This document is an electrical one-line diagram and equipment schedule for Building 62, detailing the existing switchgear, motor control centers (MCCs), and branch panel configurations. The document provides comprehensive technical specifications for the electrical distribution system, including three-phase 480/277 Wye power distribution with multiple switchboards and panels serving various building loads.

The main electrical infrastructure consists of Switchboard SWG-62 (1600A, NEMA 3R pad-mounted switchgear) fed by two main breakers (Main No. 1 and Main No. 2, both 1600A Kirk Key breakers) with an existing 400A automatic transfer switch (ATS) for normal/alternate power selection. The system serves multiple distribution points including HDP-5, HDP-6, HDP-7, HDP-9, HDP-A, MCC-10, MCC-5, MCC-7, and MCC-A, along with specialized panels such as MDP-62 and LC-62. Equipment ratings include bus capacities of 600A at various panels and 35,000 AIC short-circuit ratings. The document also includes a 75 KVA transformer and details numerous branch circuits serving decontamination sump pumps (Models 431-2007), exhaust fans (Model 475-2004), a vacuum pump, battery charger, block heater, elevator, compressor, and welding receptacle. Individual circuit details specify breaker ratings, pole configurations, trip settings, and connected loads, with demand factors applied to calculate estimated demand currents and loads throughout the distribution system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAIN NO.1

KIRK KEY

OPEN

BRK TYPE: LA-1600

METERING

NORMAL SIDE

EXCISING ATS

MCC-A

BRK TYPE: LA-600

MCC-5

BASEMENT

BRK TYPE:

LA-600

EMPTY

MCC-10

1ST FLR

ELEC RM

BRK TYPE:

LA-600

PANEL HDP-9

OLD ROOF

TOP

BRK TYPE:

LA-600

BUS TIE

BUS TIE

BLANK

METERING

MAIN NO.2

KIRK KEY

CLOSED

BRK TYPE: LA-1600

MDP-62 2ND FLR

MECH ROOM

BRK TYPE: LA-600

PANEL

HDP-6

BASEMENT

BRK TYPE:

LA-600

MCC-7 BSL

AREA

BRK TYPE:

LA-600

BLANK

BLANK

(2)3"C TO "HDP-9" 2-3"C TO "MCC10"

(2) 3"C TO TRANSFORMER

(2) 3"C TO TRANSFORMER

4"C (SPARE)

4"C TO "MDP62"

4"C (WIRES IN

CONDUIT BUT NOT

CONNECTED TO

ANY BREAKER)

3"C TO "MCC-A"

POWER TO

MAIN NO.2

N.C.

POWER TO

MAIN NO.1

N.O.

J-BOX

J-BOX

J-BOX

J-BOX

(2) 3"C TO MAIN NO.1

G 400A3P

400A3P

EXISTING 400A ATS

3"C FOR NORMAL

SIDE OF ATS

3"C TO MCC-A

OFF

FILTER RM EXH

FAN 475-2004A

BASEMENT FLR

BIO FILTER RM#2

40A FUSES

40A FUSES

FILTER RM EXH

FAN 475-2004B

BASEMENT FLR

BIO FILTER RM#2

OFF

DECON SUMP

PUMPS 431-2007-

G&H. BASEMENT

FLR BIO. FILTER #2

15A FUSES

30A 2-FUSES

OFF

OFF

BLANK

STARTER NEMA 1

30A FUSES

VAC PUMP

DECON SUMP

PUMPS 431-2007

I&J. BASEMENT

FLR NEAR F.D.T

15A FUSES

OFF

OFF

100A FUSES

75 KVA

TRANSFORMER

OFF

OFF

OFF

OFF

OFF

DECON SUMP

PUMPS 431-2007

A&B WASTE TANK

RM#5

15A FUSES

OFF

DECON

SUMP PUMP

431-2007 M&N

15AF

OFF

OFF

DECON SUMP

PUMP

431-2007 E&F

15AF

UNKNOWN

1 1

NO. 18899

ARKANSAS

ENGINEER

PROFESSIONAL

REGISTERED

OFETA

S T

A L I H ON A R M A N

D

NARKA

SA S

No. 2790

CE

RT

IF

IC

ATE OF AUTHOR

IZAT

ION

Bernhard

TME, LLC

ISSUE DATE:

SHEET NUMBER:

PROJECT

NUMBER:

1 ALLIED DRIVE, BUILDING 2

SUITE 2600

LITTLE ROCK, AR 72202

Phone: (501) 666-6776

Fax: (501) 663-8888 tme@bernhardtme.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

100% CONSTRUCTION

DOCUMENTS

E1240

BUILDING 62 - ELEVATIONS,

SCHEDULES AND NOTES

10-15-21

01-19-0062

M C

C B

R E

A K

E R

M A

IN

T

E N

A N

C E

J E

F F

E R

S O

N L

A B

O R

A T

O R

IE

S

N

C T

R R

O A

D J E

F F

E R

S O

N

A R

K A

N S

A S

9NOT TO SCALE1

BUILDING 62 - EXISTING SWITCHGEAR (A-C)

KEYED NOTES:

TRANSFER EXISTING CIRCUIT TO THE NEW DISTRIBUTION PANEL DP62-1. FIELD VERIFY

EXACT BREAKER/FUSE SIZE INDICATED ON THE ELEVATION AND MATCH. MATCH NEW

WIRES AMPACITY WITH BREAKER SIZE. IF EXISTING CIRCUIT IS ROUTED THROUGH A

STARTER, PROVIDE AND INSTALL COMBINATION MOTOR STARTER, MATCH EXISTING SIZE

AND ROUTE CIRCUIT THROUGH. REFER TO FLOOR PLAN FOR COMBINATION MOTOR

STARTER PLACEMENT LOCATION. REFER TO PANEL SCHEDULE FOR NEW BREAKERS.

ROUTE THROUGH COMBINATION MOTOR STARTER SHOWN ON FLOOR PLAN.

PROVIDE AND INSTALL CT'S AND CONNECT TO EXISTING CAMPUS NETWORK SYSTEM.

MATCH EXISTING SIEMENS DEM 2000 CT'S.

CONTRACTOR TO TRACE THE CIRCUIT AND NAME ACCORDINGLY.

TRANSFER EXISTING CIRCUIT TO THE NEW SWITCHGEAR SWG-11. VERIFY EXACT

BREAKER/FUSE SIZE INDICATED ON THE ELEVATION AND MATCH. MATCH NEW WIRES

AMPACITY WITH BREAKER SIZE. REFER TO PANEL SCHEDULE FOR NEW BREAKERS.

VERIFY WIRES AMPACITY AND SET TRIP SETTINGS TO MATCH THE WIRE AMPACITY.

SET 1600A MAIN BREAKER TRIP SETTING AT 800A.

NOT TO SCALE2

BUILDING 62 - EXISTING MCC (FPE)

Total Est. Demand Current: 0 A

Total Conn. Current: 0 A

Total Est. Demand: 0 VA

Total Conn. Load: 0 VA

POWER, OTHER 0 VA 0.00% 0 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 0 A 0 A 0 A

Total Load: 0 VA 0 VA 0 VA

41 42

39 40

37 38

35 36

33 -- -- -- 0 34

31 -- -- -- 0 32

29 * SPARE 250 3 0 0 -- -- -- 30

27 -- -- -- 0 0 -- -- -- 28

25 -- -- -- 0 0 3 20 DECON SUMP PUMP 431-2007 M&N 26

23 DECON SUMP PUMP 431-2007 E&F 20 3 0 0 -- -- -- 24

21 -- -- -- 0 0 -- -- -- 22

19 -- -- -- 0 0 3 20 DECON SUMP PUMP 431-2007A&B. WASTE TANK 20

17 75 KVA TRANSFORMER 100 3 0 0 -- -- -- 18

15 -- -- -- 0 0 -- -- -- 16

13 UNKNOWN 30 2 0 0 3 20 DECON SUMP PMP 431-2007 I&J BASEMENT F.D.T 14

11 -- -- -- 0 0 -- -- -- 12

9 -- -- -- 0 0 -- -- -- 10

7 EXHAUST FAN 475-2004A. BASEMENT BIO RM#2 40 3 0 0 3 20 DECON PUMP 431-2007G&H. BASE BIO. FILTER 8

5 -- -- -- 0 0 -- -- -- 6

3 -- -- -- 0 0 -- -- -- 4

1 VAC PUMP 30 3 0 0 3 40 EXHAUST FAN 475-2004B. BASEMENT BIO RM#2 2

C KT Circuit Description

Trip

(A) Poles "A" "B" "C" Poles

Trip

(A) Circuit Description

C

KT

EQUAL TO SQUARE-D HCM I-LINE WITH 99" BREAKER SPACE. *ADJUSTABLE THERMAL MAG BREAKER.

Notes:

Enclosure: NEMA 1

Mounting: SURFACE Wires: 4 MCB Rating: 600 A

Supply From: SWG-62 Phases: 3 Bus Rating: 600 A

Location: Volts: 480/277 Wye A.I.C. Rating: 35,000

Branch Panel: HDP-5

Notes:

Total Est. Demand Current: 4 A

Total Conn. Current: 4 A

Total Est. Demand: 3180 VA

POWER, OTHER 180 VA 100.00% 180 VA Total Conn. Load: 3180 VA

Heat 3000 VA 100.00% 3000 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 4 A

Total Conn. Load: 3180 VA

10 INTEGRATED TRANSFORMER/PANEL 2 30 A 30 A 3180 VA INSTALL BREAKER IN INSTRUMENT COMPARTMENT.

9 SPACE -- -- -- 0 VA --

8 SPARE 3 -- 600 A 0 VA LSI

7 MDP-62 3 600 A 600 A 0 VA LSI

6 HDP-7 3 600 A 600 A 0 VA LSI

5 HDP-6 3 600 A 600 A 0 VA LSI

4 HDP-A 3 600 A 600 A 0 VA LSI

3 MCC-10 3 600 A 600 A 0 VA LSI

2 HDP-9 3 600 A 600 A 0 VA LSI

1 HDP-5 3 600 A 600 A 0 VA LSI

CKT Circuit Description # of

Poles Frame Size

Trip Rating Load Remarks

EQUAL TO SQUARE-D POWER-ZONE 4 SWITCHGEAR, NEMA 3R WITH WALK-IN ENCLOSURE.

Notes:

Enclosure: 3R MCB Rating: 1600 A

Mounting: PAD MOUNT Wires: 4 Mains Rating: 1600 A

Supply From: Phases: 3 Mains Type: MCB

Location: Volts: 480/277 Wye A.I.C. Rating: 35,000

Switchboard: SWG-62

600 A

Total Est. Demand Current: 13 A

Total Conn. Current: 9 A

Total Est. Demand: 3180 VA

POWER, OTHER 180 VA 100.00% 180 VA Total Conn. Load: 3180 VA

Heat 3000 VA 100.00% 3000 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 14 A 13 A

Total Load: 1680 VA 1500 VA

17 18

15 16

13 14

11 12

9 SPARE 20 1 0 0 1 20 SPARE 10

7 SPARE 20 1 0 0 1 20 SPARE 8

5 SPARE 20 1 0 0 1 20 SPARE 6

3 -- -- -- 1500 0 1 20 SPARE 4

1 GEN. BLOCK HEATER 20 2 1500 180 1 20 GEN. BATTERY CHARGER. 2

CKT Circuit Description Trip

(A) Poles "A" "B" Poles

Trip

(A) Circuit Description CKT

Notes:

Enclosure: 3R

Mounting: SURFACE Wires: 3 MCB Rating: 70 A

Supply From: SWG-62 Phases: 1 Bus Rating: 100 A

Location: Volts: 120/240 Single A.I.C. Rating: 10,000

Branch Panel: L.C-62

GENERAL NOTES:

FURNISH SHORT CIRCUIT AND ARC FLASH STUDY WITH ARC FLASH LABELS PER

SPECIFICATIONS FOR ALL NEW SWITCHBOARDS, SWITCHGEARS, PANELBOARDS, AND

EXISTING SWITCHGEARS THAT THEIR EXISTING BREAKERS ARE BEING REFURBISHED.

1.

SUGGESTED WORK PLAN & PHASING

THE FOLLOWING IS A SUGGESTED WORK PLAN GUIDE ONLY FOR USE BY THIS CONTRACTOR AS A REFERENCE TOOL. CONTRACTOR MUST DEVELOP AND SUBMIT THEIR OWN DETAILED WORK PLAN TO THE OWNER AND ENGINEER TO REVIEW AND APPROVAL. NO WORK SHALL BE COMMENCE UNTIL THE CONTRACTOR'S WORK PLAN HAS BEEN SUBMITTED AND IS APPROVED.

CONTRACTOR SHALL COORDINATE ALL POWER OUTAGES VERY CLOSELY WITH THE OWNER PRIOR TO ANY OUTAGE. CONTRACTOR TO ACCOUNT FOR WORKING AFTER HOURS, BEFORE HOURS AND ON WEEKENDS PER OWNER'S DIRECTIONS.

SURVEY THE SITE AND THE BUILDING FOR EXACT LOCATIONS OF EXISTING AND NEW ELECTRICAL EQUIPMENT THAT ARE PART OF

THIS PROJECT AND IDENTIFY ALL NEW AND EXISTING CONDUIT ROUTINGS.

INSTALL NEW SWITCHGEAR AND NEW DISTRIBUTION PANELS AS SHOWN ON THE DRAWINGS.

REMOVE MCC-4 OUT OF THE ROOM AS SHOWN ON THE DRAWINGS.

INSTALL NEW FEEDERS FROM THE NEW SWITCHGEAR OUTSIDE TO NEW AND EXISTING PANELS AS SHOWN ON THE DRAWINGS.

A. MAKE FINAL CONNECTION TO THE NEW PANELS THAT ARE REPLACING THE EXISTING MCC'S.

B. SECURE THE FEEDERS CLOSE TO THE EXISTING PANELS THAT ARE TO REMAIN, DO NOT MAKE FINAL CONNECTION AT THIS

POINT.

PROVIDE AND INSTALL NEW FEEDERS FROM THE EXISTING TRANSFORMER TO THE NEW SWITCHGEAR AND ENERGIZE THE

SWITCHGEAR:

A. DE-ENERGIZE THE TRANSFORMER AS NEEDED FROM THE PAD MOUNT SWITCH THAT IT IS FED FROM. BEFORE DO SO, COORDINATE WITH OWNER, START THE EXISTING GENERATOR ON SITE AND TRANSFER POWER TO THE BUILDING TO

GENERATOR POWER.

B. PROVIDE AND INSTALL EXTRA LUGS FOR THE TRANSFORMER AS NEEDED IN ORDER TO TEMPORARY KEEP BOTH NEW AND

EXISTING SWITCHGEAR ENERGIZED.

C. AFTER THE NEW SWITCHGEAR IS ENERGIZED, STOP THE GENERATOR AND TRANSFER POWER TO THE BUILDING TO NORMAL

POWER.

PROVIDE TEMPORARY GENERATOR AND ALL PARTS AND CONNECTIONS NEEDED FOR CONNECTING POWER TO NEW SWITCHGEAR IN EVENT OF LOSING NORMAL POWER TO THE BUILDING WHILE THE EXISTING SWITCHGEAR AND GENERATOR ARE BEING

REMOVED.

DISCONNECT POWER AND FEEDER TO PANELS THAT ARE SHOWN TO REMAIN ON DRAWINGS AND CONNECT NEW FEEDERS.

DISCONNECT AND RE-CONNECT POWER ONE PANEL AT A TIME. COORDINATE VERY CLOSELY WITH OWNER FOR ALL POWER

INTERRUPTIONS.

TRANSFER OVER CIRCUITS FROM EXISTING MCC'S TO NEW PANELS ONE CIRCUIT AT A TIME AS SHOWN ON DRAWINGS. AFTER ALL

CIRCUITS HAVE BEEN TRANSFERRED REMOVE ALL MCC'S AND UNUSED CONDUITS AND WIRES.

AFTER ALL CIRCUITS FED OUT OF THE EXISTING SWITCHGEAR HAVE BEEN TRANSFERRED AND RE-FED FROM THE NEW

SWITCHGEAR, REMOVE EXISTING SWITCHGEAR AND EXISTING GENERATOR.

INSTALL NEW GENERATOR AND FOLLOW ALL THE TESTING REQUIREMENTS.

REMOVE TEMPORARY GENERATOR AFTER THE NEW GENERATOR IS INSTALLED AND FUNCTIONAL.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

XFMR T-62

OUTSIDE BASEMENT

OUTSIDE

LSI

MARK DATE DESCRIPTION

MAIN BREAKER

400A

OFF

BLANK

BLANK

BLANK

OFF

BSL AHU AND EMC

CONTROL POWER

60A3P BREAKER

PNL CL2A

40A3P BREAKER

CONTROL

TRANSFORMER

OFF

EF-1

NORTH 4,5,6

80A3P BREAKER

EF-1.1

SOUTH 1,2,3

80A3P BREAKER

BLANK

OFF

OFF

OFF

CONTROL

TRANSFORMER

BREAKER

OFF

OFF OFF

OFF

OFF

BLANK

PNL D1

XFMR

30A3P BRK

WELD

REC

30A3P BRK

TRANSFORMER -217-

PNL IN 62A 1ST FLOOR

30A3P BREAKER

OFF

OFF

OFF

OFF

OFF

OFF

OFF

OFF

TAPPED BUS

FOR 225KVA

XFMR FOR

PANEL AA

TRANSFORMER FOR

PANEL A.P.

OFF

OFF

OFF

OFF

OFF

OFF

OFF OFF

OFFOFF

COMPRE.

30A3P BRK

XFMR AT

METALS

LAB 1ST

FLR

30A3P BRK

CONT.

LAB. DIST.

PNL CL

30A3P BKR

ELEVATOR

60A3P BKR

OFF OFF

150A3P BREAKER

2 2

2 2

2 2 2

3 3

NO. 18899

ARKANSAS

ENGINEER

PROFESSIONAL

REGISTERED

OFETA

S T

A L I H ON A R M A N

D

NARKA

SA S

No. 2790

CE

RT

IF

IC

ATE OF AUTHOR

IZAT

ION

Bernhard

TME, LLC

ISSUE DATE:

SHEET NUMBER:

PROJECT

NUMBER:

1 ALLIED DRIVE, BUILDING 2

SUITE 2600

LITTLE ROCK, AR 72202

Phone: (501) 666-6776

Fax: (501) 663-8888 tme@bernhardtme.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

100% CONSTRUCTION

DOCUMENTS

E1250

BUILDING 62 - ELEVATIONS,

SCHEDULES AND NOTES

10-15-21

01-19-0062

M C

C B

R E

A K

E R

M A

IN

T

E N

A N

C E

J E

F F

E R

S O

N L

A B

O R

A T

O R

IE

S

N

C T

R R

O A

D J E

F F

E R

S O

N

A R

K A

N S

A S

NOT TO SCALE2

BUILDING 62 - EXISTING MCC-A (CH)

NOT TO SCALE1

BUILDING 62 - EXISTING MCC-7 (FPE)

Total Est. Demand Current: 0 A

Total Conn. Current: 0 A

Total Est. Demand: 0 VA

Total Conn. Load: 0 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 0 A 0 A 0 A

Total Load: 0 VA 0 VA 0 VA

41 42

39 40

37 38

35 36

33 34

31 32

29 30

27 28

25 26

23 24

21 22

19 20

17 -- -- -- 0 18

15 -- -- -- 0 16

13 * SPARE 250 3 0 14

11 -- -- -- 0 0 -- -- -- 12

9 -- -- -- 0 0 -- -- -- 10

7 EF-1 NORTH 4,5,6 80 3 0 0 3 80 EF-1 SOUTH 1,2,3 8

5 -- -- -- 0 0 -- -- -- 6

3 -- -- -- 0 0 -- -- -- 4

1 BSL AHU AND EMC CONTROL POWER 30 3 0 0 3 40 PNL CL2A TRANSFORMER 2

C KT Circuit Description

Trip

(A) Poles "A" "B" "C" Poles

Trip

(A) Circuit Description

C

KT

EQUAL TO SQUARE-D HCM I-LINE WITH 99" BREAKER SPACE. *ADJUSTABLE THERMAL MAG BREAKER.

Notes:

Enclosure: NEMA 1

Mounting: SURFACE Wires: 4 MCB Rating: 600 A

Supply From: SWG-62 Phases: 3 Bus Rating: 600 A

Location: Volts: 480/277 Wye A.I.C. Rating: 35,000

Branch Panel: HDP-A

Total Est. Demand Current: 0 A

Total Conn. Current: 0 A

Total Est. Demand: 0 VA

Total Conn. Load: 0 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 0 A 0 A 0 A

Total Load: 0 VA 0 VA 0 VA

41 42

39 40

37 38

35 36

33 34

31 32

29 -- -- -- 0 0 -- -- -- 30

27 -- -- -- 0 0 -- -- -- 28

25 ELEVATOR 60 3 0 0 3 250 * SPARE 26

23 -- -- -- 0 0 -- -- -- 24

21 -- -- -- 0 0 -- -- -- 22

19 TRANSFORMER AT METALS LAB 1ST FLR 30 3 0 0 3 30 CONT. LAB. DIST. PNL CL 20

17 -- -- -- 0 0 -- -- -- 18

15 -- -- -- 0 0 -- -- -- 16

13 PANEL AP TRANSFORMER 150 3 0 0 3 30 COMPRESSOR 14

11 -- -- -- 0 0 -- -- -- 12

9 -- -- -- 0 0 -- -- -- 10

7 TRANSFORMER--217 FOR PNL 662A 1ST FLOOR 30 3 0 0 3 400 PANEL AA 225KVA TRANSFORMER 8

5 -- -- -- 0 0 -- -- -- 6

3 -- -- -- 0 0 -- -- -- 4

1 PANEL D1 TRANSFORMER 30 3 0 0 3 30 WELDING RECEPTACLE 2

C KT Circuit Description

Trip

(A) Poles "A" "B" "C" Poles

Trip

(A) Circuit Description

C

KT

EQUAL TO SQUARE-D HCM I-LINE WITH 99" BREAKER SPACE.

Notes:

Enclosure: NEMA 1

Mounting: SURFACE Wires: 4 MCB Rating: 600 A

Supply From: SWG-62 Phases: 3 Bus Rating: 600 A

Location: Volts: 480/277 Wye A.I.C. Rating: 35,000

Branch Panel: HDP-7

KEYED NOTES:

TRANSFER EXISTING CIRCUIT TO THE NEW DISTRIBUTION PANEL HDP-A. FIELD VERIFY

EXACT BREAKER/FUSE SIZE INDICATED ON THE ELEVATION AND MATCH. MATCH NEW

WIRES AMPACITY WITH BREAKER SIZE. IF EXISTING CIRCUIT IS ROUTED THROUGH A

STARTER, PROVIDE AND INSTALL COMBINATION MOTOR STARTER, MATCH EXISTING SIZE

AND ROUTE CIRCUIT THROUGH. REFER TO FLOOR PLAN FOR COMBINATION MOTOR

STARTER PLACEMENT LOCATION. REFER TO PANEL SCHEDULE FOR NEW BREAKERS.

TRANSFER EXISTING CIRCUIT TO THE NEW DISTRIBUTION PANEL HDP-7. FIELD VERIFY

EXACT BREAKER/FUSE SIZE INDICATED ON THE ELEVATION AND MATCH. MATCH NEW

WIRES AMPACITY WITH BREAKER SIZE. IF EXISTING CIRCUIT IS ROUTED THROUGH A

STARTER, PROVIDE AND INSTALL COMBINATION MOTOR STARTER, MATCH EXISTING SIZE

AND ROUTE CIRCUIT THROUGH. REFER TO FLOOR PLAN FOR COMBINATION MOTOR

STARTER PLACEMENT LOCATION. REFER TO PANEL SCHEDULE FOR NEW BREAKERS.

VERIFY BREAKER SIZE AND MATCH.3

GENERAL NOTES:

FURNISH SHORT CIRCUIT AND ARC FLASH STUDY WITH ARC FLASH LABELS PER

SPECIFICATIONS FOR ALL NEW SWITCHBOARDS, SWITCHGEARS, PANELBOARDS, AND

EXISTING SWITCHGEARS THAT THEIR EXISTING BREAKERS ARE BEING REFURBISHED.

1.

2ND FLR ELEC. RM 2ND FLR ELEC. RM

MARK DATE DESCRIPTION

E1240 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES
Sheets
E001 - GENERAL NOTES, LEGEND, AND BUILDING GROUPING/ADDITIVE ALTERNATES - ELECTRICAL
E002 - DETAILS - ELECTRICAL
E003 - DETAILS - STRUCTURAL
E101 - SITE PLAN - ELECTRICAL
E201 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION
E202 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - NEW
E203 - BUILDING 5B - ELEVATIONS, SCHEDULES AND NOTES
E301 - BUILDING 9 - ELECTRICAL DEMOLITION
E302 - BUILDING 9 - ELECTRICAL NEW
E303 - BUILDING 9 - ONE-LINE DIAGRAM
E401 - BUILDING 11 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E402 - BUILDING 11 - ELEVATIONS, SCHEDULES AND NOTES
E501 - BUILDING 12 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E502 - BUILDING 12 - ELEVATIONS, SCHEDULES AND NOTES
E601 - BUILDING 26 - FLOOR PLAN & ONE-LINE DIAGRAM
E602 - BUILDING 26 - ELEVATIONS AND NOTES
E701 - BUILDING 44 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E702 - BUILDING 44 - ELEVATIONS, SCHEDULES AND NOTES
E801 - BUILDING 51 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E802 - BUILDING 51 - ELEVATIONS, SCHEDULES AND NOTES
E901 - BUILDING 52 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E902 - BUILDING 52 - ELEVATIONS, SCHEDULES AND NOTES
E1010 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION
E1020 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - NEW
E1030 - BUILDING 53A - ELEVATIONS, SCHEDULES AND NOTES
E1040 - BUILDING 53A - ELEVATIONS AND NOTES
E1110 - BUILDING 60 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E1120 - BUILDING 60 - ELEVATIONS, SCHEDULES AND NOTES
E1210 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - DEMOLITION
E1220 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - NEW
E1230 - BUILDING 62 - SECOND FLOOR PLANS - DEMOLITION & NEW
E1240 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES
E1250 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES
E1310 - BUILDING 85 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E1320 - BUILDING 85 - ELEVATIONS, SCHEDULES AND NOTES
G100 - COVER SHEET
M501 - BUILDING 12 - MECHANICAL FLOOR PLAN
E1250 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES
Sheets
E001 - GENERAL NOTES, LEGEND, AND BUILDING GROUPING/ADDITIVE ALTERNATES - ELECTRICAL
E002 - DETAILS - ELECTRICAL
E003 - DETAILS - STRUCTURAL
E101 - SITE PLAN - ELECTRICAL
E201 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION
E202 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - NEW
E203 - BUILDING 5B - ELEVATIONS, SCHEDULES AND NOTES
E301 - BUILDING 9 - ELECTRICAL DEMOLITION
E302 - BUILDING 9 - ELECTRICAL NEW
E303 - BUILDING 9 - ONE-LINE DIAGRAM
E401 - BUILDING 11 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E402 - BUILDING 11 - ELEVATIONS, SCHEDULES AND NOTES
E501 - BUILDING 12 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E502 - BUILDING 12 - ELEVATIONS, SCHEDULES AND NOTES
E601 - BUILDING 26 - FLOOR PLAN & ONE-LINE DIAGRAM
E602 - BUILDING 26 - ELEVATIONS AND NOTES
E701 - BUILDING 44 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E702 - BUILDING 44 - ELEVATIONS, SCHEDULES AND NOTES
E801 - BUILDING 51 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E802 - BUILDING 51 - ELEVATIONS, SCHEDULES AND NOTES
E901 - BUILDING 52 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E902 - BUILDING 52 - ELEVATIONS, SCHEDULES AND NOTES
E1010 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION
E1020 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - NEW
E1030 - BUILDING 53A - ELEVATIONS, SCHEDULES AND NOTES
E1040 - BUILDING 53A - ELEVATIONS AND NOTES
E1110 - BUILDING 60 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E1120 - BUILDING 60 - ELEVATIONS, SCHEDULES AND NOTES
E1210 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - DEMOLITION
E1220 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - NEW
E1230 - BUILDING 62 - SECOND FLOOR PLANS - DEMOLITION & NEW
E1240 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES
E1250 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES
E1310 - BUILDING 85 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E1320 - BUILDING 85 - ELEVATIONS, SCHEDULES AND NOTES
G100 - COVER SHEET
M501 - BUILDING 12 - MECHANICAL FLOOR PLAN