Attachment_A_-_Minimum_Qualifications.doc
DOC document 45 KB Posted
- Attached to
- On-Call Consulting Services for Electrification, Grid Modernization, and Strategic Technology
- Solicitation number
- RFQ SCL-767074509
- Issued by
- King County, Washington
About this file
This is a Minimum Qualifications attachment for an On-Call Consulting Services request issued by the City of Seattle, Washington for Electrification, Grid Modernization, and Strategic Technology. The City is seeking qualified consultants to provide services across multiple scope of work sections designated as Tasks A through F. Qualifications submissions are due no later than 2:00 pm on Friday, October 2, 2026. Questions regarding the opportunity must be submitted through the e-procurement portal at https://procurement.opengov.com/portal/seattle no later than 2:00 pm on Friday, September 4, 2026.
Prospective consultants must meet all five minimum qualifications to be eligible for consideration. Consultants must demonstrate successful completion of at least two similar contracts or projects within the applicable subject area, either as prime consultants or subconsultants. All applicants must have prior experience providing technical or customer-facing programmatic support to utilities or related subject matter areas. Consultants, subconsultants, and subject matter experts must possess professional accreditation where applicable and demonstrate a minimum of three years of relevant experience. For Tasks E and F, which involve engineering design, a Washington State-licensed Professional Engineer must lead the engineering design team. For Task F specifically, which involves engineering research and studies, a Professional Engineer licensed in any U.S. state is acceptable to lead the work. Failure to meet these minimum qualifications will result in rejection of the proposal without further consideration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| On-Call_Consulting_Services_for_Electrification,_Grid_Modernization,_and_Strategic_Technology.pdf | ||
| Exhibit_D_-_Insurance_Transmittal_Form.pdf | ||
| Exhibit_C_-_Overview_of_the_XPD_process.pdf | ||
| Exhibit_B_-_Pre-Submittal_Meeting.docx | DOCX document | |
| Exhibit_A_-_City_Consultant_Contract_Boilerplate.pdf | ||
| Attachment_H_-_Checklist_of_Tasks.docx | DOCX document | |
| Attachment_G_-_Hourly_Rates_-_Prime_&_Sub_Rate_Sheet.xlsx | XLSX spreadsheet | |
| Attachment_F_-_Consultant-Questionnaire_2-12-26.docx | DOCX document | |
| Attachment_E_-_WMBE_Consultant_Inclusion_Plan.docx | DOCX document | |
| Attachment_D_-_Relevant_Experience.docx | DOCX document | |
| Attachment_C_-_List_of_Subconsultants.docx | DOCX document | |
| Attachment_B_-_Past_Performance_Survey.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A – Minimum Qualifications
| Item # |
| Minimum Qualification |
| Complies |
| Does Not Comply |
| If you comply, describe how you meet the minimum qualification. |
| 1 |
| The Consultant and Consultant Team must have successfully completed at least two (2) contracts or projects of similar size, scope, complexity, or function within the applicable subject area. Experience may be demonstrated as a prime consultant or subconsultant and may include relevant experience of key personnel. This requirement applies only to the scope‑of‑work sections for which the Consultant is applying (Tasks A–F). |
| 2 |
| The Consultant and Consultant Team must have prior experience providing technical or customer‑facing programmatic support to utilities or in related subject matter areas. This requirement applies to all scope‑of‑work sections (Tasks A–F). |
| 3 |
| The Consultant, subconsultants, and subject matter experts must demonstrate professional accreditation (when applicable) in their respective fields and have a minimum of three (3) years of relevant experience. This requirement applies to all scope‑of‑work sections (Tasks A–F) |
| 4 |
| For Scope of Work Sections Tasks E and F (engineering design), the Consultant or Consultant Team must include a Washington State‑licensed Professional Engineer (PE) to lead the engineering design team and perform design activities in one or more applicable areas. This requirement applies to Tasks E and F |
Minimum qualifications are required for a Consultant to be eligible to submit a proposal response. Your submittal response must show compliance to these minimum qualifications. Those that are not responsive to these qualifications shall be rejected by the City without further consideration:
| 5 |
| For Scope of Work Section, Task F (engineering research and studies), the Consultant or Consultant Team must have a Professional Engineer licensed in any U.S. state to lead the work. A Washington State license is not required for this specific scope. This requirement applies only to Task F. |
RFQ # SCL-767074509
File details come from the government source that posted it. Updated .