Attachment 6 - Stand. Spec. Road and Bridge.pdf
PDF 7 MB Posted
- Solicitation number
- 26DPP01196
- Issued by
- New Jersey
About this file
Summary: Attachment 6 - Standard Specifications for Road and Bridge
This document is a Standard Specifications for Road and Bridge file prepared by the New Jersey Department of Transportation (NJDOT) for use in state and local pavement system contracts. The specifications establish uniform technical requirements and construction standards applicable to microsurfacing and slurry seal pavement projects. These standardized specifications serve as the baseline requirements for materials, equipment, workmanship, and testing procedures that contractors must follow when executing pavement maintenance and rehabilitation work. The document provides detailed guidance on project execution methodologies, quality control measures, and compliance requirements to ensure consistency across NJDOT-contracted projects.
The specifications cover comprehensive technical standards including material composition requirements, application procedures, weather and temperature conditions for installation, equipment specifications, and acceptance criteria for completed work. These standardized specifications function as a binding contractual document incorporated into bid packages and contract agreements, enabling contractors to clearly understand performance expectations and compliance obligations prior to submitting proposals. The specifications establish the technical framework through which NJDOT evaluates contractor qualifications, pricing submissions, and post-award performance on pavement system projects, ensuring all work meets established quality and durability standards regardless of project location or contractor.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Jersey
Department of Transportation
Standard Specifications for Road and Bridge Construction
New Jersey Department of Transportation
EMPLOYEE MEMORIAL
“Dedicated to those who lost their lives in service.”
Honoree Date of Death Honoree Date of Death
Herman J. Meury July 24, 1946 Anthony Frinzi June 26, 1973
Moses B. Thompson October 9, 1956 D. Douglas Roberts September 22, 1975
Joseph Panetta May 13, 1959 John J. Calarco February 2, 1979
Salvatore Brancato July 8, 1960 Mohammad Afzal November 20, 1979
Donald F. MacNeil, Jr. December 14, 1961 John W. Lauer April 23, 1980
John B. Youngmenn May 16, 1962 Brian T. Everson November 30, 1982
Oliver G. Carson July 30, 1962 Michael G. Collins December 9, 1982
Frederick V. Speth July 6, 1963 Francis J. DeGraw December 12, 1984
Faust DeLorenzo, Jr. June 24, 1964 Rodger M. Anderson September 25, 1985
Nicholas Holovacs April 1, 1965 Robert M. Karuzis January 21, 1987
Charles C. Dougherty June 10, 1966 John Komorowski September 10, 1987
Donald R. Skillman August 23, 1966 Terry J. Kresge January 1, 1988
Lee W. Emmons October 18, 1966 Kyle Kristiansen October 29, 1990
Douglas W. LaForge December 13, 1967 Calvin A. Leach January 21, 1993
Loren T. Nichols June 25, 1968 Francisco Baez August 10, 1993
George P. Moebus January 19, 1972 Louis Caruso June 18, 1999
Gaza Horvath April 11, 1972 Eduardo M. Jimenez June 19, 2007
Alphonse T. Santitoro May 18, 1973 Joseph Kealey January 11, 2010
SUSSEX PASSAIC
BERGEN
MORRIS
ESSEX
HUDSON
UNION
WARREN
HUNTERDON
SOMERSET
MERCER
MIDDLESEX
MONMOUTH
OCEAN
BURLINGTON
CAMDEN
ATLANTIC
GLOUCESTER
SALEM
CUMBERLAND
CAPE
MAY
NORTH
SOUTH
CENTRAL
i
TABLE OF CONTENTS
DIVISION 100 – GENERAL PROVISIONS
SECTION 101 – GENERAL INFORMATION
101.01 Introduction
101.02 Abbreviations
101.03 Terms
101.04 Inquiries Regarding the Project
SECTION 102 – BIDDING REQUIREMENTS AND CONDITIONS
102.01 Qualification to Bid
102.02 Bidder Registration and Downloading of the Proposal Documents
102.03 Revisions Before Submitting a Bid
102.04 Examination of Contract and Project Limits
102.05 Interpretation of Quantities in the Proposal
102.06 “If and Where Directed”
102.07 Preparation of the Bid
102.08 Balanced Bids
102.09 Proposal Bond
102.10 Submission of Bids
102.11 Withdrawal of Bids
102.12 Public Opening of Bids
102.13 Consideration of Bids
102.13.01 Bidder Pre-Award Requirements
102.14 Irregular Bids
102.15 Disqualification of Bidders
102.16 Rejection of All Bids
SECTION 103 – AWARD AND EXECUTION OF CONTRACT
103.01 Award of Contract
103.02 Cancellation of Award
103.03 Release of Proposal Bond
103.04 Execution of the Contract
103.05 Escrow of Bid Documents
103.06 Failure to Execute Contract
103.07 Acquisition of Documents
SECTION 104 – SCOPE OF WORK
104.01 Intent
104.02 Value Engineering
104.02.01 Purpose and Scope
104.02.02 Conditions
104.02.03 Submittals
104.02.04 Final Documents
104.02.05 Payment
104.03 Changes to the Contract
104.03.01 Authority to Make Changes
104.03.02 Protests to Change Orders
104.03.03 Types of Changes
104.03.04 Contractual Notice
104.03.05 Unrecoverable Costs
104.03.06 Unacceptable Cost Calculation Methods
104.03.07 Tracking Costs
104.03.08 Force Account
104.03.09 Delay Damages
SECTION 105 – CONTROL OF WORK
105.01 Authority of the Department
105.01.01 RE
ii
105.01.02 Inspection
105.01.03 Contractor Performance Evaluation
105.02 Responsibilities of the Contractor
105.02.01 Labor and Equipment
105.02.02 Superintendent
105.02.03 Subcontracted Work
105.02.04 Fabricators and Suppliers
105.02.05 Civil Rights Requirements
105.02.06 Access to Department Facilities
105.03 Conformity with Contract
105.04 Plans and Specifications
105.05 Working Drawings
105.06 Cooperation with Others
105.07 Cooperation with Utilities
105.07.01 Working in the Vicinity of Utilities
105.07.02 Work Performed by Utilities
105.08 Environmental Protection
105.09 Load Restrictions
105.10 Use of Explosives
SECTION 106 – CONTROL OF MATERIAL AND EQUIPMENT
106.01 Source of Supply and Quality Requirements
106.02 Department-Furnished Material
106.03 Foreign Materials and Equipment
106.04 Materials Questionnaire
106.05 Materials Inspections, Tests, and Samples
106.06 Plant Inspection
106.07 Certification of Compliance
106.07.01 Certification of Compliance
106.07.02 Certification for Iron and Steel
106.08 Unacceptable Material
106.09 Substitutes for Proprietary Items
106.10 Use of United States Flag Vessels
SECTION 107 – LEGAL RELATIONS
107.01 Legal Jurisdiction
107.01.01 Applicable Law
107.01.02 Permits, Licenses, and Approvals
107.01.03 Sovereign Immunity
107.02 Nondiscrimination
107.03 Affirmative Action, Disadvantaged Business Enterprises or Emerging Small Business Enterprises, and
Small Business Enterpises
107.04 New Jersey Contractual Liability Act
107.05 Limitations of Liability
107.06 Personal Liability of Public Officials
107.07 Assignment
107.08 Non Waiver
107.09 Independent Contractor
107.10 Non-Third Party Beneficiary Clause
107.11 Risks Assumed by the Contractor
107.11.01 Risks
107.11.02 General Insurance
107.12 The Contractual Claim Resolution Process
107.12.01 Satisfying the Notice Requirements
107.12.02 Steps
107.13 Litigation of Claims by the Contractor
107.14 Patented Devices, Materials, and Processes
107.15 Taxes
iii
107.16 Recovery of Monies by the State
107.17 Communication with the News Media
SECTION 108 – PROSECUTION AND COMPLETION
108.01 Subcontracting
108.02 Commencement of Work
108.03 Daily Communications
108.04 Work Site and Storage
108.05 Sanitary and Safety Provisions
108.05.01 Sanitary
108.05.02 Safety Program
108.06 Night Operations
108.07 Traffic Control
108.07.01 Interference
108.07.02 Changes to the Traffic Control Plan (TCP)
108.08 Occupancy Charges
108.09 Maintenance Within the Project Limits
108.10 Contract Time
108.11 Modifications to Contract Time
108.11.01 Extensions to Contract Time
108.11.02 Reductions to Contract Time
108.12 Right-of-Way Restrictions
108.13 Suspension of Work
108.14 Default and Termination of Contractor’s Right to Proceed
108.15 Termination of Contract
108.15.01 For Convenience
108.15.02 For Cause
108.16 Partial Acceptance
108.17 Interim Completion
108.18 Substantial Completion
108.19 Completion and Acceptance
108.20 Liquidated Damages
108.21 Warranties
SECTION 109 – MEASUREMENT AND PAYMENT
109.01 Measurement of Quantities
109.02 Scope of Payment
109.03 Payment for Force Account
109.04 Payment for Delay Damages
109.05 Estimates
109.06 Materials Payments and Storage
109.07 Bonds Posted in Lieu of Retainages
109.08 As-Built Quantities
109.09 Audits
109.10 Contractor’s Compliance
109.11 Final Payment and Claims
109.12 Ethics Standards and Conflicts of Interest
DIVISION 150 – CONTRACT REQUIREMENTS
SECTION 151 – PERFORMANCE BOND AND PAYMENT BOND
151.01 Description
151.02 Materials
151.03 Procedure
151.03.01 Performance Bond and Payment Bond
151.04 Measurement and Payment
SECTION 152 – INSURANCE
152.01 Description
152.02 Materials
iv
152.03 Procedure
152.03.01 Railroad Protective Liability Insurance
152.03.02 Pollution Liability Insurance
152.04 Measurement and Payment
SECTION 153 – PROGRESS SCHEDULE
153.01 Description
153.02 Materials
153.03 Procedure
153.03.01 CPM Progress Schedule
153.03.02 CPM Progress Schedule Updates
153.03.03 Bar Chart Progress Schedule and Updates
153.04 Measurement and Payment
SECTION 154 – MOBILIZATION
154.01 Description
154.02 Materials
154.03 Procedure
154.03.01 Mobilization
154.04 Measurement and Payment
SECTION 155 – CONSTRUCTION FIELD OFFICE
155.01 Description
155.02 Materials
155.03 Procedure
155.03.01 Field Office
155.03.02 Field Office Maintenance
155.04 Measurement and Payment
SECTION 156 – MATERIALS FIELD LABORATORY AND CURING FACILITY
156.01 Description
156.02 Materials
156.03 Procedure
156.03.01 Materials Field Laboratory
156.03.02 Materials Field Laboratory Maintenance
156.03.03 Curing Facility
156.03.04 Curing Facility Maintenance
156.03.05 Nuclear Density Gauge
156.03.06 Flexural Beam Testing Equipment
156.03.07 Concrete Compression Testing Equipment
156.04 Measurement and Payment
SECTION 157 – CONSTRUCTION LAYOUT AND MONUMENTS
157.01 Description
157.02 Materials
157.03 Procedure
157.03.01 Construction Layout
157.03.02 Monument
157.03.03 Monument Box
157.04 Measurement and Payment
SECTION 158 – SOIL EROSION AND SEDIMENT CONTROL AND WATER QUALITY CONTROL
158.01 Description
158.02 Materials
158.03 Construction
158.03.01 Environmental Manager
158.03.02 SESC Measures
158.03.03 Erosion Control Sediment Removal
158.04 Measurement and Payment
SECTION 159 – TRAFFIC CONTROL
159.01 Description
159.02 Materials
v
159.02.01 Materials
159.02.02 Equipment
159.03 Procedure
159.03.01 Traffic Control Coordinator
159.03.02 Traffic Control Devices
159.03.03 Removable Black Line Masking Tape
159.03.04 Temporary Pavement Markers
159.03.05 Temporary Pavement Marking Tape
159.03.06 Traffic Stripes, Latex ,Traffic Markings Lines, Latex and Traffic Markings Symbols, Latex ... 112
159.03.07 HMA Patch
159.03.08 Traffic Direction
159.03.09 Emergency Towing Service
159.04 Measurement and Payment
SECTION 160 – PRICE ADJUSTMENTS
160.01 Description
160.02 Materials
160.03 Procedure
160.03.01 Fuel Price Adjustment
160.03.02 Asphalt Price Adjustment
160.04 Measurement and Payment
SECTION 161 – FINAL CLEANUP
161.01 Description
161.02 Materials
161.03 Procedure
161.03.01 Final Cleanup
161.04 Measurement and Payment
DIVISION 200 – EARTHWORK
SECTION 201 – CLEARING SITE
201.01 Description
201.02 Materials
201.03 Construction
201.03.01 Clearing Site
201.03.02 Clearing Site, Bridge and Clearing Site, Structure
201.03.03 Clearing Site, Tank Removal
201.03.04 Disposing and Recycling of Contaminated Soil - Tanks
201.03.05 Monitoring Well
201.03.06 Sealing Abandoned Wells
201.03.07 Demolition
201.03.08 Removal of Asbestos
201.03.09 Temporary Shielding
201.04 Measurement and Payment
SECTION 202 – EXCAVATION
202.01 Description
202.02 Materials
202.03 Construction
202.03.01 Stripping
202.03.02 Excavation, Test Pit
202.03.03 Excavation, Unclassified
202.03.04 Presplitting
202.03.05 Excavation, Regulated Material
202.03.06 Excavation, Acid Producing Soil
202.03.07 Acid Producing Soil Remediation
202.03.08 Removal of Pavement
202.03.09 Disposal of Regulated Material
202.03.10 Disposal of Regulated Material, Hazardous
vi
202.03.11 Disposal of Acid Producing Soil
202.04 Measurement and Payment
SECTION 203 – EMBANKMENT
203.01 Description
203.02 Materials
203.02.01 Materials
203.02.02 Equipment
203.03 Construction
203.03.01 Breaking Pavement
203.03.02 Soil Aggregate
203.04 Measurement and Payment
DIVISION 300 – SUBBASE AND BASE COURSES
SECTION 301 – SUBBASE
301.01 Description
301.02 Materials
301.02.01 Materials
301.02.02 Equipment
301.03 Construction
301.03.01 Subbase
301.04 Measurement and Payment
SECTION 302 – AGGREGATE BASE COURSE
302.01 Description
302.02 Materials
302.02.01 Materials
302.02.02 Equipment
302.03 Construction
302.03.01 Soil Aggregate Base Course and Dense-Graded Aggregate Base Course
302.04 Measurement and Payment
SECTION 303 – ASPHALT-STABILIZED DRAINAGE COURSE
303.01 Description
303.02 Materials
303.02.01 Materials
303.02.02 Equipment
303.03 Construction
303.03.01 Asphalt-Stabilized Drainage Course
303.04 Measurement and Payment
SECTION 304 – CONCRETE BASE COURSE
304.01 Description
304.02 Materials
304.02.01 Materials
304.02.02 Equipment
304.03 Construction
304.03.01 Concrete Base Course
304.04 Measurement and Payment
SECTION 305 – RUBBLIZING CONCRETE PAVEMENT
305.01 Description
305.02 Materials
305.02.01 Materials
305.02.02 Equipment
305.03 Construction
305.03.01 Rubblization
305.04 Measurement and Payment
DIVISION 400 – PAVEMENTS
vii
SECTION 401 – HOT MIX ASPHALT (HMA) COURSES
401.01 Description
401.02 Materials
401.02.01 Materials
401.02.02 Equipment
401.03 Construction
401.03.01 Milling
401.03.02 Sealing Cracks in HMA Surface Course
401.03.03 HMA Pavement Repair
401.03.04 Polymerized Joint Adhesive
401.03.05 Tack Coat
401.03.06 Prime Coat
401.03.07 HMA Courses
401.03.08 Core Samples
401.04 Measurement and Payment
SECTION 402 – HMA FRICTION COURSE
402.01 Description
402.02 Materials
402.02.01 Materials
402.02.02 Equipment
402.03 Construction
402.03.01 Open-Graded Friction Course and Modified Open-Graded Friction Course
402.03.02 Asphalt-Rubber Open-Graded Friction Course
402.04 Measurement and Payment
SECTION 403 – ULTRA-THIN FRICTION COURSE
403.01 Description
403.02 Materials
403.02.01 Materials
403.02.02 Equipment
403.03 Construction
403.03.01 Ultra-Thin Friction Course
403.04 Measurement and Payment
SECTION 404 – STONE MATRIX ASPHALT (SMA)
404.01 Description
404.02 Materials
404.02.01 Materials
404.02.02 Equipment
404.03 Construction
404.03.01 Stone Matrix Asphalt Surface Course
404.04 Measurement and Payment
SECTION 405 – CONCRETE SURFACE COURSE
405.01 Description
405.02 Materials
405.02.01 Materials
405.02.02 Equipment
405.03 Construction
405.03.01 Underlayer Preparation
405.03.02 Concrete Surface Course
405.03.03 Core Samples
405.03.04 Diamond Grinding
405.04 Measurement and Payment
SECTION 406 – HIGH PERFORMANCE THIN OVERLAY
406.01 Description
406.02 Materials
406.02.01 Materials
406.02.02 Equipment
viii
406.03 Construction
406.03.01 High Performance Thin Overlay
406.04 Measurement and Payment
SECTION 407 - BINDER RICH INTERMEDIATE COURSE
407.01 Description
407.02 Materials
407.02.01 Materials
407.02.02 Equipment
407.03 Construction
407.03.01 BRIC
407.04 Measurement and Payment
SECTION 408 – ASPHALT RUBBER GAP GRADED COURSES
408.01 Description
408.02 Materials
408.02.01 Materials
408.02.02 Equipment
408.03 Construction
408.03.01 ARGG Course
408.04 Measurement and Payment
DIVISION 420 – PAVEMENT SURFACE TREATMENTS
SECTION 421 – MICRO SURFACING AND SLURRY SEAL
421.01 Description
421.02 Materials
421.02.01 Materials
421.02.02 Equipment
421.03 Construction
421.03.01 Micro Surfacing Aggregate, Type III Rut Filling
421.03.02 Micropaving Joints
421.03.03 Micro Surfacing Aggregate and Micro Surfacing Emulsion
421.03.04 Slurry Seal Aggregate and Slurry Seal Emulsion
421.04 Measurement and Payment
SECTION 422 – FOG SEAL
422.01 Description
422.02 Materials
422.02.01 Materials
422.02.02 Equipment
422.03 Construction
422.03.01 Fog Seal Surface Treatment
422.03.02 Fog Seal Strip
422.04 Measurement and Payment
DIVISION 450 – CONCRETE PAVEMENT REHABILITATION
SECTION 451 – CONCRETE SLAB STABILIZATION
451.01 Description
451.02 Materials
451.02.01 Materials
451.02.02 Equipment
451.03 Construction
451.03.01 Slab Stabilization, High-Density Polyurethane Grout
451.03.02 Slab Stabilization, Deflection Testing
451.04 Measurement and Payment
SECTION 452 – PARTIAL DEPTH CONCRETE PAVEMENT REPAIR
452.01 Description
452.02 Materials
ix
452.02.01 Materials
452.02.02 Equipment
452.03 Construction
452.03.01 Partial Depth Concrete Pavement Repair
452.04 Measurement and Payment
SECTION 453 – FULL DEPTH CONCRETE PAVEMENT REPAIR
453.01 Description
453.02 Materials
453.02.01 Materials
453.02.02 Equipment
453.03 Construction
453.03.01 Full Depth Concrete Pavement Repair, Concrete
453.03.02 Full Depth Concrete Pavement Repair, HMA
453.04 Measurement and Payment
SECTION 454 – DIAMOND GRINDING EXISTING CONCRETE PAVEMENT
454.01 Description
454.02 Materials
454.02.01 Materials
454.02.02 Equipment
454.03 Construction
454.03.01 Diamond Grinding Existing Concrete Pavement
454.03.02 Ride Quality Requirements
454.04 Measurement and Payment
SECTION 455 – SEALING EXISTING JOINTS IN CONCRETE PAVEMENT
455.01 Description
455.02 Materials
455.02.01 Materials
455.02.02 Equipment
455.03 Construction
455.03.01 Sealing Existing Joints in Concrete Pavement
455.04 Measurement and Payment
DIVISION 500 – BRIDGES AND STRUCTURES
SECTION 501 – SHEETING AND COFFERDAMS
501.01 Description
501.02 Materials
501.03 Construction
501.03.01 Temporary Sheeting
501.03.02 Permanent Sheeting
501.03.03 Temporary Cofferdam
501.03.04 Permanent Cofferdam
501.04 Measurement and Payment
SECTION 502 – LOAD BEARING PILES
502.01 Description
502.02 Materials
502.02.01 Materials
502.02.02 Equipment
502.03 Construction
502.03.01 Furnishing Pile Driving Equipment
502.03.02 Prebored Hole
502.03.03 Driving Piles
502.03.04 Splices
502.03.05 Pile Shoe
502.04 Measurement and Payment
SECTION 503 – DRILLED SHAFT FOUNDATIONS
503.01 Description
x
503.02 Materials
503.02.01 Materials
503.02.02 Equipment
503.03 Construction
503.03.01 Furnishing Drilled Shaft Equipment
503.03.02 Demonstration Drilled Shaft
503.03.03 Load Test
503.03.04 Crosshole Sonic Logging
503.03.05 Tomography
503.03.06 Shaft Coring
503.03.07 Constructing Drilled Shafts
503.03.08 Obstructions Removal
503.04 Measurement and Payment
SECTION 504 – STRUCTURAL CONCRETE
504.01 Description
504.02 Materials
504.02.01 Materials
504.02.02 Equipment
504.03 Construction
504.03.01 Reinforcement Steel
504.03.02 Concrete
504.03.03 Epoxy Waterproofing
504.03.04 Concrete Staining
504.04 Measurement and Payment
SECTION 505 – PRECAST AND PRESTRESSED STRUCTURAL CONCRETE
505.01 Description
505.02 Materials
505.02.01 Materials
505.02.02 Equipment
505.03 Construction
505.03.01 Pretensioned Prestressed Concrete Beam and Prestressed Concrete Beam
505.03.02 Precast Concrete Culvert
505.03.03 Precast Concrete Arch Structure
505.04 Measurement and Payment
SECTION 506 – STRUCTURAL STEEL
506.01 Description
506.02 Materials
506.03 Construction
506.03.01 Structural Steel
506.03.02 Bearings
506.03.03 Shear Connectors
506.03.04 Steel Pedestrian Bridges
506.03.05 Steel Grid Flooring
506.04 Measurement and Payment
SECTION 507 – CONCRETE BRIDGE DECK, BRIDGE PARAPET, AND APPROACHES
507.01 Description
507.02 Materials
507.02.01 Materials
507.02.02 Equipment
507.03 Construction
507.03.01 Joint Assemblies
507.03.02 Concrete Bridge Deck
507.03.03 Date Panel
507.03.04 Concrete Bridge Sidewalk
507.03.05 Concrete Parapet and Concrete Barrier Curb
507.03.06 Steel Bar Bridge Railing
xi
507.03.07 Concrete Bridge Approach
507.04 Measurement and Payment
SECTION 508 – BRIDGE DRAINAGE
508.01 Description
508.02 Materials
508.03 Construction
508.03.01 Inlet Frame and Grate
508.03.02 Scupper
508.03.03 Steel Alloy Pipe
508.03.04 Fiberglass Pipe
508.04 Measurement and Payment
SECTION 509 – BRIDGE COMBINATION RAILING, MISCELLANEOUS RAILINGS, AND FENCE
509.01 Description
509.02 Materials
509.03 Construction
509.03.01 Bridge Railing
509.03.02 Chain-Link Fence for Bridge
509.04 Measurement and Payment
SECTION 510 – TIMBER STRUCTURES
510.01 Description
510.02 Materials
510.03 Construction
510.03.01 Timber Structures
510.03.02 Sheeting and Wales
510.04 Measurement and Payment
SECTION 511 – BULKHEAD, FENDER, AND DOLPHIN SYSTEMS
511.01 Description
511.02 Materials
511.02.01 Materials
511.02.02 Equipment
511.03 Construction
511.03.01 Sheet Piling and Polymer Structural Members
511.04 Measurement and Payment
SECTION 512 – SIGN SUPPORT STRUCTURES
512.01 Description
512.02 Materials
512.02.01 Materials
512.02.02 Equipment
512.03 Construction
512.03.01 Sign Support Structures
512.04 Measurement and Payment
SECTION 513 – RETAINING WALLS
513.01 Description
513.02 Materials
513.02.01 Materials
513.02.02 Equipment
513.03 Construction
513.03.01 Retaining Walls
513.03.02 Retaining Wall, Cast-in-Place
513.03.03 Concrete Staining
513.04 Measurement and Payment
SECTION 514 – TEMPORARY STRUCTURES
514.01 Description
514.02 Materials
514.03 Construction
514.03.01 Temporary Structures
xii
514.04 Measurement and Payment
DIVISION 550 – STRUCTURE REHABILITATION
SECTION 551 – BRIDGE DECK REHABILITATION
551.01 Description
551.02 Materials
551.02.01 Materials
551.02.02 Equipment
551.03 Con
File details come from the government source that posted it. Updated .