Attachment_1_-_Specifications_Revised_02_20_21.docx

DOCX document 331 KB Posted

Attached to
CHOH FY21 RESURFACE TOWPATH PMIS25493A/B
Solicitation number
140P3021R0011
Issued by

About this file

This document package includes project specifications and drawings for the resurfacing of approximately 14 miles of towpath along the Chesapeake and Ohio Canal National Historical Park.

The National Park Service is soliciting bids for a base contract to resurface the towpath from Shepherdstown Access Milepost 72.80 to Milepost 86.90. An optional section is also included to resurface Milepost 118.00 to 122.60. Work will include removing vegetation from the center of the towpath, grading, and placing new aggregate surface materials in lifts up to 3 inches deep. The contractor will furnish all labor, equipment and materials to complete excavation and grading work, and install a new crushed limestone surface course and base materials. Bids are due by June 15, 2021, with work to be completed within one year excluding a winter shutdown from December through March. The contractor will be responsible for erosion control, traffic control, and complying with all federal, state and local regulations throughout the project duration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHESAPEAKE AND OHIO CANAL NATIONAL HISTORICAL PARK

REPAIR AND RESURFACE TOWPATH CHOH

PMIS NO. 254939

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE NATIONAL CAPITOL REGION 02/20/2020

TABLE OF CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS

011100 Summary of Work 013100 Project Meetings 013230 Schedules and Monthly Inspections 013300 Submittals 013310 Submittal Forms 013600 Accident Prevention 015100 Temporary Services 014300 Contractor Quality Control 015200 Field Offices and Sheds 015600 Barriers 015700 Temporary Controls 016000 Material and Equipment 017200 Field Engineering 017700 Project Closeout

DIVISION 31 - SITE WORK

310000 Roadway Excavation and Embankment 312000 Towpath Resurfacing 001-008 Specifications.

PARK-PKG. TOC-1

SECTION 011100 SUMMARY OF WORK

BASE BID

SHEPHERDSTOWN TO

MILE 86.90

OPTION 1

MILE 118.0 TO 122.6

INSTRUCTIONS TO BIDDERS

1.1 DESCRIPTION:

1. The Base Bid work consists of the general grading, repair and resurfacing of approximately 14.10 miles of historic towpath by placing, compacting and grading granular stone. The contractor will be required to furnish all equipment, material, labor and supervision to resurface the towpath, repair minor erosion damage on the towpath shoulders. The towpath can only be accessed in specific locations and therefore, some repairs will be necessary at ingress and egress locations of work areas. The towpath is weight restricted and narrow due to historic structures along the towpath. The contractor shall submit equipment type, size and weight to the NPS for approval prior to construction starts. For bidding purposes, the project is broken down into two sections as outlined in the detailed specifications. Option 1 work consists of applying two inches, 2” of AASHTO#10 limestone to approximately four miles of existing towpath over a previously section of towpath that has the grading and base material completed.

2. Base Bid: Shepherdstown Access MP# 72.80 to MP# 86.90 Work includes removing center grass strip, grading and leveling existing towpath surface in accordance to Detail Drawings in of the Specifications. Contractor shall place a layer of AASHTO #10 limestone finish layer over regraded and repaired towpath in accordance to Detail Drawing # 4 of the contract drawings between MP# 72.80 and MP# 77.00. Finished towpath shall be compacted, free of potholes, roots, and washouts with positive drainage established off the towpath.

Between MP# 77.00 and MP# 81.00 see Detail Drawing # 6 of the contract drawings. This section will require 3” of CR-8 crusher run base with a 2” layer of AASHTO #10 top layer 8’ wide.

Between MP# 80.00 and MP#81.00 see Detail Drawing # 5 of the contract drawings. This section requires 3” of CR-8 crusher run base with a 2” layer of AASHTO# 10 top layer 10’ wide.

Between MP# 82.00 to MP86.90: Work includes removing center grass strip, grading and leveling existing towpath surface in accordance to Detail Drawings in the Specifications. Contractor shall place a layer of 3” AASHTO #10 limestone finished layer over regarded and repaired towpath in accordance to Detail Drawing # 4 of the Contract Drawings.

OPTION 1: MP# 118.00 TO MP# 122.60: Work included removing center grass strip and placing a layer of 2” AASHTO #10 limestone finished layer in accordance to Detail drawing # 3 of the contract drawings.

3. Contractor shall obtain and pay for all necessary hauling / over-road permits from state and local authorities having jurisdiction. Contractor shall roll and compact the prepared towpath surface and all placed aggregate in the same day.

4. All work will be performed under a single contract.

1.2 LOCATION

1. Project located is on the towpath of the Chesapeake and Ohio Canal National Historic Park between Shepherdstown MP# 72.80 and Dam #4 MP# 86.90, and Mile Marker Road MP# 118.00 to Hancock Maintenance Center MP# 122.60 in the state of Maryland, no work or equipment will be permitted on the aqueducts.

2. Access to the project areas and stockpile will be at these locations, weight restrictions may apply:

· Milepost #72.80 Shepherdstown access and stockpile area

· Milepost #76.65 Snyder’s Landing access and stockpile area

· Milepost #81.00 Taylors Landing access and stockpile area

· Milepost #85.40 Big Slackwater access and stockpile area

· Milepost #116.75 Mile Marker Road Access and stockpile area

· Milepost #122.50 Hancock maintenance area access and stockpile area

3. The contractor shall enter and exit the towpath via the access points listed above. The contractor shall prepare and submit for review and approval site specific traffic management plans. The plan should address the following items: management of the staging areas ingress and egress from the staging areas to the worksite, the worksite locations, flagging, signs, towpath driving rules, types of vehicles and equipment including size. Loading weight, number and axle type.

4. The Contractor will be required to provide pre-approved bridging over existing waste weirs prior to crossing these structures.

1.3 CONTRACTORS USE OF PREMISES

1. The towpath will not be closed to the public during construction. The contractor must provide signs and flag personnel as required to alert bicyclists and hikers on the towpath of the construction areas. Use of a detour should be considered. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public. Total towpath closures will not be permitted, however, 15-minute delays will be permitted, if the contractor provides proper signage and approved flag persons to assist the public. Additional delay time may be approved when placing structures. All traffic on the towpath must yield to pedestrians and cyclists unless they are within a traffic-controlled area utilizing the approved traffic control plan.

2/24/202188 011100-4

SUMMARY OF WORK

2. The contractor shall follow park rules for vehicles on the towpath and shall provide highway and towpath signage in accordance to MUTCD as specified for each established entrance point along the ingress and egress of the national park. The contractor shall make reasonable accommodations to maintain access for National Park Service administrative and other official business throughout the construction phase.

3. The Contractor shall provide approved E&S controls at stockpile areas and confine storage of material to approved stockpile areas located on the plans. The contractor shall not store materials on the towpath.

4. Preservation of natural features: Confine all operations to within the work limits of the project. Prevent damage to natural surroundings. Restore damaged areas repairing or replacing damaged trees and planted, at no additional expense to the Government.

· Provide temporary barriers to protect existing trees if required by the COR

· Do not remove injured or destroyed trees or other plants without prior approval. Consult with COR and remove agreed on roots and branches that interfere with construction.

· Do not fasten ropes, cables or guys to existing trees.

· Carefully supervise excavating, grading, filling, and other construction near trees to prevent damage.

5. EXISTING UTILITIES: Notify COR and utility companies of proposed locations and times of excavation.

· Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs repair utility at no additional expense to the government.

· Notify Miss Utility 72 hours prior to excavation.

6. HAULING RESTRICTIONS: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are the same as state road restrictions with such additional regulations as may be imposed by the Contracting Officer. The towpath is not considered a road, but rather a trail.

1.4 SPECIAL CONSTRUCTION REQUIREMENTS

1. The worksite and the access to the worksite is the Historic Towpath. The contractor shall insurer that all employees are aware of and fully comply with the rules for operating equipment and vehicles on the towpath. There is a maximum 10 mph speed limit and 15 ton (GVW) single axle vehicle weight restriction on the towpath unless authorized otherwise by the COR. If historic structures are avoided additional weight limits can be approved for certain areas.

2. Tri-axle trucks may be used to deliver to approved stockpile areas shown on the drawings. The contractor shall be responsible for verifying all load restrictions, overhead clearances and utilities.

6/26/2018 011100-3

3. Holiday work restrictions: No on-site work shall be performed on weekends or holidays unless approved in writing by the COR. Requests shall be made at least 72 hours in advance for consideration by park management. The contract period is for 10 months beginning with the issuance of the Notice to Proceed.

4. All work shall take place between the hours of 6:30 a.m. and 5:30 p.m. From the contract award date, the contractor will have a period of one calendar year to complete the project. Due to the sensitivity to the towpath infrastructure, a winter blackout with no construction will be from December 1st to March 1st of the proposed project year. The project will have a nine-month work construction period.

5. The Contractor shall use approved portable bridges or mats for crossing waste weirs with weight certification capacity that exceeds the equipment and material loading on the bridges. COR approval required prior to bridge placement. Span crossing are between 10 and 12 feet. This shall be part of the Contractors Mobilization costs.

1.5 FIELD VERIFICATION

1. Field verify all existing conditions and dimensions affecting the work of this contract before ordering materials or commencing grading operations. Positive drainage off the towpath shall be discussed with the Contracting Officer’s Representative prior to commencing work.

1.6 CONSTRUCTION MATERIALS

1. All materials, including borrow and aggregates, shall be Contractor furnished from an approved source outside the park. Aggregate shall be from a State DOT approved quarry supplier. All material shall have samples approved by the COR prior to delivery.

2. The towpath wearing course material shall be AASHTO #10 crushed limestone from a MDOT certified quarry or approved equal.

3. The towpath leveling course and sub base repair material shall be CR-8 subbase repair and CR-8 base course crushed limestone from an approved MDOT certified quarry or approved equal.

1.7 SALVAGED MATERIALS

1. Organic material removed from the towpath shall be reuse as backfill material along the sides for the finished towpath surface. Any material not reused shall be disposed of outside the park by the Contractor.

END OF SECTION

2/9/2018 011100-4

SECTION 013100 PROJECT MEETINGS

PART 1 GENERAL

1 .1 PRECONSTRUCTION CONFERENCE

A. Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:

1. Park rules and regulations

2. Authorized Representatives

3. Correspondence procedures

4. Labor standards provisions

5. Payroll reports

6. Modifications

7. Payments to Contractor

8. Acceptance/rejection

9. Construction meetings

10. Subcontractors

11. Documents required under the contract

12. Submittal of shop drawings, project data, samples, and approved equals

13. As-constructed drawings/operation and maintenance (O&M) manuals

14. Saturday, Sunday, holiday and night work

15. Reference materials

16. Contractor quality control

17. Value engineering

18. Liquidated damages

19. Notice to proceed

20. Tentative construction schedule

21. Recycling Program

2/9/2018 013100-2

PROJECT MEETINGS

1 .2 PROGRESS MEETINGS

A. The Contracting Officer will schedule weekly meetings with the Contractor and subcontractors.

B. Subcontractors will not be allowed to work until they have attended a meeting.

C. Additional meetings will be held as needed or for new subcontractors.

D. The meeting agenda will include the following as a minimum:

1. Approval of minutes of previous meetings

2. Review of work progress

3. Field observations, problems, and decisions

4. Identification of problems which impede planned progress

5. Review of Contractor’s Quality Control Program and activities

6. Review of submittals schedule and status of submittals

7. Review of off-site fabrication and delivery schedules

8. Status of project record drawings (monthly)

9. Status of operation and maintenance data manuals (monthly)

10. Maintenance of progress schedule

11. Corrective measures to regain projected schedules

12. Planned progress during succeeding work period

13. Coordination of projected progress

14. Maintenance of quality and work standards

15. Effect of proposed changes on progress schedule and coordination

16. Other business relating to work PART 2 PRODUCTS NOT USED. PART 3 EXECUTION NOT USED.

END OF SECTION

SECTION 013230

PROJECT SCHEDULE AND INSPECTIONS

1 .1 DESCRIPTION

A. Summary: The work of this section consists of project schedule requirements including preparation of a project schedule, schedule updates, schedule revisions and time impact analysis. The project schedule shall be based upon the Critical Path Method (CPM) for planning, scheduling and reporting progress of the Work.

B. Purpose: The purpose of the project schedule is to ensure adequate planning, coordination, scheduling, and reporting during execution of the work by the Contractor. The project schedule will assist the Contractor and Contracting Officer in monitoring the progress of the work, evaluating proposed changes, and processing the Contractor's monthly progress payment.

C. Software: The software shall be the latest version of Primavera Project Planner (P3), SureTrak Project Scheduler, Microsoft Project, or approved equal. The Contractor shall provide to the Contracting Officer Representative a licensed copy of the software used for the project schedule and a software reference manual. The software and reference manual will be returned to the Contractor at completion of the Contract.

1 .2 SUBMITTALS:

A. As specified in Section 013300

B. Project Schedule: Within 28 calendar days after Notice to Proceed, submit one electronic copy on PC compatible CD-ROM and 2 paper copies of the proposed project schedule, and accompanying CPM Schedule Reports.

C. Project Schedule Updates: On or before the 7th day preceding the progress payment request date, submit estimates of the percent completion of each schedule activity and necessary supporting data. Provide two paper copies and one electronic copy.

D. Schedule of Values

1. Within 14 calendar days after the date of the Notice to Proceed, submit a schedule of dollar values based on the Contract Bid Schedule. Breakdown each lump-sum bid item into component parts of work for which progress payments may be requested. The total costs for the component parts of work shall equal the bid amount for that lump-sum item. The Contracting Officer Representative may request data to verify accuracy of dollar values. Include mobilization, general condition costs, overhead and profit in the total dollar value of unit price items and in the component parts of work for each lump-sum

2/9/2018 013230-5

PROJECT SCHEDULE AND MONTHLY INSPECTIONS

item, as described below. Do not include mobilization, general condition costs, overhead or profit as a separate item.

2. The total cost of all items shall equal the contract sum.

3. An acceptable Schedule of Values shall be agreed upon by the Contractor and Contracting Officer Representative before the first progress payment is processed.

1 .3 PRELIMINARY REQUIREMENTS

A. Meeting: The Contractor shall meet with the Contracting Officer on the day of the preconstruction conference to conduct a joint review of the project schedule requirements of the contract to assure the Contracting Officer of the Contractor's and subcontractors' understanding of the requirements of this section.

B. Contractor's Schedule Representative: Before or at the preconstruction conference, designate in writing and provide the qualifications of an authorized representative in the Contractor's organization who shall be responsible for coordinating with the Contracting Officer Representative during the preparation and maintenance of the project schedule.

1 .4 PROJECT SCHEDULE

A. Schedule Development:

1. The late finish date shown on the schedule shall be the same date as the last day of the contract period.

2. The Contractor's project schedule shall consist of, but not be limited to, the following for each activity:

a. Identify each and every activity number with numerical designations (maximum 5- digit). Numbering of activities shall be in increments of 10 digits.

b. Concise description of the work represented by the activity (maximum 48 characters). Avoid the use of non-standard abbreviations. The work related to each activity shall be limited to one work trade.

c. Activity duration in whole working days with a maximum duration of 15 work days each, unless otherwise approved by the Contracting Officer, except for non-construction activities including mobilization, shop drawing and sample submittals, fabrication of materials, delivery of materials and equipment, and concrete curing.

4. In developing the project schedule, ensure that subcontractor work at all tiers, as well as the prime work, is included and coordinated in the project schedule.

5. The project schedule as developed shall show the sequence and interdependence of activities required for complete performance of the work. Ensure all work sequences are logical and the project schedule shows a coordinated plan of the work.

6. Proposed duration assigned to each activity shall be the Contractor's best estimate of time required to complete the activity considering the scope and resources planned for the activity.

7. Resource loading of each activity shall list all personnel by labor category and equipment type and capacity proposed to complete the activity in the duration shown.

B. Joint Review, Revision, and Acceptance:

1. Within seven calendar days of receipt of the Contractor's proposed project schedule, the Contracting Officer Representative and Contractor shall meet for joint review, correction, or adjustment of the proposed project schedule. Any areas which, in the opinion of the Contracting Officer, conflict with timely completion of the project shall be subject to revision by the Contractor.

2. In the event the Contractor fails to define any element of work, activity, or logic, and the Contracting Officer Representative review does not detect this omission or error, such omission or error, when discovered by the Contractor or Contracting Officer, shall be corrected by the Contractor at the next monthly project schedule update and shall not affect the contract time.

3. Within seven calendar days after the joint review between the Contractor and Contracting Officer, the Contractor shall revise and resubmit the project schedule in accordance with agreements reached during the joint review.

4. Upon acceptance of the project schedule by the Contracting Officer, the project schedule will be used to evaluate the Contractor's monthly applications for payment based upon information developed at the monthly project schedule update meeting.

1 .5 PROJECT SCHEDULE UPDATES

A. General: Update the project schedule on a monthly basis throughout the entire contract time and until project substantial completion. The status date of each schedule update shall be the 7th day preceding the progress payment request date.

B. Procedure: The Contractor shall meet with the Contracting Officer’s Representative each month at a project schedule update meeting to review actual progress made through the status date of the project schedule update, including dates activities were started and/or completed and the percentage of work completed on each activity started and/or completed. In case of disagreements at the schedule update meeting concerning actual progress to date, the Contracting Officer's determination shall govern. The schedule update meeting shall occur on the seventh day prior to the progress payment request date.

C. Progress Payments: The monthly updating of the project schedule shall be an integral part of the process upon which progress payments will be made under this contract. If, in the judgment of the Contracting Officer, the Contractor fails or refuses to provide a complete schedule update or revision as specified hereinafter, the Contractor shall be deemed to have not provided the required information upon which the progress payment may be made, and shall be subject to retainage of a portion of the payment.

1 .6 PROJECT SCHEDULE REVISIONS

A. Required Revisions: If, as a result of the monthly schedule update, it appears the project schedule no longer represents the actual prosecution and progress of the work, the Contracting Officer Representative will request, and the Contractor shall submit, a revision to the project schedule. The Contractor may also request reasonable revisions to the project schedule in the event the Contractor's planning for the work is revised. If the Contractor desires to make changes in the project schedule, the Contractor shall notify the Contracting Officer Representative in writing, stating the reason for the proposed revision. Accepted revisions will be incorporated into the project schedule at the next monthly schedule update.

B. Procedure: If revision to the project schedule is contemplated, the Contractor or Contracting Officer Representative shall so advise the other in writing at least seven calendar days prior to the next schedule update meeting, describing the revision and setting forth the reasons therefore. Government-requested revisions to the project schedule will be presented in writing to the Contractor, who shall respond in writing within seven calendar days.

1 .7 TIME IMPACT ANALYSIS FOR CONTRACT MODIFICATIONS, CHANGES, DELAYS, AND CONTRACTOR REQUESTS

A. Requirements: When contract modifications or changes are initiated, delays are experienced, or the Contractor desires to revise the project schedule, the Contractor shall submit to the Contracting Officer’s Representative a written time impact analysis illustrating the influence of each modification, change, delay, or Contractor request on the contract time.

B. Time Extensions: Activity delays shall not automatically mean that an extension of the contract time is warranted or due the Contractor. It is possible that a modification, change, or delay will not affect existing critical path activities or cause non-critical activities to become critical. A modification, change, or delay may result in only absorbing a part of the available total float that may exist within an activity chain of the project schedule, thereby not causing any effect on the contract time. Time extensions will be granted in accordance with the terms of the contract.

C. Float: Float is not for the exclusive use or benefit of either the Government or the Contractor. Extension of the contract time will be granted only to the extent the equitable time adjustments to the activity or activities affected by the modification, change, or delay exceeds the total (positive or zero) float of a critical path activity and extends the contract completion date.

D. Procedure: Each time impact analysis shall be submitted within the time period stated in a request for proposal, or the time period designated under the clauses entitled Changes or Default. In cases where the Contractor does not submit a written request for extension of time and a time impact analysis within the designated time, it is mutually agreed that the particular modification, change, delay, or Contractor request does not require an extension of the contract time. Upon acceptance, the time impact analysis shall be incorporated into the project schedule at the next monthly schedule update.

1 .8 INSPECTIONS

A. Project record drawings as specified in Section 01770.

B. Inspect and document subsurface of towpath with COR before placing the top aggregate material PART 2 PRODUCTSNOT USED.
PART 3 EXECUTIONNOT USED.

END OF SECTION

SECTION 013300 SUBMITTALS

PART 1 GENERAL

1 .1 DESCRIPTION

A. The work of this section consists of submittal requirements before and during construction.

1 .2 RELATED REQUIREMENTS

A. Closeout submittals - Section 017700.

1 .3 SUBMITTAL AND APPROVAL PROCEDURES

A. All submittals shall be transmitted using National Park Service form DSC-1(CS), dated 03/10. (A copy of the form is included at the end of this section.) No action will be taken on a submittal item unless accompanied by the transmittal form.

B. As specified in the individual sections, forward submittals to Contracting Officer Representative at least 30 days before need for approval. Unless a different number is specified, submit one reproducible original and two copies of each shop drawing, three copies of manufacturer's catalog sheets (cut sheets), three specimens of each sample, and three copies of all other submittals requested.

1. Samples: Samples shall be large enough to illustrate clearly the functional characteristics and full range of color, texture, pattern and size.

2. Samples of all stone aggregate to be used is a requirement of this project.

3. Manufacturers' Catalog Sheets: Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use.

4. Manufacturer's Installation Instructions: When contract documents require compliance with manufacturer's printed instructions, provide one complete set of instructions for Contracting Officer Representative and keep another complete set of instructions at the project site until substantial completion.

C. All submittals shall be submitted electronically.

D. Contracting Officer’s Representative reserves the right to require submittals in addition to those called for in individual sections.

E. Approved Equals:

1. For each item proposed as an "approved equal," submit supporting data, including:

a. Drawings and samples as appropriate.

b. Comparison of the characteristics of the proposed item with that specified.

2/9/2018 013300-8

SUBMITTALS

c. Changes required in other elements of the work because of the substitution.

d. Name, address, and telephone number of vendor.

e. Manufacturer's literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

2. A request for approval constitutes a representation that Contractor:

a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

b. Will provide the same warranties for the proposed item as for the item specified.

c. Has determined that the proposed item is compatible with interfacing items.

d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

e. Waives all claims for additional expenses that may be incurred as a result of the substitution.

3. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material. Every effort will be made by the National Park Service to approve these materials.

F. Coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward submittals that are related to or affect one another as a package to facilitate coordinated review. Each transmittal shall contain only data specific to that individual submittal.

G. Submittal Identification:

1. The contractor shall utilize NPS furnished submittal log and forms. Each submittal shall include the park name-package number, project title, contract number, and transmittal number.

2. All sets of shop drawings, manufacturer's catalog sheets, samples, and other documents submitted to the Contracting Officer Representative must have the identification information stamped on the submittal.

3. Identification information shall be applied to the bottom right margin on each page. Identification information on samples shall be applied to the most readily visible area on the sample or on tags attached to sample.

H. Submittal Numbering:

1. Number each submittal consecutively.

2. For re-submittals use the original submittal number, plus a letter suffix beginning with A.

3. Additional re-submittals of the same item shall contain the original number with the next consecutive letter.

I. Contracting Officer's Review:

1. Submittals will be returned disapproved without technical review if identification information is missing, not filled in, or if placed on the back of the submittal; an incorrect number or format of submittals is provided; the transmittal form is incorrectly filled out; submittals are not coordinated; or submittals do not show evidence of Contractor's approval.

2. Any work done or orders for materials or services placed before approval shall be at the Contractor's own risk.

3. After reviewing submittals, the Contracting Officer Representative will return one copy of form DSC-1(CS) and one copy of applicable (marked up) submittal sheets to the Contractor. Shop drawing review notations will be returned on the reproducible original shop drawing. All other submitted items will be retained. The Contractor is responsible for producing additional copies for his/her own use.

4. The returned submittal will be marked in one of three ways as defined below:

a. APPROVED: Acceptable with no corrections.

b. APPROVED WITH NOTATIONS: Minor corrections or clarifications required. All comments are clear and no further review is required. The Contractor shall address all review comments when proceeding with the work.

c. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The Contracting Officer Representative will identify the reasons for disapproval. The Contractor shall revise and resubmit with changes clearly identified.

PART 2 PRODUCTS NOT USED. PART 3 EXECUTION NOT USED.

SECTION 013600 ACCIDENT PREVENTION

PART 1 GENERAL

1 .1 DESCRIPTION

A. The work of this section consists of establishing an effective accident prevention program and providing a safe environment for all personnel and visitors.

1 .2 SUBMITTALS

A. Accident Prevention Program: Before on-site work begins, submit for approval an accident prevention program. The Contracting Officer Representative will review the proposed program for compliance with OSHA and project requirements. If the program requires any revisions or corrections, the Contractor shall resubmit the program within 10 days. No work shall be allowed and no progress payments will be made until the program is approved. The program shall include:

1. Name of responsible supervisor to carry out the program.

2. Weekly and monthly safety meetings.

3. First aid procedures.

4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.

5. Training, both initial and continuing.

6. Planning for possible emergency situations, such as floods, fires, cave-ins, slides, explosions, power outages, and wind storms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.

7. Housekeeping: Section 015700.

8. Fire Protection: Section 015100.

B. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.

C. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.

D. Submit a report of safety meetings and of inspections.

E. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.

2/9/2018 013600-4

ACCIDENT PREVENTION

1. 3 QUALITY CONTROL

A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the contract. In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.

B. Qualifications of Employees:

1. . Ensure that employees are physically qualified to perform their assigned duties in a safe manner.

2. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

3. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment. Newly hired operators shall be individually tested by an experienced operator or supervisor to determine if they are capable of safely operating equipment.

C. Quality Control Plan: Contractors shall monitor all contract tasks for a measure of quality. The Government will only accept invoices for completed tasks included in these specifications. Key tasks are monitored by the Government and are listed as Quality Assurance.

D. Quality Assurance: The COR will conduct routine evaluations of the following tasks:

Para #
Description
Acceptable Quality Level
Means of monitoring
013600-1.3(B)
Qualification of employee

Physically able / licensed Provide licensed capable operators to provide on time service 90% time

COR surveillance

013230 1.8, 014300 (multi) 3120000 (multi) Inspection – Base Course

Inspection wearing surface Provide dates of base course completion for Gov’t inspection 90% on schedule

COR Inspection report

1 .4 ACCIDENT REPORTING

A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident and fires. Notify Contracting Officer Representative immediately in the event of a reportable accident. Within 7 days of a reportable accident, fill out and forward to Contracting Officer Representative an Accident/Property Damage Report (Form CM-22). Form may be obtained from the Contracting Officer.

B. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer Representative as soon as possible and assist the Contracting Officer Representative and other officials as required in the investigation of the accident.

PART 2 PRODUCTS

2 .1 FIRST AID FACILITIES

A. Provide adequate facilities for the number of employees and the type of construction at the site.

2 .2 PERSONNEL PROTECTIVE EQUIPMENT

A. Meet requirements of NIOSH and MSHA

2 .3 BARRIERS

A. Section 015600.

PART 3 EXECUTION

3 .1 EMERGENCY INSTRUCTIONS

A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

3 .2 EGRESS

A. Provide and maintain adequate egress at all times in accordance with the Life Safety Code (NFPA 101). No corridor, aisle, stairway, door, or exit shall be obstructed or used in a manner that interferes with egress.

3 .3 PROTECTIVE EQUIPMENT

A. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.

B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

3 .4 SAFETY MEETINGS

A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.

B. Conduct monthly safety meetings for all levels of supervision. Notify the Contracting Officer Representative of meeting dates and times. These meetings shall be used to review the effectiveness of the Contractor's safety effort, to resolve current health and safety problems, to provide a forum for planning safe construction activities, and for updating the accident prevention program. The Contracting Officer Representative will attend the meeting and enter the results of the meetings into the daily log.

3 .5 HARD HATS AND PROTECTIVE EQUIPMENT AREAS

A. A hard hat area will be designated by the Contracting Officer. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.

B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide six hard hats for use by visitors. Change liners before reissuing hats.

3 .6 TRAINING

A. First Aid: Provide adequate training to ensure prompt and efficient first aid.

B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.

SECTION 014300 CONTRACTOR QUALITY CONTROL

PART 1 GENERAL

1 .1 DESCRIPTION

A. The work of this section consists of preparing and executing a quality control program.

1 .2 RELATED REQUIREMENTS

A. "Inspection of Construction" clause of the contract.

1 .3 SUBMITTALS

A. As specified in section 013300.

B. Quality Control Plan:

1. At the time of the preconstruction conference, submit for approval a written Contractor Quality Control (CQC) plan.

2. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.

3. The Government reserves the right to require changes in the plan during the contract period as necessary to obtain the quality specified.

4. No change in the approved plan may be made without written concurrence by the Contracting Officer Representative .

5. The plan shall include:

a. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.

b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.

c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

d. Methods of performing, documenting, and enforcing quality control of all work.

e. Methods of monitoring and controlling environmental pollution and contamination as required by regulations and laws.

f. Bottomline: Address all sections of 014300

C. Contractor's Daily Reports: Submit showing all inspections and tests on the first workday following the date covered by the report.

D. Test Reports:

1. Submit Daily Test Information Sheets with Quality Control Daily Reports.

2. Submit failing test results and proposed remedial actions within four hours of noted deficiency.

3. Submit three copies of complete test results not later than three calendar days after the test was performed.

E. Off-Site Inspection Reports: Submit prior to shipment.

F. If the CQC plan and Quality Control Daily Reports are not submitted as specified, the Contracting Officer Representative may retain all payments until such time a plan is approved and implemented.

1 .4 QUALITY CONTROL

A. General:

1. The quality of all work shall be the responsibility of the Contractor. Testing shall be the responsibility of an independent testing laboratory

2. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.

3. Quality Control Daily Reports shall be completed by the Quality Control Supervisor.

4. Test reports shall be completed by person performing the test.

5. The Contracting Officer Representative may designate locations of tests.

B. Quality Control Staff:

1. The Contractor's Quality Control Supervisor may also perform the duties of Project Superintendent.

2. The Contractor's designated Quality Control Supervisor shall be on the project site whenever contract work is in progress.

3. The Contractor's job supervisory staff may be used to assist the Quality Control Supervisor, supplemented as necessary by additional certified testing technicians.

C. Testing Laboratory and Equipment:

1. Employ certified independent laboratories to perform sampling and testing. The testing laboratory organization shall be certified for the type of testing work to be done.

2. All measuring devices, laboratory equipment, and instruments shall be calibrated at established intervals against certified standards in accordance with NBS requirements. Upon request, measuring and testing devices shall be made available for use by the Government for verification tests.

PART 2 Safety Plan: Contractor shall provide a safety plan addressing safety for employees, Government personnel and park visitors.

2/9/2018 014300-2

CONTRACTOR QUALITY CONTROL

PART 3 EXECUTION

3 .1 OFF-SITE CONTROL

A. Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication.

3 .2 ON-SITE CONTROL

A. Notification:

1. Notify the Contracting Officer’s Representative at least 48 hours in advance of the preparatory phase meeting.

2. Notify the Contracting Officer’s Representative at least 24 hours in advance of the initial and follow- up phases.

B. Preparatory Phase: Perform before beginning each feature of work.

1. Review control submittal requirements with personnel directly responsible for the quality control work. As a minimum, the Contractor's Quality Control Supervisor and the foreman responsible for the feature of work shall be in attendance.

2. Review all applicable specifications sections and drawings related to the feature of work.

3. Ensure that copies of all referenced standards related to sampling, testing, and execution for the feature of work are available on site.

4. Ensure that provisions have been made for field control testing.

5. Examine the work area to ensure that all preliminary work has been completed.

6. Verify all field dimensions and advise the Contracting Officer Representative of discrepancies with contract documents.

7. Ensure that necessary equipment and materials are at the project site and that they comply with approved shop drawings and submittals.

8. Prepare a report on all preparatory phase activities and discussions. Attach report to Contractor's Quality Control Daily Report.

C. Initial Phase:

1. As soon as work begins, inspect and test a representative portion of a particular feature of work for quality of workmanship.

2. Review control testing procedures to ensure compliance with contract requirements.

3. Prepare a report on all initial phase activities and discussions. Attach report to Contractor's Quality Control Daily Report. Exact location of initial phase shall be indicated for future reference and comparison with follow-up phases.

4. Field Testing: As to demonstrate capability and competency the contractor shall place 150 linear feet of base material and AASHTO 10 at the prescribed depth per the attached plans and specifications. This demonstration shall occur at the starting point of the project located on the towpath to be determined by the COR. During the pre-construction conference, the contractor, Contracting Officer, and COR shall agree to a date and time of the demonstration. The demonstration placement must be found acceptable by the COR prior to the contractor proceeding with placement along the remaining project length.

5. Submit Field test results using submittal process.

D. Follow-Up Phase: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.

1. The submittal will need to be signed / approved prior to top layer of footpath

2. Status of submittals and Inspection will be reviewed during Progress Meetings

E. Additional Preparatory and Initial Phases: Additional preparatory and initial phases may be required on the same feature of work for the following reasons:

1. Quality of on-going work is unacceptable.

2. Changes occur in the applicable quality control staff, on-site production supervision, or work crew.

3. Work on a particular feature of work is resumed after a substantial period of inactivity.

3 .3 DOCUMENTATION

A. Maintain Quality Control Daily Reports and Daily Test Report Information Sheets (samples attached) of quality control activities and tests.

B. Quality Control Daily Reports may not be substituted for other written reports required under clauses of the contract, such as Disputes, Differing Site Conditions, or Changes.

3 .4 ENFORCEMENT

A. The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the Contracting Officer’s Representative .

END OF SECTION

CONTRACTOR'S QUALITY CONTROL DAILY REPORT

REPORT NO. SHEET 1 OF

PROJECT
CONTRACT NO.
DATE
PARK
CONTRACTOR'S REPRESENTATIVE ON THE JOB
WEATHER (Rain, Snow, Cloudy, Windy, etc.)
RAINFALL

Inches

TEMPERATURE
GROUND CONDITIONS (Dry, Damp, Wet, Frozen, etc.)
MAX.
MIN.

1. PRIME CONTRACTOR

NO. EMPLOYEES BY JOB CATEGORIES
Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY PRIME CONTRACTOR:

MATERIALS DELIVERED
OFFICIAL VISITORS TO SITE

2A. SUBCONTRACTOR, : (If more than one subcontractor use copies of following page.)

NO. EMPLOYEES BY JOB CATEGORIES
Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

3. SPECIFIC INSPECTIONS: (Inspections performed, results, and corrective actions)

4. TESTING: 1 Check if any testing was performed today. (Complete and attach Test Report Information Sheets.)

Type and Location of Testing:

5. VERBAL INSTRUCTION RECEIVED FROM GOVERNMENT ON CONSTRUCTION DEFICIENCIES OR RE-TESTING REQUIRED:

6. REMARKS:

7. CERTIFICATION:

I certify that the above report is complete and correct and that I, or my authorized representative, have inspected all work performed this day by the prime contractor and each subcontractor and determined that all materials, equipment, and workmanship are in strict compliance with the plans and specifications except as may be noted above.

Contractor's Quality Control Representative

SUBCONTRACTOR WORK CONTINUED:
CONTRACT NO.
REPORT NO.SHEETOF

2 SUBCONTRACTOR,

NO. EMPLOYEES BY JOB CATEGORIES
Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

2 SUBCONTRACTOR,

NO. EMPLOYEES BY JOB CATEGORIES
Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

2 SUBCONTRACTOR,

NO. EMPLOYEES BY JOB CATEGORIES
Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
Comments

WORK PERFORMED BY SUBCONTRACTOR:

2 SUBCONTRACTOR,

NO. EMPLOYEES BY JOB CATEGORIES
Hours
HEAVY EQUIPMENT ON JOB
NO. UNITS
HRS. WORKING
YES
NO
COMMENTS

WORK PERFORMED BY SUBCONTRACTOR:

DAILY TEST REPORT INFORMATION SHEET

CONTRACT NO.REPORT NO.SHEETOF
1. Individual Making Inspection or Test:
2. Testing Laboratory; Name:
Phone #:

Address:

3. Description of Work and Test Method:

4. Location of Samples and Tests or Inspections:

5. Specification Section:

6. Inspection or Test Data:

7. Test Results and Interpretations of Test Results:

8. Comments or Professional Opinion About Compliance of Inspected Work or Tested Work with contract Document Requirements:

9. Recommendations:

10. Corrective Actions Taken:

CERTIFICATION:

I certify that the above testing report is complete and correct and that all testing performed this day for this contract is in strict compliance with the plans and specifications except as noted above.

Signature of Inspector

SECTION 015100 TEMPORARY SERVICES

PART 1 GENERAL

1 .1 DESCRIPTION

A. The work of this section consists of providing temporary services required for Contractor's performance of the work of this contract. For the purposes of this project the Contractor is not expected to furnish temporary services for the government, however, the Contractor may desire to furnish temporary services for his own use; if so, the following guidelines shall be met.

1 .2 RELATED REQUIREMENTS

A. Section 015200 - Field Offices and Sheds.

B. Section 015700 - Temporary Controls.

2 .1 GENERAL

A. Temporary materials may be new or used, but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.

2 .2 SANITARY FACILITIES

A. Provide and maintain temporary toilet facilities in accordance with State Health Department and National Park Service requirements.

B. Sufficiently lighted and ventilated toilet facilities in weatherproof, handicap accessible, sturdy enclosures with privacy locks.

2 .3 FIRE PROTECTION EQUIPMENT

A. Extinguisher shall have a minimum UL rating of 2-A:10-B:C.

PART 3 EXECUTION

3 .1 ELECTRICITY AND LIGHTING

A. Make arrangements with utility company for metered connection to existing utility and pay all costs.

2/9/2018 015100-3

TEMPORARY SERVICES

3 .2 HEATING, VENTILATING, AND COOLING

A. Provide and maintain adequate approved facilities, as required for safety and construction requirements, during the progress of the work. Provide ample clearance around stoves and heaters and all chimney and vent connections to prevent ignition of combustible material.

B. Furnish temporary heating and cooling. Use of permanent heating and cooling system will not be allowed without written authorization from Contracting Officer’s Representative . When the permanent heating and cooling system is approved for use as temporary heating and cooling, pay all costs until final acceptance. Permanent heating and cooling system must be sufficiently complete, including controls, to permit safe operation.

C. Install and maintain temporary filters when air handing equipment is used for temporary heating and cooling. Install new filters before final acceptance in addition to any extra sets of filters required. Clean coils as determined by Contracting Officer’s Representative .

D.

This is the start of the file's text. The full file is on GovTribe.