About this file

This document is a set of electrical demolition construction drawings for Building 62, prepared by Bernhard TME architectural and engineering firm. The drawings depict floor plans and a one-line diagram showing the removal and decommissioning of existing electrical equipment across the basement, first floor, second floor, and third floor/mechanical room areas.

The primary demolition scope includes removal of a 480V, 250KW generator and its associated automatic transfer switch (ATS), an existing 400A ATS, an existing 1600A Allis-Chalmers switchgear, an existing 600A FPE motor control center (MCC), an existing GE MCC, empty conduit on walls, and existing feeder and circuit connections. The work requires the re-feeding of all existing circuits from new switchgear after the legacy equipment is removed. An existing 500KVA transformer (T-62) is to remain in place. The general notes direct contractors to coordinate all connection points in advance prior to construction and reference the one-line diagram for circuit locations and elevations. Multiple keyed demolition notes numbered 1 through 12 provide supplemental instructions regarding equipment removal sequencing, circuit decommissioning procedures, and protective measures for network infrastructure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REMOVE EXISTING

480V, 250KW

GENERATOR AND

ATS.

REMOVE EXISTING 400A ATS

EXISTING 500KVA

TRANSFORMER TO

REMAIN

REMOVE

EMPTY

CONDUIT ON

THE WALL

T-62

11MCC-10

REMOVE EXISTING 1600A ALLIS-CHALMERS SWITCHGEAR AFTER THE

NEW SWITCHGEAR IS INSTALLED AND ALL THE EXISTING CIRCUITS

ARE RE-FED FROM NEW SWITCHGEAR.

EXISTING 500KVA

TRANSFORMER "T-62"

G

REMOVE EXISTING

250KW GENERATOR

REMOV EXISTING 400A ATS

OUTSIDE

BASEMENT

REMOVE EXISTING 600A FPE MCC

1ST FLOOR

2ND FLOOR

ELECTRICAL ROOM

MCC-A3

TO MAIN #1

TO MAIN #2

MCC-7

MCC-4

TAP

VERIFY EXACT ROUTING

3RD FLOOR MECHANICAL

ROOM/SECOND FLOOR ROOF

HDP-9

MDP-62

HDP-6

VERIFY EXACT ROUTING

MCC-10

EXISTING 600A, 480V/3Ø

SQUARE-D I-LINE

EXISTING 400A, 480V/3Ø

SQUARE-D I-LINE

EXISTING 600A, 480V/3Ø

SQUARE-D I-LINE

EXISTING

GE MCC

REMOVE EXISTING FPE 600A MCC

HDP-6

NO. 18899

ARKANSAS

ENGINEER

PROFESSIONAL

REGISTERED

OFETA

S T

A L I H ON A R M A N

D

NARKA

SA S

No. 2790

CE

RT

IF

ICA

TE OF AUTHOR IZAT

ION

Bernhard

TME, LLC

ISSUE DATE:

SHEET NUMBER:

PROJECT

NUMBER:

1 ALLIED DRIVE, BUILDING 2

SUITE 2600

LITTLE ROCK, AR 72202

Phone: (501) 666-6776

Fax: (501) 663-8888 tme@bernhardtme.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

100% CONSTRUCTION

DOCUMENTS

E1210

BUILDING 62 - FIRST &

BASEMENT FLOOR PLANS &

ONE-LINE DIAGRAM -

DEMOLITION

10-15-21

01-19-0062

M C

C B

R E

A K

E R

M A

IN

T

E N

A N

C E

J E

F F

E R

S O

N L

A B

O R

A T

O R

IE

S

N

C T

R R

O A

D J E

F F

E R

S O

N

A R

K A

N S

A S

1/8" = 1'-0"2

FLOOR PLAN - BUILDING 62 FIRST FLOOR - DEMOLITION

NOT TO SCALE3

ONE-LINE DIAGRAM - BUILDING 62 DEMOLITION

1/8" = 1'-0"1

FLOOR PLAN - BUILDING 62 BASEMENT - DEMOLITION

DEMOLITION KEYED NOTES:

REMOVE EXISTING SWITCHGEAR AFTER THE NEW SWITCHGEAR IS INSTALLED AND ALL THE

EXISTING CIRCUITS ARE RE-FED FROM THE NEW SWITCHGEAR. REFER TO NEW FLOOR PLAN

AND ELEVATIONS.

EXISTING CIRCUITS FED OUT OF THE MCC TO BE RE-FED FROM NEW DISTRIBUTION PANEL.

REFER TO ELEVATIONS AND NEW FLOOR PLAN.

REMOVE FEEDER AND MCC-A AFTER NEW DISTRIBUTION PANEL IS INSTALLED AND ALL THE

CIRCUITS HAVE BEEN TRANSFERED TO THE NEW PANEL. REFER TO NEW FLOOR PLAN AND ONE-

LINE DIAGRAM.

REMOVE EXISTING FEEDER AFTER NEW SWITCHGEAR IS INSTALLED AND ALL THE CIRCUITS ARE

RE-FED FROM NEW SWITCHGEAR.

ALL EXISTING CIRCUITS FED OUT OF THE SWITCHGEAR TO BE RE-FED FROM NEW SWITCHGEAR

WITH NEW CONDUITS AND WIRES. REFER TO ELEVATIONS AND NEW FLOOR PLAN.

PROTECT NETWORK WIRING FOR CT'S, EXTEND AND CONNECT TO THE NEW SWITCHGEAR.

REMOVE,MODIFY FENCE FOR NEW SWITCHGEAR. REFER TO NEW FLOOR PLAN.

REMOVE DECOMMISSIONED MCC-4.

EXISTING GE MCC TO REMAIN AND RE-FED FROM NEW DISTRIBUTION PANEL. REFER TO NEW

FLOOR PLAN. REMOVE EXISTING FEEDER AFTER MCC IS RE-FED.

REMOVE FEEDER AND MCC-7 AFTER NEW DISTRIBUTION PANEL IS INSTALLED AND ALL THE

CIRCUITS HAVE BEEN TRANSFERED TO THE NEW PANEL. REFER TO NEW FLOOR PLAN AND ONE-

LINE DIAGRAM.

EXISTING PANEL/MCC TO REMAIN AND PROTECTED DURING CONSTRUCTION. PANEL TO BE RE-

FED FROM NEW SWITCHGEAR. REMOVE EXISTING FEEDER AFTER PANEL IS RE-FED FROM NEW

SWITCHGEAR. REFER TO NEW FLOOR PLAN AND ONE-LINE DIAGRAM.

GENERAL NOTES:

UNLESS OTHERWISE NOTED, ALL ELECTRICAL EQUIPMENT TO REMAIN AND PROTECTED

DURING CONSTRUCTION.

COORDINATE ALL POWER OUTAGES VERY CAREFULLY WITH OWNER MINIMUM OF 3 WEEKS

IN ADVANCE PRIOR TO DISCONNECTING POWER.

1.

2.

MARK DATE DESCRIPTION

Sheets
E001 - GENERAL NOTES, LEGEND, AND BUILDING GROUPING/ADDITIVE ALTERNATES - ELECTRICAL
E002 - DETAILS - ELECTRICAL
E003 - DETAILS - STRUCTURAL
E101 - SITE PLAN - ELECTRICAL
E201 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION
E202 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - NEW
E203 - BUILDING 5B - ELEVATIONS, SCHEDULES AND NOTES
E301 - BUILDING 9 - ELECTRICAL DEMOLITION
E302 - BUILDING 9 - ELECTRICAL NEW
E303 - BUILDING 9 - ONE-LINE DIAGRAM
E401 - BUILDING 11 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E402 - BUILDING 11 - ELEVATIONS, SCHEDULES AND NOTES
E501 - BUILDING 12 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E502 - BUILDING 12 - ELEVATIONS, SCHEDULES AND NOTES
E601 - BUILDING 26 - FLOOR PLAN & ONE-LINE DIAGRAM
E602 - BUILDING 26 - ELEVATIONS AND NOTES
E701 - BUILDING 44 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E702 - BUILDING 44 - ELEVATIONS, SCHEDULES AND NOTES
E801 - BUILDING 51 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E802 - BUILDING 51 - ELEVATIONS, SCHEDULES AND NOTES
E901 - BUILDING 52 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E902 - BUILDING 52 - ELEVATIONS, SCHEDULES AND NOTES
E1010 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION
E1020 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - NEW
E1030 - BUILDING 53A - ELEVATIONS, SCHEDULES AND NOTES
E1040 - BUILDING 53A - ELEVATIONS AND NOTES
E1110 - BUILDING 60 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E1120 - BUILDING 60 - ELEVATIONS, SCHEDULES AND NOTES
E1210 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - DEMOLITION
E1220 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - NEW
E1230 - BUILDING 62 - SECOND FLOOR PLANS - DEMOLITION & NEW
E1240 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES
E1250 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES
E1310 - BUILDING 85 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E1320 - BUILDING 85 - ELEVATIONS, SCHEDULES AND NOTES
G100 - COVER SHEET
M501 - BUILDING 12 - MECHANICAL FLOOR PLAN

File details come from the government source that posted it. Updated .