Attachment 2-E1220 - BUILDING 62 - FIRST AND BASEMENT FLOOR PLANS AND ONE-LINE DIAGRAM - NEW.pdf

PDF 580 KB Posted

Attached to
FDA NCTR Bldg. 62 MCC-Switchgear Replacement
Solicitation number
75F40126SSNFY26_MCC
Issued by

About this file

Summary

This document is an electrical engineering schematic and floor plan for Building 62 MOC Breaker Maintenance project. The plans depict a comprehensive electrical infrastructure upgrade including installation of a new 480V, 3-phase, 500KW diesel generator with 48-hour sub-base tank and weather-rated enclosure located outside the basement. Additional major components include a new 1600A switchgear with walk-in 3R enclosure, a new 800A 3-pole automatic transfer switch (ATS) with NEMA 3R rating and bypass isolation capability, and a new 600A 480V/3-phase distribution panel. The system includes multiple distribution panels across multiple floors: HDP-5, HDP-6, HDP-7, HDP-9, and MDP-62, with an existing 500KVA transformer (T-62) and existing GE motor control center (MCC).

The specifications detail extensive cabling requirements throughout the facility, including multiple sets of 300 KMIL and 350 KMIL conductors with various gauges and conduit sizes (ranging from 1-inch to 3-inch) connecting the basement electrical room, first floor, second floor electrical room, and third floor mechanical room/second floor roof. The design includes grounding and bonding systems connected to metal water piping and building steel in accordance with NEC Article 250. This appears to be 100% construction documentation prepared by Bernhard TME (Sheet E1220), with floor plans showing basement and first-floor layouts and a complete one-line electrical diagram for the new Building 62 system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HDP-5

HDP-5- 1,3,5

HDP-6

NEW 480V,

3Ø,500KW DIESEL

GENERATOR WITH

48HR SUB-BASE

TANK. WITH

WEATHER RATED

ENCLOSURE.

GATE

T-62

NEW 800A 3

POLE ATS

SWG-62

L.C-62

L.C-62- 1,3

L.C-62- 2

MCC-10 11

NEW 1600A

SWITCHGEAR WITH

WALK IN 3R

ENCLOSURE.

EXISTING 500KVA

TRANSFORMER

"T-62"

G

NEW 480V,

3Ø,500KW DIESEL

GENERATOR WITH

48HR SUB-BASE

TANK. WITH

WEATHER RATED

ENCLOSURE.

NEW 480V, 800A, 3Ø,3 POLE

NEMA 3R ATS, WITH BYPASS

ISOLATION

OUTSIDE

BASEMENT

1ST FLOOR

2ND FLOOR

ELECTRICAL ROOM

HDP-A

HDP-5

(3) SETS (4) 300 KMIL,

#1/0G, 3"C

(3) SETS (4) 300 KMIL, 3"C

(3) SETS (4) 300 KMIL,

#1/0G, 3"C

NEW 600A, 480V/3Ø

DISTRIBUTION PANEL

(3) #4, #8G, 1"C

L.C-62

(3) SETS (4) 300 KMIL,

#1/0G, 3"C

HDP-7

MDP-62

3RD FLOOR MECHANICAL

ROOM/SECOND FLOOR ROOF

MCC-10

HDP-9

HDP-6

(2) SETS (4) 350 KMIL, #1/0G, 3"C

(2) SETS (4) 350 KMIL, #1/0G, 3"C

(2) SETS (4) 350 KMIL, #1/0G, 3"C

(2) SETS (4) 350 KMIL, #1/0G, 3"C

(2) SETS (4) 350 KMIL, #1/0G, 3"C

(2) SETS (4) 350 KMIL, #1/0G, 3"C

(2) SETS (4) 350 KMIL, #1/0G, 3"C

EXISTING

GE MCC

(2) SETS (4) 350 KMIL, #1/0G, 3"C

LSI

800A3P

LSI

GROUND AND BOND SYSTEM

TO METAL WATER PIPING AND

BUILDING STEEL IN ACCORDANCE

WITH NEC ARTICLE 250

NO. 18899

ARKANSAS

ENGINEER

PROFESSIONAL

REGISTERED

OFETA

S T

A L I H ON A R M A N

D

NARKA

SA S

No. 2790

CE

RT

IF

ICA

TE OF AUTHOR IZAT

ION

Bernhard

TME, LLC

ISSUE DATE:

SHEET NUMBER:

PROJECT

NUMBER:

1 ALLIED DRIVE, BUILDING 2

SUITE 2600

LITTLE ROCK, AR 72202

Phone: (501) 666-6776

Fax: (501) 663-8888 tme@bernhardtme.com

SHEET TITLE:

ENGINEER SEAL

CORPORATE SEAL

100% CONSTRUCTION

DOCUMENTS

E1220

BUILDING 62 - FIRST &

BASEMENT FLOOR PLANS &

ONE-LINE DIAGRAM - NEW

10-15-21

01-19-0062

M C

C B

R E

A K

E R

M A

IN

T

E N

A N

C E

J E

F F

E R

S O

N L

A B

O R

A T

O R

IE

S

N

C T

R R

O A

D J E

F F

E R

S O

N

A R

K A

N S

A S

1/8" = 1'-0"1

FLOOR PLAN - BUILDING 62 BASEMENT - NEW

1/8" = 1'-0"2

FLOOR PLAN - BUILDING 62 FIRST FLOOR - NEW

NOT TO SCALE3

ONE-LINE DIAGRAM - BUILDING 62 NEW

KEYED NOTES:

RE-CONNECT EXISTING CIRCUITS THAT WERE FED FROM MCC TO NEW DISTRIBUTION

PANEL. MATCH EXISTING WIRE SIZE AND TRIP SETTINGS. REFER TO PANEL

SCHEDULES AND ELEVATIONS FOR MORE DETAILS.

RE-FEED EXISTING CIRCUITS THAT WERE FED FROM EXISTING SWITCHGEAR WITH NEW

CONDUIT AND WIRES. REFER TO NEW ONE-LINE DIAGRAM.

PROVIDE AND INSTALL CT'S FOR MAIN BREAKER. EXTEND NETWORK WIRING AND

CONNECT TO CT'S. MATCH EXISTING SIEMENS DEM 2000 CT'S.

INSTALL NEW FENCE WITH A GATE IN FRONT OF THE NEW SWITCHGEAR.

PROVIDE AND INSTALL 600V, 30A3P, COMBINATION MOTOR STARTER. PROVIDE AND

INSTALL NEMA 1 STARTER. TRANSFER CIRCUIT FROM REMOVED MCC-5 AND ROUTE

THROUGH INDICATED PANEL AND COMBINATION MOTOR STARTER. MATCH EXISTING

WIRE SIZE.

PROVIDE AND INSTALL SQUARE-D, NEMA3R, INTEGRATED 15KVA, 480V-120/240, SINGLE

PHASE TRANSFORMER AND 100A, 120/240, SINGLE PHASE NQ PANEL.

CONNECT POWER TO GENERATOR BLOCK HEATER.

CONNECT POWER TO GENERATOR BATTERY CHARGER.

PROVIDE AND INSTALL 600V, 800A FRAME, 800A TRIP, NEMA3R ENCLOSED LSI MAIN

BREAKER.

RE-FEED PANEL FROM NEW SWITCHGEAR. REFER NO NEW ONE-LINE DIAGRAM.

RE-FEED MCC FROM NEW SWITCHGEAR. REFER NO NEW ONE-LINE DIAGRAM.

CATERPILLAR GENERATOR IS BASIS OF DESIGN, IF CATERPILLAR GENERATOR IS NOT

SUBMITTED AS BASE BID THEN CONTRACTOR TO PROVIDE AN ALTERNATE PRICING FOR

CATERPILLAR GENERATOR.

PROVIDE AND INSTALL 480V, 800A, 3Ø, 3 POLE ATS WITH BYPASS ISOLATION. PROVIDE

WITH SPD AND PHASE ROTATION MONITOR.

PROVIDE AND INSTALL 1" CONDUIT FOR CONTROL WIRES.

GENERATOR EXHAUST TO BE MOUNTED ON THIS PART OF THE GENERATOR.

REFER TO STRUCTURAL DETAILS AND GENERATOR SITE SPECIFIC DRAWINGS FOR

CONCRETE PAD, CONDUIT ROUTING, AND ETC.

BUILD A NEW PLATFORM TO ACCESS THE GENERATOR.

PROVIDE AND INSTALL EPO (EMERGENCY POWER OFF) BUTTON FOR THE GENERATOR.

VERIFY EXACT PLACEMENT OF THE EPO WITH COR PRIOR TO ROUGH IN. PROVIDE WITH

LOCKABLE COVER AND LABEL.

GENERAL NOTES:

ALLL EXPOSED CONDUITS TO BE RMC. 1.

MARK DATE DESCRIPTION

Sheets
E001 - GENERAL NOTES, LEGEND, AND BUILDING GROUPING/ADDITIVE ALTERNATES - ELECTRICAL
E002 - DETAILS - ELECTRICAL
E003 - DETAILS - STRUCTURAL
E101 - SITE PLAN - ELECTRICAL
E201 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION
E202 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - NEW
E203 - BUILDING 5B - ELEVATIONS, SCHEDULES AND NOTES
E301 - BUILDING 9 - ELECTRICAL DEMOLITION
E302 - BUILDING 9 - ELECTRICAL NEW
E303 - BUILDING 9 - ONE-LINE DIAGRAM
E401 - BUILDING 11 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E402 - BUILDING 11 - ELEVATIONS, SCHEDULES AND NOTES
E501 - BUILDING 12 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E502 - BUILDING 12 - ELEVATIONS, SCHEDULES AND NOTES
E601 - BUILDING 26 - FLOOR PLAN & ONE-LINE DIAGRAM
E602 - BUILDING 26 - ELEVATIONS AND NOTES
E701 - BUILDING 44 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E702 - BUILDING 44 - ELEVATIONS, SCHEDULES AND NOTES
E801 - BUILDING 51 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E802 - BUILDING 51 - ELEVATIONS, SCHEDULES AND NOTES
E901 - BUILDING 52 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E902 - BUILDING 52 - ELEVATIONS, SCHEDULES AND NOTES
E1010 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION
E1020 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - NEW
E1030 - BUILDING 53A - ELEVATIONS, SCHEDULES AND NOTES
E1040 - BUILDING 53A - ELEVATIONS AND NOTES
E1110 - BUILDING 60 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E1120 - BUILDING 60 - ELEVATIONS, SCHEDULES AND NOTES
E1210 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - DEMOLITION
E1220 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - NEW
E1230 - BUILDING 62 - SECOND FLOOR PLANS - DEMOLITION & NEW
E1240 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES
E1250 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES
E1310 - BUILDING 85 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW
E1320 - BUILDING 85 - ELEVATIONS, SCHEDULES AND NOTES
G100 - COVER SHEET
M501 - BUILDING 12 - MECHANICAL FLOOR PLAN

File details come from the government source that posted it. Updated .