Attachment 2-E1220 - BUILDING 62 - FIRST AND BASEMENT FLOOR PLANS AND ONE-LINE DIAGRAM - NEW.pdf
PDF 580 KB Posted
- Attached to
- FDA NCTR Bldg. 62 MCC-Switchgear Replacement
- Solicitation number
- 75F40126SSNFY26_MCC
About this file
Summary
This document is an electrical engineering schematic and floor plan for Building 62 MOC Breaker Maintenance project. The plans depict a comprehensive electrical infrastructure upgrade including installation of a new 480V, 3-phase, 500KW diesel generator with 48-hour sub-base tank and weather-rated enclosure located outside the basement. Additional major components include a new 1600A switchgear with walk-in 3R enclosure, a new 800A 3-pole automatic transfer switch (ATS) with NEMA 3R rating and bypass isolation capability, and a new 600A 480V/3-phase distribution panel. The system includes multiple distribution panels across multiple floors: HDP-5, HDP-6, HDP-7, HDP-9, and MDP-62, with an existing 500KVA transformer (T-62) and existing GE motor control center (MCC).
The specifications detail extensive cabling requirements throughout the facility, including multiple sets of 300 KMIL and 350 KMIL conductors with various gauges and conduit sizes (ranging from 1-inch to 3-inch) connecting the basement electrical room, first floor, second floor electrical room, and third floor mechanical room/second floor roof. The design includes grounding and bonding systems connected to metal water piping and building steel in accordance with NEC Article 250. This appears to be 100% construction documentation prepared by Bernhard TME (Sheet E1220), with floor plans showing basement and first-floor layouts and a complete one-line electrical diagram for the new Building 62 system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HDP-5
HDP-5- 1,3,5
HDP-6
NEW 480V,
3Ø,500KW DIESEL
GENERATOR WITH
48HR SUB-BASE
TANK. WITH
WEATHER RATED
ENCLOSURE.
GATE
T-62
NEW 800A 3
POLE ATS
SWG-62
L.C-62
L.C-62- 1,3
L.C-62- 2
MCC-10 11
NEW 1600A
SWITCHGEAR WITH
WALK IN 3R
ENCLOSURE.
EXISTING 500KVA
TRANSFORMER
"T-62"
G
NEW 480V,
3Ø,500KW DIESEL
GENERATOR WITH
48HR SUB-BASE
TANK. WITH
WEATHER RATED
ENCLOSURE.
NEW 480V, 800A, 3Ø,3 POLE
NEMA 3R ATS, WITH BYPASS
ISOLATION
OUTSIDE
BASEMENT
1ST FLOOR
2ND FLOOR
ELECTRICAL ROOM
HDP-A
HDP-5
(3) SETS (4) 300 KMIL,
#1/0G, 3"C
(3) SETS (4) 300 KMIL, 3"C
(3) SETS (4) 300 KMIL,
#1/0G, 3"C
NEW 600A, 480V/3Ø
DISTRIBUTION PANEL
(3) #4, #8G, 1"C
L.C-62
(3) SETS (4) 300 KMIL,
#1/0G, 3"C
HDP-7
MDP-62
3RD FLOOR MECHANICAL
ROOM/SECOND FLOOR ROOF
MCC-10
HDP-9
HDP-6
(2) SETS (4) 350 KMIL, #1/0G, 3"C
(2) SETS (4) 350 KMIL, #1/0G, 3"C
(2) SETS (4) 350 KMIL, #1/0G, 3"C
(2) SETS (4) 350 KMIL, #1/0G, 3"C
(2) SETS (4) 350 KMIL, #1/0G, 3"C
(2) SETS (4) 350 KMIL, #1/0G, 3"C
(2) SETS (4) 350 KMIL, #1/0G, 3"C
EXISTING
GE MCC
(2) SETS (4) 350 KMIL, #1/0G, 3"C
LSI
800A3P
LSI
GROUND AND BOND SYSTEM
TO METAL WATER PIPING AND
BUILDING STEEL IN ACCORDANCE
WITH NEC ARTICLE 250
NO. 18899
ARKANSAS
ENGINEER
PROFESSIONAL
REGISTERED
OFETA
S T
A L I H ON A R M A N
D
NARKA
SA S
No. 2790
CE
RT
IF
ICA
TE OF AUTHOR IZAT
ION
Bernhard
TME, LLC
ISSUE DATE:
SHEET NUMBER:
PROJECT
NUMBER:
1 ALLIED DRIVE, BUILDING 2
SUITE 2600
LITTLE ROCK, AR 72202
Phone: (501) 666-6776
Fax: (501) 663-8888 tme@bernhardtme.com
SHEET TITLE:
ENGINEER SEAL
CORPORATE SEAL
100% CONSTRUCTION
DOCUMENTS
E1220
BUILDING 62 - FIRST &
BASEMENT FLOOR PLANS &
ONE-LINE DIAGRAM - NEW
10-15-21
01-19-0062
M C
C B
R E
A K
E R
M A
IN
T
E N
A N
C E
J E
F F
E R
S O
N L
A B
O R
A T
O R
IE
S
N
C T
R R
O A
D J E
F F
E R
S O
N
A R
K A
N S
A S
1/8" = 1'-0"1
FLOOR PLAN - BUILDING 62 BASEMENT - NEW
1/8" = 1'-0"2
FLOOR PLAN - BUILDING 62 FIRST FLOOR - NEW
NOT TO SCALE3
ONE-LINE DIAGRAM - BUILDING 62 NEW
KEYED NOTES:
RE-CONNECT EXISTING CIRCUITS THAT WERE FED FROM MCC TO NEW DISTRIBUTION
PANEL. MATCH EXISTING WIRE SIZE AND TRIP SETTINGS. REFER TO PANEL
SCHEDULES AND ELEVATIONS FOR MORE DETAILS.
RE-FEED EXISTING CIRCUITS THAT WERE FED FROM EXISTING SWITCHGEAR WITH NEW
CONDUIT AND WIRES. REFER TO NEW ONE-LINE DIAGRAM.
PROVIDE AND INSTALL CT'S FOR MAIN BREAKER. EXTEND NETWORK WIRING AND
CONNECT TO CT'S. MATCH EXISTING SIEMENS DEM 2000 CT'S.
INSTALL NEW FENCE WITH A GATE IN FRONT OF THE NEW SWITCHGEAR.
PROVIDE AND INSTALL 600V, 30A3P, COMBINATION MOTOR STARTER. PROVIDE AND
INSTALL NEMA 1 STARTER. TRANSFER CIRCUIT FROM REMOVED MCC-5 AND ROUTE
THROUGH INDICATED PANEL AND COMBINATION MOTOR STARTER. MATCH EXISTING
WIRE SIZE.
PROVIDE AND INSTALL SQUARE-D, NEMA3R, INTEGRATED 15KVA, 480V-120/240, SINGLE
PHASE TRANSFORMER AND 100A, 120/240, SINGLE PHASE NQ PANEL.
CONNECT POWER TO GENERATOR BLOCK HEATER.
CONNECT POWER TO GENERATOR BATTERY CHARGER.
PROVIDE AND INSTALL 600V, 800A FRAME, 800A TRIP, NEMA3R ENCLOSED LSI MAIN
BREAKER.
RE-FEED PANEL FROM NEW SWITCHGEAR. REFER NO NEW ONE-LINE DIAGRAM.
RE-FEED MCC FROM NEW SWITCHGEAR. REFER NO NEW ONE-LINE DIAGRAM.
CATERPILLAR GENERATOR IS BASIS OF DESIGN, IF CATERPILLAR GENERATOR IS NOT
SUBMITTED AS BASE BID THEN CONTRACTOR TO PROVIDE AN ALTERNATE PRICING FOR
CATERPILLAR GENERATOR.
PROVIDE AND INSTALL 480V, 800A, 3Ø, 3 POLE ATS WITH BYPASS ISOLATION. PROVIDE
WITH SPD AND PHASE ROTATION MONITOR.
PROVIDE AND INSTALL 1" CONDUIT FOR CONTROL WIRES.
GENERATOR EXHAUST TO BE MOUNTED ON THIS PART OF THE GENERATOR.
REFER TO STRUCTURAL DETAILS AND GENERATOR SITE SPECIFIC DRAWINGS FOR
CONCRETE PAD, CONDUIT ROUTING, AND ETC.
BUILD A NEW PLATFORM TO ACCESS THE GENERATOR.
PROVIDE AND INSTALL EPO (EMERGENCY POWER OFF) BUTTON FOR THE GENERATOR.
VERIFY EXACT PLACEMENT OF THE EPO WITH COR PRIOR TO ROUGH IN. PROVIDE WITH
LOCKABLE COVER AND LABEL.
GENERAL NOTES:
ALLL EXPOSED CONDUITS TO BE RMC. 1.
MARK DATE DESCRIPTION
| Sheets |
| E001 - GENERAL NOTES, LEGEND, AND BUILDING GROUPING/ADDITIVE ALTERNATES - ELECTRICAL |
| E002 - DETAILS - ELECTRICAL |
| E003 - DETAILS - STRUCTURAL |
| E101 - SITE PLAN - ELECTRICAL |
| E201 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION |
| E202 - BUILDING 5B - FLOOR PLAN & ONE-LINE DIAGRAM - NEW |
| E203 - BUILDING 5B - ELEVATIONS, SCHEDULES AND NOTES |
| E301 - BUILDING 9 - ELECTRICAL DEMOLITION |
| E302 - BUILDING 9 - ELECTRICAL NEW |
| E303 - BUILDING 9 - ONE-LINE DIAGRAM |
| E401 - BUILDING 11 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E402 - BUILDING 11 - ELEVATIONS, SCHEDULES AND NOTES |
| E501 - BUILDING 12 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E502 - BUILDING 12 - ELEVATIONS, SCHEDULES AND NOTES |
| E601 - BUILDING 26 - FLOOR PLAN & ONE-LINE DIAGRAM |
| E602 - BUILDING 26 - ELEVATIONS AND NOTES |
| E701 - BUILDING 44 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E702 - BUILDING 44 - ELEVATIONS, SCHEDULES AND NOTES |
| E801 - BUILDING 51 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E802 - BUILDING 51 - ELEVATIONS, SCHEDULES AND NOTES |
| E901 - BUILDING 52 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E902 - BUILDING 52 - ELEVATIONS, SCHEDULES AND NOTES |
| E1010 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - DEMOLITION |
| E1020 - BUILDING 53A - FLOOR PLAN & ONE-LINE DIAGRAM - NEW |
| E1030 - BUILDING 53A - ELEVATIONS, SCHEDULES AND NOTES |
| E1040 - BUILDING 53A - ELEVATIONS AND NOTES |
| E1110 - BUILDING 60 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E1120 - BUILDING 60 - ELEVATIONS, SCHEDULES AND NOTES |
| E1210 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - DEMOLITION |
| E1220 - BUILDING 62 - FIRST & BASEMENT FLOOR PLANS & ONE-LINE DIAGRAM - NEW |
| E1230 - BUILDING 62 - SECOND FLOOR PLANS - DEMOLITION & NEW |
| E1240 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES |
| E1250 - BUILDING 62 - ELEVATIONS, SCHEDULES AND NOTES |
| E1310 - BUILDING 85 - FLOOR PLANS & ONE-LINE DIAGRAMS - DEMOLITION AND NEW |
| E1320 - BUILDING 85 - ELEVATIONS, SCHEDULES AND NOTES |
| G100 - COVER SHEET |
| M501 - BUILDING 12 - MECHANICAL FLOOR PLAN |
File details come from the government source that posted it. Updated .