Attachment 5 Submittal Register SolarPV Bldg.57-58 .pdf
PDF 201 KB Posted
- Solicitation number
- SP330022B0001
- Issued by
-
Defense Logistics Agency Distribution
About this file
This document contains a submittal register and related federal contract opportunity for an electrical power resiliency project at Defense Logistics Agency Distribution buildings 57 and 58. The submittal register outlines submittal requirements for division 1 general requirements and division 26 electrical work. It requires submittals including an accident prevention plan, construction schedule, contractor quality control plan, and shop drawings. The federal contract opportunity is a solicitation to design and construct roof-mounted solar photovoltaic systems of 500KW for building 57 and 300KW for building 58. It provides the solicitation number, opportunity type, project description including interconnection of the solar arrays with the existing electrical service and use of generated power, scope of work, specifications, and applicable drawing numbers. The pre-construction meeting and initial and final submittals are to be in accordance with Section F.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division 01 Special Requirements
FORM 4288
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION
DDJC ELECTRIC POWER RESILINCY BLDG.57-58 Division 1 - General Requirements
CONTRACTOR
A C T I V I T Y
N O
R A N S M I T T
L
S P E
DESCRIPTION OF ITEM SUBMITTED
R A G R A
H
G
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR SCHEDULE DATES CONTRACTOR
ACTION
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH
REMARKS
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
T I
D
DATE OF
DATE FWD
TO APPR
AUTH
DATE RCD
CONTR
TO OTHER
REVIEWER
DATE RCD
FROM OTH
T I
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
011400 WORK RESTRICTIONS
SD-01 PRECONSTRUCTION SUBMITTALS
Special Access Determination Form 1.4.1.5 G
013201 PROJECT SCHEDULE
SD-01 PRECONSTRUCTION SUBMITTALS
Construction Project Schedule 3.3 G
013300 SUBMITTAL PROCEDURES
SD-01 PRECONSTRUCTION SUBMITTALS
Submittal Register 1.11 G
013529 SAFETY AND OCCUPATIONAL HEALTH REQTS.
SD-01 PRECONSTRUCTION SUBMITTALS
Accident Prevention Plan (APP) 1.6 G Injury Prevention Plan G Activity Hazard Analysis (AHA) 1.7 G Crane/Fork Lift plan 1.6 G
SD-06 TEST REPORTS
Accident Reports 1.11.1 G Monthly Exposure Reports 1.11.3 G Crane/Fork Lift Report 1.11.4 G
SD-07 CERTIFICATES
Hot Work Permit 1.12 G
014500 CONTRACTOR QUALITY CONTROL
SD-01 PRECONSTRUCTION SUBMITTALS
Contractor Quality Control Plan 3.2 G
Division 01 Special Requirements
DDJC ELECTRIC POWER RESILINCY BLDG.57-58 Division 1 – General Requirements
T I V I
A N S M I T T
R A G R A
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR SCHEDULE DATES CONTRACTOR
MAILED TO
CONTR/
DATE RCD
APPR AUTH
APPROVAL
MATERIAL
T I
TO APPR
AUTH
DATE RCD
TO OTHER
DATE RCD
FROM OTH
T I
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
015719 ENVIRONMENTAL PROTECTION
SD-01 PRECONSTRUCTION SUBMITTALS
Environmental Protection Plan 1.7 G
SD-11 CLOSEOUT SUBMITTALS
017800 PROJECT CLOSE OUT
SD-02 SHOP DRAWINGS
As-Built Drawings 1.2.1 G
SD-03 PRODUCT DATA
As-Built Record of Equipment and Material. 1.2.2 G Warranty Management Plan 1.3.1 G Final Cleaning 1.6 G
SD-11 CLOSEOUT SUBMITTALS
Record Drawings 1.2.1 G Post construction Survey 1.6.1 G
Page 3/3
DDJC ELECTRIC POWER RESILINCY BLDG.57-58 Division 26 - Electrical
T I V I
A N
S M I T T
R
A
G
R
A
CONTRACT
OR
ACTION O
APPROV
AL
NEEDED
BY
MATERI
AL
NEEDED
BY
T I
DATE
OF
ACTIO
FWD
TO
APPR
AUTH
DATE
RCD
FWD TO
OTHER
REVIEW
ER
RCD
FROM
OTH
REVIEW
ER
T I
OF
ACTIO
N
V C T L A O S R S I A F / I E C A R T E I V O W N R
CONTR/
DATE
FROM
APPR
AUTH
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
ELECTRICAL
260500 SD 02 Product Data Conduit 1.3 G Wires and cables 1.3 G
010110 SD 03 Solar PV design 1.1.1 263100 SD 02 Interconnection diagram 1.4 SD 03 Installation diagram 1.4 SD 03 Product data 1.4 SD 05 Design data 1.4 SD 05 Test report 1.4 SD 07 Certificates 1.4 SD 08 Manufacturer’s instructions 1.4 SD 10 Operation and maintenance data 1.4 Letter of conformance 2.2. j 481450 Same as section 263100 1.3
Division 26 E l e c t r i c a l
File details come from the government source that posted it. Updated .