

THE VA AND THE STRUCTURAL ENGINEER DO NOT ACCEPT ANY RESPONSIBILITY FOR THE

CONTRACTOR'S FAILURE TO COMPLY WITH THESE REQUIREMENTS.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATE DESIGN AND CONSTRUCTION OF

ALL FORMS AND SHORING REQUIRED. SHORING INDICATIONS (LOCATION, DIRECTION,

DURATION, ETC.) ARE ONLY SHOWN ON THE STRUCTURAL DRWGS WHEN REQUIRED TO

IMPLEMENT THE DESIGN INTENT OF THE FINAL WORK PRODUCT. DETERMINATION WHETHER

SHORING IS REQUIRED FOR TEMPORARY OR INTERMEDIATE CONDITIONS DURING

CONSTRUCTION IS WHOLLY THE RESPONSIBILITY OF THE CONTRACTOR.

WHERE SPECIFICATIONS HAVE BEEN PREPARED FOR THIS PROJECT, THEY ARE ARRANGED IN

SEVERAL SECTIONS, BUT SUCH SEPARATION SHALL NOT BE CONSIDERED AS THE LIMITS OF

THE WORK REQUIRED OF ANY SEPARATE TRADE. THE TERMS AND CONDITIONS OF SUCH

LIMITATIONS ARE WHOLLY BETWEEN THE CONTRACTOR AND HIS SUBCONTRACTORS.

1.

2.

3.

4.

5.

6.

7.

8.

9.

A.

B.

C.

A.

B.

C.

D.

E.

F.

G.

A.

B.

C.

AB

ABV

BLW

BOF

BRG

BTWN

CC

CJ

CLR

CMU

CONT

CONTR

CP

CSK

DF

DL

DO

DWG

(E)

EF

EJ

ELEV

EN

EOS

EQ

EW

EWEF

FB

FC

FF

FS

FT

GA

GLB

HDG

HDR

HSB

HSS

HT

JH

LL

LLH

LLV

LS

LW

LWIC

MB

MFR

ANCHOR BOLT

ABOVE

BELOW

BOTTOM OF FOOTING

BEARING

BETWEEN

CENTER TO CENTER

CONSTRUCTION JOINT

CLEAR

CONCRETE MASONRY UNIT

CONTINUOUS

CONTRACTOR

COMPLETE JOINT PENETRATION

COUNTERSINK

DOUGLAS FIR

DEAD LOAD

DITTO

DRAWING

EXISTING

EACH FACE OR EDGE FASTENER

EXPANSION JOINT

ELEVATION

EDGE NAILING

EDGE OF SLAB

EQUAL

EACH WAY

EACH WAY EACH FACE

FACE OF BLOCK(OR BRICK) OR

FLAT BAR

FACE OF CONCRETE OR

FRAMING CLIP(SIMPSON A35 UNO)

FINISH FLOOR

FACE OF STUD OR FAR SIDE

FIRE TREATED

GAUGE OR GAGE

GLUED LAMINATED BEAM

HOT DIPPED GALVANIZED

HEADER

HIGH STRENGTH BOLT

HOLLOW STRUCTURAL SECTION

HEIGHT

JOIST HANGER

LIVE LOAD

LONG LEG HORIZONTAL

LONG LEG VERTICAL

LAG SCREW

LIGHT WEIGHT

LIGHT WEIGHT INSULATING CONC

MACHINE BOLT

MANUFACTURER

MI

MTL

(N)

NIC

NS

NTS

NW

OH

OSB

PC

PJP

PT

REIN

RWD

SC

SHTG

SIM

SJ

SMS

SP

STFNR

STL

STGRD

T&B T&G

THRD

TN

TO

TOC

TOF

TOS

TOW

UNO

VIF

W/ W/O

WP

WS

WWF

VA

CL

PL

WF

SQ

Ø

(A) (B)

MALLEABLE IRON

METAL

NEW

NOT IN CONTRACT

NEAR SIDE

NOT TO SCALE

NORMAL WEIGHT

OPPOSITE HAND

ORIENTED STRAND BOARD

PIECE

PARTIAL JOINT PENETRATION

PRESSURE TREATED

REINFORCING

REDWOOD

SLIP CRITICAL

SHEATHING

SIMILAR

SLAB CONTROL JOINT

SHEET METAL SCREW

STRUCTURAL PANEL

STIFFENER

STEEL

STAGGERED

TOP & BOTTOM

TONGUE & GROOVE

THREADED

TOE NAIL

TOP OF

TOP OF CONCRETE (SLAB UNO)

TOP OF FOOTING OR

TOP OF FRAMING

TOP OF STEEL

TOP OF WALL

UNLESS NOTED OTHERWISE

VERIFY IN FIELD

WITH

WITHOUT

WORK POINT

WOOD SCREW

WELDED WIRE FABRIC

DEPARTMENT OF VETERANS AFFAIRS

CENTERLINE

PLATE

WIDE FLANGE

NUMBER OR POUNDS

SQUARE

ROUND OR DIAMETER

CONT WOOD IN SECTION

WOOD BLOCKING IN SECTION

"MEMBER" ABOVE

"MEMBER" BELOW

100SN003-1

ABBREVIATIONS

DRILLED-IN ANCHORS

305SN001-1

ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS GIVEN IN THE ICC

REPORT.

UNLESS NOTED OTHERWISE ANCHORS HAVE BEEN DESIGNED FOR SPECIAL INSPECTION. PROVIDE

SPECIAL INSPECTION AS INDICATED IN THE ICC REPORT.

WHEN INSTALLING DRILLED-IN ANCHORS IN EXISTING CONCRETE OR MASONRY, USE CARE AND

CAUTION TO AVOID CUTTING OR DAMAGING EXISTING REINFORCING BARS. DO NOT INSTALL

ANCHORS IN PRESTRESSED CONCRETE ELEMENTS.

FOR CONCRETE CONSTRUCTION, EPOXY ANCHORS SHALL BE HILTI HIT-HY 200 PER ESR-3187, HILTI HIT-RE500-SD PER ESR-2322, SIMPSON SET-XP PER ESR-2508, OR POWERS PURE 110 PER ESR-3298 FOR THR'D ROD & REBAR. EXPANSION ANCHORS SHALL BE HILTI KB-TZ PER ESR-1917, SIMPSON STRONG-BOLT 2 PER ESR-3037, OR POWERS POWER-STUD+ SD2 PER ESR-2502. SCREW ANCHORS SHALL BE HILTI KWIK HUS-EZ (KH-EZ) PER ESR-3027, SIMPSON TITEN HD PER ESR-2713, OR POWERS

WEDGEBOLT+ PER ESR-2526.

ANCHORS INSTALLED FROM THE BOTTOM INTO METAL DECK WITH CONCRETE SHALL BE

INSTALLED IN THE CENTER OF THE LOW FLUTE OF THE DECKING UNLESS NOTED OTHERWISE IN

ICC REPORT. THE DECKING SHALL HAVE A MINIMUM THICKNESS OF 20 GAUGE. THE MINIMUM

THICKNESS OF THE CONCRETE ABOVE THE HIGH FLUTE OF THE METAL DECK SHALL BE AS

INDICATED IN THE ICC REPORT. SEE ICC REPORT FOR ADDITIONAL REQUIREMENTS, INCLUDING

MINIMUM DIMENSIONS FOR FLUTE WIDTH AND DEPTH.

ADHESIVE ANCHORS SHALL BE INSTALLED IN CONCRETE HAVING A MINIMUM AGE OF 21 DAYS AT THE

TIME OF ANCHOR INSTALLATION PER ACI 318, APPENDIX D.

1.

FOR MASONRY CONSTRUCTION, EPOXY ANCHORS SHALL BE HILTI HIT-HY 70 PER ESR-2682, SIMPSON

SET PER ESR-1772, OR POWERS T308+ PER ESR-3149 FOR THRD'D ROD & REBAR. EXPANSION

ANCHORS SHALL BE HILTI KWIK BOLT 3 (KB3) PER ESR-1385, SIMPSON WEDGE-ALL PER ESR-1396, OR POWERS POWER-STUD+ PER ESR-2966. SCREW ANCHORS SHALL BE HILTI KWIK HUS-EZ (KH-EZ) PER

ESR-3056, SIMPSON TITEN HD PER ESR-1056, OR POWERS WEDGEBOLT+ PER ESR-1678.

ANCHOR TYPE, SIZE & EMBEDMENT SHALL BE INDICATED IN DRAWINGS. POST-INSTALLED ANCHORS FOR REPAIR SHALL BE EVALUATED ON A CASE BY CASE BASIS. NOTIFY STRUCTURAL ENGINEER FOR

REPAIRS.

THE INSPECTION OF THE ANCHORS SHALL BE DONE BY A QUALIFIED INSPECTION AGENCY AND A

REPORT OF THE INSPECTION RESULTS SHALL BE SUBMITTED TO THE VA AND

ARCHITECT/STRUCTURAL ENGINEER.

INSTALLER CERTIFICATION AND INSPECTION IS REQUIRED FOR HORIZONTAL AND UPWARDLY

INCLINED ADHESIVE ANCHORS SUBJECTED TO SUSTAINED TENSION LOADING IN ACCORDANCE WITH

ACI 318, APPENDIX D.

2.

3.

4.

5.

6.

7.

8.

9.

10.

STRUCTURAL OBSERVATION

100IN017-1

IN ACCORDANCE WITH SECTION 1704.5 OF THE 2015 IBC, THIS PROJECT IS REQUIRED TO HAVE STRUCTURAL OBSERVATION. STRUCTURAL OBSERVATION MEANS THE VISUAL OBSERVATION OF THE

STRUCTURAL SYSTEM, FOR GENERAL CONFORMANCE TO THE APPROVED PLANS AND

SPECIFICATIONS, AT SIGNIFICANT CONSTRUCTION STAGES AND AT COMPLETION OF THE

STRUCTURAL SYSTEM. STRUCTURAL OBSERVATION DOES NOT INCLUDE OR WAIVE THE

RESPONSIBILITY FOR THE INSPECTIONS REQUIRED BY 2015 IBC SECTIONS 110 OR 1704. THE

FOLLOWING PROJECT MILESTONES SHALL BE OBSERVED:

FOUNDATIONS (PRIOR TO CONCRETE PLACEMENT)

STEEL ERECTION PRIOR TO COMPLETION OF FIRST ELEVATED LEVEL (FLOOR OR ROOF)

METAL DECK AND CONCRETE OVER DECK REINFORCING (PRIOR TO CONCRETE PLACEMENT)

THE VA SHALL EMPLOY THE ARCHITECT OR STRUCTURAL ENGINEER OF RECORD, OR ANOTHER

REGISTERED PROFESSIONAL ENGINEER OR ARCHITECT DESIGNATED TO PERFORM STRUCTURAL

OBSERVATION. OBSERVED DEFICIENCIES SHALL BE REPORTED IN WRITING TO THE VA, SPECIAL

INSPECTOR, AND CONTRACTOR. THE STRUCTURAL OBSERVER SHALL SUBMIT TO THE VA A

STATEMENT THAT THE FIELD VISITS HAVE OCCURRED AND IDENTIFY ANY REPORTED DEFICIENCIES THAT, TO THE BEST OF THE STRUCTURAL OBSERVER'S KNOWLEDGE, HAVE NOT BEEN RESOLVED.

THE CONTRACTOR SHALL NOTIFY THE STRUCTURAL OBSERVER A MINIMUM OF 48 HOURS IN ADVANCE

OF PROJECT MILESTONES SO THAT OBSERVATIONS MAY BE SCHEDULED.

A.

B.

C.

1.

2.

3.

COLD FORMED METAL FRAMING

540SN001-1

GALVANIZED SHEET STEEL SHALL CONFORM TO ASTM A653, STRUCTURAL QUALITY, WITH A

MINIMUM YIELD STRENGTH OF 33 KSI FOR 43 MILS (18 GA) AND THINNER AND ASTM A653,

STRUCTURAL QUALITY, WITH A MINIMUM YIELD STRENGTH OF 50 KSI FOR 54 MILS (16 GA) AND THICKER. HOT-ROLLED CARBON SHEET AND STRIP STEEL USED IN THE FABRICATION OF COLD-

FORMED MEMBERS SHALL CONFORM TO ASTM A1011 WITH A RUST INHIBITIVE COATING.

METAL STUDS AND JOISTS SHALL BE OF SIZE AND THICKNESS SHOWN ON DRAWINGS WITH THE

MINIMUM EFFECTIVE SECTION PROPERTIES SHOWN IN THE TABLE(S).

MINIMUM THICKNESS SHOWN IN TABLE FOR THE THICKNESS SPECIFIED REPRESENTS 95% OF

DESIGN THICKNESS PER 2007 AISI-NAS W/ S2-2010 SUPPLEMENT.

METAL FRAMING SHALL BE PER ICC-ES NO. 3064P. CONTRACTOR SHALL BE RESPONSIBLE FOR

OBTAINING AGENCY APPROVAL FOR ANY SUBSTITUTIONS.

WELDING SHALL BE IN ACCORDANCE WITH AWS D1.3 "STRUCTURAL WELDING CODE-SHEET STEEL".

WELDERS SHALL BE AWS CERTIFIED. WELDING RODS: E60XX SERIES. ALL FIELD WELDING SHALL

HAVE SPECIAL INSPECTION.

TYPICAL METAL TRACK SHALL BE SAME GAUGE AS STUDS WHICH IT SUPPORTS, UNPUNCHED, WITH A FLANGE WIDTH OF 1 1/4 INCHES AND A DEPTH EQUAL TO THE NOMINAL STUD PLUS 2 TIMES THE

TRACK THICKNESS PLUS THE RADIUS. NESTED TRACKS SHALL BE FABRICATED TO FILL THE

OUTSIDE OF A TYPICAL METAL TRACK. DEEP LEG TRACKS SHALL HAVE A MINIMUM FLANGE WIDTH OF 2 INCHES. USE SLOTTED SLIP TRACKS WHERE SPECIFIED. SEE SECTIONS AND TYPICAL METAL

STUD DETAILS.

METAL STUDS SHALL NOT HAVE PUNCH-OUTS CLOSER THAN 10" FROM THE END OF THE STUD OR AT INTERMEDIATE LATERAL BEARING POINTS OF STUDS. METAL STUDS WHICH ARE PART OF BUILT-

UP

HEADER SECTIONS SHALL BE UNPUNCHED FULL LENGTH.

1.

2.

3.

4.

5.

6.

7.

GAUGE/MIL

MIN

THICKNESS

DEPTH "D"

2 1/2"

3 5/8"

4"

6"

8"

0.235

SxIx

0.0329 0.0428 0.0538 0.0677

20/33 18/43 16/54 14/68

1 5/8"

S STUDS &

JOISTS

0.180 0.302 0.240 0.370 0.284 0.450 0.357

0.551 0.268 0.710 0.372 0.873 0.444 1.069 0.574

0.6481.3460.4981.0980.4170.8920.2990.692

1.1643.5250.9162.8600.7672.3160.5771.793

1.6637.0701.2295.6001.0194.5000.7103.384

Ix Sx Ix Sx Ix Sx

DESIGNATION S162-33 S162-43 S162-54 S162-68

FOR COMPLETE SECTION DESIGNATIONS IN ACCORDANCE WITH SSMA STANDARDS, ADD MEMBER

DEPTH TO FRONT OF INDICATED DESIGNATION. EXAMPLE: FOR 3 5/8" MEMBER WITH GAUGE/MIL OF

18/43, THE FULL DESIGNATION IS 362S162-43.

SECTION PROPERTIES SHOWN ARE EFFECTIVE PROPERTIES CONFORMING TO AISI A7.2 PER SSMA

STANDARDS FOR MATERIAL STRENGTH NOTED BELOW.

PROVIDE 33 KSI MIN MATERIAL FOR 18/43 & LIGHTER SECTIONS, PROVIDE 50 KSI MATERIAL FOR 16/54

& HEAVIER SECTIONS.

- - - - 14.298 1.914 18.390 2.645

- - 7.523 1.302 9.391 1.572 11.978 2.154

12"

10"

COLD FORMED METAL FRAMING SECTION PROPERTIES - SSMA C STUDS & JOISTS - S162 SECTIONS2,3

540SN002-1

/2

T

Y P

TYP

'D

1.

2.

3.

SHOT PINS USED TO ATTACH HANGER WIRES FOR SUSPENDED CEILINGS SHALL BE TESTED IN

ACCORDANCE WITH DSA IR 25-2.13

POWDER ACTUATED FASTENERS (SHOT PINS)

100TN016-1

THESE NOTES GOVERN ALL CONDITIONS CALLED OUT ON THE PLANS AS 'SHOT PINS' UNLESS

SPECIFICALLY NOTED OTHERWISE.

ALL SHOT PINS SHALL BE X-U UNIVERSAL KNURLED SHANK FASTENERS WITH SHANK DIAMETER OF 0.157" AS MANUFACTURED BY HILTI INCORPORATED IN ACCORDANCE WITH ICC ESR-2269 AND THE

CURRENT EDITION OF THE HILTI 'PRODUCT TECHNICAL GUIDE.'

SHOT PINS DRIVEN INTO STEEL BASE MATERIAL SHALL MAINTAIN A MINIMUM EDGE DISTANCE AT ALL STEEL ELEMENTS OF 1/2" AND MINIMUM FASTENER SPACING SHALL BE 1". LENGTH OF PIN SHALL BE AS REQUIRED TO PENETRATE THRU STEEL MEMBER UNO AT 3/4" THICK STEEL, PENETRATION NEED

NOT EXCEED 1/2".

SHOT PINS DRIVEN INTO CONCRETE BASE MATERIAL SHALL MAINTAIN A MINIMUM EDGE DISTANCE AT ALL CONCRETE ELEMENTS OF 3" AND MINIMUM FASTENER SPACING SHALL BE 4". PINS SHALL

HAVE 1 1/4" PENETRATION UNO MINIMUM CONCRETE THICKNESS SHALL BE 3 TIMES THE

PENETRATION DEPTH. CONCRETE SHALL ATTAIN FULL DESIGN STRENGTH PRIOR TO INSTALLING

SHOT PINS.

SHOT PINS DRIVEN INTO 3 1/4" MINIMUM LIGHT WEIGHT CONCRETE FILL OVER 3"X 20 GA MINIMUM METAL DECK MAY BE INSTALLED FROM THE TOP OR FROM THE BOTTOM IN EITHER THE HIGH OR LOW FLUTE. PINS INSTALLED FROM THE TOP SHALL BE SPACED AS NOTED ABOVE FOR TYPICAL

CONCRETE ELEMENTS. PINS INSTALLED FROM THE BOTTOM IN THE HIGH FLUTES SHALL BE

INSTALLED WITHIN 1" OF FLUTE CENTER. PINS INSTALLED FROM THE BOTTOM IN THE LOW

FLUTES SHALL BE INSTALLED WITHIN 1" OF THE FLUTE CENTER AND SHALL BE NO CLOSER THAN 1 1/8" TO THE EDGE OF THE LOW FLUTE. PINS INSTALLED FROM THE BOTTOM SHALL BE SPACED NO CLOSER THAN 5 1/2" PARALLEL TO THE FLUTES. PINS SHALL HAVE 1" PENETRATION INTO

CONCRETE UNO CONCRETE SHALL ATTAIN FULL DESIGN STRENGTH PRIOR TO INSTALLING SHOT

PINS.

SHOT PINS MAY BE DRIVEN INTO 8" NOMINAL MINIMUM THICKNESS FULLY GROUTED NORMAL-

WEIGHT CMU WITH TYPE S MORTAR AND MINIMUM F'M = 1500 PSI AT TIME OF INSTALLATION.

SHOT PINS MAY BE INSTALLED INTO THE FACE SHELLS, HORIZONTAL MORTAR JOINTS OR

VERTICALLY CENTERED IN THE TOP OF GROUTED CELLS. SHOT PINS SHALL NOT BE INSTALLED IN

VERTICAL MORTAR JOINTS OR WITHIN 1" OF VERTICAL MORTAR JOINTS. NO MORE THAN ONE

SHOT PIN MAY OCCUR IN AN INDIVIDUAL MASONRY UNIT CELL AND MUST BE INSTALLED A

MINIMUM OF 4" FROM THE EDGE OF THE WALL. SHOT PINS IN MORTAR JOINTS MUST BE A

MINIMUM OF 8" FROM THE END OF THE WALL AND SHALL HAVE A MINIMUM SPACING OF 8".

ALL SHOT PINS SHALL INCLUDE STANDARD HILTI STEEL WASHERS.

THE OPERATOR, TOOL, AND FASTENER SHALL BE PRE-QUALIFIED BY THE PROJECT INSPECTOR OF RECORD. SHOT PIN INSTALLERS SHALL BE CERTIFIED BY HILTI AND HAVE A CURRENT HILTI ISSUED

OPERATORS LICENSE. SHOT PIN INSTALLATION SHALL MEET ALL OSHA REQUIREMENTS.

1.

2.

3.

4.

5.

6.

7.

8.

9.

WINDOW SYSTEM DESIGN CRITERIA

100SN010-1

2015 IBC ULTIMATE WIND SPEED- 110 MPH EXPOSURE CATEGORY C.

ALL MULLIONS AND THEIR CONNECTIONS SHALL BE DESIGNED TO SPAN BETWEEN STRUCTURAL

SUPPORTS AS SHOWN ON DRAWINGS. VERIFY CEILING HEIGHTS WITH ARCHITECTURAL DRAWINGS.

ALL MULLIONS AND THEIR CONNECTIONS SHALL ALLOW FOR A RELATIVE MOVEMENT BETWEEN

STORIES OF NOT LESS THAN 1.5'' DUE TO SEISMIC LOADS.

SUBMIT COMPLETE SHOP DRAWINGS AND CALCULATIONS SIGNED BY A REGISTERED CALIFORNIA

CIVIL ENGINEER PRIOR TO FABRICATION.

DETAILS PROVIDED IN THESE DRAWINGS ARE FOR REFERENCE ONLY. WINDOW SYSTEM

MANUFACTURER SHALL DESIGN AND SUPPLY ALL CONNECTION MATERIALS (INCLUDING EMBEDDED

ITEMS, DIAGONAL BRACING ANGLES, BRACKETS, OUTRIGGERS, ETC.) AS REQUIRED FOR THE

SUPPORT OF THE WINDOW SYSTEM. EMBEDDED ITEMS SHALL BE INSTALLED BY THE GENERAL

CONTRACTOR.

1.

2.

3.

4.

HOLLOW CONCRETE UNIT MASONRY (BLOCK)

410SN001-1

ALL MASONRY SHALL BE MANUFACTURED AND PLACED IN ACCORDANCE WITH ACI 530,

"BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES", AND ACI 530.1 "SPECIFICATION

FOR MASONRY STRUCTURES".

MORTAR SHALL BE TYPE S PER ASTM C270.

GROUT SHALL BE PROPORTIONED TO ATTAIN A 28 DAY COMPRESSIVE STRENGTH OF 2000 PSI. NOT MORE THAN 5% OF THE PEA GRAVEL SHALL PASS THE NO. 8 SIEVE AND 100% SHALL PASS THE 3/8" SIEVE. WHEN REQUIRED, GROUT STRENGTH SHALL BE VERIFIED IN ACCORDANCE WITH SECTION

2105.2.2.1.2 OF THE IBC.

REINFORCING STEEL SHALL CONFORM TO ASTM A615 GRADE 60 FOR #4 AND LARGER, GRADE 40

FOR #3 AND SMALLER. REINFORCING STEEL THAT IS TO BE WELDED SHALL CONFORM TO ASTM

A706. CONTRACTOR SHALL SUBMIT REBAR MILL CERTIFICATES.

MINIMUM REBAR CLEARANCE TO FACE SHELL IS ONE BAR DIAMETER OR 1/2", WHICHEVER IS

GREATER. WHERE WALLS ARE EXPOSED TO EARTH OR WEATHER, A MINIMUM COVER FOR THE

REINFORCING BARS OF 2" SHALL BE MAINTAINED.

BEFORE BLOCK IS PLACED ON CONCRETE, THOROUGHLY CLEAN CONCRETE OF ALL LAITANCE AND

ALL LOOSE MATERIAL. ROUGHEN AS IN A CONCRETE CONSTRUCTION JOINT.

CONCRETE BLOCK MASONRY SHALL BE BUILT TO PRESERVE THE UNOBSTRUCTED VERTICAL

CONTINUITY OF THE CELLS. ALL HEAD AND END JOINTS SHALL BE SOLIDLY FILLED WITH MORTAR FOR A DISTANCE IN FROM THE FACE OF THE WALL OR UNIT NOT LESS THAN THE THICKNESS OF THE LONGITUDINAL FACE SHELLS. BOND SHALL BE PROVIDED BY LAPPING SUCCESSIVE COURSES

OR BY EQUIVALENT MECHANICAL ANCHORAGE.

VERTICAL CELLS SHALL HAVE VERTICAL ALIGNMENT SUFFICIENT TO MAINTAIN A CLEAR

UNOBSTRUCTED CONTINUOUS VERTICAL CELL.

GROUT PLACEMENT SHALL CONFORM TO ACI 530.1 SECTION 3.5.

CLEAN OUT OPENINGS SHALL BE PROVIDED AT THE BOTTOMS OF ALL CELLS TO BE FILLED AT

EACH LIFT OR POUR OF GROUT WHERE SUCH LIFT OR POUR OF GROUT IS IN EXCESS OF 5'-4" IN HEIGHT, IN ACCORDANCE WITH ACI 530.1 SECTION 3.2F. ANY OVERHANGING MORTAR OR OTHER

OBSTRUCTION OR DEBRIS SHALL BE REMOVED FROM INSIDE OF SUCH CELLS. THE CLEAN OUTS

SHALL BE SEALED AFTER INSPECTION AND BEFORE GROUTING. MECHANICALLY VIBRATE ALL

GROUT POURS.

VERTICAL REINFORCING SHALL BE HELD IN POSITION AT TOP AND BOTTOM AND AT INTERVALS NOT

TO EXCEED 192 BAR DIAMETERS.

THOROUGHLY CLEAN ALL CELLS AND BOND BEAMS OF MORTAR BEFORE GROUTING.

ALL CELLS SHALL BE FILLED SOLIDLY WITH GROUT. ALL GROUTING SHALL BE DONE UNDER THE

OBSERVATION OF A QUALIFIED INSPECTOR WHERE INDICATED ON PLANS. REFER TO SPECIAL

STRUCTURAL INSPECTION SECTION OF THESE NOTES FOR FREQUENCY OF GROUTING

INSPECTION.

WHEN GROUTING IS STOPPED FOR ONE HOUR OR LONGER, HORIZONTAL CONSTRUCTION JOINTS,

OR KEYS, SHALL BE FORMED BY STOPPING THE POUR OF GROUT 1-1/2" BELOW THE TOP OF THE

UPPERMOST UNIT.

EVERY VERTICAL BAR IN WALLS SHALL BE LAPPED PER THE TABLE BELOW WITH A DOWEL OF THE SAME SIZE EXTENDING FROM THE FOUNDATION. LOCATE VERTICAL REINFORCING AT CENTERLINE

OF WALL UNLESS SHOWN OR NOTED OTHERWISE. CARRY EACH DOWEL TO WITHIN 3" OF THE

BOTTOM OF THE FOUNDATION AND TERMINATE WITH 90 DEGREE HOOK. DOWELS SHALL BE

STRAIGHT AND PLUMB.

ALL EMBEDDED ITEMS (BOLTS, STRAPS, ETC.) SHALL BE SECURED IN PLACE PRIOR TO GROUTING.

CUT A HOLE IN THE FACE SHELL TO ATTAIN A MINIMUM OF 1/2" GROUT ALL AROUND EMBEDDED ITEMS AT THE FACE SHELL. WITHIN THE CELL OF THE UNIT, PROVIDE A MINIMUM OF 8" OF GROUT

AROUND EMBEDDED ITEMS. AT HORIZONTAL ANCHOR INSTALLATIONS, MAINTAIN A MINIMUM

CLEAR DISTANCE OF 1/2" BETWEEN END OF ANCHOR AND FACE SHELL OF UNIT.

SINGLE CONDUITS (3/4" MAX) MAY BE PLACED IN VERTICAL CELLS NOT CONTAINING VERTICAL.

REBAR. NO HORIZONTAL CONDUITS ALLOWED IN WALL CONSTRUCTION.

ANCHOR BOLTS CAST IN MASONRY SHALL BE HEADED BOLTS WITH CUT THREADS CONFORMING

TO ASTM F1554 GRADE 36, OR ASTM A307 GRADE A, UNO. BENT BAR ANCHOR BOLTS ARE NOT

PERMITTED.

USE OPEN END BLOCK FOR ALL CONSTRUCTION NOT LAID IN RUNNING BOND.

ALL REBAR SHALL BE LAP SPLICED AND DEVELOPED AS FOLLOWS (UNO). WHERE EPOXY COATED REBAR IS USED, MULTIPLY LAP LENGTHS BY 1.5. BARS LARGER THAN #8 ARE TO BE LAPPED WITH MECHANICAL SPLICES THAT DEVELOP AT LEAST 125 PERCENT OF THE YIELD STRENGTH OF THE BAR.

1.

5.

6.

7.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

CMU SLICE & DEVELOPMENT LENGTHS (F'M = 2000 PSI)

BAR

SIZE

FY

(KSI)

6" CMU

CENTER

40#3

60#4

#5

#6

#7

#8

1.0

1.0

1.0

1.3

1.3

1.5 γ E.F.

8" CMU

CENTER E.F.

10" CMU

CENTER E.F.

12" CMU

CENTER

14"

18"

22"

38"

52"

E.F.

14"

22"

35"

54"

63"

VERTICAL REINFORCING SHALL CONSIST OF #5 BARS AT 16" ON CENTER, LOCATED AT EACH FACE OF MASONRY WALL, UNO. LOCATE BARS AT ALL CORNERS, WALL ENDS, INTERSECTIONS, JAMBS AND AT EACH SIDE OF A WALL JOINT. LOCATE BARS OR ADD ADDITIONAL BARS DIRECTLY UNDER

FRAMING MEMBERS SUCH AS BEAMS, JOISTS, GIRDERS, AND TRUSSES WHERE CENTER TO

CENTER SPACING OF FRAMING MEMBERS EXCEED 48" CC. DOWELS WITH STANDARD 90° HOOKS

INTO THE FOUNDATION SHALL MATCH AND LAP VERTICAL REINFORCING, TYPICAL, UNLESS NOTED

OTHERWISE.

8.

INTERMEDIATE HORIZONTAL REINFORCING SHALL CONSIST OF #4 BARS AT 24" ON CENTER, LOCATED

AT THE CENTER OF THE MASONRY WALL, UNO. LOCATE TWO (2) #5 HORIZONTAL BARS AT ALL

ELEVATED FRAMING ASSEMBLIES, SUCH AS ROOFS, FLOORS, AND STAIRS. ALSO, LOCATE ONE #5 HORIZONTAL BAR AT TOPS OF PARAPETS, TOPS OF FREE-STANDING WALLS, AT THE BOTTOM OF ALL WALLS, AND ALIGNED WITH THE SLAB-ON-GRADE. PLACE A #5 BAR AT EACH FACE OF THE MASONRY WALL ABOVE AND BELOW ALL WALL OPENINGS, UNO. EXTEND THESE BARS A MINIMUM OF A LAP LENGTH PAST THE EDGE OF THE OPENING. WHERE EXTENSION CAN NOT BE ACHIEVED, BEND BARS

UP OR DOWN FOR A DISTANCE EQUAL TO THE SPECIFIED LAP LENGTH.

9.

PLACE ALL HORIZONTAL BARS IN BOND BEAM UNITS. WHEN 2 BARS ARE USED, STAGGER LAPS

MINIMUM OF 5'-0".

10.

72" 72"

CMU SLICE & DEVELOPMENT LENGTHS (F'M = 1500 PSI)

BAR

SIZE

FY

(KSI)

6" CMU

CENTER

40#3

60#4

#5

#6

#7

#8

1.0

1.0

1.0

1.3

1.3

1.5 γ E.F.

8" CMU

CENTER E.F.

10" CMU

CENTER E.F.

12" CMU

CENTER

16"

21"

26"

43"

60"

E.F.

16"

26"

40"

54"

63"

72" 72"

16"

21"

26"

43"

60"

16"

26"

40"

54"

63"

72"

16"

21"

26"

43"

60"

16"

26"

40"

54"

16"

21"

32"

54"

14"

18"

28"

53"

14"

18"

22"

38"

52"

14"

22"

35"

54"

14"

18"

22"

38"

52"

14"

22"

35"

54"

63"

72"

CONCRETE BLOCK UNITS SHALL CONFORM TO ASTM C90 . F'M = 1500 PSI. F'M SHALL BE

VERIFIED IN ACCORDANCE WITH SECTION 2105.2.2.1.2 OF THE IBC. CONCRETE BLOCK UNITS

SHALL BE MEDIUM WEIGHT. ALL MASONRY CONSTRUCTION IS TO BE GROUTED SOLID.

4.

MASONRY UNITS AND COMPONENTS THAT ARE DAMAGED ARE NOT TO BE INSTALLED IN THIS

PROJECT. REINFORCEMENTS AND ACCESSORIES ARE NOT TO BE STORED ON THE GROUND

AND ARE TO BE PROTECTED FROM PERMANENT DISTORTIONS.

2.

WHEN THE AMBIENT AIR TEMPERATURE IS BELOW 40°F, THE COLD WEATHER PROCEDURES

FROM ACI 530.1, ARTICLE 1.8C ARE TO BE IMPLEMENTED. WHEN THE AMBIENT AIR

TEMPERATURE IS ABOVE 90°F, THE HOT WEATHER PROCEDURES FROM ACI 530.1, ARTICLE 1.8D

ARE TO BE IMPLEMENTED.

3.

DEFERRED APPROVALS

100SN007-1

THE FOLLOWING ITEMS REQUIRE DEFERRED APPROVAL FROM THE ENFORCEMENT AGENCY:

ELEVATOR

ARCHITECTURAL PRECAST OR GFRC PANELS AND CONNECTIONS

SKYLIGHTS

WINDOW WALL/STORE FRONT SYSTEMS

PREFABRICATED METAL STAIRS AND CONNECTIONS TO THE STRUCTURE

FIRE SPRINKLER SUPPORT

EQUIPMENT STRUCTURAL ANCHORAGE

VIBRATION ISOLATION FOR MEDICAL EQUIPMENT

PREFABRICATED BLEACHERS AND BASKETBALL BACKBOARD ASSEMBLY

EXTERIOR BUILDING MAINTENANCE OR FALL RESTRAINT/ FALL ARREST EQUIPMENT

PREFABRICATED LIGHT GAGE STEEL OR WOOD TRUSSES

PROPRIETARY DEEP FOUNDATION SYSTEMS

THE DESIGN OF THE ABOVE ITEMS IS BY THE CONTRACTOR/MANUFACTURER.

CONTRACTOR/MANUFACTURER MUST PREPARE ALL NECESSARY CALCULATIONS AND DRAWINGS PER

THE INTERNATIONAL BUILDING CODE UNDER THE SUPERVISION OF A CIVIL ENGINEER, REGISTERED IN CALIFORNIA, AND SHALL OBTAIN ALL NECESSARY PLAN CHECK APPROVALS FROM THE ENFORCEMENT

AGENCY.

INSTALLATION OF THE ABOVE ITEMS SHALL NOT BE STARTED UNTIL DETAILED PLANS,

SPECIFICATIONS AND ENGINEERING CALCULATIONS HAVE BEEN REVIEWED BY THE ARCHITECT OR

STRUCTURAL ENGINEER OF RECORD, AND APPROVED BY THE VA.

1.

2.

3.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

S

S TA TE O F CA L I FO R N I A

STRUCTURAL

R

EFORP

DERETSIGE

S I N

ENGINEER

O AL

5 THIRD STREET, SUITE 1125

SAN FRANCISCO, CA 94103

415 495 1635

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 on e ei gh t i nc h o ne fo ot on e qu ar te r in ch o ne fo ot th re e ei gh ts in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot

VA FORM 08-6231

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Drawing Title: Project Title: Project Number:

Building Number:

Drawing Number:Location

Date Checked Drawn

Office of Construction and Facilities Management

DRAFT DOCUMENTS

NOT FOR CONSTRUCTION

Dwg. of04/04/2018

VA MEDICAL CENTER, MATHER, CA 95655

-K F DAVIS ENGINEERING, INC

530 LA GONDA WAY, SUITE E,

DANVILLE, CA 94526

WWW.KFDE.COM

(925) 743-8884

DAC MAR

DREW A.

CHALSTROM

No. 4670

DESIGN EYE CLINIC

MINOR

SS001

STRUCTURAL GENERAL NOTES

612-161

APPLICABLE TO ALL DRAWINGS UNLESS NOTED OR SHOWN OTHERWISE

GENERAL NOTES

01/03/2019

STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS AND TESTING

110IN001-1

SPECIAL INSPECTIONS AND TESTING SHALL BE PROVIDED BY A TESTING AND INSPECTION AGENCY, EMPLOYED BY THE CONTRACTOR, AND APPROVED BY THE VA TO PROVIDE SPECIAL INSPECTIONS

AND TESTING FOR THE PARTICULAR TYPE OF CONSTRUCTION.

FREQUENCY OF SPECIAL INSPECTIONS AND TESTING SHALL BE, AT A MINIMUM, AS NOTED FOR THE INDIVIDUAL ELEMENTS WITHIN THE TABLES BELOW. THE CONTRACTOR SHALL COORDINATE TIMING OF

SPECIAL INSPECTIONS AND TESTING WITH THE SPECIAL INSPECTION AND TESTING AGENCY,

SPECIAL INSPECTION IS REQUIRED FOR ALL SHOP FABRICATED MEMBERS OR ASSEMBLIES UNLESS

WAIVED PER THE EXCEPTIONS IN IBC SECTION 1704.2.5.

THE TESTING AND INSPECTION AGENCY SHALL SUBMIT REPORTS OF SPECIAL INSPECTIONS AND TESTS TO THE VA, STRUCTURAL ENGINEER OF RECORD AND THE CONTRACTOR, PER IBC SECTION

1704.2.4. THE REPORTS SHALL INDICATE WHETHER WORK INSPECTED OR TESTED CONFORMED TO

THE APPROVED CONSTRUCTION DOCUMENTS. ANY DISCREPANCIES SHALL BE IMMEDIATELY

BROUGHT TO THE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF DISCREPANCIES ARE

NOT CORRECTED, THEY SHALL BE BROUGHT TO THE ATTENTION OF THE VA AND THE STRUCTURAL

ENGINEER OF RECORD.

SPECIAL INSPECTIONS AND TESTING ARE REQUIRED FOR THE LATERAL FORCE-RESISTING SYSTEM

(LFRS) AND SHALL BE PROVIDED FOR ALL COMPONENTS AND CONNECTIONS ASSOCIATED WITH

THE DESCRIPTION BELOW. SPECIAL INSPECTIONS AND TESTING FOR THE LFRS SHALL BE PER THE LFRS TABLES ABOVE, AND ARE IN ADDITION TO ALL OTHER REQUIRED INSPECTIONS AND TESTING.

IF NO LFRS TABLES ARE INCLUDED, INSPECTIONS AND TESTING FOR THE LFRS ITEMS NOTED SHALL

BE PER THE TYPICAL MATERIAL TABLES.

SPECIAL INSPECTION AND TESTING RECORDS SHALL BE RETAINED BY THE CONTRACTOR ON SITE

UNTIL COMPLETION OF CONSTRUCTION.

THE CONTRACTOR SHALL SUBMIT A WRITTEN STATEMENT TO THE VA ACKNOWLEDGING

RESPONSIBILITY FOR CONSTRUCTION OF THE MAIN LATERAL-FORCE RESISTING SYSTEM PRIOR TO

COMMENCEMENT OF THAT WORK AS REQUIRED BY IBC SECTION 1704.4.

ALL SOILS AND FOUNDATION EXCAVATION INSPECTIONS SHALL BE BY THE GEOTECHNICAL ENGINEER

OF RECORD, OR A GEOTECHNICAL FIRM HIRED BY THE VA PER IBC SECTION 1705.6.

1.

3.

5.

10.

6.

7.

9.

13.

PRIOR TO THE START OF CONSTRUCTION, THE TESTING AND INSPECTION AGENCY SHALL PROVIDE

DOCUMENTATION TO THE VA DEMONSTRATING COMPETENCE AND RELEVANT EXPERIENCE OR

TRAINING OF THE SPECIAL INSPECTORS WHO WILL PERFORM THE SPECIAL INSPECTIONS AND TESTS

DURING CONSTRUCTION, IN ACCORDANCE WITH IBC SECTION 1704.2.1.

4.

THE TESTING AGENCY SHALL SUBMIT TO THE VA, A FINAL REPORT DOCUMENTING SPECIAL

INSPECTIONS AND TESTS PER IBC SECTION 1704.2.4, AND REPORTS AND CERTIFICATES PER IBC

SECTION 1704.5.

8.

DEFINITIONS:11.

CONTINUOUS - SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS CONTINUOUSLY

PRESENT WHEN AND WHERE THE WORK TO BE INSPECTED IS BEING PERFORMED.

A.

PERIODIC - SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS INTERMITTENTLY PRESENT

WHERE THE WORK TO BE INSPECTED HAS BEEN OR IS BEING PERFORMED.

B.

OBSERVE (O) - OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED

PENDING THESE INSPECTIONS.

E.

PERFORM (P) - PERFORM THOSE TASKS PRIOR TO FINAL ACCEPTANCE FOR EACH ITEM OR

ELEMENT.

F.

DOCUMENT (D) - THE INSPECTOR SHALL PREPARE REPORTS INDICATING THAT THE WORK

HAS BEEN PERFORMED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE REPORT

NEED NOT PROVIDE DETAILED MEASUREMENTS FOR JOINT FIT-UP, WPS SETTINGS,

COMPLETED WELDS, OR OTHER INDIVIDUAL ITEMS LISTED IN THE TABLES. FOR SHOP

FABRICATION, THE REPORT SHALL INDICATE THE PIECE MARK OF THE PIECE INSPECTED. FOR

FIELD WORK, THE REPORT SHALL INDICATE THE REFERENCE GRID LINES AND FLOOR OR

ELEVATION INSPECTED. WORK NOT IN COMPLIANCE WITH THE CONTRACT DOCUMENTS AND

WHETHER THE NONCOMPLIANCE HAS BEEN SATISFACTORILY REPAIRED SHALL BE NOTED IN

THE INSPECTION REPORT.

G.

TABLES OF SPECIAL INSPECTIONS AND TESTING ARE DERIVED FROM THE STRUCTURAL PROVISIONS OF THE IBC AND REFERENCED STANDARDS AND ARE FOR REFERENCE ONLY. THE INCLUDED TABLES ARE PROVIDED FOR THE CONVENIENCE OF THE VA, TESTING AGENCY AND CONTRACTOR IN DEVELOPING THE

SCOPE OF WORK FOR REQUIRED TESTING AND INSPECTION OF STRUCTURAL MATERIALS AND

COMPONENTS. FINAL DEFINITION OF THIS SCOPE OF WORK IS TO BE DETERMINED BY THE TESTING

AGENCY AND THE VA (OR VA'S AUTHORIZED AGENT).

2.

QUALITY ASSURANCE (QA) - MONITORING AND INSPECTION TASKS PERFORMED BY AN AGENCY OR

FIRM OTHER THAN THE FABRICATOR OR ERECTOR TO ENSURE THAT THE MATERIAL PROVIDED

AND WORK PERFORMED BY THE FABRICATOR AND ERECTOR MEET THE REQUIREMENTS OF THE

APPROVED CONSTRUCTION DOCUMENTS AND REFERENCED STANDARDS. QUALITY ASSURANCE

INCLUDES THOSE TASKS DESIGNATED 'SPECIAL INSPECTION' BY THE APPLICABLE CODE.

C.

QUALITY CONTROL (QC) - CONTROLS AND INSPECTIONS IMPLEMENTED BY THE FABRICATOR OR

ERECTOR, AS APPLICABLE, TO ENSURE THAT THE MATERIAL PROVIDED AND WORK PERFORMED

MEET THE REQUIREMENTS OF THE APPROVED CONSTRUCTION DOCUMENTS AND REFERENCED

STANDARDS.

D.

LFRS DESCRIPTION: CONCRETE OVER METAL DECK FLOOR AND ROOF, WF BEAMS AND GIRDERS,

STEEL BRACED FRAMES, BRACED FRAME ANCHOR BOLTS AND FOUNDATIONS.

SPECIAL INSPECTIONS AND TESTING SHALL BE PERFORMED DURING CONSTRUCTION ON THE WORK SHOWN IN THE CONSTRUCTION DOCUMENTS AS REQUIRED BY IBC CHAPTER 17, THE TABLES LISTED BELOW, AND THE JURISDICTION'S SPECIAL INSPECTION AND TESTING FORM. IF DISCREPANCIES ARE NOTED, CONTACT THE SEOR. ALL EXCEPTIONS INCLUDED IN IBC CHAPTER 17 ARE PERMITTED TO BE

USED.

12.

LFRS (SEE NOTE #13)

SOILS

CONCRETE CONSTRUCTION

CONCRETE CONSTRUCTION (POST-INSTALLED ANCHORS)

MASONRY CONSTRUCTION - LEVEL B

STEEL CONSTRUCTION - WELDING INSPECTION

STEEL CONSTRUCTION - WELDING TESTING

STEEL CONSTRUCTION - BOLTING

STEEL COMPOSITE CONSTRUCTION

COLD-FORMED STEEL DECK

STRUCTURAL STEEL LFRS - WELDING INSPECTIONS

STRUCTURAL STEEL LFRS - WELDING TESTING

STRUCTURAL STEEL LFRS BOLTING

STRUCTURAL STEEL LFRS COMPOSITE CONSTRUCTION

LFRS DETAILS: SS401 (ALL DETAILS), SS402 (ALL DETAILS), 5/SS502

TYPE

SOILS - REQUIRED SPECIAL INSPECTIONS AND TESTS

110IN201-1

CONTINUOUS PERIODIC

1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE

TO ACHIEVE THE DESIGN BEARING CAPACITY.

- X

2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE

REACHED PROPER MATERIAL.

- X

3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL

MATERIALS.

- X

4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES

DURING PLACEMENT AND COMPACTION OF COMPACTED FILL.

X -

5. PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND

VERIFY THAT SITE HAS BEEN PREPARED PROPERLY.

- X

IBC TABLE 1705.6

TYPE

CONCRETE CONSTRUCTION - REQUIRED SPECIAL INSPECTIONS AND TESTS

110IN301-1

CONTINUOUS REFERENCED STANDARDPERIODIC

1. INSPECT REINFORCEMENT, INCLUDING

PRESTRESSING TENDONS, AND VERIFY

PLACEMENT.

ACI 318 CH. 20, 25.2, 25.3,

26.5.1-26.5.3

- X

2. REINFORCING BAR WELDING: AWS D.14

ACI 318: 26.5.4

A. VERIFY WELDABILITY OF REINFORCING

BARS OTHER THAN ASTM A706

B. INSPECT SINGLE-PASS FILLET WELDS,

MAXIMUM 5/16"

C. INSPECT ALL OTHER

WELDS

- X

- X

X -

3. INSPECT ANCHORS CAST IN CONCRETE. X - ACI 318: 17.8.2

4. INSPECT ANCHORS POST-INSTALLED IN

HARDENED CONCRETE MEMBERS.

ACI 318: 17.8.2.4, 17.8.2

A. ADHESIVE ANCHORS INSTALLED IN

HORIZONTALLY OR UPWARDLY INCLINED

ORIENTATIONS TO RESIST SUSTAINED

TENSION LOADS.

X -

B. MECHANICAL ANCHORS AND ADHESIVE

ANCHORS NOT DEFINED IN 4.A.

- X

5. VERIFY USE OF REQUIRED DESIGN MIX. ACI 318: CH. 19, 26.4.3,

26.4.4

- X

6. PRIOR TO CONCRETE PLACEMENT,

FABRICATE SPECIMENS FOR STRENGTH

TESTS, PERFORM SLUMP AND AIR

CONTENT TESTS, AND DETERMINE THE

TEMPERATURE OF THE CONCRETE.

ASTM C172

ASTM C31

ACI 318: 26.4.5, 26.12

X -

7. INSPECT CONCRETE AND SHOTCRETE

PLACEMENT FOR PROPER APPLICATION

TECHNIQUES.

ACI 318: 26.4.5- X

8. VERIFY MAINTENANCE OF SPECIFIED

CURING TEMPERATURE AND TECHNIQUES.

ACI 318: 26.5.3- X

9. VERIFY IN-SITU CONCRETE STRENGTH,

PRIOR TO STRESSING OF TENDONS IN

POST-TENSIONED CONCRETE AND PRIOR

TO REMOVAL OF SHORES AND FORMS

FROM BEAMS AND STRUCTURAL SLABS.

ACI 318: 26.10.2- X

10. INSPECT FORMWORK FOR SHAPE,

LOCATION AND DIMENSIONS OF THE

CONCRETE MEMBER BEING FORMED.

ACI 318: 26.11- X

IBC TABLE 1705.3

A

B

A. WHERE APPLICABLE, SEE ALSO SECTION 1705.12, SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE.

B. SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH REPORT FOR THE ANCHOR ISSUED BY AN APPROVED SOURCE IN ACCORDANCE WITH 17.8.2 IN ACI 318, OR

OTHER QUALIFICATION PROCEDURES. WHERE SPECIFIC REQUIREMENTS ARE NOT PROVIDED,

SPECIAL INSPECTION REQUIREMENTS SHALL BE SPECIFIED BY THE REGISTERED DESIGN

PROFESSIONAL AND SHALL BE APPROVED BY THE VA PRIOR TO COMMENCEMENT OF THE WORK.

INSPECTION TASK

MASONRY CONSTRUCTION - LEVEL B REQUIRED SPECIAL INSPECTIONS AND TESTS

110IN402-1

CONTINUOUS TMS 402/

ACI 530/

ASCE 5

PERIODIC

1. VERIFY COMPLIANCE WITH THE

APPROVED SUBMITTALS

- X

2. AS MASONRY CONSTRUCTION BEGINS,

VERIFY THAT THE FOLLOWING ARE IN

COMPLIANCE

A. PROPORTIONS OF SITE-PREPARED

MORTAR

B. CONSTRUCTION OF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .