Attachment 3 - Quality Assurance Surveillance Plan.docx
DOCX document 33 KB Posted
- Attached to
- Role Player Support Services Federal contract opportunity
- Solicitation number
- H92240-22-Q-2000
- Issued by
- United States Special Operations Command
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
Naval Special Warfare Role Player Support
H92240-14-R-0012 Attachment 3
H92240-22-Q-2000 Attachment 3 i
TABLE OF CONTENTS
| 1 | INTRODUCTION | 1 |
| 1.1 | Purpose | 1 |
| 1.2 | Performance Management Approach | 1 |
| 1.3 | Performance Management Strategy | 1 |
| 2 | ROLES AND RESPONSIBILITIES | 2 |
| 2.1 | The Contracting Officer | 2 |
| 2.2 | The Contracting Officer’s Technical Representative | 2 |
| 3 | IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS | 2 |
| 4 | METHODOLOGIES TO MONITOR PERFORMANCE | 2 |
| 4.1 | Surveillance Techniques | 2 |
| 4.2 | Customer Feedback | 3 |
| 4.3 | Acceptable Quality Levels | 3 |
| 5 | QUALITY ASSURANCE DOCUMENTATION | 3 |
| 5.1 | The Performance Management Feedback Loop | 3 |
| 5.2 | Monitoring Forms | 3 |
| 6 | ANALYSIS OF QUALITY ASSURANCE ASSESSMENT | 4 |
| 6.1 | Determining Performance | 4 |
| 6.2 | Reporting | 4 |
| 6.3 | Reviews and Resolution | 4 |
| ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY | 5 | |
| ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM | 6 |
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled TRADET-1 Role Player Support Services. This plan sets forth the procedures and guidelines Naval Special Warfare Command will use in ensuring the required performance standards or services levels are achieved by the contractor.
Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
This QASP defines the roles and responsibilities, identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by Naval Special Warfare to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
Performance Management Strategy The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
ROLES AND RESPONSIBILITIES
The Contracting Officer The procuring contracting officer (PCO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the contracting officer's representative (COR) when assigned and the contractor. If assigned, the PCO will designate one COR or Technical Representative as the government authority for performance management.
The Contracting Officer’s Representative or Technical Representative– if assigned The COR or TR will be identified by the CO to act as his or her authorized representative to assist in administering a contract. COR/TR limitations are contained in the written appointment. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR/TR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the PCO for action. The COR/TR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the Contract Terms and Conditions clause for any service relating to the contract.
IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are (include those that apply)
· Random monitoring, which shall be performed by the PCO, COR or TR.
Customer Feedback The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the PCO, COR or TR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint and must be forwarded to the PCO, COR or TR. The PCO, COR or TR will accept those customer complaints for review and identification of required action.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
Acceptable Quality Levels The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall performance.
QUALITY ASSURANCE DOCUMENTATION
The Performance Management Feedback Loop The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.
Monitoring Forms The Government’s QA surveillance, accomplished by the PCO, COR or TR, will be reported using the monitoring forms in Attachment 2. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.
The PCO/COR will retain a copy of all completed QA surveillance forms.
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
Determining Performance Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
Reporting At the end of each quarter, the PCO/COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
Reviews and Resolution The PCO, COR or TR may require the contractor’s project manager, or a designated alternate, to meet with the government personnel as deemed necessary to discuss performance evaluation. The PCO/COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
· Quarterly performance assessment data and trend analysis
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
· Recommendations for improved efficiency and/or effectiveness
The PCO, COR or TR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics if applicable will be incorporated as a contract modification.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
| Performance Objective |
| Performance Standard |
| Method of Performance Assessment |
| Provide timely notification for instructor substitution requiring Government action. |
| No more than 10 days to report to the Government for Instructor substitution. |
| Review requirements and qualifications. |
| Provide a suitable training site(s), vehicles, Medical support, training schedule, curriculum and training media as required. |
| 100% of the time through duration of the course. |
| Review site, vehicles, schedule, curriculum and media. |
| Maintain certification for range safety requirements. |
| 100% of the time through duration of the course. |
| Review certification records. |
| Maintain all equipment and facilities to include vehicles. |
| No more than 15 minutes wait for a replacement vehicle. |
| Review course records. |
| Provide changes to curriculum. |
| 100% of the time by the start of the course. |
| Review course content, external factors. |
| Maintain an orderly and professional atmosphere in all classroom and field settings. |
| 100% of the time throughout entire course. |
| Review environment, course climate. |
| Provide timely notification of students who are having academic or performance problems. |
| Immediately (within 1day) report to the Government. |
| Evaluate student’s well-being, mental and physical capacity. |
| Report any disciplinary problems between contractor staff and military staff or student. |
| Immediately (within 1 day) report to the Government. |
| Evaluate student’s well-being, mental and physical capacity. |
| Report any security incident or indication of potential unauthorized disclosure or compromise of sensitive unclassified information. |
| Immediately (within 1 day) report to the Government. |
| Review course records. |
| Report any safety and training related problems or mishaps. |
| Immediately (within 1 day) report to the Government. Formal written report within 2 working days. |
| Review documentation, formal report. |
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (Check):
| Monthly | Quarterly | As needed | |
| PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: | ______ % |
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
| Service Provider’s Performance (Check): | Meets Standards |
| Does Not Meet Standards |
Narrative of Performance during Survey Period:
PREPARED BY: ___________________________________ DATE: _________________
File details come from the government source that posted it. Updated .