This document is an electrical one-line diagram and equipment schedule for Building 62, detailing the existing switchgear, motor control centers (MCCs), and branch panel configurations. The document provides comprehensive technical specifications for the electrical distribution system, including three-phase 480/277 Wye power distribution with multiple switchboards and panels serving various building loads.
The main electrical infrastructure consists of Switchboard SWG-62 (1600A, NEMA 3R pad-mounted switchgear) fed by two main breakers (Main No. 1 and Main No. 2, both 1600A Kirk Key breakers) with an existing 400A automatic transfer switch (ATS) for normal/alternate power selection. The system serves multiple distribution points including HDP-5, HDP-6, HDP-7, HDP-9, HDP-A, MCC-10, MCC-5, MCC-7, and MCC-A, along with specialized panels such as MDP-62 and LC-62. Equipment ratings include bus capacities of 600A at various panels and 35,000 AIC short-circuit ratings. The document also includes a 75 KVA transformer and details numerous branch circuits serving decontamination sump pumps (Models 431-2007), exhaust fans (Model 475-2004), a vacuum pump, battery charger, block heater, elevator, compressor, and welding receptacle. Individual circuit details specify breaker ratings, pole configurations, trip settings, and connected loads, with demand factors applied to calculate estimated demand currents and loads throughout the distribution system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAIN NO.1
KIRK KEY
OPEN
BRK TYPE: LA-1600
METERING
NORMAL SIDE
EXCISING ATS
MCC-A
BRK TYPE: LA-600
MCC-5
BASEMENT
BRK TYPE:
LA-600
EMPTY
MCC-10
1ST FLR
ELEC RM
BRK TYPE:
LA-600
PANEL HDP-9
OLD ROOF
TOP
BRK TYPE:
LA-600
BUS TIE
BUS TIE
BLANK
METERING
MAIN NO.2
KIRK KEY
CLOSED
BRK TYPE: LA-1600
MDP-62 2ND FLR
MECH ROOM
BRK TYPE: LA-600
PANEL
HDP-6
BASEMENT
BRK TYPE:
LA-600
MCC-7 BSL
AREA
BRK TYPE:
LA-600
BLANK
BLANK
(2)3"C TO "HDP-9" 2-3"C TO "MCC10"
(2) 3"C TO TRANSFORMER
(2) 3"C TO TRANSFORMER
4"C (SPARE)
4"C TO "MDP62"
4"C (WIRES IN
CONDUIT BUT NOT
CONNECTED TO
ANY BREAKER)
3"C TO "MCC-A"
POWER TO
MAIN NO.2
N.C.
POWER TO
MAIN NO.1
N.O.
J-BOX
J-BOX
J-BOX
J-BOX
(2) 3"C TO MAIN NO.1
G 400A3P
400A3P
EXISTING 400A ATS
3"C FOR NORMAL
SIDE OF ATS
3"C TO MCC-A
OFF
FILTER RM EXH
FAN 475-2004A
BASEMENT FLR
BIO FILTER RM#2
40A FUSES
40A FUSES
FILTER RM EXH
FAN 475-2004B
BASEMENT FLR
BIO FILTER RM#2
OFF
DECON SUMP
PUMPS 431-2007-
G&H. BASEMENT
FLR BIO. FILTER #2
15A FUSES
30A 2-FUSES
OFF
OFF
BLANK
STARTER NEMA 1
30A FUSES
VAC PUMP
DECON SUMP
PUMPS 431-2007
I&J. BASEMENT
FLR NEAR F.D.T
15A FUSES
OFF
OFF
100A FUSES
75 KVA
TRANSFORMER
OFF
OFF
OFF
OFF
OFF
DECON SUMP
PUMPS 431-2007
A&B WASTE TANK
RM#5
15A FUSES
OFF
DECON
SUMP PUMP
431-2007 M&N
15AF
OFF
OFF
DECON SUMP
PUMP
431-2007 E&F
15AF
UNKNOWN
1 1
NO. 18899
ARKANSAS
ENGINEER
PROFESSIONAL
REGISTERED
OFETA
S T
A L I H ON A R M A N
D
NARKA
SA S
No. 2790
CE
RT
IF
IC
ATE OF AUTHOR
IZAT
ION
Bernhard
TME, LLC
ISSUE DATE:
SHEET NUMBER:
PROJECT
NUMBER:
1 ALLIED DRIVE, BUILDING 2
SUITE 2600
LITTLE ROCK, AR 72202
Phone: (501) 666-6776
Fax: (501) 663-8888 tme@bernhardtme.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
100% CONSTRUCTION
DOCUMENTS
E1240
BUILDING 62 - ELEVATIONS,
SCHEDULES AND NOTES
10-15-21
01-19-0062
M C
C B
R E
A K
E R
M A
IN
T
E N
A N
C E
J E
F F
E R
S O
N L
A B
O R
A T
O R
IE
S
N
C T
R R
O A
D J E
F F
E R
S O
N
A R
K A
N S
A S
9NOT TO SCALE1
BUILDING 62 - EXISTING SWITCHGEAR (A-C)
KEYED NOTES:
TRANSFER EXISTING CIRCUIT TO THE NEW DISTRIBUTION PANEL DP62-1. FIELD VERIFY
EXACT BREAKER/FUSE SIZE INDICATED ON THE ELEVATION AND MATCH. MATCH NEW
WIRES AMPACITY WITH BREAKER SIZE. IF EXISTING CIRCUIT IS ROUTED THROUGH A
STARTER, PROVIDE AND INSTALL COMBINATION MOTOR STARTER, MATCH EXISTING SIZE
AND ROUTE CIRCUIT THROUGH. REFER TO FLOOR PLAN FOR COMBINATION MOTOR
STARTER PLACEMENT LOCATION. REFER TO PANEL SCHEDULE FOR NEW BREAKERS.
ROUTE THROUGH COMBINATION MOTOR STARTER SHOWN ON FLOOR PLAN.
PROVIDE AND INSTALL CT'S AND CONNECT TO EXISTING CAMPUS NETWORK SYSTEM.
MATCH EXISTING SIEMENS DEM 2000 CT'S.
CONTRACTOR TO TRACE THE CIRCUIT AND NAME ACCORDINGLY.
TRANSFER EXISTING CIRCUIT TO THE NEW SWITCHGEAR SWG-11. VERIFY EXACT
BREAKER/FUSE SIZE INDICATED ON THE ELEVATION AND MATCH. MATCH NEW WIRES
AMPACITY WITH BREAKER SIZE. REFER TO PANEL SCHEDULE FOR NEW BREAKERS.
VERIFY WIRES AMPACITY AND SET TRIP SETTINGS TO MATCH THE WIRE AMPACITY.
SET 1600A MAIN BREAKER TRIP SETTING AT 800A.
NOT TO SCALE2
BUILDING 62 - EXISTING MCC (FPE)
Total Est. Demand Current: 0 A
Total Conn. Current: 0 A
Total Est. Demand: 0 VA
Total Conn. Load: 0 VA
POWER, OTHER 0 VA 0.00% 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Amps: 0 A 0 A 0 A
Total Load: 0 VA 0 VA 0 VA
41 42
39 40
37 38
35 36
33 -- -- -- 0 34
31 -- -- -- 0 32
29 * SPARE 250 3 0 0 -- -- -- 30
27 -- -- -- 0 0 -- -- -- 28
25 -- -- -- 0 0 3 20 DECON SUMP PUMP 431-2007 M&N 26
23 DECON SUMP PUMP 431-2007 E&F 20 3 0 0 -- -- -- 24
21 -- -- -- 0 0 -- -- -- 22
19 -- -- -- 0 0 3 20 DECON SUMP PUMP 431-2007A&B. WASTE TANK 20
17 75 KVA TRANSFORMER 100 3 0 0 -- -- -- 18
15 -- -- -- 0 0 -- -- -- 16
13 UNKNOWN 30 2 0 0 3 20 DECON SUMP PMP 431-2007 I&J BASEMENT F.D.T 14
11 -- -- -- 0 0 -- -- -- 12
9 -- -- -- 0 0 -- -- -- 10
7 EXHAUST FAN 475-2004A. BASEMENT BIO RM#2 40 3 0 0 3 20 DECON PUMP 431-2007G&H. BASE BIO. FILTER 8
5 -- -- -- 0 0 -- -- -- 6
3 -- -- -- 0 0 -- -- -- 4
1 VAC PUMP 30 3 0 0 3 40 EXHAUST FAN 475-2004B. BASEMENT BIO RM#2 2
C KT Circuit Description
Trip
(A) Poles "A" "B" "C" Poles
Trip
(A) Circuit Description
C
KT
EQUAL TO SQUARE-D HCM I-LINE WITH 99" BREAKER SPACE. *ADJUSTABLE THERMAL MAG BREAKER.
Notes:
Enclosure: NEMA 1
Mounting: SURFACE Wires: 4 MCB Rating: 600 A
Supply From: SWG-62 Phases: 3 Bus Rating: 600 A
Location: Volts: 480/277 Wye A.I.C. Rating: 35,000
Branch Panel: HDP-5
Notes:
Total Est. Demand Current: 4 A
Total Conn. Current: 4 A
Total Est. Demand: 3180 VA
POWER, OTHER 180 VA 100.00% 180 VA Total Conn. Load: 3180 VA
Heat 3000 VA 100.00% 3000 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 4 A
Total Conn. Load: 3180 VA
10 INTEGRATED TRANSFORMER/PANEL 2 30 A 30 A 3180 VA INSTALL BREAKER IN INSTRUMENT COMPARTMENT.
9 SPACE -- -- -- 0 VA --
8 SPARE 3 -- 600 A 0 VA LSI
7 MDP-62 3 600 A 600 A 0 VA LSI
6 HDP-7 3 600 A 600 A 0 VA LSI
5 HDP-6 3 600 A 600 A 0 VA LSI
4 HDP-A 3 600 A 600 A 0 VA LSI
3 MCC-10 3 600 A 600 A 0 VA LSI
2 HDP-9 3 600 A 600 A 0 VA LSI
1 HDP-5 3 600 A 600 A 0 VA LSI
CKT Circuit Description # of
Poles Frame Size
Trip Rating Load Remarks
EQUAL TO SQUARE-D POWER-ZONE 4 SWITCHGEAR, NEMA 3R WITH WALK-IN ENCLOSURE.
Notes:
Enclosure: 3R MCB Rating: 1600 A
Mounting: PAD MOUNT Wires: 4 Mains Rating: 1600 A
Supply From: Phases: 3 Mains Type: MCB
Location: Volts: 480/277 Wye A.I.C. Rating: 35,000
Switchboard: SWG-62
600 A
Total Est. Demand Current: 13 A
Total Conn. Current: 9 A
Total Est. Demand: 3180 VA
POWER, OTHER 180 VA 100.00% 180 VA Total Conn. Load: 3180 VA
Heat 3000 VA 100.00% 3000 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Amps: 14 A 13 A
Total Load: 1680 VA 1500 VA
17 18
15 16
13 14
11 12
9 SPARE 20 1 0 0 1 20 SPARE 10
7 SPARE 20 1 0 0 1 20 SPARE 8
5 SPARE 20 1 0 0 1 20 SPARE 6
3 -- -- -- 1500 0 1 20 SPARE 4
1 GEN. BLOCK HEATER 20 2 1500 180 1 20 GEN. BATTERY CHARGER. 2
CKT Circuit Description Trip
(A) Poles "A" "B" Poles
Trip
(A) Circuit Description CKT
Notes:
Enclosure: 3R
Mounting: SURFACE Wires: 3 MCB Rating: 70 A
Supply From: SWG-62 Phases: 1 Bus Rating: 100 A
Location: Volts: 120/240 Single A.I.C. Rating: 10,000
Branch Panel: L.C-62
GENERAL NOTES:
FURNISH SHORT CIRCUIT AND ARC FLASH STUDY WITH ARC FLASH LABELS PER
SPECIFICATIONS FOR ALL NEW SWITCHBOARDS, SWITCHGEARS, PANELBOARDS, AND
EXISTING SWITCHGEARS THAT THEIR EXISTING BREAKERS ARE BEING REFURBISHED.
1.
SUGGESTED WORK PLAN & PHASING
THE FOLLOWING IS A SUGGESTED WORK PLAN GUIDE ONLY FOR USE BY THIS CONTRACTOR AS A REFERENCE TOOL. CONTRACTOR MUST DEVELOP AND SUBMIT THEIR OWN DETAILED WORK PLAN TO THE OWNER AND ENGINEER TO REVIEW AND APPROVAL. NO WORK SHALL BE COMMENCE UNTIL THE CONTRACTOR'S WORK PLAN HAS BEEN SUBMITTED AND IS APPROVED.
CONTRACTOR SHALL COORDINATE ALL POWER OUTAGES VERY CLOSELY WITH THE OWNER PRIOR TO ANY OUTAGE. CONTRACTOR TO ACCOUNT FOR WORKING AFTER HOURS, BEFORE HOURS AND ON WEEKENDS PER OWNER'S DIRECTIONS.
SURVEY THE SITE AND THE BUILDING FOR EXACT LOCATIONS OF EXISTING AND NEW ELECTRICAL EQUIPMENT THAT ARE PART OF
THIS PROJECT AND IDENTIFY ALL NEW AND EXISTING CONDUIT ROUTINGS.
INSTALL NEW SWITCHGEAR AND NEW DISTRIBUTION PANELS AS SHOWN ON THE DRAWINGS.
REMOVE MCC-4 OUT OF THE ROOM AS SHOWN ON THE DRAWINGS.
INSTALL NEW FEEDERS FROM THE NEW SWITCHGEAR OUTSIDE TO NEW AND EXISTING PANELS AS SHOWN ON THE DRAWINGS.
A. MAKE FINAL CONNECTION TO THE NEW PANELS THAT ARE REPLACING THE EXISTING MCC'S.
B. SECURE THE FEEDERS CLOSE TO THE EXISTING PANELS THAT ARE TO REMAIN, DO NOT MAKE FINAL CONNECTION AT THIS
POINT.
PROVIDE AND INSTALL NEW FEEDERS FROM THE EXISTING TRANSFORMER TO THE NEW SWITCHGEAR AND ENERGIZE THE
SWITCHGEAR:
A. DE-ENERGIZE THE TRANSFORMER AS NEEDED FROM THE PAD MOUNT SWITCH THAT IT IS FED FROM. BEFORE DO SO, COORDINATE WITH OWNER, START THE EXISTING GENERATOR ON SITE AND TRANSFER POWER TO THE BUILDING TO
GENERATOR POWER.
B. PROVIDE AND INSTALL EXTRA LUGS FOR THE TRANSFORMER AS NEEDED IN ORDER TO TEMPORARY KEEP BOTH NEW AND
EXISTING SWITCHGEAR ENERGIZED.
C. AFTER THE NEW SWITCHGEAR IS ENERGIZED, STOP THE GENERATOR AND TRANSFER POWER TO THE BUILDING TO NORMAL
POWER.
PROVIDE TEMPORARY GENERATOR AND ALL PARTS AND CONNECTIONS NEEDED FOR CONNECTING POWER TO NEW SWITCHGEAR IN EVENT OF LOSING NORMAL POWER TO THE BUILDING WHILE THE EXISTING SWITCHGEAR AND GENERATOR ARE BEING
REMOVED.
DISCONNECT POWER AND FEEDER TO PANELS THAT ARE SHOWN TO REMAIN ON DRAWINGS AND CONNECT NEW FEEDERS.
DISCONNECT AND RE-CONNECT POWER ONE PANEL AT A TIME. COORDINATE VERY CLOSELY WITH OWNER FOR ALL POWER
INTERRUPTIONS.
TRANSFER OVER CIRCUITS FROM EXISTING MCC'S TO NEW PANELS ONE CIRCUIT AT A TIME AS SHOWN ON DRAWINGS. AFTER ALL
CIRCUITS HAVE BEEN TRANSFERRED REMOVE ALL MCC'S AND UNUSED CONDUITS AND WIRES.
AFTER ALL CIRCUITS FED OUT OF THE EXISTING SWITCHGEAR HAVE BEEN TRANSFERRED AND RE-FED FROM THE NEW
SWITCHGEAR, REMOVE EXISTING SWITCHGEAR AND EXISTING GENERATOR.
INSTALL NEW GENERATOR AND FOLLOW ALL THE TESTING REQUIREMENTS.
REMOVE TEMPORARY GENERATOR AFTER THE NEW GENERATOR IS INSTALLED AND FUNCTIONAL.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
XFMR T-62
OUTSIDE BASEMENT
OUTSIDE
LSI
MARK DATE DESCRIPTION
MAIN BREAKER
400A
OFF
BLANK
BLANK
BLANK
OFF
BSL AHU AND EMC
CONTROL POWER
60A3P BREAKER
PNL CL2A
40A3P BREAKER
CONTROL
TRANSFORMER
OFF
EF-1
NORTH 4,5,6
80A3P BREAKER
EF-1.1
SOUTH 1,2,3
80A3P BREAKER
BLANK
OFF
OFF
OFF
CONTROL
TRANSFORMER
BREAKER
OFF
OFF OFF
OFF
OFF
BLANK
PNL D1
XFMR
30A3P BRK
WELD
REC
30A3P BRK
TRANSFORMER -217-
PNL IN 62A 1ST FLOOR
30A3P BREAKER
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
TAPPED BUS
FOR 225KVA
XFMR FOR
PANEL AA
TRANSFORMER FOR
PANEL A.P.
OFF
OFF
OFF
OFF
OFF
OFF
OFF OFF
OFFOFF
COMPRE.
30A3P BRK
XFMR AT
METALS
LAB 1ST
FLR
30A3P BRK
CONT.
LAB. DIST.
PNL CL
30A3P BKR
ELEVATOR
60A3P BKR
OFF OFF
150A3P BREAKER
2 2
2 2
2 2 2
3 3
NO. 18899
ARKANSAS
ENGINEER
PROFESSIONAL
REGISTERED
OFETA
S T
A L I H ON A R M A N
D
NARKA
SA S
No. 2790
CE
RT
IF
IC
ATE OF AUTHOR
IZAT
ION
Bernhard
TME, LLC
ISSUE DATE:
SHEET NUMBER:
PROJECT
NUMBER:
1 ALLIED DRIVE, BUILDING 2
SUITE 2600
LITTLE ROCK, AR 72202
Phone: (501) 666-6776
Fax: (501) 663-8888 tme@bernhardtme.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
100% CONSTRUCTION
DOCUMENTS
E1250
BUILDING 62 - ELEVATIONS,
SCHEDULES AND NOTES
10-15-21
01-19-0062
M C
C B
R E
A K
E R
M A
IN
T
E N
A N
C E
J E
F F
E R
S O
N L
A B
O R
A T
O R
IE
S
N
C T
R R
O A
D J E
F F
E R
S O
N
A R
K A
N S
A S
NOT TO SCALE2
BUILDING 62 - EXISTING MCC-A (CH)
NOT TO SCALE1
BUILDING 62 - EXISTING MCC-7 (FPE)
Total Est. Demand Current: 0 A
Total Conn. Current: 0 A
Total Est. Demand: 0 VA
Total Conn. Load: 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Amps: 0 A 0 A 0 A
Total Load: 0 VA 0 VA 0 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 -- -- -- 0 18
15 -- -- -- 0 16
13 * SPARE 250 3 0 14
11 -- -- -- 0 0 -- -- -- 12
9 -- -- -- 0 0 -- -- -- 10
7 EF-1 NORTH 4,5,6 80 3 0 0 3 80 EF-1 SOUTH 1,2,3 8
5 -- -- -- 0 0 -- -- -- 6
3 -- -- -- 0 0 -- -- -- 4
1 BSL AHU AND EMC CONTROL POWER 30 3 0 0 3 40 PNL CL2A TRANSFORMER 2
C KT Circuit Description
Trip
(A) Poles "A" "B" "C" Poles
Trip
(A) Circuit Description
C
KT
EQUAL TO SQUARE-D HCM I-LINE WITH 99" BREAKER SPACE. *ADJUSTABLE THERMAL MAG BREAKER.
Notes:
Enclosure: NEMA 1
Mounting: SURFACE Wires: 4 MCB Rating: 600 A
Supply From: SWG-62 Phases: 3 Bus Rating: 600 A
Location: Volts: 480/277 Wye A.I.C. Rating: 35,000
Branch Panel: HDP-A
Total Est. Demand Current: 0 A
Total Conn. Current: 0 A
Total Est. Demand: 0 VA
Total Conn. Load: 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Amps: 0 A 0 A 0 A
Total Load: 0 VA 0 VA 0 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 -- -- -- 0 0 -- -- -- 30
27 -- -- -- 0 0 -- -- -- 28
25 ELEVATOR 60 3 0 0 3 250 * SPARE 26
23 -- -- -- 0 0 -- -- -- 24
21 -- -- -- 0 0 -- -- -- 22
19 TRANSFORMER AT METALS LAB 1ST FLR 30 3 0 0 3 30 CONT. LAB. DIST. PNL CL 20
17 -- -- -- 0 0 -- -- -- 18
15 -- -- -- 0 0 -- -- -- 16
13 PANEL AP TRANSFORMER 150 3 0 0 3 30 COMPRESSOR 14
11 -- -- -- 0 0 -- -- -- 12
9 -- -- -- 0 0 -- -- -- 10
7 TRANSFORMER--217 FOR PNL 662A 1ST FLOOR 30 3 0 0 3 400 PANEL AA 225KVA TRANSFORMER 8
5 -- -- -- 0 0 -- -- -- 6
3 -- -- -- 0 0 -- -- -- 4
1 PANEL D1 TRANSFORMER 30 3 0 0 3 30 WELDING RECEPTACLE 2
C KT Circuit Description
Trip
(A) Poles "A" "B" "C" Poles
Trip
(A) Circuit Description
C
KT
EQUAL TO SQUARE-D HCM I-LINE WITH 99" BREAKER SPACE.
Notes:
Enclosure: NEMA 1
Mounting: SURFACE Wires: 4 MCB Rating: 600 A
Supply From: SWG-62 Phases: 3 Bus Rating: 600 A
Location: Volts: 480/277 Wye A.I.C. Rating: 35,000
Branch Panel: HDP-7
KEYED NOTES:
TRANSFER EXISTING CIRCUIT TO THE NEW DISTRIBUTION PANEL HDP-A. FIELD VERIFY
EXACT BREAKER/FUSE SIZE INDICATED ON THE ELEVATION AND MATCH. MATCH NEW
WIRES AMPACITY WITH BREAKER SIZE. IF EXISTING CIRCUIT IS ROUTED THROUGH A
STARTER, PROVIDE AND INSTALL COMBINATION MOTOR STARTER, MATCH EXISTING SIZE
AND ROUTE CIRCUIT THROUGH. REFER TO FLOOR PLAN FOR COMBINATION MOTOR
STARTER PLACEMENT LOCATION. REFER TO PANEL SCHEDULE FOR NEW BREAKERS.
TRANSFER EXISTING CIRCUIT TO THE NEW DISTRIBUTION PANEL HDP-7. FIELD VERIFY
EXACT BREAKER/FUSE SIZE INDICATED ON THE ELEVATION AND MATCH. MATCH NEW
WIRES AMPACITY WITH BREAKER SIZE. IF EXISTING CIRCUIT IS ROUTED THROUGH A
STARTER, PROVIDE AND INSTALL COMBINATION MOTOR STARTER, MATCH EXISTING SIZE
AND ROUTE CIRCUIT THROUGH. REFER TO FLOOR PLAN FOR COMBINATION MOTOR
STARTER PLACEMENT LOCATION. REFER TO PANEL SCHEDULE FOR NEW BREAKERS.
VERIFY BREAKER SIZE AND MATCH.3
GENERAL NOTES:
FURNISH SHORT CIRCUIT AND ARC FLASH STUDY WITH ARC FLASH LABELS PER
SPECIFICATIONS FOR ALL NEW SWITCHBOARDS, SWITCHGEARS, PANELBOARDS, AND
EXISTING SWITCHGEARS THAT THEIR EXISTING BREAKERS ARE BEING REFURBISHED.
1.
2ND FLR ELEC. RM 2ND FLR ELEC. RM
MARK DATE DESCRIPTION
| E1240 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES |
| Sheets |
| E001 - GENERAL NOTES, LEGEND, AND BUILDING GROUPING/ADDITIVE ALTERNATES - ELECTRICAL |
| E002 - DETAILS - ELECTRICAL |
| E003 - DETAILS - STRUCTURAL |
| E101 - SITE PLAN - ELECTRICAL |
| E201 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION |
| E202 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - NEW |
| E203 - BUILDING 5B - ELEVATIONS, SCHEDULES AND NOTES |
| E301 - BUILDING 9 - ELECTRICAL DEMOLITION |
| E302 - BUILDING 9 - ELECTRICAL NEW |
| E303 - BUILDING 9 - ONE-LINE DIAGRAM |
| E401 - BUILDING 11 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E402 - BUILDING 11 - ELEVATIONS, SCHEDULES AND NOTES |
| E501 - BUILDING 12 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E502 - BUILDING 12 - ELEVATIONS, SCHEDULES AND NOTES |
| E601 - BUILDING 26 - FLOOR PLAN & ONE-LINE DIAGRAM |
| E602 - BUILDING 26 - ELEVATIONS AND NOTES |
| E701 - BUILDING 44 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E702 - BUILDING 44 - ELEVATIONS, SCHEDULES AND NOTES |
| E801 - BUILDING 51 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E802 - BUILDING 51 - ELEVATIONS, SCHEDULES AND NOTES |
| E901 - BUILDING 52 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E902 - BUILDING 52 - ELEVATIONS, SCHEDULES AND NOTES |
| E1010 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION |
| E1020 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - NEW |
| E1030 - BUILDING 53A - ELEVATIONS, SCHEDULES AND NOTES |
| E1040 - BUILDING 53A - ELEVATIONS AND NOTES |
| E1110 - BUILDING 60 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E1120 - BUILDING 60 - ELEVATIONS, SCHEDULES AND NOTES |
| E1210 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - DEMOLITION |
| E1220 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - NEW |
| E1230 - BUILDING 62 - SECOND FLOOR PLANS - DEMOLITION & NEW |
| E1240 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES |
| E1250 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES |
| E1310 - BUILDING 85 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E1320 - BUILDING 85 - ELEVATIONS, SCHEDULES AND NOTES |
| G100 - COVER SHEET |
| M501 - BUILDING 12 - MECHANICAL FLOOR PLAN |
| E1250 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES |
| Sheets |
| E001 - GENERAL NOTES, LEGEND, AND BUILDING GROUPING/ADDITIVE ALTERNATES - ELECTRICAL |
| E002 - DETAILS - ELECTRICAL |
| E003 - DETAILS - STRUCTURAL |
| E101 - SITE PLAN - ELECTRICAL |
| E201 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION |
| E202 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - NEW |
| E203 - BUILDING 5B - ELEVATIONS, SCHEDULES AND NOTES |
| E301 - BUILDING 9 - ELECTRICAL DEMOLITION |
| E302 - BUILDING 9 - ELECTRICAL NEW |
| E303 - BUILDING 9 - ONE-LINE DIAGRAM |
| E401 - BUILDING 11 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E402 - BUILDING 11 - ELEVATIONS, SCHEDULES AND NOTES |
| E501 - BUILDING 12 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E502 - BUILDING 12 - ELEVATIONS, SCHEDULES AND NOTES |
| E601 - BUILDING 26 - FLOOR PLAN & ONE-LINE DIAGRAM |
| E602 - BUILDING 26 - ELEVATIONS AND NOTES |
| E701 - BUILDING 44 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E702 - BUILDING 44 - ELEVATIONS, SCHEDULES AND NOTES |
| E801 - BUILDING 51 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E802 - BUILDING 51 - ELEVATIONS, SCHEDULES AND NOTES |
| E901 - BUILDING 52 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E902 - BUILDING 52 - ELEVATIONS, SCHEDULES AND NOTES |
| E1010 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION |
| E1020 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - NEW |
| E1030 - BUILDING 53A - ELEVATIONS, SCHEDULES AND NOTES |
| E1040 - BUILDING 53A - ELEVATIONS AND NOTES |
| E1110 - BUILDING 60 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E1120 - BUILDING 60 - ELEVATIONS, SCHEDULES AND NOTES |
| E1210 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - DEMOLITION |
| E1220 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - NEW |
| E1230 - BUILDING 62 - SECOND FLOOR PLANS - DEMOLITION & NEW |
| E1240 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES |
| E1250 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES |
| E1310 - BUILDING 85 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E1320 - BUILDING 85 - ELEVATIONS, SCHEDULES AND NOTES |
| G100 - COVER SHEET |
| M501 - BUILDING 12 - MECHANICAL FLOOR PLAN |
File details come from the government source that posted it. Updated .