Attachment_5_-_Subcontracting_Percentage_Worksheet.docx
DOCX document 93 KB Posted
- Attached to
- CHOH FY21 RESURFACE TOWPATH PMIS25493A/B
- Solicitation number
- 140P3021R0011
About this file
This document contains a subcontracting percentage worksheet template for use in calculating the percentage of work to be subcontracted out on a federal landscape maintenance contract opportunity. The prime contractor and potential subcontractor would input direct labor costs, fringe benefits, and general and administrative overhead rates into the provided formula to calculate the percentage of total contract labor costs represented by subcontracted work. The related federal contract opportunity is for towpath resurfacing work at Chesapeake and Ohio Canal National Historical Park in fiscal year 2021. The solicitation number is 140P3021R0011 and the project name is CHOH FY21 Resurface Towpath PMIS25493A/B. The contracting agency is the National Park Service National Office within the Department of the Interior.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_6_-_Item_Specifications_Shepherdstown_to_Dam_4_0001.docx | DOCX document | |
| Attachment_7_-_Questions_and_Answers_0001.docx | DOCX document | |
| Sol_140P3021R0011_Amd_0001.pdf | ||
| Attachment_8_-_Revised_Combined_Drawings_0001.pdf | ||
| Attachment_3_-_WD_MD20210104_Montgomery_effective_1-1-21.pdf | ||
| Sol_140P3021R0011.pdf | ||
| Attachment_1_-_Specifications_Revised_02_20_21.docx | DOCX document | |
| Attachment_4_-_Proposal_Submission_Package.docx | DOCX document | |
| Attachment_2_-_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
DOI Region 1 - NATIONAL CAPITAL AREA 1100 Ohio Drive S.W.
Washington, D.C., 20242
NPS-National Capital Region Solicitation: 140P3019R0015 – Landscape Maintenance Page 2 of 2
5 April 2021
SUBJECT: FAR CLAUSE 52.219-14, SUBCONTRACTING PERCENTAGE WORKSHEET
PRIME CONTRACTOR: _________________________ SOURCE: ________________________
SUBCONTRACTOR: ___________________________ SOURCE: ________________________
To calculate, either follow the below directions OR right click the above Excel ‘Object’ and select ‘Worksheet Object’ then ‘Edit’. You can then input Direct Labor/Fringe Benefits/G&A % and it will calculate for you.
a) To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
b) Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
c) Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).
d) Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
e) Next, using the formula below, calculate the subcontracting labor percentage.
____(D)____
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE = %
*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
**G&A denotes General and Administrative Costs ***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.
NPS-National Capital Area Page 1 of 1
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION – SEE FAR 3.104
Preserving unimpaired the natural and cultural resources and values of the national park system for the enjoyment, education, and inspiration of this and future generations.
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION – SEE FAR 3.104
image1.emf
Microsoft_Excel_Worksheet.xlsx Sheet1
PRIME CONTRACTOR SUBCONTRACTOR
DIRECT LABOR $250.00 $50.00
FRINGE BENEFITS $300.00 $100.00
SUB TOTAL (A)$550 (B)$150
LABOR G&A** @ 10.00% $55.00 10.00% $15.00
TOTAL LABOR COST (C)$605 (D)$165
Subcontracting Labor Percentage 21.43% image2.jpeg image3.jpeg