This document is a set of electrical demolition construction drawings for Building 62, prepared by Bernhard TME architectural and engineering firm. The drawings depict floor plans and a one-line diagram showing the removal and decommissioning of existing electrical equipment across the basement, first floor, second floor, and third floor/mechanical room areas.
The primary demolition scope includes removal of a 480V, 250KW generator and its associated automatic transfer switch (ATS), an existing 400A ATS, an existing 1600A Allis-Chalmers switchgear, an existing 600A FPE motor control center (MCC), an existing GE MCC, empty conduit on walls, and existing feeder and circuit connections. The work requires the re-feeding of all existing circuits from new switchgear after the legacy equipment is removed. An existing 500KVA transformer (T-62) is to remain in place. The general notes direct contractors to coordinate all connection points in advance prior to construction and reference the one-line diagram for circuit locations and elevations. Multiple keyed demolition notes numbered 1 through 12 provide supplemental instructions regarding equipment removal sequencing, circuit decommissioning procedures, and protective measures for network infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REMOVE EXISTING
480V, 250KW
GENERATOR AND
ATS.
REMOVE EXISTING 400A ATS
EXISTING 500KVA
TRANSFORMER TO
REMAIN
REMOVE
EMPTY
CONDUIT ON
THE WALL
T-62
11MCC-10
REMOVE EXISTING 1600A ALLIS-CHALMERS SWITCHGEAR AFTER THE
NEW SWITCHGEAR IS INSTALLED AND ALL THE EXISTING CIRCUITS
ARE RE-FED FROM NEW SWITCHGEAR.
EXISTING 500KVA
TRANSFORMER "T-62"
G
REMOVE EXISTING
250KW GENERATOR
REMOV EXISTING 400A ATS
OUTSIDE
BASEMENT
REMOVE EXISTING 600A FPE MCC
1ST FLOOR
2ND FLOOR
ELECTRICAL ROOM
MCC-A3
TO MAIN #1
TO MAIN #2
MCC-7
MCC-4
TAP
VERIFY EXACT ROUTING
3RD FLOOR MECHANICAL
ROOM/SECOND FLOOR ROOF
HDP-9
MDP-62
HDP-6
VERIFY EXACT ROUTING
MCC-10
EXISTING 600A, 480V/3Ø
SQUARE-D I-LINE
EXISTING 400A, 480V/3Ø
SQUARE-D I-LINE
EXISTING 600A, 480V/3Ø
SQUARE-D I-LINE
EXISTING
GE MCC
REMOVE EXISTING FPE 600A MCC
HDP-6
NO. 18899
ARKANSAS
ENGINEER
PROFESSIONAL
REGISTERED
OFETA
S T
A L I H ON A R M A N
D
NARKA
SA S
No. 2790
CE
RT
IF
ICA
TE OF AUTHOR IZAT
ION
Bernhard
TME, LLC
ISSUE DATE:
SHEET NUMBER:
PROJECT
NUMBER:
1 ALLIED DRIVE, BUILDING 2
SUITE 2600
LITTLE ROCK, AR 72202
Phone: (501) 666-6776
Fax: (501) 663-8888 tme@bernhardtme.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
100% CONSTRUCTION
DOCUMENTS
E1210
BUILDING 62 - FIRST &
BASEMENT FLOOR PLANS &
ONE-LINE DIAGRAM -
DEMOLITION
10-15-21
01-19-0062
M C
C B
R E
A K
E R
M A
IN
T
E N
A N
C E
J E
F F
E R
S O
N L
A B
O R
A T
O R
IE
S
N
C T
R R
O A
D J E
F F
E R
S O
N
A R
K A
N S
A S
1/8" = 1'-0"2
FLOOR PLAN - BUILDING 62 FIRST FLOOR - DEMOLITION
NOT TO SCALE3
ONE-LINE DIAGRAM - BUILDING 62 DEMOLITION
1/8" = 1'-0"1
FLOOR PLAN - BUILDING 62 BASEMENT - DEMOLITION
DEMOLITION KEYED NOTES:
REMOVE EXISTING SWITCHGEAR AFTER THE NEW SWITCHGEAR IS INSTALLED AND ALL THE
EXISTING CIRCUITS ARE RE-FED FROM THE NEW SWITCHGEAR. REFER TO NEW FLOOR PLAN
AND ELEVATIONS.
EXISTING CIRCUITS FED OUT OF THE MCC TO BE RE-FED FROM NEW DISTRIBUTION PANEL.
REFER TO ELEVATIONS AND NEW FLOOR PLAN.
REMOVE FEEDER AND MCC-A AFTER NEW DISTRIBUTION PANEL IS INSTALLED AND ALL THE
CIRCUITS HAVE BEEN TRANSFERED TO THE NEW PANEL. REFER TO NEW FLOOR PLAN AND ONE-
LINE DIAGRAM.
REMOVE EXISTING FEEDER AFTER NEW SWITCHGEAR IS INSTALLED AND ALL THE CIRCUITS ARE
RE-FED FROM NEW SWITCHGEAR.
ALL EXISTING CIRCUITS FED OUT OF THE SWITCHGEAR TO BE RE-FED FROM NEW SWITCHGEAR
WITH NEW CONDUITS AND WIRES. REFER TO ELEVATIONS AND NEW FLOOR PLAN.
PROTECT NETWORK WIRING FOR CT'S, EXTEND AND CONNECT TO THE NEW SWITCHGEAR.
REMOVE,MODIFY FENCE FOR NEW SWITCHGEAR. REFER TO NEW FLOOR PLAN.
REMOVE DECOMMISSIONED MCC-4.
EXISTING GE MCC TO REMAIN AND RE-FED FROM NEW DISTRIBUTION PANEL. REFER TO NEW
FLOOR PLAN. REMOVE EXISTING FEEDER AFTER MCC IS RE-FED.
REMOVE FEEDER AND MCC-7 AFTER NEW DISTRIBUTION PANEL IS INSTALLED AND ALL THE
CIRCUITS HAVE BEEN TRANSFERED TO THE NEW PANEL. REFER TO NEW FLOOR PLAN AND ONE-
LINE DIAGRAM.
EXISTING PANEL/MCC TO REMAIN AND PROTECTED DURING CONSTRUCTION. PANEL TO BE RE-
FED FROM NEW SWITCHGEAR. REMOVE EXISTING FEEDER AFTER PANEL IS RE-FED FROM NEW
SWITCHGEAR. REFER TO NEW FLOOR PLAN AND ONE-LINE DIAGRAM.
GENERAL NOTES:
UNLESS OTHERWISE NOTED, ALL ELECTRICAL EQUIPMENT TO REMAIN AND PROTECTED
DURING CONSTRUCTION.
COORDINATE ALL POWER OUTAGES VERY CAREFULLY WITH OWNER MINIMUM OF 3 WEEKS
IN ADVANCE PRIOR TO DISCONNECTING POWER.
1.
2.
MARK DATE DESCRIPTION
| Sheets |
| E001 - GENERAL NOTES, LEGEND, AND BUILDING GROUPING/ADDITIVE ALTERNATES - ELECTRICAL |
| E002 - DETAILS - ELECTRICAL |
| E003 - DETAILS - STRUCTURAL |
| E101 - SITE PLAN - ELECTRICAL |
| E201 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION |
| E202 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - NEW |
| E203 - BUILDING 5B - ELEVATIONS, SCHEDULES AND NOTES |
| E301 - BUILDING 9 - ELECTRICAL DEMOLITION |
| E302 - BUILDING 9 - ELECTRICAL NEW |
| E303 - BUILDING 9 - ONE-LINE DIAGRAM |
| E401 - BUILDING 11 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E402 - BUILDING 11 - ELEVATIONS, SCHEDULES AND NOTES |
| E501 - BUILDING 12 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E502 - BUILDING 12 - ELEVATIONS, SCHEDULES AND NOTES |
| E601 - BUILDING 26 - FLOOR PLAN & ONE-LINE DIAGRAM |
| E602 - BUILDING 26 - ELEVATIONS AND NOTES |
| E701 - BUILDING 44 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E702 - BUILDING 44 - ELEVATIONS, SCHEDULES AND NOTES |
| E801 - BUILDING 51 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E802 - BUILDING 51 - ELEVATIONS, SCHEDULES AND NOTES |
| E901 - BUILDING 52 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E902 - BUILDING 52 - ELEVATIONS, SCHEDULES AND NOTES |
| E1010 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION |
| E1020 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - NEW |
| E1030 - BUILDING 53A - ELEVATIONS, SCHEDULES AND NOTES |
| E1040 - BUILDING 53A - ELEVATIONS AND NOTES |
| E1110 - BUILDING 60 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E1120 - BUILDING 60 - ELEVATIONS, SCHEDULES AND NOTES |
| E1210 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - DEMOLITION |
| E1220 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - NEW |
| E1230 - BUILDING 62 - SECOND FLOOR PLANS - DEMOLITION & NEW |
| E1240 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES |
| E1250 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES |
| E1310 - BUILDING 85 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E1320 - BUILDING 85 - ELEVATIONS, SCHEDULES AND NOTES |
| G100 - COVER SHEET |
| M501 - BUILDING 12 - MECHANICAL FLOOR PLAN |
File details come from the government source that posted it. Updated .