This solicitation notice seeks statements of qualifications from architecture and engineering firms for design services related to an eye clinic expansion project at a Veterans Affairs medical center in California. Firms must submit an SF-330 by December 1st, 2021 for consideration. The selected firm will provide investigative and feasibility design, schematic designs, design development drawings, construction documents, and construction period services for the expansion and relocation of an 11,500 square foot eye clinic using previous 95% design plans as a basis for modification. The project budget for design services is $716,853 and the anticipated period of performance for design is 400 calendar days from notice to proceed. The selection process will include an initial evaluation of SF-330s followed by interview presentations for the top three shortlisted firms. The solicitation is designated as a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
A
D
I E
T D
S T N
U
E T
M
AP
R
E NT O
S
A
T SE FO
R E
M
A
CI
N
VE RA
TE
A
FA
I R
F S
F
A
D
I
E
T
D S T
N U
E T
M
AP
R
E NT O
S
A
T SE FO
R E
M
A
CI
N
VE RA
TE
A
FA
I R F
S DESIGN EYE CLINIC MINOR
PROJECT NO. : 612-161
VA MATHER NORTHERN CALIFORNIA HEALTHCARE
SYSTEM
MATHER, CALIFORNIA
COVER SHEET
SITE MAP
VICINITY MAP
SCALE: NTS
SCALE: NTS
95% CD SUBMITTAL
PROJECT
NORTH
NORTH
PROJECT
LOCATION
NORTHEAST 3D VIEW
NORTHWEST 3D VIEW
BID ADDITIVES:
BID ADDITIVE #1
IN LIEU OF THE ENLARGED FITTING DISPLAY RM#
1B03 AT THE FIRST FLOOR AND THE STOREROOM
RM#2BC1A AT THE SECON FLOOR ADD AN
ELEVATOR AND ALL OF THE ELEVATOR
ASSOCIATED COMPONENTS. SEE GI101 FOR
REFERENCE.
BID ADDITIVE #2
ADD SINKS IN ROOMS: 2B12, 2B16, 2B17 AND 2B18.
BID ADDITIVE #3
ADD CASEWORK IN ROOMS: 1B03, 1B04, 1B05, 1B06,
1B11,1B12, 1B13, 1B14, 1B15, 1B16, 1B17 AND AT
CHECK-IN/CHECK-OUT 1B02.
BID ADDITIVE #4
ADD THREE (3) CUSTOM VETERAN THEMED BRONZE
STATUES, MINIMUN 10'-0" HIGH ON 3'-0" HIGH
CONCRETE PEDESTAL. SUBMIT DESIGN TO VA FOR
APPROVAL PRIOR TO FABRICATION.
BID ADDITIVE #5
ADD EXTERIOR LANDSCAPING AND IRRIGATION PER
L.1.1, L.2.1, L.3.1 AND L.3.2
BID ADDITIVE #6
ADD CUSTOM 12'-0" DIAMETER TWO TIER CUSTOM
BUILT STONE FOUNTAN. SUBMIT DESIGN TO VA FOR
APPROVAL PRIOR TO FABRICATION.
BID ADDITIVE #7
ADD 3 X 3 STONE PAVERS IN LIEU OF CONCRETE
SIDEWALK AND FLATWORK. SUBMIT DESIGN TO VA
FOR APPROVAL PRIOR TO FABRICATION.
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t o n e i n c h o n e f o o t
VA FORM 08-6231
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title: Project Title: Project Number:
Building Number:
Drawing Number:Location
Date Checked Drawn
Office of Construction and Facilities Management
DRAFT DOCUMENTS
NOT FOR CONSTRUCTION
Dwg. of01/03/2019
VA MEDICAL CENTER, MATHER, CA 95655
643K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
1/11/2019 1:13:20 PMH:\Revit User Files\2018\MATHER - EYE CLINIC - 9TH SUBMITTAL - CD SUBMITTAL - CENTRAL_IValdovinos.rvt
DESIGN EYE CLINIC
MINOR
I. VALDOV
GI100
COVER SHEET
J.ROBERTS
612-161
I. VALDOV
1ST SUBMITTAL - BLOCK PLANS 08-14-16
2ND SUBMITTAL - BLOCK PLANS 08-29-16
3RD SUBMITTAL - BLOCK PLANS 11-04-16
4TH SUBMITTAL - SCHEMATIC DESIGN 04-13-17
6TH SUBMITTAL - FINAL FLOOR PLAN APPROVAL 11-07-17
7TH SUBMITTAL - FINAL FLOOR PLAN APPROVAL 12-11-17
8TH SUBMITTAL - DESIGN DEVELOPMENT 04-04-18
9TH SUBMITTAL - 95% SUBMITTAL 01-03-19
SHEET INDEX
SHEET
NO. SHEET NAME
PL102 PLUMBING FIRST FLOOR PLAN - DRAINAGE PIPING
PL103 PLUMBING SECOND FLOOR PLAN - WATER PIPING
PL104 PLUMBING SECOND FLOOR PLAN - DRAINAGE PIPING
PL105 PLUMBING ROOF PLAN
PL501 PLUMBING SCHEDULES
PL502 PLUMBING DIAGRAMS AND DETAILS
PL503 PLUMBING DIAGRAMS AND DETAILS
PL601 DIAGRAM - DWV PIPING
PL602 DIAGRAM - DWV PIPING
PL603 DIAGRAM - WATER PIPING (FIRST FLOOR)
PL604 DIAGRAM - WATER PIPING (SECOND FLOOR)
M001 MECHANICAL GENERAL NOTES, LEGEND AND
ABBREVIATIONS
MH201 MECHANICAL SCHEDULES
MH202 MECHANICAL SCHEDULES
MH203 MECHANICAL SCHEDULES
MH204 MECHANICAL SCHEDULES
MH301-1 MECHANICAL FIRST FLOOR ENLARGED PLAN - EAST
MH301-2 MECHANICAL FIRST FLOOR ENLARGED PLAN - WEST
MH302-1 MECHANICAL SECOND FLOOR ENLARGED PLAN - EAST
MH302-2 MECHANICAL SECOND FLOOR ENLARGED PLAN - WEST
MH303-1 MECHANICAL ROOF LEVEL ENLARGED PLAN - EAST
MH401-1 MECHANICAL FIRST FLOOR ENLARGED PIPING PLANS -
EAST
MH401-2 MECHANICAL FIRST FLOOR ENLARGED PIPING PLANS -
WEST
MH402-1 MECHANICAL SECOND FLOOR ENLARGED PIPING PLANS -
EAST
MH402-2 MECHANICAL SECOND FLOOR ENLARGED PIPING PLANS -
WEST
MH403-1 MECHANICAL ROOF LEVEL ENLARGED PIPING PLAN - EAST
MH502 MECHANICAL HEATING HOT WATER PRIMARY / SECONDARY
SYSTEM
MH503 MECHANICAL AIR SIDE P & ID
MH504 MECHANICAL VARIABLE AIR VOLUME AIR HANDLING UNIT
DIAGRAM
MH601 MECHANICAL DETAILS
MH602 MECHANICAL DETAILS
MH603 MECHANICAL DETAILS
E001 ELECTRICAL GENERAL NOTES, LEGEND AND
ABBREVIATIONS
EL111-1 ELECTRICAL LIGHTING PLAN - PARTIAL FIRST FLOOR - EAST
EL111-2 ELECTRICAL LIGHTING PLAN - PARTIAL FIRST FLOOR - WEST
EL112-1 ELECTRICAL LIGHTING PLAN - PARTIAL SECOND FLOOR -
EAST
EL112-2 ELECTRICAL LIGHTING PLAN - PARTIAL SECOND FLOOR -
WEST
EL113 ELECTRICAL LIGHTING PLAN - ROOF
EP120 ELECTRICAL POWER AND GROUNDING SITE PLAN
EP121-1 ELECTRICAL POWER PLAN - PARTIAL FIRST FLOOR - EAST
EP121-2 ELECTRICAL POWER PLAN - PARTIAL FIRST FLOOR - WEST
EP122-1 ELECTRICAL POWER PLAN - PARTIAL SECOND FLOOR -
EAST
EP122-2 ELECTRICAL POWER PLAN - PARTIAL SECOND FLOOR -
WEST
EP131-1 ELECTRICAL MECHANICAL PLUMBING AND HVAC POWER
PLAN - FIRST FLOOR - EAST
EP131-2 ELECTRICAL MECHANICAL PLUMBING AND HVAC POWER
PLAN - FIRST FLOOR - WEST
EP132-1 ELECTRICAL MECHANICAL PLUMBING AND HVAC POWER
PLAN - SECOND FLOOR - EAST
EP132-2 ELECTRICAL MECHANICAL PLUMBING AND HVAC POWER
PLAN - SECOND FLOOR - WEST
EP133 ELECTRICAL MECHANICAL POWER PLAN - ROOF
EP134 ELECTRICAL FIRST FLOOR EYE CLINIC CONDUIT ROUTING
PLAN
EP601 ELECTRICAL POWER SINGLE LINE DIAGRAM
EP701 ELECTRICAL LIGHTING SCHEDULE
EP702 ELECTRICAL PANEL SCHEDULES AND SINGLE LINE
DIAGRAM
EP703 ELECTRICAL PANEL SCHEDULES
EP801 ELECTRICAL DETAILS
EP802 ELECTRICAL DETAILS
EP803 ELECTRICAL DETAILS
SHEET INDEX
SHEET
NO. SHEET NAME
GI100 COVER SHEET
GI100-1 APPROVALS
GI101 PROJECT AREAS BID ADDITIVES
GI200 GENERAL PROJECT NOTES
GC001 FIRST FLOOR EXIT PLAN AND CODE DATA
GC002 SECOND FLOOR EXIT PLAN AND CODE DATA
C101 SITE DETAILS
C102 SITE LAYOUT, DIMENSION, SIGNING, AND STRIPING PLAN
CD101 DEMOLITION PLAN
CEC101 EROSION CONTROL PLAN
CG101 GRADING PLAN
CS101 OVERALL SITE PLAN
CU101 UTILITY PLAN
L1.1 PLANTING PLAN
L2.1 IRRIGATION PLAN
L3.1 LANDSCAPE DETAILS
L3.2 LANDSCAPE DETAILS, WELO NOTES AND CALCULATIONS
SS001 STRUCTURAL GENERAL NOTES
SS002 STRUCTURAL GENERAL NOTES
SS003 TYPICAL CONCRETE DETAILS
SS004 TYPICAL EXTERIOR METAL STUD DETAILS
SS005 TYPICAL INTERIOR METAL STUD DETAILS
SS006 TYPICAL METAL STUD DETAILS
SS007 TYPICAL METAL STUD DETAILS
SS201 FOUNDATION PLAN
SS202 2ND FLOOR FRAMING PLAN
SS203 ROOF FRAMING PLAN
SS301 SECTIONS
SS302 SECTIONS
SS303 SECTIONS
SS401 BRACED FRAME ELEVATIONS
SS402 SPECIAL CONCENTRIC BRACED FRAME DETAILS
SS403 SPECIAL CONCENTRIC BRACED FRAME DETAILS
SS501 TYPICAL SHEET DETAILS
SS502 TYPICAL SHEET DETAILS
SS503 TYPICAL SHEET DETAILS
SS504 TYPICAL METAL DECK DETAILS
SS505 TYPICAL METAL DECK DETAILS
SS506 STAIR AND MISC DETAILS
A001 ARCHITECTURAL GENERAL NOTES, LEGEND AND
ABBRREVIATIONS
AS101 ARCHITECTURAL SITE PLAN
AE101 ARCHITECTURAL FIRST FLOOR PLAN
AE101-1 ARCHITECTURAL FIRST FLOOR ENLARGED PLAN-EAST
AE101-2 ARCHITECTURAL FIRST FLOOR ENLARGED PLAN-WEST
AE102 ARCHITECTURAL SECOND FLOOR PLAN
AE102-1 ARCHITECTURAL SECOND FLOOR ENLARGED PLAN-EAST
AE102-2 ARCHITECTURAL SECOND FLOOR ENLARGED PLAN-WEST
AE103 ARCHITECTURAL REFLECTED CEILING PLANS
AE104 ARCHITECTURAL ROOF PLAN
AE105 ARCHITECTURAL ENLARGED STAIR PLANS
AE106-1 ARCHITECTURAL SIGNAGE PLAN
AE106-2 ARCHITECTURAL SIGNAGE PLAN
AE107 FINISH FLOOR PLAN
AE201 ARCHITECTURAL EXTERIOR ELEVATIONS
AE301 ARCHITECTURAL BUILDING SECTIONS
AE302 ARCHITECTURAL EXTERIOR WALL SECTIONS
AE303 ARCHITECTURAL INTERIOR WALL SECTIONS
AE401 ARCHITECTURAL TOILET ACCESSIBILITY AND ACCESSORIES
AE405 ARCHITECTURAL ELEVATOR SECTION
AE501 ARCHITECTURAL DETAILS
AE502 ARCHITECTURAL DETAILS
AE503 ARCHITECTURAL DETAILS
AE504 ARCHITECTURAL DETAILS
AE505 ARCHITECTURAL DETAILS
AE601 ARCHITECTURAL SCHEDULES
AE602 ARCHITECTURAL INTERIOR ELEVATIONS
AC101 FIRST FLOOR ACCESS CONTROL PLAN
AC102 SECOND FLOOR ACCESS CONTROL PLAN
FA101 FIRST FLOOR FIRE ALARM PLAN
FA102 SECOND FLOOR FIRE ALARM PLAN
FP101 FIRST FLOOR FIRE SPRINKLER PLAN
FP102 SECOND FLOOR FIRE SPRINKLER PLAN
P001 PLUMBING GENERAL NOTES, LEGEND AND ABBREVIATIONS
PL101 PLUMBING FIRST FLOOR PLAN - WATER PIPING
A
D
I
E
T D
S T N
U
E T
M
AP
R
E
NT O
S
A
T SE FO
R E
M
A
CI
N
VE RA
TE
A
FA
I R F
S F
A
D
I
E
T
D S T
N U
E T
M
AP
R
E
NT O
S
A
T SE FO
R E
M
A
CI
N
VE RA
TE
A
FA
I R F
S
UP
F.E.C. F.E.C.
F.E.C.
UP
DN
F.E.C.
F.E.C.
N
DESIGN EYE CLINIC MINOR
PROJECT NO. : 612-161
VA MATHER NORTHERN CALIFORNIA HEALTHCARE
SYSTEM
MATHER, CALIFORNIA
APPROVALS
Kevin C. Maxson PE Chief, E&FMS
Roma Patel, M.D.
Chief, Eye Clinic Service
Dr. Dawn Erckenbrack, Associate Director Sacramento Valley Division
Kathryn K. Bucher, DNP, RN, NEA-BC Associate Director Patient Care Services, Nurse Executive
William Cahill, M.D.
Chief of Staff
David Stockwell, MHA Director
D
A
B
C
E
F
G
H
J
K
L
M
N
P
1 2 43 5 6 7 8 10
F.1
EXAM 3
1B17
EXAM 4
1B16
EXAM 5
1B15
EXAM 6
1B14
EXAM 7
1B13
EXAM 8
1B12
EXAM 9
1B11
STAFF TOILET
1B10
P H
O T
O G
R A
P H
Y R
O O
M
B
PUBLIC
TOILET
1B22
ALCOVE
1B21
UTILITY,
SOILED
1B19
SUPPLY,
CLEAN
1B18
U L
T R
A S
O U
N D
O P
T
IC
A L
B
5 E
Y E
P R
O C
E D
U R
E R
O O
M
B
ELECTRICAL
CLOSET
1B23
LASER ROOM
1B09
PRE-TEST
1B24
FITTING
DISPLAY
1B03
EXAM 1
1B04
EXAM 2
1B05
PATIENT
EDUCATION
1B06
STAIR
B1
WAITING
1B20
WAITING
AREA
1B01
CORRIDOR 1
1BC1
CHECK-IN
CHECK-OUT
1B02
MECHANICAL
ROOM
1B26
ELEVATOR
E2
CORRIDOR 3
1BC3
C O
R R
ID
O
R
B
C
EYE CLINICDERMATOLOGY
C O
R R
ID
O
R
B
C
WHEEL
CHAIRS L
E N
S S
T A
R E
Q U
IP
D
A
B
C
E
F
G
H
J
K
L
M
N
P
1 2 43 5 6 7 8 10
F.1
NURSE
WORKSTATION
2B13
SECRETARY
WAITING
2B14
WHEELCHAIRS
2BC1A
NURSE
MANAGER
2B08
PATIENT
TOILET
2B09
ELECTRO
DIAGNOSIS
2B10
STAFF TOILET
2B11
SERVICE
CHIEF
2B12
CONSULT
VIEWING
2B18
SHARED
OFFICE
2B17
SHARED
OFFICE
2B16
OPEN OFFICE
2B15
H.A.C.
2B20
STORAGE
2B19
EXAM 16
2B21
VISUAL
FIELDS
2B22
EXAM 14
2B02
ELECTRICAL
2B23
EXAM 15
2B03
SUPPLY,
CLEAN
2B25
UTILITY,
SOILED
2B24
EXAM 10
2B04
EXAM 11
2B05
EXAM 12
2B06 EXAM 13
2B07
SHAFT
WAITING
2B01
CORRIDOR 1
2BC1
C O
R R
ID
O
R
B
C
CORRIDOR 4
2BC4
DERMATOLOGY EYE CLINIC
STAIR
B1
ELEVATOR
E2
APPROVED BUILDING AREA
11500 SF
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t o n e i n c h o n e f o o t
VA FORM 08-6231
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title: Project Title: Project Number:
Building Number:
Drawing Number:Location
Date Checked Drawn
Office of Construction and Facilities Management
DRAFT DOCUMENTS
NOT FOR CONSTRUCTION
Dwg. of01/03/2019
VA MEDICAL CENTER, MATHER, CA 95655
643K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
1/11/2019 1:24:43 PMH:\Revit User Files\2018\MATHER - EYE CLINIC - 9TH SUBMITTAL - CD SUBMITTAL - CENTRAL_IValdovinos.rvt
DESIGN EYE CLINIC
MINOR
I. VALDOV
GI100-1
APPROVALS
J.ROBERTS
612-161
I. VALDOV
SCALE: NTSGI100-1
1 FIRST FLOOR PLAN
SCALE: NTSGI100-1
2 SECOND FLOOR PLAN
6,358 NET SF 4,790 NET SF
The project includes 11,148 square feet of Eye Clinic space including administration and common spaces. In addition, the project includes demolition/removal of Building 720, a 6,434 square foot temporary and deficient structure. Three government electric vehicle charging stations will also be included as part of this project.
GROSS AREA TABLE
LEVEL NAME AREA TYPE
FIRST FLOOR FIRST FLOOR GROSS
BUILDING AREA
6358 SF
SECOND FLOOR SECOND FLOOR GROSS
BUILDING AREA
4790 SF
GRAND TOTAL 11148 SF
D
Y H
S
S
SS
S
S
S
SS
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
V
S
91.64DI
91.49
91.87
92.45
92.91
90.23
92.42
MH R
IM
89.68 B
URIE
D
IN
V.8
2.6 0-
95 95
91 91
93 93
3 9
O2 LINES
O2
O2
O
O2
GAS REGULATOR
STATION
A B
A N
D O
N E
D I
N P
LA
C
E
G
"G
"G
"G
"G
3"G
3"G
3"G
3"G 3"G 3"G 3"G
4"G4"G 4"G
4"D
6"D
6"D
4"R W
D
6"RWD
4"D
17"AC
15"D
10"MU
13"MU
11"MU
12"MU
NORTH
12"FIR
9"F
10"EU
MTEU
28"D
5"D
7"MU
ssmh
SDMH
SDMH
sig n fc lip o f gu tter lip o f gu tter a sp h alt lip o f g u tte r cb cb
14" sycamore
5" oak a sp h alt lan d-sca p in g c onc strip trun ca ted dom e s cb d i a sp h alt lan dsc ap in g
6"oak
14"tree
4"oak fh
BLDG 807
BLDG 806
BLDG 805
BL
DG
BL
DG
A
BL
DG
T a sp h alt c on c e lec pa ne ls s mo kin g sh elt er wood deck
4" fire
5"oak
4"oak
4"tree
4"tree
4"tree
4"tree
4"tree
4"tree
4"tree
4"tree 5"tree
6"tree
8"tree
10"oak re ta in ing w all c b fh b trun ate d d o m e (typ conc conc deck ra m p c on c la n ds ca pi n g
"c on c
BL
DG
B wood deck
5"tree is s pb la n ds ca pi n g w al kw a y ssm h sdmh sdmh lip of gutter fc conc walk la nd scap in g c on uildi ng
6 46 co nc re te w alk ay scap in g oncrete lkw y scap in g b a ck o f c o nc rete w a lk w a y
BLDG T803
BL
DG
lan dsc ap in g asphalt a sp h alt a sp h alt a sp h alt a sp h alt a sp ha lt sph alt a sp ha lt a sp ha lt a sp ha lt elec ha r gin g s tat ion
BL
DG
a sp ha lt lip o f gu tter fac e o f cu rb li p of g u t ter fa ce o f c ur b lip o f gu tter fac e o f cu rb to p o f c urb c on c c on c s pe ed b um p di p m h s dm h d i ir rig p b t el pb
3-e lec p asp halt sp h a l t a sp ha lt a sp ha lt li p of g u t ter fa ce o f c ur b ep
2 ' r ock s wale di di conc asphalt ir rig p b ir rig p b ir rig p b e lec p b p b
HO
SP
ITA
L
WA
Y
S O U T H
W H
IT
E
R O C K
R O A D islan d rou nd a bo u t irr p irrp b irrp b d i sd mh walkway fh
(e) parking lot lan ds ca pesid ew alk wm irrp b
4"oak
30"tree
4"tree
4"tree
15"rdwd
18"rdwd
6"tree
12"red
12"tree
8"oak
10"oak 10"oak
12"oak
4"tree
16"tree e le c va ult fh ssmh
PE
TE
R A M
CC
U
EN
B
LV
D
B L A
IS
D E L L
B L V D
HOSPITAL WAY
H O S P
IT
A L
W A Y
H O
SP
IT
AL
W
AY
AREA 2
A R
E A
BLDG 720
PROJECT DESCRIPTION SUMMARY
DELETE ELEVATOR AND ALL ASSOCIATED COMPONENTS. IN ITS
PLACE AT THE FIRST FLOOR ENLARGE THE FITTING ROOM TO 224 S.F.
AND AT THE SECOND FLOOR ADD AN 83 S.F. STORAGE ROOM.
AREA 1 DEMOLISH EXISTING PARKING LOT AND BUILD A 2-
STORY OPTHALMOLOGY CLINIC BUILDING AND SITE
IMPROVEMENTS AS SHOWN.
AREA 2
SUMMARY OF WORK
BUILDING TITLE SHALL BE "OPTHALMOLOGY OUTPATIENT SERVICE",
BUILDING 643. THE SITE IS LOCATED AT THE VA MATHER CAMPUS,
10535 HOSPITAL WAY, MATHER, CALIFORNIA 95655. THE LOCATION OF
THE BUILDING DESIGN SHALL BE ON THE WEST SIDE OF THE CAMPUS
JUST ACROSS FROM BUILDING 646, AND WILL INCLUDE THE
DEMOLITION OF PARKING SPOTS FOR THE CONSTRUCTION OF THE
NEW BUILDING. SPECIFICATIONS SHALL GOVERN THE DRAWINGS
LANGUAGE. THE BUILDING DESIGN SHALL INCLUDE A NEW 11,148
SQUARE FEET, 2 STORY OUTPATIENT OPTHALMOLOGY SERVICE
BUILDING. THE DURATION FOR CONSTRUCTION IS 500 DAYS.
BUILDINGS OCCUPANCY WILL BE B/NEW BUSINESS AND THE BUILDING
TYPE WILL BE II B/ II (000). COORDINATION WITH THE LOCAL UTILITY
COMPANY SMUD IS REQUIRED AND MUST BE COMPLETED BY THE
CONTRACTOR.
PRELIMINARY WORK COMMON TO ALL AREAS
PRIOR TO DEMOLITION CONTRACTOR SHALL CONDUCT A SITE
WALKTHROUGH WITH THE VA TO IDENTIFY AND DOCUMENT ANY
ITEMS TO BE STORED, SALVAGED, AND/OR REUSED BY THE VA.
CONTRACTOR IS RESPONSIBLE FOR PROTECTING, STORING, AND
DELIVERING SUCH ITEMS WHERE INSTRUCTED BY THE VA.
THE WORK INCLUDES, BUT IS NOT LIMITED TO, SITE WORK
DEMOLITION, MODULAR BUILDING DEMOLITION, SITE IMPROVEMENTS,
SITE UTILITIES, CONCRETE FOUNDATIONS, STEEL BUILDING
STRUCTURAL FRAMING, EXTERIOR ENVELOPE SYSTEMS,
PREFABRICATED STEEL STAIRS, ELEVATOR SYSTEM, INTERIOR NON-
COMBUSTIBLE CONSTRUCTION, FINISHES, AND ALL OTHER
ASSOCIATED CIVIL, MECHANICAL, PLUMBING, ELECTRICAL, FIRE
PROTECTION, AND TELECOMMUNICATION WORK AS SHOWN ON THE
DRAWINGS AND AS SPECIFIED FOR A NEW OPTHALMOLOGY OUT
PATIENT SERVICES BUILDING INCLUDING REMOVAL OF AN EXISTING
MODULAR BUILDING.
DEMOLITION/REMOVAL OF MODULAR BUILDING #720
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t o n e i n c h o n e f o o t
VA FORM 08-6231
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title: Project Title: Project Number:
Building Number:
Drawing Number:Location
Date Checked Drawn
Office of Construction and Facilities Management
DRAFT DOCUMENTS
NOT FOR CONSTRUCTION
Dwg. of01/03/2019
VA MEDICAL CENTER, MATHER, CA 95655
643K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
1/11/2019 1:13:26 PMH:\Revit User Files\2018\MATHER - EYE CLINIC - 9TH SUBMITTAL - CD SUBMITTAL - CENTRAL_IValdovinos.rvt
DESIGN EYE CLINIC
MINOR
I. VALDOV
GI101
PROJECT AREAS BID ADDITIVES
J.ROBERTS
612-161
I. VALDOV
SCALE: NTSGI101
1 PROJECT AREAS
SCALE: NTSGI101
2 2ND FLOOR PLAN (IN LIEU OF BID ADDITIVE #2)
SCALE: NTSGI101
3 1ST FLOOR PLAN (IN LIEU OF BID ADDITIVE #1)
GENERAL NOTES
ABBREVIATIONS/DEFINITIONS
CO CONTRACTING OFFICER
COR/COTR CONTRACTING OFFICER'S (TECHNICAL) REPRESENTATIVE
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
GOVERNMENT THE TERM GOVERNMENT SHALL MEAN DEPARTMENT OF VETERANS AFFAIRS
QUALITY CONTROL, INSPECTIONS AND WORKMANSHIP IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
ANY OBSERVATIONS MADE BY THE GOVERNMENT OR ARCHITECT/ENGINEER DURING THE COURSE OF CONSTRUCTION ARE FOR THE BENEFIT OF THE GOVERNMENT AND DOES NOT ALLEVIATE THE CONTRACTOR OF
THIS RESPONSIBILITY.
THE CONTRACTOR SHALL NOT STORE ANY CHEMICALS ON THE SITE OR WITHIN THE CONFINES OF THE
BUILDING
IF THE CONTRACTOR ENCOUNTERS ANY UNKNOWN SUBSTANCE OR MATERIAL THAT MAY BE SUSPECTED HAZARDOUS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK AND NOTIFY THE CONTRACTING OFFICER.
ASBESTOS CONTAINING MATERIALS ARE NOT PERMITTED.
ASBESTOS CONTAINING MATERIALS ARE NOT PERMITTED.
CONTRACTOR SHALL MAINTAIN AND KEEP THE EXISTING FIRE ACCESS LANE AND PEDESTRIAN ACCESS AND
EXIT PATHS CLEAR AT ALL TIMES.
THE VA RESERVES THE RIGHT TO REQUIRE SOME WORK TO BE DONE AFTER NORMAL WORKING HOURS, ON HOLIDAYS AND/OR WEEKENDS. THIS INCLUDES ANY WORK WHICH COULD POTENTIALLY BLOCK ACCESS TO THE FACILITY OR CAUSE DISRUPTION TO THE NORMAL OPERATIONS OF THE MEDICAL CENTER. THE WORK WILL HAVE TO BE CAREFULLY PLANNED AND PHASED FOR MINIMAL DISRUPTION TO MEDICAL CENTER ACTIVITIES.
ANY WORK AFTER HOURS MUST BE CAREFULLY COORDINATED WITH, AND APPROVED BY THE GOVERNMENT, A
MINIMUM OF THREE WEEKS IN ADVANCE.
CONTRACTOR SHALL DEVELOP AND SUBMIT A DETAILED PHASING PLAN INDICATING THE SEQUENCE OF WORK, THE POTENTIAL UTILITY CUTOVERS OR OUTAGES, AND SPECIFICALLY LIST ANY POTENTIAL DISRUPTIONS TO THE NORMAL OPERATIONS OF THE MEDICAL CENTER. THIS PLAN SHALL BE SUBMITTED AND APPROVED PRIOR
TO MOBILIZING ON THE SITE.
ALL UTILITY OUTAGES MUST OCCUR AFTER HOURS OR ON WEEKENDS UNDER NO CIRCUMSTANCES CAN THERE BE UTILITY OUTAGES,INCLUDING BRIEF CUTOVERS, ANYWHERE ON THE CAMPUS WITHOUT THE EXPRESS WRITTEN CONSENT OF THE GOVERNMENT. THE CONTRACTOR SHALL PLAN AND FORECAST UPCOMING WORK WHICH MAY DISRUPT NORMAL OPERATIONS OR INTERFERE WITH STAFF OR PATIENTS AND IDENTIFY THESE IN THE PHASING PLAN, AS WELL AS REPORT THESE IN THE WEEKLY MEETINGS. IT MAY BE NECESSARY TO POSTPONE OR RESCHEDULE WORK TO ACCOMMODATE THE NEEDS OF THE MEDICAL CENTER. ALL SUCH TIME
SHALL BE INCLUDED IN THE BASE BID AND WILL NOT BE BILLABLE TO THE GOVERNMENT.
CONTRACTOR SHALL SUBMIT TO THE GOVERNMENT, FOR APPROVAL, THE LOCATION FOR LOADING AND UNLOADING MATERIALS. CONTRACTOR IS ADVISED THAT THERE WILL BE TIME RESTRICTIONS ASSOCIATED WITH SUCH ACTIVITIES AND SHALL TAKE THIS INTO CONSIDERATION WHEN PREPARING THE PHASING PLAN.
CONTRACTOR SHALL PROVIDE SEISMIC ANCHORING AND/OR BRACING OF ALL CONSTRUCTION, WHETHER OR NOT SPECIFICALLY STATED ON THE DRAWINGS OR SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO, WALLS, PARTITIONS, CASEWORK, FIXTURES, CEILING SUSPENDED ITEMS, OVERHEAD DUCTWORK, EQUIPMENT, PLUMBING AND ELECTRICAL PIPES AND RACEWAYS, AND FIRE PROTECTION SYSTEMS PER SPECIFICATION SECTION 130541 AND AS SHOWN ON THE PLANS AND/OR SPECIFIED BY EACH RESPECTIVE DISCIPLINE.
WHERE EXTERIOR WORK OCCURS, THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE CONTRACTING OFFICER THAT THE BUILDING DOES NOT LEAK. ANY DEFECTS OR LEAKS SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S
EXPENSE.
CONTRACTOR SHALL PROVIDE ALL SAFETY AND CAUTION SIGNAGE TO REDIRECT PEDESTRIAN TRAFFIC AND/OR ALERT THEM TO POTENTIAL CONSTRUCTION ACTIVITIES AND HAZARDS. SAFE AND ACCESSIBLE PEDESTRIAN ROUTES SHALL BE MAINTAINED AT ALL TIMES. PROVIDE SIGNAGE IN ACCORDANCE WITH OSHA STANDARD SPECIFICATION FOR ACCIDENT PREVENTION SIGNS AND TAGS 1910.145. PRIOR TO DEMOLITION CONTRACTOR SHALL PROVIDE A TEMPORARY SIGNAGE PLAN FOR VA APPROVAL INDICATING SIGN LANGUAGE AND LOCATIONS. CONTRACTOR SHALL MAINTAIN AND REPLACE DAMAGED SIGNS FOR THE DURATION OF
CONSTRUCTION.
FOR VA-PROVIDED EQUIPMENT TO BE INSTALLED BY THE CONTRACTOR (SHOWN AS "VC" ON THE PLANS OR SCHEDULES), CONTRACTOR SHALL DISCONNECT, REMOVE AND RELOCATE SUCH EQUIPMENT AND SHALL BE
RESPONSIBLE FOR RE-CONNECTING AND TESTING PROPER OPERATION (PER MANUFACTURER'S
INSTRUCTIONS) OF SUCH EQUIPMENT PRIOR TO TURNING OVER SUCH EQUIPMENT TO THE VA.
FOR UTILITY INTERRUPTIONS OF LESS THAN 15 MINUTES IN DURATION, THE CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, FIVE (10) WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION. FOR UTILITY INTERRUPTIONS EXCEEDING 15 MINUTES IN DURATION, THE CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, TEN (10) WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT
TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION.
THE CEILING ACCESS PANELS SHOWN ON DRAWINGS ARE FOR MAJOR MECHANICAL EQUIPMENT ACCESS ONLY.
ADDITIONAL ACCESS PANELS (NOT SHOWN) WILL BE REQUIRED FOR MAINTENANCE, PLUMBING, ELECTRICAL AND FIRE PROTECTION. CONTRACTOR SHALL PROVIDE ADDITIONAL ACCESS PANELS REQUIRED FOR THE ABOVE SPECIALTIES AT NO ADDITIONAL COST TO THE GOVERNMENT. CONTRACTOR SHALL COORDINATE WITH EACH SPECIALTY TRADE AND LOCATE ADDITIONAL ACCESS PANELS FOR REVIEW AND APPROVAL BY THE VA
PRIOR TO FRAMING THE CEILING.
SHORING, BRACING AND PROTECTION OF EXISTING STRUCTURE AND EARTHWORK IS THE CONTRACTORS RESPONSIBILITY. PROVIDE ADEQUATE SHORING OF ANY EXISTING CONDITIONS OR CONDITIONS CAUSED BY CONSTRUCTION RELATED ACTIVITIES, AS NECESSARY TO PROTECT PERSONS AND STRUCTURE FROM POTENTIAL FALLING STRUCTURE, EQUIPMENT OR COLLAPSE OF EARTHWORK. AS A MINIMUM, FOR ANY EARTHWORK RESULTING IN TRENCHES OR EXCAVATIONS EXCEEDING THREE FEET (3') IN DEPTH, THE CONTRACTOR SHALL RETAIN THE SERVICES OF A LICENSED STRUCTURAL ENGINEER TO PROVIDE INSTRUCTIONS, FOR VA APPROVAL, ON THE METHODS TO BE USED FOR SHORING. ANY OVERHEAD STRUCTURE, EQUIPMENT OR SIMILARLY HEAVY CONDITION TO REMAIN, SHALL BE PROPERLY SHORED WITH INPUT FROM A LICENSED STRUCTURAL ENGINEER, AS REQUIRED, TO ENSURE THE PERSONAL SAFETY AND
PROTECTION OF REMAINING STRUCTURE.
PROVIDE TEMPORARY CONSTRUCTION BARRIERS AS NECESSARY TO SEPARATE DEMOLITION AREAS FROM ADJACENT OCCUPIED SPACES WHEN BARRIERS CROSS A REQUIRED EXIT PATH, PROVIDE EXIT DOORS WITHIN
BARRIER WALL.
THESE DOCUMENTS ARE NOT INTENDED TO SHOW EVERY EXISTING CONDITION OR ITEM. CONTRACTOR SHALL NOTIFY VA OF MISCELLANEOUS ITEMS FOUND. COORDINATE WITH THE VA REGARDING THE DISPOSITION OF
SUCH ITEMS, AND HANDLE ACCORDINGLY AT NO COST TO THE GOVERNMENT
BEFORE LAYING OUT DUCTWORK, PIPING, CONDUITS, FIXTURES, REGISTERS AND/OR OTHER UTILITIES ABOVE CEILING, COORDINATE CEILING SUSPENSION SYSTEM SUPPORT LOCATIONS TO AVOID CONFLICTS WITH EXISTING OR NEW CONSTRUCTION. WHERE INTERFERENCE WITH CEILING SUPPORTS CANNOT BE AVOIDED, CONTRACTOR SHALL PROVIDE ALTERNATE CODE-COMPLIANT SUSPENSION SYSTEM AND LAYOUT AT NO EXTRA
COST TO THE VA.
FIRE PROOFING
CONTRACTOR SHALL PROVIDE FIRE PROOFING WHERE INDICATED AND AS REQUIRED IN ACCORDANCE WITH
SPECIFICATIONS.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY APPROVALS AND PERMITS REQUIRED FROM
REGULATING AGENCIES BEFORE STARTING ANY WORK.
SUBJECT TO MINOR EXCEPTIONS, GENERALLY THE ITEMS SHOWN IN BOLD LINES ARE NEW AND ITEMS SHOWN IN
GRAYSCALE ARE EXISTING.
THE WORK ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO CONVEY THE SCOPE OF WORK, INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT AND FINAL LAYOUT. THE DRAWINGS ARE GENERIC IN NATURE AND ARE INTENDED TO BE SUPPORTED BY SPECIFIC MANUFACTURER AND/OR FABRICATORS SHOP DRAWINGS AND SIMILAR DETAILS TO DETERMINE EXACT SPACING AND/OR INSTALLATION REQUIREMENTS.
IF ANY PART OF THE DRAWINGS OR SPECIFICATIONS CONTRADICT THE MANUFACTURER'S RECOMMENDATIONS, APPLICATION OR INSTALLATION INSTRUCTIONS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK, ADVISE THE
CONTRACTING OFFICER AND RECEIVE CLEAR, WRITTEN, DIRECTION BEFORE PROCEEDING.
DO NOT SCALE THE DRAWINGS. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. IF ANY DISCREPANCIES OR OMISSIONS IN THE DIMENSIONS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY. ANY WORK DONE WITHOUT PROPER NOTIFICATION BEING GIVEN TO THE
CONTRACTING OFFICER IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
PRIOR TO DEMOLITION, CONTRACTOR SHALL VERIFY ALL DIMENSIONS, EXISTING CONDITIONS AND LOCATION OF NEW CONSTRUCTION WITH EXISTING WALLS, FLOORS, CEILINGS, COLUMNS, FURRING, MECHANICAL AND
ELECTRICAL EQUIPMENT AND EXISTING CONSTRUCTION.
FIELD INVESTIGATION PERFORMED DURING THE DESIGN STAGE IS LIMITED TO WHAT CAN BE REASONABLY SEEN AND DOCUMENTED WHILE THE SPACE IS OPERATIONAL AND OCCUPIED BY PERSONNEL, EQUIPMENT AND FURNITURE. AS SUCH, THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING A THOROUGH REVIEW AND VALIDATING ALL FIELD CONDITIONS PRIOR TO COMMENCEMENT OF WORK. THE CONTRACTOR SHALL REPORT ANY PROBLEMS/CONFLICTS TO THE CONTRACTING OFFICER WITHIN TWO (2) DAYS OF DISCOVERY. ANY CHANGES RESULTING FROM CONDITIONS ARISING IN THE FIELD WHICH ARE NOT BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER ARE TO BE MADE BY THE CONTRACTOR AT NO ADDITIONAL COST TO GOVERNMENT.
DRAWINGS SHOWN ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND ENSURE SHOP DRAWINGS ARE PROVIDED BEFORE DETAILING COMPLETE UTILITY LAYOUT AND INSTALLATION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ROUTE NEW CONDUITS, DUCTS, PIPING AND SIMILAR LINES TO AVOID POTENTIAL INTERFERENCES, AND WHERE THIS CANNOT BE ACCOMPLISHED, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REMOVE, REROUTE, ADJUST REINSTALL THE INTERFERENCE SUCH THAT IT NO LONGER POSES A PROBLEM. THESE ITEMS ARE TO BE ADDRESSED AND CORRECTED AT NO ADDITIONAL COST
TO THE GOVERNMENT
CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES TO AVOID POTENTIAL CONFLICTS.
FINAL LOCATION OF MECHANICAL AND ELECTRICAL EQUIPMENT SUCH AS PANELBOARDS, METERS, FLUES, VENTS, ETC., SHALL BE APPROVED BY THE GOVERNMENT.
EACH SUBCONTRACTOR IS CONSIDERED TO BE A SPECIALIST IN HIS RESPECTIVE FIELD AND SHALL, PRIOR TO SUBMISSION OF BID OR PERFORMANCE OF WORK, NOTIFY THE CONTRACTOR AND THE CONTRACTING OFFICER, IN WRITING, OF ANY WORK CALLED FOR IN THE DRAWINGS OR SPECIFICATIONS THAT CANNOT BE FULLY
GUARANTEED.
THE CONTRACTOR WARRANTS ALL WORK TO BE PERFORMED AND ALL MATERIALS TO BE FURNISHED UNDER THIS CONTRACT AGAINST DEFECTS IN WORKMANSHIP FOR A PERIOD OF NOT LESS THAN 1 YEAR FROM THE DATE OF FINAL ACCEPTANCE. UPON WRITTEN NOTICE OF ANY DEFECT IN MATERIALS OR WORKMANSHIP, THE CONTRACTOR SHALL, AT THE OPTION OF THE GOVERNMENT, REPAIR OR REPLACE SAID DEFECT WITHOUT COST
TO THE GOVERNMENT.
ALL MATERIALS SHALL CONFORM TO THE "BUY AMERICAN ACT".
ALL CONSTRUCTION WORK, ARCHITECTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION, ETC. SHALL CONFORM TO THE MOST CURRENT ISSUE OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), THE INTERNATIONAL BUILDING CODE, VA CRITERIA AND ANY APPLICABLE LOCAL, STATE AND FEDERAL CODES AND GUIDELINES. SHOULD THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE CONFLICT WITH THE REQUIREMENTS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), THEN THE MORE STRINGENT
BETWEEN THE TWO SHALL GOVERN.
IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR WORKING CONDITIONS AT THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO WORK HOURS. CONTRACTOR SHALL CONFORM TO ALL SAFETY REGULATIONS ENFORCED AT THE TIME OF CONSTRUCTION. JOB SITE SAFETY IS STRICTLY THE RESPONSIBILITY
OF THE CONTRACTOR, AND NOT THE ARCHITECT/ENGINEER OR THE GOVERNMENT.
THE CONTRACTOR SHALL PROVIDE U.L. RATED PORTABLE FIRE EXTINGUISHERS, TYPE 24.10.B.C ON SITE AND IN A
LOCATION APPROVED BY THE GOVERNMENT.
THE CONTRACTOR SHALL MAINTAIN THE CONSTRUCTION AREA AND ALL ADJACENT AFFECTED AREAS, IN A CLEAN AND ORDERLY MANNER THROUGHOUT THE COURSE OF CONSTRUCTION. DO NOT BLOCK ENTRANCES, EXITS, LOBBIES, CORRIDORS, ETC.
THE CONTRACTOR SHALL REMOVE ALL DEBRIS ON A DAILY BASIS IN ACCORDANCE WITH VA AND EPA REGULATIONS. DEBRIS SHALL BE TRANSPORTED ON COVERED CARTS TO THE APPROVED DISPOSAL AREA AS DIRECTED BY THE CONTRACTING OFFICER. THE CONSTRUCTION AREA, AND ALL ADJACENT AREAS, SHALL BE
CLEAN AND FREE OF DEBRIS AT THE END OF EACH DAY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL LEFT-OVER MATERIALS, DEBRIS, TOOLS AND EQUIPMENT INVOLVED IN HIS OPERATIONS AT THE CONCLUSION OF THE PROJECT. ALL PROJECT AREAS AND SURROUNDING AREAS AFFECTED BY CONSTRUCTION SHALL BE LEFT CLEAN AND IN PERFECT CONDITION.
THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO ENSURE THAT ALL PROPERTIES, EQUIPMENT AND DEVICES AT THE PROJECT SITE ARE PROTECTED DURING THE CONSTRUCTION PERIOD. ANY DAMAGES TO EXISTING CONSTRUCTION, LANDSCAPING, EQUIPMENT AND DEVICES SHALL BE REPAIRED AND RESTORED TO A CONDITION EQUAL TO THAT EXISTING AT THE COMMENCEMENT OF THE WORK. THE CONTRACTOR SHALL RESTORE ANY DAMAGE AT HIS OWN EXPENSE. THE CONTRACTOR SHALL SUBMIT THE PROCEDURE FOR
CONSTRUCTION AND DEMOLITION PRIOR TO COMMENCING WORK
ALL FINISH WORK, EITHER NEW OR EXISTING, WHICH IS DAMAGED OR STAINED AS A RESULT OF CONSTRUCTION ACTIVITIES, SHALL BE REPAIRED OR REPLACED AS NECESSARY AT NO ADDITIONAL COST TO GOVERNMENT.
ALL SURFACES SHALL BE SMOOTH, CONTINUOUSLY FREE OF IMPERFECTIONS AND IN PROPER CONDITION TO RECEIVE THE FINISH AS SPECIFIED. IN AREAS WHERE A FINISH IS NOT SPECIFIED, THEY SHALL MATCH ADJACENT
MATERIAL IN CONSTRUCTION, COLOR, TEXTURE AND MANUFACTURER.
WORK SHALL NOT BE PERFORMED WHEN WEATHER CONDITIONS MAY CREATE HAZARDOUS WORKING
CONDITIONS OR LEAD TO FAILURE IN WORKMANSHIP.
ANY ROOF, WALL OR OTHER OPENINGS MADE DURING CONSTRUCTION SHALL BE SEALED AND PROTECTED FROM
RAIN, MOISTURE, WIND, DUST AND OTHER OUTSIDE ELEMENTS.
AN APPROPRIATELY QUALIFIED REPRESENTATIVE OF THE CONTRACTOR SHALL BE ON SITE TO SUPERVISE AND COORDINATE CONSTRUCTION AT ALL TIMES WHILE WORK IS IN PROGRESS. SUCH PERSON SHALL BE RESPONSIBLE FOR OSHA COMPLIANCE AND JOB SITE SAFETY. JOB SITE SAFETY IS STRICTLY THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE GOVERNMENT, ARCHITECTS AND ENGINEERS ARE NOT
RESPONSIBLE FOR ANY ASPECT OF JOB SITE SAFETY.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t o n e i n c h o n e f o o t
VA FORM 08-6231
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title: Project Title: Project Number:
Building Number:
Drawing Number:Location
Date Checked Drawn
Office of Construction and Facilities Management
DRAFT DOCUMENTS
NOT FOR CONSTRUCTION
Dwg. of01/03/2019
VA MEDICAL CENTER, MATHER, CA 95655
643K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
1/11/2019 1:13:27 PMH:\Revit User Files\2018\MATHER - EYE CLINIC - 9TH SUBMITTAL - CD SUBMITTAL - CENTRAL_IValdovinos.rvt
DESIGN EYE CLINIC
MINOR
D.DIMAT
GI200
GENERAL PROJECT NOTES
J.ROBERTS
612-161
D.DIMAT
F.E.C.F.E.C.
F.E.C.
F .E
.C
UP
F.E.C. F.E.C.
BUILDING CODE DATA
BUILDING OCCUPANCY
CONSTRUCTION TYPE
BUILDING GROSS AREA
( STAIR AND ELEVATOR AREA
INCLUDED ON FIRST FLOOR ONLY)
FIRST FLOOR
SECOND FLOOR
TOTAL OCCUPANCY LOAD
FIRE SPRINKLER THROUGHOUT
ACCESSIBLE ENTRY ROUTE
ACCESSIBLE MEANS OF EGRESS
2ND FLOOR ACCESS VIA ELEVATOR
MIN. EGRESS DOORS CAPACITY (EA.)
STAIRWAY CAPACITY (EA.)
B/NEW BUSINESS
II B/ II (000)
11148 SF
YES
YES
YES
YES
CODE REFERENCESLEGEND
EXIT SIGN
EGRESS ROUTE
OCCUPANT LOAD
EXIT LOAD
1 HOUR FIRE RATED WALL
2 HOUR FIRE RATED WALL
FIRE EXTINGUISHER
CABINET
MAXIMUM TRAVEL DISTANCE
FEC
THE FOLLOWING CODES ARE USED FOR THE
BASIS OF DESIGN FOR THIS PROJECT BUT ARE
NOT LIMITED TO:
· IBC
· NFPA 101
· NEC
· NFPA 80
· NFPA 110
· IMC
· IPC
· VA MANUAL H-18-8
· ASCE-7
NOTE: THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING AND USING THE MOST CURRENT
APPLICABLE CODE.
EXAM 3
1B17
EXAM 4
1B16
EXAM 5
1B15
EXAM 6
1B14
EXAM 7
1B13
EXAM 8
1B12
EXAM 9
1B11
STAFF TOILET
1B10
PHOTOGRAPHY
ROOM
1B08
PUBLIC
TOILET
1B22
ALCOVE
1B21
UTILITY,
SOILED
1B19
SUPPLY,
CLEAN
1B18
ULTRA
SOUND
OPTICAL
1B25
EYE
PROCEDURE
ROOM
1B07
ELECTRICAL
CLOSET
1B23
LASER ROOM
1B09
150 SF
PRE-TEST
1B24
FITTING
DISPLAY
1B03
EXAM 1
1B04
EXAM 2
1B05
PATIENT
EDUCATION
1B06 STAIR
B1
WAITING
1B20
WAITING
AREA
1B01
CORRIDOR 1
1BC1
CHECK-IN
CHECK-OUT
1B02
443 SF
MECHANICAL
ROOM
1B26
ELEVATOR
E2
540 SF
CORRIDOR 3
1BC3
C O
R R
ID
O
R
B
C
EXIT SEPARATION
DISTANCE = 106'-0"
2 2 2 2
2 2 2 2 2 2 2
524 SF
CORRIDOR 4
200'-0" = MAXIMUM OVERALL DIAGONAL
DIMENSION. MINIMUM EXIT
SEPARATION DISTANCE IS 1/3 OF THE
MAXIMUM OVERALL DIMENSION PER
UBC 1007.1.1 AND NFPA 7.5.1.3 MINIMUM
SEPARATION DISTANCE = 66'-8"
101 EXIT SEPARATION
DISTANCE = 102'-0"
22222222
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t o n e i n c h o n e f o o t
VA FORM 08-6231
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title: Project Title: Project Number:
Building Number:
Drawing Number:Location
Date Checked Drawn
Office of Construction and Facilities Management
DRAFT DOCUMENTS
NOT FOR CONSTRUCTION
Dwg. of01/03/2019
VA MEDICAL CENTER, MATHER, CA 95655
643K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
1/11/2019 1:13:14 PMH:\Revit User Files\2018\MATHER - EYE CLINIC - 9TH SUBMITTAL - CD SUBMITTAL - CENTRAL_IValdovinos.rvt
DESIGN EYE CLINIC
MINOR
I. VALDOV
GC001
FIRST FLOOR EXIT PLAN AND CODE
DATA
J.ROBERTS
612-161
I. VALDOV
SCALE: NTSGC001
2 FIRST FLOOR EXIT PLAN
NET AREA
NAME AREA
WAITING AREA 327 SF
5848 SF
SECOND FLOOR
CONSULT VIEWING 120 SF
CORRIDOR 1 508 SF
CORRIDOR 2 252 SF
CORRIDOR 4 232 SF
ELECTRICAL 38 SF
ELECTRO DIAGNOSIS 133 SF
ELEVATOR 88 SF
EXAM 10 119 SF
EXAM 11 126 SF
EXAM 12 124 SF
EXAM 13 135 SF
EXAM 14 150 SF
EXAM 15 125 SF
EXAM 16 116 SF
H.A.C. 37 SF
NURSE MANAGER 115 SF
NURSE WORKSTATION 180 SF
OPEN OFFICE 631 SF
PATIENT TOILET 65 SF
SECRETARY WAITING 56 SF
SERVICE CHIEF 100 SF
SHARED OFFICE 120 SF
SHARED OFFICE 120 SF
STAFF TOILET 65 SF
STAIR 231 SF
STORAGE 38 SF
SUPPLY, CLEAN 67 SF
UTILITY, SOILED 57 SF
VISUAL FIELDS 122 SF
WAITING 96 SF
WHEELCHAIRS 40 SF
4408 SF
GRAND TOTAL 10256 SF
NET AREA
NAME AREA
FIRST FLOOR
ALCOVE 34 SF
CHECK-IN CHECK-OUT 194 SF
CORRIDOR 1 388 SF
CORRIDOR 2 385 SF
CORRIDOR 3 540 SF
CORRIDOR 4 524 SF
ELECTRICAL CLOSET 40 SF
ELEVATOR 90 SF
EXAM 1 125 SF
EXAM 2 127 SF
EXAM 3 124 SF
EXAM 4 125 SF
EXAM 5 123 SF
EXAM 6 125 SF
EXAM 7 123 SF
EXAM 8 125 SF
EXAM 9 125 SF
EYE PROCEDURE ROOM 204 SF
FITTING DISPLAY 134 SF
LASER ROOM 162 SF
MECHANICAL ROOM 443 SF
PATIENT EDUCATION 119 SF
PHOTOGRAPHY ROOM 178 SF
PRE-TEST 150 SF
PUBLIC TOILET 85 SF
STAFF TOILET 60 SF
STAIR 231 SF
SUPPLY, CLEAN 62 SF
ULTRA SOUND OPTICAL 174 SF
UTILITY, SOILED 63 SF
WAITING 139 SF
GROSS AREA TABLE
LEVEL NAME AREA TYPE
FIRST FLOOR FIRST FLOOR GROSS
BUILDING AREA
6358 SF
SECOND FLOOR SECOND FLOOR GROSS
BUILDING AREA
4790 SF
GRAND TOTAL 11148 SF
PROJECT
NORTH
F.E.C.
.E
.C
F.E.C.
F.E.C.
UP
DN
GFCI
F.E.C.
F.E.C.
N
N
BUILDING CODE DATA
BUILDING OCCUPANCY
CONSTRUCTION TYPE
BUILDING GROSS AREA
( STAIR AND ELEVATOR AREA
INCLUDED ON FIRST FLOOR ONLY)
FIRST FLOOR
SECOND FLOOR
TOTAL OCCUPANCY LOAD
FIRE SPRINKLER THROUGHOUT
ACCESSIBLE ENTRY ROUTE
ACCESSIBLE MEANS OF EGRESS
2ND FLOOR ACCESS VIA ELEVATOR
MIN. EGRESS DOORS CAPACITY (EA.)
STAIRWAY CAPACITY (EA.)
B/NEW BUSINESS
II B/ II (000)
11148 SF
YES
YES
YES
YES
CODE REFERENCESLEGEND
EXIT SIGN
EGRESS ROUTE
OCCUPANT LOAD
EXIT LOAD
1 HOUR FIRE RATED WALL
2 HOUR FIRE RATED WALL
FIRE EXTINGUISHER
CABINET
MAXIMUM TRAVEL DISTANCE
FEC
THE FOLLOWING CODES ARE USED FOR THE
BASIS OF DESIGN FOR THIS PROJECT BUT ARE
NOT LIMITED TO:
· IBC 2015
· NFPA 101 2015
· NEC 2014
· NFPA 80 2013
· NFPA 110 2013
· IMC 2014
· IPC 2012
· VA MANUAL H-18-8 2013
· ASCE-7
NOTE: THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING AND USING THE MOST CURRENT
APPLICABLE CODE.
S T
A
IR
NURSE
WORKSTATION
2B13SECRETARY
WAITING
2B14
WHEELCHAIRS
2BC1A
NURSE
MANAGER
2B08
65 SF
PATIENT
TOILET
2B09
ELECTRO
DIAGNOSIS
2B10
STAFF TOILET
2B11
SERVICE
CHIEF
2B12
CONSULT
VIEWING
2B18
SHARED
OFFICE
2B17
SHARED
OFFICE
2B16
OPEN OFFICE
2B15
H.A.C.
2B20
STORAGE
2B19
EXAM 16
2B21
VISUAL
FIELDS
2B22
EXAM 14
2B02
ELECTRICAL
2B23
EXAM 15
2B03
SUPPLY,
CLEAN
2B25
UTILITY,
SOILED
2B24
EXAM 10
2B04
EXAM 11
2B05
EXAM 12
2B06
EXAM 13
2B07
SHAFT
STAIR B1
WAITING
2B01
CORRIDOR 1
2BC1
252 SF
CORRIDOR 2
2BC2
232 SF
CORRIDOR 4
2BC4
EXIT SEPARATION
DISTANCE = 72'-0"
2 2 2 2
2 2
TO STAIR
22223
18 14
184'-0" = MAXIMUM OVERALL DIAGONAL
DIMENSION. MINIMUM EXIT SEPARATION
DISTANCE IS 1/3 OF THE MAXIMUM OVERALL
DIAGONAL DIMENSION PER UBC 1007.7.1.1 AND
NFPA 7.5.13 MINIMUM SEPARATION DISTANCE =
61'-4"
EXIT SEPARATION
DISTANCE = 109'-0"
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h t in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t o n e i n c h o n e f o o t
VA FORM 08-6231
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title: Project Title: Project Number:
Building Number:
Drawing Number:Location
Date Checked Drawn
Office of Construction and Facilities Management
DRAFT DOCUMENTS
NOT FOR CONSTRUCTION
Dwg. of01/03/2019
VA MEDICAL CENTER, MATHER, CA 95655
643K F DAVIS ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
1/11/2019 1:13:19 PMH:\Revit User Files\2018\MATHER - EYE CLINIC - 9TH SUBMITTAL - CD SUBMITTAL - CENTRAL_IValdovinos.rvt
DESIGN EYE CLINIC
MINOR
I. VALDOV
GC002
SECOND FLOOR EXIT PLAN AND
CODE DATA
J.ROBERTS
612-161
I. VALDOV
1/8" = 1'-0"GC002
2 SECOND FLOOR EXIT PLAN PROJECT
NORTH
NET AREA
NAME AREA
WAITING AREA 327 SF
5848 SF
SECOND FLOOR
CONSULT VIEWING 120 SF
CORRIDOR 1 508 SF
CORRIDOR 2 252 SF
CORRIDOR 4 232 SF
ELECTRICAL 38 SF
ELECTRO DIAGNOSIS 133 SF
ELEVATOR 88 SF
EXAM 10 119 SF
EXAM 11 126 SF
EXAM 12 124 SF
EXAM 13 135 SF
EXAM 14 150 SF
EXAM 15 125 SF
EXAM 16 116 SF
H.A.C. 37 SF
NURSE MANAGER 115 SF
NURSE WORKSTATION 180 SF
OPEN OFFICE 631 SF
PATIENT TOILET 65 SF
SECRETARY WAITING 56 SF
SERVICE CHIEF 100 SF
SHARED OFFICE 120 SF
SHARED OFFICE 120 SF
STAFF TOILET 65 SF
STAIR 231 SF
STORAGE 38 SF
SUPPLY, CLEAN 67 SF
UTILITY, SOILED 57 SF
VISUAL FIELDS 122 SF
WAITING 96 SF
WHEELCHAIRS 40 SF
4408 SF
GRAND TOTAL 10256 SF
NET AREA
NAME AREA
FIRST FLOOR
ALCOVE 34 SF
CHECK-IN CHECK-OUT 194 SF
CORRIDOR 1 388 SF
CORRIDOR 2 385 SF
CORRIDOR 3 540 SF
CORRIDOR 4 524 SF
ELECTRICAL CLOSET 40 SF
ELEVATOR 90 SF
EXAM 1 125 SF
EXAM 2 127 SF
EXAM 3 124 SF
EXAM 4 125 SF
EXAM 5 123 SF
EXAM 6 125 SF
EXAM 7 123 SF
EXAM 8 125 SF
EXAM 9 125 SF
EYE PROCEDURE ROOM 204 SF
FITTING DISPLAY 134 SF
LASER ROOM 162 SF
MECHANICAL ROOM 443 SF
PATIENT EDUCATION 119 SF
PHOTOGRAPHY ROOM 178 SF
PRE-TEST 150 SF
PUBLIC TOILET 85 SF
STAFF TOILET 60 SF
STAIR 231 SF
SUPPLY, CLEAN 62 SF
ULTRA SOUND OPTICAL 174 SF
UTILITY, SOILED 63 SF
WAITING 139 SF
GROSS AREA TABLE
LEVEL NAME AREA TYPE
FIRST FLOOR FIRST FLOOR GROSS
BUILDING AREA
6358 SF
SECOND FLOOR SECOND FLOOR GROSS
BUILDING AREA
4790 SF
GRAND TOTAL 11148 SF
ENGINEERS
Tel: (707) 255-2729 FAX. (707) 255-5021 WWW.CHAUDHARY.COM
INSPECTORS
211 GATEWAY RD. WEST, SUITE 204
SURVEYORS
NAPA, CALIFORNIA 94558
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
(925) 743-8884
K F DAVIS ENGINEERING, INC
CONCRETE CURB AND GUTTER
ASPHALT CONCRETE PAVING
LANDSCAPE BEHIND CURB
CONCRETE WALK BEHIND CURB
CONCRETE POST BARRICADES
PAVEMENT MARKING WALK BARS
PATIENT PARKING SIGN
CATCH BASIN
U
P
ENGINEERS
Tel: (707) 255-2729 FAX. (707) 255-5021 WWW.CHAUDHARY.COM
INSPECTORS
211 GATEWAY RD. WEST, SUITE 204
SURVEYORS
NAPA, CALIFORNIA 94558
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
(925) 743-8884
K F DAVIS ENGINEERING, INC
S
S
D
S
D
S
D
S
D
S
D
S
D
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S D
S D
S
D
S
D
S D
S D
S D
S D
S D
S D
S
D
S
D
S
D
S
D
S
D
ENGINEERS
Tel: (707) 255-2729 FAX. (707) 255-5021 WWW.CHAUDHARY.COM
INSPECTORS
211 GATEWAY RD. WEST, SUITE 204
SURVEYORS
NAPA, CALIFORNIA 94558
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S D
S D
S D
S
D
S
D
U
P
ENGINEERS
Tel: (707) 255-2729 FAX. (707) 255-5021 WWW.CHAUDHARY.COM
INSPECTORS
211 GATEWAY RD. WEST, SUITE 204
SURVEYORS
NAPA, CALIFORNIA 94558
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
(925) 743-8884
K F DAVIS ENGINEERING, INC
ENGINEERS
Tel: (707) 255-2729 FAX. (707) 255-5021 WWW.CHAUDHARY.COM
INSPECTORS
211 GATEWAY RD. WEST, SUITE 204
SURVEYORS
NAPA, CALIFORNIA 94558
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D s s m h r i n v i n v
S D
S D
S
D
S
D
S D
S D
S D
S D
S D
S D
S
D
S
D
S
D
S
D
S
D
U
P
ENGINEERS
Tel: (707) 255-2729 FAX. (707) 255-5021 WWW.CHAUDHARY.COM
INSPECTORS
211 GATEWAY RD. WEST, SUITE 204
SURVEYORS
NAPA, CALIFORNIA 94558
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
(925) 743-8884
K F DAVIS ENGINEERING, INC
ENGINEERS
Tel: (707) 255-2729 FAX. (707) 255-5021 WWW.CHAUDHARY.COM
INSPECTORS
211 GATEWAY RD. WEST, SUITE 204
SURVEYORS
NAPA, CALIFORNIA 94558
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
ENGINEERS
Tel: (707) 255-2729 FAX. (707) 255-5021 WWW.CHAUDHARY.COM
INSPECTORS
211 GATEWAY RD. WEST, SUITE 204
SURVEYORS
NAPA, CALIFORNIA 94558
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
(925) 743-8884
K F DAVIS ENGINEERING, INC
S
SD
W
SS
W
SD
SD
W
SS
ENGINEERS
Tel: (707) 255-2729 FAX. (707) 255-5021 WWW.CHAUDHARY.COM
INSPECTORS
211 GATEWAY RD. WEST, SUITE 204
SURVEYORS
NAPA, CALIFORNIA 94558
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
W
W
W
W
W
W
W
W
W
S
D
S
D
S
D
S
D
W
W
W
W
W
W
W
W
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D s s m h r i n v i n v
S D
S D
S
D
S
D
S D
S D
S D
S D
S D
S D
S
D
S
D
S
D
S
D
S
D
U
P
ENGINEERS
Tel: (707) 255-2729 FAX. (707) 255-5021 WWW.CHAUDHARY.COM
INSPECTORS
211 GATEWAY RD. WEST, SUITE 204
SURVEYORS
NAPA, CALIFORNIA 94558
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
(925) 743-8884
K F DAVIS ENGINEERING, INC
ENGINEERS
Tel: (707) 255-2729 FAX. (707) 255-5021 WWW.CHAUDHARY.COM
INSPECTORS
211 GATEWAY RD. WEST, SUITE 204
SURVEYORS
NAPA, CALIFORNIA 94558
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
(925) 743-8884
K F DAVIS ENGINEERING, INC
SAWCUT PATCH
TYPE 1 UTILITY TRENCH PATCH
U
P
U
P
C
H
A
I
R
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
(925) 743-8884
K F DAVIS ENGINEERING, INCLandscape Architecture 151 N. Norlin St, Sonora, CA 95370
209.532.2856 www.kla-ca.com
KLA #17-1988
L1.1
U
P
U
P
C
H
A
I
R
C
SS
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
(925) 743-8884
K F DAVIS ENGINEERING, INCLandscape Architecture 151 N. Norlin St, Sonora, CA 95370
209.532.2856 www.kla-ca.com
KLA #17-1988
C
SS
L2.1
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
(925) 743-8884
K F DAVIS ENGINEERING, INCLandscape Architecture 151 N. Norlin St, Sonora, CA 95370
209.532.2856 www.kla-ca.com
L3.1
No. C54927RE
GI
ST
ER
ED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
TAM DUONG
DESIGN EYE CLINIC MINOR
VA MEDICAL CENTER, MATHER, CA 95655
612-161
ENGINEERING
K F DAVIS
530 LA GONDA WAY, SUITE E,
DANVILE, CA. 94526
WWW.KFDE.COM
(925) 743-8884
K F DAVIS ENGINEERING, INCLandscape Architecture 151 N. Norlin St, Sonora, CA 95370
209.532.2856 www.kla-ca.com
L3.2
| Sheets |
| GI100 - COVER SHEET |
| GI100-1 - APPROVALS |
| GI101 - PROJECT AREAS BID ADDITIVES |
| GI200 - GENERAL PROJECT NOTES |
| GC001 - FIRST FLOOR EXIT PLAN AND CODE DATA |
| GC002 - SECOND FLOOR EXIT PLAN AND CODE DATA |