This solicitation seeks proposals from small businesses to replace two chillers and optionally provide two additional chillers at an Air Route Traffic Control Center in Houston, Texas. The project size is estimated between $850,000 to $1,300,000. The solicitation is issued by the Federal Aviation Administration Southwestern Region. The NAICS code is 238220 for plumbing, heating, and air conditioning contractors with a small business size standard of $16.5 million. Key dates include an optional site visit on August 10th with RSVP required 48 hours in advance, questions due by August 17th, and proposals due by August 29th.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-22-R-00401 AMD 2 8 22 22.pdf | ||
| FAA Response to Questions 8 22 22.docx | DOCX document | |
| 697DCK-22-R-00401 amd 1.pdf | ||
| ZHU Chiller Pre-Bid Site Visit Amendment 1 8 17 22.pdf | ||
| Attachment 3 SOP HAZARDOUS ENERGY.doc | DOC document | |
| Attachment 8 Houston Customer Past Performance Satisfaction Survey.docx | DOCX document | |
| Attachment 7 Davis Bacon Wage Determination TX20220253 7 8 22.pdf | ||
| Attachment 4 LOTO_Guidelines.doc | DOC document | |
| Attachment 1 SPECIFICATION_ZHU CHILLER 400 AND 500 REPLACEMENT.pdf | ||
| 697DCK-22-R-00401 final 7 28.pdf | ||
| Attachment 6 FAA-C-1217H.pdf | ||
| Cover memo ZHU Chiller 7 28 22 (002).pdf | ||
| Attachment 5 FAA-STD-019e.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
TO REMAIN (TYP)
LIMITING FUSES
EXISTING CURRENT
TX
02/05/2021 1706158
ZHU-D-CHILR-E001
02/05/20211706158CHILLER 400 & 500 REPLACEMENT
C O
N S
T R
U
IO
ENGINEERING SERVICES
OPERATIONS
CHILR
FY21
CHILLER 400 & 500 REPLACEMENT
AIR ROUTE TRAFFIC CONTROL CENTERHOUSTON
PROJECT ENGINEER MGR: ENGINEERING - FORT WORTH
z h u -d -c il r-e .d g n
THIS DRAWING PRODUCED ON ASW REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
ESSENTIAL POWER ONE-LINE DIAGRAM
ESSENTIAL BUS SWITCHGEAR (EXISTING)
MCC-B
(EXISTING)
MCC-C
SWBD-EB
MCC-1C
MCC-1B (EXISTING)MCC-1A (EXISTING)MCC-A (EXISTING)
CLF
EXISTING FEEDERS TO REMAIN
GENERAL NOTES:
EXISTING FEEDERS
TO REMAIN
CLF CLF
CLF CLFCLF
IN
D
SPARE
BUS "B"
BUS "A"
K
M
IL
IT
E
F
CHILLER
CH-500
CH-400
CH-300
CH-200
MMMM
G
PUMP P-1A
60HP
PUMP P-1B
60HP 3HP
AHU-11
3HP
EF E-10
ELECTRICAL DEVICES AND EQUIPMENT.
ARE INTENDED ONLY TO INDICATE CONNECTIONS BETWEEN
ROUTE OF CONDUITS ARE SHOWN ARE ILLUSTRATIVE AND3.
SCHEDULES, PRIOR TO DEMOLITION WORK.
BRANCH CIRCUIT CONNECTIONS AND PANEL BOARD
OF ALL ELECTRICAL EQUIPMENT, DEVICES, FEEDERS,
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS2.
ZHU-D-CHILR-G002.
REFER TO ADDITIONAL GENERAL NOTES SEE DRAWING1.
IS
ESSENTIAL POWER ONE-LINE DIAGRAM - DEMOLITION
NOT TO SCALE
u r-e
/0
/2
:0
P lo tt e d b y
V
-C
A
-E
B
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
zhu-d-chilr-e001
2021-06-02T07:02:23-0500
JUAN ROMERO
2021-04-23T07:58:23-0500
Ian Donald Hoover
(TYPICAL)
NOTE 2
TO REMAIN (TYP)
LIMITING FUSES
EXISTING CURRENT
ZHU-D-CHILR-E002
ESSENTIAL POWER ONE-LINE DIAGRAM
u r-e
ESSENTIAL BUS SWITCHGEAR (EXISTING)
SWBD-EB
MCC-1B (EXISTING)MCC-1A (EXISTING)MCC-A (EXISTING)
600AT
1600AF
BUS "B"
BUS "A"
W
CH-100
C4
100AF
30AT
200AF
150AT
.1
.6
200A
3P
30A
MM
PUMP P-1B NEW EF-10
PUMP P-1A
PUMP P-1E
EXISTING FEEDERS
TO REMAIN
EXISTING FEEDERS TO REMAIN
ELECTRICAL DEVICES AND EQUIPMENT.
ARE INTENDED ONLY TO INDICATE CONNECTIONS BETWEEN
ROUTE OF CONDUITS ARE SHOWN ARE ILLUSTRATIVE AND3.
ESSENTIAL POWER ONE-LINE DIAGRAM - NEW CONSTRUCTION
u r-e
:1 lo tt e zhu-d-chilr-e002
2021-06-02T07:03:24-0500
JUAN ROMERO
2021-04-23T07:58:35-0500
Ian Donald Hoover
PANEL PP-MOV
FLOW COMPUTER NO.1
FLOW COMPUTER NO.2
PANEL PP-CH
TR-CH TRANSFORMER
TRANSFER SWITCH
PP-MOV
DDC PANEL
DGP'S
HVAC CONTROL PANEL
EF-E10
MCC-1A
MCC-1BMCC-1C
ZHU-D-CHILR-E003
ELECTRICAL FLOOR PLAN - DEMOLITION
u r-e
B-B
A-A
2 3 41
UH-10
CHILLER ROOM
P-1A
P-1B
AHU-11
UH-11
PANEL IKA
IKA-29
IA
L
MCC-A
BETWEEN ELECTRICAL DEVICES AND EQUIPMENT.
AND ARE INTENDED ONLY TO INDICATE CONNECTIONS
ROUTE OF CONDUITS ARE SHOWN ARE ILLUSTRATIVE3.
SCALE: 1/8" = 1'-0"
8' 16'08'
ELECTRICAL FLOOR PLAN - DEMOLITION
FCV-4B
FCV-5B
FCV-5A
FCV-4A
SHEET NOTES:
THE NEW FLOW CONTROL VALVE WILL BE 120V.
DEMOLISH CABLING BACK TO THE POWER PANEL.
DEMOLISH FCV ACTUATOR.
DEMOLISH POWER CABLES.
u r-e
:2 lo tt e zhu-d-chilr-e003
2021-06-02T07:03:45-0500
JUAN ROMERO
2021-04-23T07:58:48-0500
Ian Donald Hoover
UH-10
12 GND IN 3/4"C (TYP.)
3 NO. 12 AND 1 NO.
DDC PANELS
FLOW COMPUTER NO. 4
FLOW COMPUTER NO. 3
LEAK MONITOR
REFRIGERANT
PP-CH-1
PANEL PP-MOV
DDC PANEL
TRANSFER SWITCH
TR-CH TRANSFORMER
PANEL PP-CH
FLOW COMPUTER NO. 2
FLOW COMPUTER NO. 1
2,4,6
HVAC CONTROL PANEL
DURING CONSTRUCTION ONLY
TEMPORARY PARTITION
MCC-1A
MCC-1B
ZHU-D-CHILR-E004
ELECTRICAL FLOOR PLAN
u r-e
EF-10
B-B
1 2 3 4
PP-CH-12,14,16
MCC-A
PANEL IKA
25,27,29
FCV-4A
31,33,35
FCV-5A
32,34,36
FCV-5B
FCV-4B
26,28,30
UH-11M
7,9,11
PP-CH-3
1,3,5
PP-CH-7
20,22,24
37,39,41
FCV-10M
ELECTRICAL FLOOR PLAN - NEW CONSTRUCTION
NEW ACTUATOR.
AT THE CLOSEST EXISTING PANEL TO POWER THE
NEW FLOW CONTROL VALVES SHALL BE 120V. BREAKER5.
CONDUCTORS.
EXISTING COUNTERPOISE USING NO. 4 AWG
ALL NEW CHILLERS SHALL BE CONNECTED TO THE4.
BETWEEN ELECTRICAL DEVICES AND EQUIPMENT.
AND ARE INTENDED ONLY TO INDICATE CONNECTIONS
ROUTE OF CONDUITS ARE SHOWN ARE ILLUSTRATIVE3.
BRANCH CIRCUIT CONNECTIONS AND PANEL BOARDS
u r-e
:3 lo tt e zhu-d-chilr-e004
2021-06-02T07:03:58-0500
JUAN ROMERO
2021-04-23T07:59:02-0500
Ian Donald Hoover
ZHU-D-CHILR-G001
COVER SHEET
u r-g
AVIA
I
TRAT
SI
NI
HOUSTON, TEXAS
AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC)
T OF TRANSPO
T A
IC
OF
STATES
TM
EN
u r-g lo tt e zhu-d-chilr-g001
2021-06-02T06:56:19-0500
JUAN ROMERO
2021-04-23T07:54:11-0500
Ian Donald Hoover
ZHU-D-CHILR-G002
CONSTRUCTION SEQUENCE FY21
DRAWING INDEX, GENERAL NOTES &
u r-g
ELECTRICAL FLOOR PLAN FY21ZHU-D-CHILR-E004
ELECTRICAL FLOOR PLAN - DEMOLITION FY21ZHU-D-CHILR-E003
ESSENTIAL POWER ONE-LINE DIAGRAM FY21ZHU-D-CHILR-E002
ESSENTIAL POWER ONE-LINE DIAGRAM FY21ZHU-D-CHILR-E001
CONTROL POINT SCHEDULE FY21ZHU-D-CHILR-M010
EQUIPMENT SCHEDULES FY21ZHU-D-CHILR-M009
COOLING TOWER PIPING DIAGRAM FY21ZHU-D-CHILR-M008
CHILLER WATER PIPING DIAGRAM FY21ZHU-D-CHILR-M007
CHILLER ROOM SECTIONS FY21ZHU-D-CHILR-M006
PARTIAL CHILLER ROOM PLAN FY21ZHU-D-CHILR-M005
PARTIAL CHILLER ROOM PLAN FY21ZHU-D-CHILR-M004
PARTIAL CHILLER ROOM PLAN FY21ZHU-D-CHILR-M003
PARTIAL CHILLER ROOM PLAN - DEMOLITION FY21ZHU-D-CHILR-M002
MECHANICAL GENERAL NOTES FY21ZHU-D-CHILR-M001
LEGENDS FY21ZHU-D-CHILR-G004
SITE & CONSTRUCTION STAGING PLAN FY21ZHU-D-CHILR-G003
DRAWING INDEX, GENERAL NOTES & CONSTRUCTION SEQUENCE FY21ZHU-D-CHILR-G002
COVER SHEET FY21ZHU-D-CHILR-G001
C.
INSTALLATION OF THE ELECTRICAL SYSTEMS THAT ARE SPECIFIC FOR THE AIR TRAFFIC OPERATIONS.
STANDARD. THE FAA'S ELECTRICAL STANDARDS INCLUDE SPECIFIC REQUIREMENTS FOR GROUNDING, SPLICING, TERMINATION, BONDING, AND
OBTAIN A COPY OF THE FAA'S STANDARDS FOR ELECTRICAL WORK AND SHALL COMPLY WITH ALL THE REQUIREMENTS SET BY THIS
INTERNATIONAL BUILDING CODE, NFPA, ASHRAE, SMACNA, THE NATIONAL INSULATION STANDARD, AND FAA ORDERS. THE CONTRACTOR SHALL
APPLICABLE CODES AND STANDARDS FOR THIS PROJECT INCLUDES AND IS NOT LIMITED TO THE LATEST EDITIONS OF THE
AS A MINIMUM, THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS, CODES, STANDARDS, AND REGULATIONS. 9.
ORDINANCES DURING THE CONSTRUCTION PHASE OF THIS PROJECT.
THE INDUSTRY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MEET ALL FAA ORDERS, FEDERAL, STATES, AND LOCAL CODES AND
THE CONTRACTOR OF THIS PROJECT SHALL BE QUALIFIED AND FULLY KNOWLEDGEABLE OF THE APPLICABLE CODES AND STANDARDS OF 8.
ALL CONSTRUCTION SHALL BE DONE IN A NEAT AND WORKMANLIKE MANNER IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.7.
TRANSFERRED TO THE BUILDING STRUCTURE. COORDINATE WITH THE COR THESE ACTIVITIES IN ADVANCE.
ELECTRIC DEMOLITION OR ROTARY HAMMERS, SCRAPERS, HAMMERING, CHIPPING, OR ANY ACTIVITY THAT PRODUCES VIBRATIONS
THE FAA. NOISY DEMOLITION AND CONSTRUCTION ACTIVITIES INCLUDE AND ARE NOT LIMITED TO ACTIVITIES REQUIRING THE USE OF
OFF-REGULAR LABOR HOURS FOR ALL NOISY DEMOLITION AND CONSTRUCTION ACTIVITIES OF THE PROJECT AT NO ADDITIONAL COST TO
THIS IS AN EXISTING, FULLY OCCUPIED, AND FULLY OPERATIONAL AIR TRAFFIC CONTROL FACILITY. THE CONTRACTOR SHALL SCHEDULE 6.
FROM THE APPROVED COORDINATION DRAWINGS.
INSTALLATION AND SHALL USE THESE TO DICTATE THE FIELD WORK. THE COR SHALL STOP WORK ACTIVITIES IF FIELD WORK DEVIATES
THE ACTUAL FIELD CONDITIONS. THE CONTRACTOR SHALL ENSURE THE COORDINATION DRAWINGS ARE APPROVED BY THE COR PRIOR TO
BUILDING ELEMENTS. INDICATE IN THE COORDINATION DRAWINGS ANY DEVIATION FROM THE DESIGN TO FIT THE NEW INSTALLATION TO
DIMENSIONS, DISTANCES, AND ELEVATIONS THAT RELATE TO THE NEW EQUIPMENT AND COMPONENTS WITHIN THE SPACE AND THE
THE CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS FOR THE APPROVAL OF THE COR. COORDINATION DRAWINGS SHALL INDICATE 5.
ADDITIONAL COST TO THE FAA.
LOCATIONS AND ROUTING OF UTILITIES TO FIT THE CONDITIONS ENCOUNTERED ON SITE ONCE APPROVED BY THE COR AND AT NO
THE CONTRACTOR SHALL BE RESPONSIBLE TO FIELD VERIFY THE EXACT CONDITIONS ON SITE TO ADJUST, OR MODIFY EQUIPMENT 4.
OUTAGES SHALL BE COORDINATED WITH THE COR AT LEAST 10 DAYS IN ADVANCE.
(ENERGIZE) ANY VALVE OR CIRCUIT BREAKER AT ANY TIME. WORK REQUIRING PERMANENT, TEMPORARY, OR PARTIAL ELECTRICAL/WATER
ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS AND VALVES. THE CONTRACTOR SHALL NOT OPEN (DE-ENERGIZE) OR CLOSE 3.
MAY CAUSE ACCIDENTS AND/OR LOSS OF LIFE.
THIS FACILITY IS AN OPERATIONAL AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) AND UNAUTHORIZED OUTAGES OF UTILITY SERVICES
EXTREME CAUTION MUST BE PRACTICED WHEN WORKING ON ANY OF THE BUILDING UTILITIES (ELECTRICAL, MECHANICAL, OR PLUMBING). 2.
PRODUCE AN ACCEPTABLE PRODUCT FOR THE GOVERNMENT.
INFORMATION PROVIDED HERE WITH SITE CONDITIONS, EQUIPMENT AND MATERIAL SUPPLIERS AND WITH ALL PROJECT REQUIREMENTS TO
ENCOUNTERED DURING THE CONSTRUCTION PROCESS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND CONFIRM ALL
THESE CONTRACT DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS TO BE 1.
DRAWING NO. DESCRIPTION
SEQUENCE OF CONSTRUCTION
GENERAL NOTES
A.
PROJECT.
REPLACE SUCH BUILDING ELEMENTS IF DAMAGED THROUGH THE COURSE OF THE
CONTRACTOR'S RESPONSIBILITY TO RESTORE TO ITS ORIGINAL CONDITIONS OR
CONSTRUCTION ACTIVITIES OF THIS PROJECT. IT WILL BE THE
ANY BUILDING COMPONENT THAT WILL CONFLICT OR INTERRUPT THE
THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE, SECURE, AND REINSTALL1.
ROOM 105 PREP FOR CHILLER REPLACEMENT:
DRAWING INDEX
PERSONNEL.
DISASSEMBLED AND REASSEMBLED BY THE CHILLER MANUFACTURER'S SERVICE
SHALL BRING THE CHILLERS IN VIA THE NORTH DOOR WITH THE COMPRESSOR
DUE TO HEIGHT LIMITATIONS CAUSED BY PIPING IN THE CHILLER ROOM, THE CONTRACTOR2.
WITH EXISTING CONDITIONS.
PLANS MUST INCLUDE ELEVATIONS AND ANY MODIFICATIONS NEEDED DUE TO CONFLICTS
SHOWING FABRICATED LENGTH OF PIPING AND PLACEMENT OF EQUIPMENT. THESE
SHALL HAVE AN APPROVED CONSTRUCTION SEQUENCE AND CONSTRUCTION PLANS
ETC.) AND ACCESSORIES APPROVED AND ON SITE. ADDITIONALLY, THE CONTRACTOR
THE CONTRACTOR SHALL HAVE THE CHILLER AND ALL EQUIPMENT (VALVES, PIPING,
BEFORE THE START OF DEMOLITION AND NEW CONSTRUCTION FOR EACH CHILLER,1.
CHILLER 500 REPLACEMENT APPLIES TO JCN 1706223 ONLY.
REPLACEMENT APPLIES TO JCN 1706158 ONLY AND ALL WORK ASSOCIATED WITH
THE CONTRACTOR SHALL BE AWARE THAT ALL WORK ASSOCIATED WITH CHILLER 400
* ORGANIZATION RISK MANAGEMENT (ORM) REQUIRED.
CH-500.
PROCEED WITH SAME SEQUENCE TO PERFORM THE REPLACEMENT OF FLOW CONTROL VALVES ASSOCIATED TO
SEAL WEATHERPROOF ALL JOINTS.2.
PROJECT COMPLETION. DOOR SECURITY DEVICES SHALL BE REINSTALLED.
THE CONTRACTOR SHALL REPLACE THE DOOR, FRAME, AND WALL LOUVERS AT 1.
REPLACE ROOM 105 EXTERIOR DOOR AND LOUVER:E.
PROCEED WITH SAME SEQUENCE TO PERFORM THE REPLACEMENT OF CH-500.
IN THE EVENT OF ANY EQUIPMENT FAILURE OR MALFUNCTION.
RESET THE DURATION TO OPERATE CH-400 FOR ANOTHER 5 CONSECUTIVE DAYS
RUN CH-400 CONTINUOUSLY FOR A 5 CONSECUTIVE DAY PROVING PERIOD.19.
TEST AND BALANCE CONTRACTOR TO CONFIRM WATER FLOWS THROUGH CH-400.18.
PERFORM STARTUP PROCEDURE AND PERFORMANCE VERIFICATION TEST.17.
FAA PERSONNEL SHALL OPEN VALVES AND ENERGIZE CH-400 ELECTRIC CIRCUIT.16.
PRESSURE TEST THE NEW PIPING.15.
WATER FROM THE CHILLER PLANT.
FILL CWS, CWR, CTS, AND CTR PIPING AND VENT ALL AIR. DO NOT USE 14.
CLEAN AND FLUSH NEW PIPING SECTIONS BEFORE STARTING THE NEW CH-400.13.
ELECTRIC POWER, AND CONTROLS.
INSTALL CH-400 ASSOCIATED PIPING, ACCESSORIES, VALVES, INSULATION, 12.
REQUIREMENTS.
CHILLER ANCHORING SHALL COMPLY WITH THE SEISMIC INSTALLATION
BRING NEW CH-400 IN TO ROOM 105 AND INSTALL IN ITS FINAL LOCATION. 11.
UPDATE NEW HOUSEKEEPING PADS FOR CH-400 AS INDICATED IN S102.10.
DEMOLISH THE EXISTING, PIPE SUPPORTS. 9.
WITH CH-400 (REFER TO E001 FOR ELECTRICAL DEMOLITION).
DEMOLISH THE EXISTING ELECTRIC STARTER AND CONDUITS ASSOCIATED 8.
DEMOLISH CH-400. REFER TO M001 FOR MECHANICAL DEMOLITION. 7.
WORK OF THE EQUIPMENT.
RECOVER CH-400 REFRIGERANT AND OIL BEFORE STARTING DEMOLITION 6.
TO THE SOURCE, AND DEMOLISH CONDUITS.
DISCONNECT POWER AND CONTROL DEVICES; REMOVE CABLING BACK 5.
INCLUDED).
BACK TO ISOLATION VALVES (ALL DRAIN AND VENT LINES
DEMOLISH CH-400 ASSOCIATED PIPING AND ACCESSORIES 4.
DRAIN CHILLER AND ASSOCIATED CW AND CT WATER PIPING. 3.
VERIFY THAT ISOLATION VALVES ARE SEALED. 2.
ISOLATION VALVES ON CWS, CWR, CTS, AND CTR LINES.
FAA PERSONNEL SHALL DE-ENERGIZE CH-400 AND CLOSE THE ASSOCIATED 1.
CH-100, CH-200, AND CH-300 ON LINE):
REPLACE CHILLER-400 (CHILLER PLANT SHALL BE OPERATING WITH D.
MIGRATING ON TO THE EXISTING INSULATED PIPING ADJACENT TO THE WORK AREA.
COMPLETED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING CONDENSATION FROM
SPECIFIED INSULATION AND JACKET. DO NOT LEAVE INSULATION WORK UNTIL FURTHER WORK IS
IMMEDIATELY AFTER THE PIPING WORK IS COMPLETED, INSULATE CHILLED WATER PIPING WITH 9.
PRESSURE BUILD UP IN THE CHILLER ASSEMBLY.
TEST OPERATION OF THE NEW FLOW CONTROL VALVES BY EXERCISING THEM AND OBSERVING 8.
FAA PERSONNEL TO OPEN CHILLER ASSOCIATED ISOLATION VALVES AND FLOW CONTROL VALVES.7.
VERIFY THERE ARE NO LEAKS AFTER NEW VALVES ARE INSTALLED.6.
AIR VALVES. USE ONLY AN EXTERNAL SOURCE OF WATER TO FILL THE CHILLER ASSEMBLY.
FILL UP THE CHILLER AND ASSOCIATED PIPING AND PURGE ALL AIR THROUGH THE EXISTING MANUAL 5.
REPLACE EXISTING FLOW CONTROL VALVLES ASSOCIATED TO CH-400.4.
ASSOCIATED PIPING.
DRAIN WATER SYSTEM DOWNSTREAM FROM THE MAIN ISOLATION VALVES AND ALL THE CHILLER'S 3.
CONTRACTOR TO PROCEED WITH REST OF THE WORK.
IF PRESSURE BUILDS UP. ONCE VALVE SEALING IS PROVEN, THE COR SHALL AUTHORIZE THE
LINES TO DROP PRESSURE IN THE CHILLER ASSEMBLY AND CLOSE DRAIN BACK AGAIN TO OBSERVE
VERIFY THAT THE EXISTING ISOLATION VALVES ARE SEALED. CONTRACTOR SHALL PARTIALLY DRAIN 2.
CH-400. ONLY ONE CHILLER SHALL BE SHUT DOWN AT A TIME.
FAA PERSONNEL TO CLOSE EXISTING ISOLATION VALVES IN THE CWS AND CWR PIPING TO ISOLATE 1.
ADD NEW FLOW CONTROL VALVES TO CH-400 AND CH-500:B.
u r-g
:4 lo tt e zhu-d-chilr-g002
2021-06-02T06:56:39-0500
JUAN ROMERO
2021-04-23T07:54:45-0500
Ian Donald Hoover
ZHU-D-CHILR-G003
SITE & CONSTRUCTION STAGING PLAN
u r-g
HOUSTON VICINITY MAP
ZHU ARTCC VICINITY MAP
INTERSTATE
N N
HOU - HOBBY AIRPORT
GREENS RD
45249
J
Y
INTERCONTINENTAL (IAH)
HOUSTON
HARDY TOLL RD
GREENS RD TO U.S. HWY 59
PARKING LOT
LOT
PARKING
CONTRACTOR ACCESS ROUTE
INTERCONTINENTAL
IAH - HOUSTON
ARTCC
ZHU
ARTCC
ZHU
CONSTRUCTION STAGING
LEGEND:
VISITOR PARKING
GUARD HOUSE
OF STAGING AREA.
COR/RE SHALL DETERMINE FINAL LOCATION
SECURITY FENCE. SEE NOTES B.1 AND D.1
REMAIN A MINIMUM OF 25 FT AWAY FROM
DEBRIS AT ALL TIMES. CONTRACTOR MUST
AREA SHALL REMAIN CLEAN AND FREE FROM
CONTRACTOR PARKING AND STAGING. THIS P
FIRE HYDRANT
SUBSTATION
BLDG
POWER SERVICE
UNION
CREDIT
TOWERS
COOLING
X
COMPUTER
HOST
BUILDING "B"
COURTYARD 2
DSR
SUPPORT WING
CONTROLLER
BLDG
NCO
OFFICE
FAA-RE
F.1
PROPERTY LINE
FACILITY/CONSTRUCTION STAGING LAYOUT
SCALE: 1" = 80' - 0"G002
COURTYARD 3
BUILDING "A"
COURTYARD 1
FACILITY WATERWELL
FIRE HYDRANT FIRE HYDRANT
VAULT
METER
J. F. KENNEDY FRONTAGE RD
PROPERTY LINE
IR
SCALE: 1" = 80'
80' 160'080' u r-g
:5 lo tt e zhu-d-chilr-g003
2021-06-02T06:59:31-0500
JUAN ROMERO
2021-04-23T07:54:59-0500
Ian Donald Hoover
LEGENDS
ZHU-D-CHILR-G004
u r-g
TS
PI
TI
FS
FI
FCV
FM
AM
PS
DI
AI
DO
AO
CH
PD
SS
AX
SPA
MCC
PC
A-
DC
DP
SL
SW
COLUMN LINE GRID DESIGNATION
MATCH LINE
BREAK LINES
DEMOLITION
BY CONTRACTOR
DOOR NUMBER
CLOUD TO ENCOMPASS
REVISED AREA
B72
REVISION
EL 00.00'
REVISION DESIGNATION
ROOM/AREA NUMBER
NOTE MARK - SEE PLAN
NOTES ON SHEET
TAKEN OR FIRST REFERENCED
SHEET FROM WHICH DETAIL IS
OR SCHEDULED
DETAIL IS DRAWN
SHEET ON WHICH
DETAIL TITLE REFERENCE
DETAIL NUMBER
ELEVATION SYMBOL
B100
EARTH
CONCRETE
SHEET WHERE SECTION IS CUT
SECTION IS DRAWN
SHEET ON WHICH
SECTION TITLE REFERENCE
SECTION LETTER
SECTION CUT
PARTIAL SECTION CUT
ELEVATION REFERENCE
NORTH ARROW
RETURN OR EXHAUST DUCT (DOWN)
RETURN OR EXHAUST DUCT (UP OR OUT)
SUPPLY DUCT (UP OR OUT)
TURNING VANES
SUPPLY DUCT (DOWN)
VOLUME DAMPER
(FIRST FIGURE IS SIDE SHOWN)
RECTANGULAR DUCT
20X10
VD
M MOTOR OPERATED PARALLEL
BLADE DAMPER
CONNECTION BETWEEN
IDENTIFYING SYMBOL
EQUIPMENT DESIGNATION SYMBOL
HOT TAP FITTING
CAPPED OR PLUGGED PIPE
BLIND FLANGE
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW METER
FLEXIBLE PIPE CONNECTORS
AUTOMATIC AIR VENT
FLOOR DRAIN
AAV
FD
DIFFERENTIAL PRESSURE CONTROL VALVE
PRESSURE REGULATING VALVE
FLOW CONTROL VALVE
SEGMENTED BALL VALVE
TEST AND BALANCING VALVE
CHECK VALVE
BALANCING VALVE
BUTTERFLY VALVE
BALL VALVE
PLUG VALVE
GLOBE VALVE
GATE VALVE
STRAINER W/BLOWDOWN VALVE
UNION
DRAIN LINE
DOMESTIC COLD WATER
CW
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
REFRIGERANT VENTRV
CTR COOLING TOWER WATER RETURN
COOLING TOWER WATER SUPPLYCTS
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
EXISTING PIPING OR EQUIPMENT
TO BE REMOVED
NEW PIPING AND EQUIPMENT INSTALLATION
EXISTING PIPING AND EQUIPMENT INSTALLATION FLOW CONTROL VALVE
DOOR CLOSER
DIFFERENTIAL PRESSURE SWITCH
TEMPERATURE SENSOR
PRESSURE INDICATOR
TEMPERATURE INDICATOR
PRESSURE DIFFERENCE SENSOR
PRESSURE SENSOR
PRESSURE CONTROL SWITCH
FLOW SWITCH
FLOW INDICATOR
AMMETER
HORN
STROBE LIGHT
DIGITAL INPUT TO DDCP
DIGITAL OUTPUT FROM DDCP
ANALOG INPUT TO DDCP
ANALOG OUTPUT FROM DDCP
MOTOR CONTROL CENTER
START-STOP CONTROL
AUXILIARY CONTACT
SET POINT ADJUSTMENT
MANUAL SWITCH
TRANSFORMER
STARTERS AND CONTROLS IN HEAD
MOTOR OPERATED VALVE
PUSHBUTTON
MAGNETIC STARTER, NUMBER INDICATES
STARTER NEMA SIZE
NOTED, +60" AFF UON
DISCONNECT SWITCH NON-FUSED UNLESS OTHERWISE
MOTOR
BRANCH CIRCUIT CONCEALED IN OR BELOW FLOOR
GROUND CONDUCTOR
ARTICLE 250.
SHALL BE SIZED IN ACCORDANCE WITH N.E.C.
1 NEUTRAL AND 1 GROUND WIRE. GROUND WIRES
IF NO LINES ARE INDICATED, PROVIDE 1 PHASE,
SHOWS 3 PHASE, 1 NEUTRAL AND 1 GROUND WIRE).
NUMBER OF CONDUCTORS IN COUNDUIT (SYMBOL
HOME RUN TO PANELBOARD A-. ARROWS INDICATE
NUMBER OF CIRCUITS CROSS LINES INDICATE
BRANCH CIRCUIT
277/480V., 30
DISTRIBUTION PANELBOARD, +72" AFF TO TOP
TO TOP 120/208 V., 30
LIGHTING AND APPLIANCE PANELBOARD, +72" AFF
JUNCTION BOX - CEILING MOUNTED
JUNCTION BOX - WALL MOUNTED
AND INSTALLATION
HEAVY LINES INDICATE NEW EQUIPMENT
AND INSTALLATION
LIGHT LINES INDICATE EXISTING EQUIPMENT
DEMOLISHED EQUIPMENT DEMOLITION CIRCUITS OR EQUIPMENT ON ONE LINE
TRANSFORMERS, TYPE AND SIZE AS NOTED
PRIMARY FUSE AND SWITCH
AIR CIRCUIT BREAKER, 3-POLE, DRAW-OUT TYPE
M - MANUALLY OPERATED, E - ELECTRICALLY OPERATED
1600AF = 1600 AMP FRAME SIZE
800AT = 800 AMP TRIP SETTING
225AT
600AF
100AF
20AT
MOLDED CASE CIRCUIT BREAKER, 3-POLE,
UNLESS OTHERWISE NOTED
20AT = 20 AMP TRIP SETTING
100AF = 100 AMP FRAME SIZE
INDICATES NOMINAL HORSE POWER
MOTOR, THREE PHASE, INDUCTION, NUMBERM
MOTOR SINGLE PHASE, FRACTION INDICATES
NOMINAL HORSE POWER
1/4
AS
HEATER
INSTRUMENT: A=AMMETER, V=VOLTMETER
INSTRUMENT SELECTOR SWITCH:
AS = AMMETER SELECTOR SWITCH,
VS = VOLTMETER SELECTOR SWITCH
CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
GROUND CONNECTION
FUSE CARTRIDGE TYPE
PUSH-BUTTON, MOMENTARY CONTACT, NORMALLY OPEN
PUSH-BUTTON, MOMENTARY CONTACT, NORMALLY CLOSED
DISCONNECT SWITCH, NON-FUSED
MANUAL MOTOR STARTER SWITCH W/THERMAL OVERLOAD
PROTECTION
A HAND - OFF - AUTOMATIC
SELECTOR SWITCH; 3-POSITION:
COIL SYMBOL, " " DENOTES COIL NUMBER
M = MAGNETIC STARTER COIL
C = MAGNETIC CONTRACTOR COIL
R = RELAY OPERATING COIL
TD = TIME DELAY RELAY OPERATING COIL
LOW VOLTAGE WIRE (LESS THAN 120V AC)
BY HVAC CONTROL CONTRACTOR
LINE VOLTAGE WIRING (SCHEMATIC DIAG.)
LIMIT SWITCH
NORMALLY OPEN CONTACT
NORMALLY CLOSED CONTACT
INDICATING LIGHT
R = RED
G = GREEN
A = AMBER
GENERAL LEGEND
SYMBOLS SYMBOLS
MECHANICAL LEGEND ELECTRICAL LEGEND
SYMBOLS
A12
A12
A012
E1
A01
REF
A010
A01
REF 3
A012
REFERENCE PLAN SYMBOLS DIAGRAM SYMBOLS
MATERIALS
NEW AND EXISTING
FOR CONT
SEE DWG A01
u r-g lo tt e zhu-d-chilr-g004
2021-06-02T06:59:47-0500
JUAN ROMERO
2021-04-23T07:55:14-0500
Ian Donald Hoover
ZHU-D-CHILR-M001
MECHANICAL GENERAL NOTES
u r-m
MECHANICAL GENERAL NOTES:
EQUIPMENT TO BE USED WHEN WORKING INSIDE ROOM 105.
PROVIDE ITS PERSONNEL WITH THE REQUIRED PERSONAL PROTECTION
PROVIDE ALTERNATE REFRIGERANT DETECTION IN THE ROOM AND MUST
MONITORING SYSTEM TO BE SHUT DOWN, THE CONTRACTOR SHALL
EVENT THAT WORK INSIDE ROOM 105 REQUIRES THE REFRIGERANT
UNLESS FALSE ALARMS ARE TRIGGERED BY THE CONSTRUCTION. IN THE
ACTIVATED DURING THE CONSTRUCTION ACTIVITIES OF THIS PROJECT
THE REFRIGERANT MONITORING SYSTEM SHALL BE KEPT CONTINUOUSLY
ROOM 105 IS EQUIPPED WITH A REFRIGERANT MONITORING SYSTEM.25.
CHILLER MANUFACTUREER RECOMENDATIONS AND REQUIREMENTS.
CHILLER. THE NEW REFRIGERANT RECOVERY UNIT SHALL COMPLY WITH THE
SHALL PROVIDE A NEW REFRIGERANT RECOVERY UNIT SPECIFIC TO THE NEW
PROVIDE THE COR WITH THE SLIP OF REFRIGERANT RECLAIM. THE CONTRACTOR
BEFORE DEMOLITION AND DELIVER IT TO AN AUTHORIZED RECLAIM CENTER.
THE CONTRACTOR SHALL RECOVER THE EXISTING CHILLERS REFRIGERANT24.
CHILLERS AND ALL PIPING, AND PIPING ACCESSORIES ARE ON SITE.
DEMOLITION WORK SHALL NOT BE ALLOWED TO START UNTIL THE NEW23.
THE COR.
FAA'S CONSTRUCTION STANDARDS APPLICABLE TO THIS PROJECT FROM
AND REQUIREMENTS. THE CONTRACTOR MAY OBTAIN A COPY OF THE
THE WORK MUST FOLLOW SPECS AND THE FAA'S OPERATIONAL STANDARDS
REQUIREMENTS SET FORTH IN THESE DOCUMENTS AND PERFORMANCE OF
ALL MATERIALS, EQUIPMENT AND PRODUCTS MUST MEET ALL THE
IN THE SPECIFICATIONS DOCUMENTS IN ADDITION TO THESE DRAWINGS.
THE CONTRACTOR IS REQUIRED TO FOLLOW ALL REQUIREMENTS STATED22.
GOVERNMENT.
TRIP OR TAKE OFFLINE ANY EQUIPMENT BELONGING TO THE
APPROPRIATE TIME ALLOWANCE TO OPERATE, SHUT DOWN, TURN OFF,
PREMISES. THE CONTRACTOR SHALL REQUEST TO THE COR WITH
TURN OFF, TRIP OR TAKE OFFLINE ANY EQUIPMENT ON THE SITE
THE CONTRACTOR NOR ITS PERSONNEL SHALL OPERATE, SHUT DOWN,21.
PROCEEDING WITH SUCH CHANGES.
NOTIFY THE COR OF ANY DEVIATION FROM THE WORK PLAN BEFORE
WORK ACTIVITIES SHALL NOT BE ALLOWED. THE CONTRACTOR SHALL
WITH 10 DAYS IN ADVANCE WITH THE COR. IMPROVISATION OF THE
ALL UTILITY SERVICE OUTAGES SHALL BE MINIMIZED AND COORDINATED
FOLLOW TO PERFORM CAVITIES COVERED UNDER THIS SCOPE OF WORK.
DESCRIPTIVE WRITE UP OF THE PROCESS THE CONTRACTOR WILL
SHALL SUBMIT IN WRITING, TO THE COR FOR HIS APPROVAL, A
THE CONTRACTOR SHALL PLAN WORK AHEAD OF ITS EXECUTION AND20.
VENTILATION LAYOUT TO THE COR FOR APPROVAL.
ACCORDANCE WITH OSHA AND ACGIH REQUIREMENTS. SUBMIT
EFFECTS TO FACILITY OCCUPANTS OR CONTRACTOR'S PERSONNEL IN
PRODUCTS WHICH MAY CAUSE ACUTE OR CHRONIC HEALTH OR SAFETY
PROVIDE LOCAL VENTILATION OF THE AREA DURING APPLICATION OF19.
MODIFICATIONS OF THE SPACE AT HIS OWN EXPENSE.
INSTALLATION; AND SHALL BE RESPONSIBLE TO MAKE CHANGES AND
FOR APPROVAL WITH NOTIFICATION OF REQUIRED CHANGES PRIOR TO
EQUIPMENT TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR)
THE EQUIPMENT. THE CONTRACTOR SHALL SUBMIT THE PROPOSED
SPECIFICATIONS AND FITS THE EXISTING SPACE AVAILABLE TO HOUSE
ENSURE THE SUBSTITUTION EQUIPMENT CONFORMS TO THE PROJECT'S
AND CONFIGURATION. THE CONTRACTOR SHALL BE RESPONSIBLE TO
THE REQUIREMENTS OF THE LOCATION, EQUIPMENT SIZE, CLEARANCES,
CONTRACTOR'S PRIOR VERIFICATION OF CONFORMANCE ACCORDING TO
NUMBERS. SUBSTITUTION OF SUCH EQUIPMENT WILL REQUIRE THE
SHOWN ARE BASED ON SPECIFIC SCHEDULED MANUFACTURERS AND MODEL
LOCATIONS, SIZES, CLEARANCES AND CONFIGURATIONS OF EQUIPMENT18.
INSIDE OR OUTSIDE THE BUILDING.
CUTTING, TORCHING, MECHANICAL GRINDING, OR WELDING ACTIVITIES
ONLY. HOT WORK PERMITS SHALL BE OBTAINED IN ADVANCE OF
DETERMINED BY COR. HOT WORK PERMITS ARE ONE DAY DURATION
PERFORMED OUTSIDE OF THE FACILITY OR IN A SAFE LOCATION TO BE
WELDING SHALL BE SCHEDULED IN WRITING WITH COR AND SHALL BE17.
SEPARATE GROUND WIRE SHALL BE PROVIDED.
FACILITY STRUCTURAL STEEL SHALL NOT BE USED AS GROUND. A
NO WELDING SHALL BE POWERED FROM FACILITY ELECTRICAL SYSTEM.16.
PENETRATIONS, SUPPORTS, CONCRETE SLABS, ETC. ARE REMOVED.
NEW AND EXISTING CONSTRUCTION WHERE ITEMS SUCH AS PIPES
CONTRACTOR SHALL PATCH, REPAIR AND INFILL SURFACES TO MATCH15.
BEFORE CONTINUING WITH THE PROJECT'S WORK.
BEEN REMOVED AND DISPOSED UNDER THE HAZMAT ABATEMENT PROCESS
THAT ALL COMPONENTS THAT MAY CONTAIN HAZARDOUS MATERIALS HAVE
THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO ENSURE14.
CONDITION REQUIREMENTS SHALL BE 94 DEG F AND 80% HUMIDITY.
CONDITIONS WILL LIKELY BE IN AUGUST AFTER 1400 CST. MINIMUM
CONDITIONS. PER ASHRAE 90.1 ZHU IS IN CLIMATE ZONE 2A. PEAK
CONDITIONS, PERFORM ADDITIONAL PVT DURING NEAR-PEAK SUMMER
PROCEDURES ARE NOT PERFORMED DURING NEAR-PEAK SUMMER
OF OPERATIONS OF THE EQUIPMENT ARE FUNCTIONAL. IF INITIAL PVT
BACNET DDC SYSTEM OF THE BUILDING AND THAT ALL SEQUENCES
EQUIPMENT HAS BEEN FULLY INTEGRATED TO THE EXISTING
ON EACH CHILLER AFTER STARTUP. THE PVT SHALL CONFIRM THE
A PERFORMANCE VERIFICATION TEST (PVT) SHALL BE PERFORMED13.
BALANCING OF THE CHILLERS HYDRONIC SYSTEM (TAB).
THE CONTRACTOR SHALL PROVIDE TESTING, ADJUSTMENT, AND12.
BEST INSTALLATION OF THE HVAC SYSTEM.
STANDARDS, AND INSTALLATION REQUIREMENTS TO ACHIEVE THE
OPERATIONS. CONTRACTOR SHALL FOLLOW ALL CODES AND
EQUIPMENT TO BE INSTALLED AND THEIR SEQUENCE OF
CONTRACTOR SHALL HAVE ADEQUATE EXPERIENCE WITH THE11.
THE EQUIPMENT.
AND ALL ELECTRICAL CONTRACT DOCUMENTS PRIOR TO ORDERING
PART OF THE HVAC EQUIPMENT WITH THE ELECTRICAL CONTRACTOR
CONTRACTOR SHALL COORDINATE VOLTAGE AND PHASE OF EACH10.
CONCRETE PADS AND/OR EXPOSED TO THE ENVIRONMENT.
INCLUDING THE ON-SITE EQUIPMENT ALREADY MOUNTED ON
PROTECTED ADEQUATELY DURING THE CONSTRUCTION PROCESS
SHALL BE RESPONSIBLE TO ENSURE ALL EQUIPMENT HAVE BEEN
EXTERIOR OF THE BUILDING. THE MECHANICAL CONTRACTOR
SECURE THE HVAC EQUIPMENT AND DEVICES TO THE INTERIOR OR
THE MECHANICAL CONTRACTOR SHALL FURNISH, INSTALL, AND9.
BEEN INSTALLED.
THESE ITEMS SHALL HAVE THE APPROVAL OF THE COR BEFORE
PROJECT SITE CONDITIONS. THE LOCATIONS AND HEIGHTS OF
BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE
THE EXACT LOCATIONS AND HEIGHTS NECESSARY TO SECURE THE
NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY.
DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE
THE LOCATIONS AND HEIGHTS OF ALL ITEMS SHOWN ON THESE8.
ADDITIONAL COST TO THE GOVERNMENT.
WITH OTHER TRADES AND EXISTING BUILDING ELEMENTS AT NO
ELECTRICAL. MAKE OFFSETS AND TRANSITIONS TO COORDINATE
COORDINATE PIPING WITH DUCTWORK, STRUCTURAL, PLUMBING AND7.
NO ADDITIONAL COST TO THE GOVERNMENT.
ACTIVITIES OR OUTAGES DURING OFF-REGULAR LABOR HOURS AT
THIS PROJECT. THE CONTRACTOR SHALL SCHEDULE DISRUPTING
SHALL BE PREVENTED OR MINIMIZED DURING THE EXECUTION OF
THE WORK CONSIDERING THESE CONDITIONS. SCHEDULED OUTAGES
OPERATION. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE
PERFORMED WHILE THE BUILDING IS OCCUPIED AND IN FULL
CONSTRUCTION ACTIVITIES OF THIS PROJECT SHALL BE6.
COR IN WRITING AT LEAST 10 DAYS IN ADVANCE.
FACILITY. THE CONTRACTOR SHALL REQUEST OUTAGES TO THE
INTERRUPTIONS TO THE SYSTEM OR TO THE OPERATION OF THE
THE CONTRACTOR IS NOT ALLOWED TO MAKE UNSCHEDULED5.
CORRECT THE DISCREPANCY WITHOUT PRIOR APPROVAL OF THE COR.
DEVELOPED SOLUTION. THE CONTRACTOR SHALL NOT PROCEED TO
COR WHICH DESCRIBES SAID DISCREPANCY AND PRESENT A FULLY
PERFORMANCE. THE CONTRACTOR SHALL SUBMIT A LETTER TO THE
THAT CAN CAUSE A DETRIMENTAL EFFECT ON THE SYSTEM
WRITING, ANY DISCREPANCY WITH THE SYSTEM DESIGN OR MATTER
TRADES; AND SHALL BRING TO THE COR'S ATTENTION, IN
COORDINATE WITH OTHER CONTRACT DOCUMENTS AND WITH OTHER
THE CONTRACTOR SHALL CAREFULLY REVIEW THESE DRAWINGS AND4.
PERFORM PROCEDURES FOLLOWING THE BEST INDUSTRY PRACTICES.
MECHANICAL CODE, AND APPLICABLE FAA ORDERS; AND SHALL
TO THE INTERNATIONAL BUILDING CODE THE INTERNATIONAL
APPLICABLE CODES AND STANDARDS, INCLUDING BUT NOT LIMITED
MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS; AND ALL
THIS AND OTHER CONTRACT DOCUMENTS; WITH ALL EQUIPMENT
THE CONTRACTOR SHALL CONFORM WITH ALL PARAMETERS GIVEN IN3.
TO THE SYSTEMS.
AND MAKE ACCESSIBLE ALL EQUIPMENT AND DEVICES PERTAINING
TRADES AND DISCIPLINES INVOLVED IN THIS PROJECT TO FIT IN
RESPONSIBLE TO COORDINATE ALL WORK ACTIVITIES WITH OTHER
AND CONTROLS. THE MECHANICAL CONTRACTOR SHALL BE
OPERATIONAL WITH ALL NECESSARY EQUIPMENT, APPURTENANCES
THE CONTRACTOR SHALL FURNISH A FINAL SYSTEM, FULLY2.
COMMENCING ANY WORK.
THE DESIGN OF OTHER TRADES BEFORE PREPARING SHOP DRAWINGS, AND
GOVERNMENT. CAREFULLY REVIEW ALL CONTRACT DOCUMENTS AND
TO PRODUCE AN ACCEPTABLE FINAL PRODUCT FOR THE
EQUIPMENT, SUPPLIERS, AND WITH ALL PROJECT REQUIREMENTS
ALL INFORMATION PROVIDED HERE WITH SITE CONDITIONS,
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND CONFIRM
ENCOUNTERED DURING THE CONSTRUCTION PROCESS. IT IS THE
NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS TO BE
THESE CONTRACT DRAWINGS ARE SCHEMATIC IN NATURE AND ARE1.
u lo tt e zhu-d-chilr-m001
2021-06-02T07:00:00-0500
JUAN ROMERO
2021-04-23T07:55:34-0500
Ian Donald Hoover
2" RV
TO POWER SERVICE BUILDING
4" CWR
4" CWS
10" BF
BF
ZHU-D-CHILR-M002
PARTIAL CHILLER ROOM PLAN - DEMOLITION
u
GENERAL NOTES:321
BB
AA
TW
TS TS
8" CTR
8" CTS
CTS
CTR
6" CWR
6" CWS
8" CWR
12" BF
1A
12" BF
POT FEEDER
MOTOR CONTROL CENTER
MATCH LINE - FOR CONTINUATION SEE DWG M004
SHEET NOTES (FOR CONSTRUCTION SEQUENCE SEE DWG G002)
SCALE: 1/2" = 1'-0"
5'1' 2'01'
PARTIAL CHILLER ROOM PLAN - DEMOLITION
WIRING SHALL BE REMOVED AND REPLACED.
CONTROL SENSORS, TRANSMITTERS AND ASSOCIATED
TO THE ISOLATION VALVES. ALL FLOW CONTROL VALVES,
500 ASSOCIATED PIPING, FITTINGS, AND INSULATION BACK
THE CONTRACTOR SHALL REMOVE THE CHILLER 400 AND4.
REPLACEMENT OF THE EQUIPMENT.
AT ALL TIMES THROUGHOUT THE REMOVAL AND
THE CHILLED WATER PLANT SHALL REMAIN IN OPERATION3.
WRITTEN APPROVAL OF THE COR.
CONTRACTOR SHALL NOT BEGIN WORK UNTIL RECEIVING
FOR CLOSING VALVES AND SHUTTING OFF EQUIPMENT. THE
EXPECTED TIME OF EXECUTION AND REQUIRED REQUEST
SEQUENCE OF DEMOLITION ACTIVITIES WITH THE
COMMENCING WORK. THE WORK PLAN SHALL PROVIDE A
PROVIDE THE COR WITH A DEMOLITION PLAN BEFORE2.
ZHU-D-CHILR-G002 AND ZHU-D-CHILR-M001.
REFER TO ADDITIONAL GENERAL NOTES SEE DRAWINGS1.
NOT USED.
ACCESSORIES AS INDICATED.
AND REMOVE 8" CWR PIPE W/ASSOCIATED
INSTALL HOT TAP FITTING W/BUTTERFLY VALVE
DEMOLISH FLOW CONTROL VALVES (4).
W/ELECTRICAL CONTRACTOR.
COORDINATE CH-400 & CH-500 STARTER REMOVAL
FLANGE ON ISOLATING VALVE.
ISOLATING VALVE & CHILLER. INSTALL BLIND
REMOVE ALL 8" PIPING AND ACCESSORIES BETWEEN
REMOVE CH-400 & CH-500.
REMOVAL WITH CONTROL CONTRACTOR.
COORDINATE CH-400 AND CH-500 HONEYWELL INTERFACE PANELS
NO USED.
REMOVE CABLING ASSOCIATED WITH THE CONTROL DEVICES.
SAND FILTER, PUMPS AND CHEMICAL TREATMENT STATION TO REMAIN.
u lo tt e zhu-d-chilr-m002
2021-06-02T07:00:12-0500
JUAN ROMERO
2021-04-23T07:55:51-0500
Ian Donald Hoover
8" CWS
FOR CLARITY
VALVE NOT SHOWN
3/4"
FOR POT FEEDER
NEW 1" TAP
2"
OF BF (TYP OF 4)
TAP AT THE BOTTOM
PIPE BLOW-DOWN PIPING TO NEAREST FD
TO 1'-6" AFF
14X10 DOWN
16X16
3"RV
8"CTR
AAV (TYP)
1 1/2"
BEAMS
ROOF
EXISTING
1 1/2" 8" CWS
FOR CLARITY
VALVE NOT SHOWN
12" CWR
2"2"
SYSTEMS BUILDING
TO POWER
ZHU-D-CHILR-M003
PARTIAL CHILLER ROOM PLAN
u
S1
SL H SW SW
NOTES: (FOR CONSTRUCTION SEQUENCE SEE DWG M001)
CWS
1E
CWR
UH
4A
AA
BB
1 2 3
4B
5B
M08
TUBE SERVICE
AREA
VD 1
STARTERS
32X16
MATCH LINE - FOR CONTINUATION SEE DWG M004
CURRENT AT ALL TIMES.
TO FABRICATE PIPING. A HOT WORK PERMIT SHALL BE
SHALL HAVE DESIGNATED AREAS AUTHORIZED BY THE COR
PRIOR TO COMMENCING NEW WORK, THE CONTRACTOR2.
INSTALL FLOW METER ON 4" CWS AS INDICATED.
INSTALL NEW PRESSURE INDICATORS ON EXISTING PIPING AS INDICATED.
AND PIPE TO EXISTING FLOOR DRAINS.
INSTALL NEW DRAIN PIPING AT NEW CHILLERS AND NEW PUMPS
COORDINATE THE SOURCE OF CHILLER CONTROLS WITH THE COR.
THE COR.
PRIMED AND PAINTED. COORDINATE THE COLOR SELECTION WITH
ALL CONDENSER WATER PIPING, NEW AND EXISTING, SHALL BE
VALVES.
ACCESSORIES AND APPURTENANCES BACK TO NEW ISOLATION
PROVIDE NEW INSULATED CWS AND CWR PIPING WITH PIPING
THE SPECIFICATIONS. TYPICAL FOR ALL NEW PIPING.
DIRECTION AND AT A MAXIMUM LINEAR DISTANCE ACCORDING TO
A MAXIMUM DISTANCE OF 1 FT FROM EVERY CHANGE OF
PROVIDE NEW HANGERS AND SUPPORTS. PROVIDE PIPE HANGERS
INDICATED.
INSTALL 3" RV PIPE AND CONNECT IT TO THE 6" RV PIPE AS
LOCATE 6" RV AS INDICATED.
AND MAINS.
INSTALL 8" CWR PIPES AND CONNECT THEM TO THE PUMPS
LOCATION WITH THE COR.
WITH EXTERIOR GRADE SEALER. CONFIRM PIPE SIZE AND
RV LINE THROUGH THE PRE-CAST PANEL. SEAL PENETRATION
BORE A HOLE IN THE EXISTING PRE-CAST PANEL. EXTEND THE
REPLACE FLOW CONTROL VALVES (4).
ISOLATING VALVES SHALL BE REMOVED.
WITH BUTTERFLY VALVES AS INDICATED. BLIND FLANGES AT
AND CONNECT THEM TO CHILLERS AND HOT TAP FITTINGS
INSTALL 8" CWS AND CWR PIPES WITH ASSOCIATED ACCESSORIES
AS SHOWN.
REPLACE PNEUMATIC THERMOSTAT AND ELECTRONIC THERMOSTAT
AND CONNECT THEM TO CHILLER AS INDICATED.
INSTALL 8" CTS AND CTR PIPES WITH ASSOCIATED ACCESSORIES
INDICATED.
INSTALL CH-400 AND CH-500 ON THE EXISTING PADS AS
u lo tt e zhu-d-chilr-m003
2021-06-02T07:00:24-0500
JUAN ROMERO
2021-04-23T07:56:08-0500
Ian Donald Hoover
REMOVED
3" RV
DDCP PANELS
REMOVED
8"CWR
8"CWR
8" BFV
2" D
14" CTR
14" CTS
PANELS
DDCP
FROM 10X14
TRANSITION
16 1/2" C.W.R.
OFFSET UP
FITTING
10" STOPPLE
(HCFC-123)
MONITOR SENSOR
UNIT
COIL
FAN
CONCRETE PADS
13'-8" TO 11'-7" BOP
OFFSET DOWN FROM
12" CTR AND CTS
VALVE
BUTTERFLY
10"
PLAN DWG ZHU-D-CHILR-M005
SEE PARTIAL MEZZANINE
FOR CONTINUATION
ZHU-D-CHILR-M004
u
3A
2A
3B
ID
1B
CWR 3
2 1
2B
REFENCE PURPOSES ONLY.
THIS IS A CONTINUATION DRAWING, INCLUDED FOR1.
MATCH LINE - FOR CONTINUATION SEE DWG. M003
2"D 2"D
6" BFV
6" RV
D D
2"D
1 1/2" D
MATCH LINE - FOR CONTINUATION SEE DWG. M005
u lo tt e zhu-d-chilr-m004
2021-06-02T07:00:35-0500
JUAN ROMERO
2021-04-23T07:56:26-0500
Ian Donald Hoover
FLOW COMPUTER NO. 2
FLOW COMPUTER NO. 1 NO.3
FLOW COMPUTER
NO.5
NO.4
1 1/2" D
3/4" D
12" CWS
8" CTR 10" CTR
10" CTS
10X14
6" BYPASS
6" HOT TAP
6" HOT TAP
WITH BF
12" BFV
CHILLER PLANT SPACE
(HCFC-123)
SENSOR
MONITOR
34"X16"
10"x10"
19"X27"
PENTHOUSE
EXHAUST AIR
TO 34"X34" AT
TRANSITION
HVAC PANEL
SENSOR 18"AFF (HCFC-123)
REFRIGERANT MONITOR
STROBE LIGHT
HFC-123 ALARM
EXHAUST SWITCH
SWITCH AND EMERGENCY
HCFC-123 ALARM SILENCE
LIGHT AND HORN
HCFC-123 ALARM STROBE
ZHU-D-CHILR-M005
u
32 1
M005
M005
SL
SL SW
SWH
CWS PD
TS 10
FCVPITI
11CWS
FCY
EF
AHU
DCU-21FIELD GEAR PANELDCU-20
12" CWR8" CWS
MATCH LINE - FOR CONTINUATION SEE DWG M006
EF-10 IS PART OF THE
HCFC-123 EMERGENCY
EXHAUST SYSTEM
CCMS ROOM
114A
REFERENCE PURPOSES ONLY.
THIS IS A CONTINUATION DRAWING, INCLUDED FOR1.
PARTIAL PLAN
PARTIAL MEZZANINE PLAN
u lo tt e zhu-d-chilr-m005
2021-06-02T07:00:51-0500
JUAN ROMERO
2021-04-23T07:56:42-0500
Ian Donald Hoover
STRAINER
UP TO STRAINER
2" DRAIN PIPE
SIESMIC RESTRAINT
ISOLATORS (TYP)
NEOPRENE PAD VIBRATION
SIESMIC RESTRAINT SIESMIC RESTRAINT
10" CWR
6" GATE VALVE
6"-4" REDUCER
STRAINER
2" D 2" D
FOR SERVICING CHILLER (TYP)
DISCONNECTING PIPING
PROVIDE COUPLING FOR
IN RV (TYP FOR 5)
PRESSURE RELIEF VALVES
PROVIDE SPRING OPERATED
SIESMIC RESTRAINT
SEE DETAIL E/M006
PIPE SUPPORT (TYP)
INSULATION
PIPE SADDLE
WELDED
ANGLE
MINIMUM ROD
1/2" DIA.
MORE PIPES
FOR 2 OR
PIPE
CLEVIS HANGER
PRE-ENGINEERED
MINIMUM ROD
1/2" DIA.
SADDLE
SHEET PIPE
GALVANIZED
18 GAUGE
ZHU-D-CHILR-M006
CHILLER ROOM SECTIONS
u
PD CTS
TS CTR
16x32
PI21
TYP
FLOOR SLAB
FLOOR SLAB
REQUIREMENTS.
APPROVED FOR THIS PROJECT. REFER TO SPECIFICATION SECTION 23 07 19 FOR THE SUBMITTAL
THESE PLATES TO SUBMIT THEIR PROPOSED METHOD OF INSTALLATION OF THE INSULATION PRODUCTS
MICA NATIONAL COMMERCIAL AND INDUSTRIAL INSULATION STANDARDS. THE CONTRACTOR SHALL USE
THE CONTRACTOR SHALL SUBMIT FOR APPROVAL OF THE COR THE INSULATION PLATES FROM THE
SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT".
ACCORDANCE TO SPECIFICATIONS 23 05 48, "VIBRATION AND
PROVIDE SEISMIC RESTRAINTS TO PIPE HANGER SUPPORTS IN 7.
ALWAYS USE PIPE SADDLES TO PROTECT PIPE INSULATION.6.
PIPE HANGER SELECTIONS AND APPLICATIONS.
COMPLY WITH PROJECT SPECIFICATIONS AND MSS-SP-69 FOR
BRIDGE TO HAVE NOT MORE THAN A 1/8 INCH DEFLECTION.
FOR MULTIPLE PIPES USE TRAPEZE HANGER. DESIGN TRAPEZE 5.
AND MSS-SP-58 FOR REQUIREMENTS.
EQUIPMENT MAY BE SUBJECTED. REFER TO PROJECT SPECIFICATIONS
DYNAMIC LOADING TO WHICH THE PIPING AND ASSOCIATED
CONCRETE INSERTS CAPABLE OF WITHSTANDING ALL STATIC AND
CONNECT HANGER RODS TO CONCRETE CEILING BY USE OF 4.
(WITHOUT INSULATION AND SADDLES.)
HANGERS ARE ALSO TYPICAL FOR UNINSULATED PIPING 3.
RATINGS OF MSS-SP-58 BUT NOT LESS THAN 1/2 INCH DIAMETER.
HANGER RODS DIAMETER SHALL BE PER SELECTION AND LOAD 2.
STRENGTH OF NOT LESS THAN 3,300 PSI.
PIPING INSULATION SHALL BE FOAM GLASS WITH A COMPRESSIVE 1.
AND MINIMUM LENGTH OF 9"
BE 3 TIMES THE PIPE DIA. SIZE
LENGTH OF PIPE SADDLE SHALL
DETAIL NOTES
VAPOR STOP CONSTRUCTION IS REQUIRED ON CHILLED WATER PIPING
PVC JACKET IN ACCORDANCE WITH SPECIFICATIONS
BUTT JOINT OVERLAP SEALED
WIRE, TAPE, OR BANDS TO SECURE INSULATION
LONGITUDINAL OVERLAP ON FIELD-APPLIED JACKETING
RIGID INSULATION AS SPECIFIED
PIPE
DETAIL NOTES
CHILLER SECTION (REF)
SCALE: 1/2" = 1'-0"M006
CHILLER WATER PIPING INSULATION DETAIL
M006
SINGLE & MULTIPLE PIPING SUPPORTS DETAILS
M006 u
:1 lo tt e zhu-d-chilr-m006
2021-06-02T07:01:04-0500
JUAN ROMERO
2021-04-23T07:57:01-0500
Ian Donald Hoover
CONTROL PANEL
STARTER
1 1/2" (TYP)
(TYP)
3"
6" RV TO EXTERIOR
IN-LINE WITH DISK
PRESSURE RELIEF
FROM CTR HEADER
FLOW METERS
GENERATOR BYPASS
FROM CHILLER AND
EXISTING TEMPERATURE SENSOR RELOCATED
EXISTING FLOW METER RELOCATED
PLUG VALVE
STRAINER (TYP)
TEST AND BALANCE VALVE (TYP)
5#COMPUTER
TO FLOW
10 GPM
TO MAINTAIN
CHECK VALVE (TYP)
BYPASS
BUILDING
SYSTEMS
POWER
TO
4"
MEZZANINE
LOCATED ON
CHILLER PLANT SPACE
MONITOR PANEL
REFRIGERANT LEAK
LOCATIONS.
M04 AND M06 FOR
SWITCHES. SEE DWGS.
EMERGENCY EXHAUST
CHILLER PLANT
ZHU-D-CHILR-M007
CHILLER WATER PIPING DIAGRAM
u
SPASPA
PI DP
TSTI
PI CWS
1E
P PI
PIPI
5A
PDPI
DPPI TI TS
PDPI
TI TS AI
4AFCV
4A
DPPI
TS AI
SPA SPA
PI PD
PI DP TI TS
AI FM
TS AI
CWS07
FM TS
FCV FM
TI PI
PI CWR
PD TS
27 PI
1C
1D
NO.1
975 GPM
PIPI
EF
SW
SW TS HS
AIAIAIAI
FLOW
COMPUTER NO. 5
PI PD
TI TS AI
PI DP TI TS
SPA SPA
AX SS AM
VICI
SSAX AM
1.
2. COMPLETE HYDRONIC SYSTEM IS SHOWN FOR INFORMATION ONLY. ONLY
WORK DESCRIBED BY CONTRACT DOCUMENTS PERTAINING TO CHILLERS
400 AND 500.
EXISTING CHILLED WATER SYSTEM DDCP POINTS WHICH ARE CONNECTED TO THE
EXISTING CSI INPUT/OUTPUT CONTROLLERS SHALL BE RE-USED AS INDICATED TO
PROVIDE THE POINTS AS SHOWN. REMOVE DEVICES TO PERMIT INSTALLATION OF
NEW CHILLERS. INSTALL NEW SENSORS, RECONNECT, AND
RE-CALIBRATE ALL DEVICES TO A PROVIDE A FULLY OPERATIONAL SYSTEM.
COORDINATE LOCATIONS OF OUTDOOR AIR TEMPERATURE AND HUMIDITY SENSORS
WITH COR.
TO FLOOR DRAIN (TYP)
DI DO
3/4" D TO FLOOR DRAIN
FEEDER
CHEMICAL
1"
1"
CI VI
5A
CONTROL PACKAGE
TO CHILLER
AOAO
FLOOR DRAIN (TYP)
THE NEAREST
2" DRAIN TO
AO AO
AI AI
VICI
AOAO
AI AI AI AI
WATER FLOW METER
FROM CH-300 TOWER
FROM CH-200 TOWERNO.2
COMPUTER NO. 1NO.3
NO.1CH200-CWS
CH300-CWS
NO.2
COMPUTER NO. 2
NO.3
CH400-CWS
CH500-CWS
NO.3 NO.1
COMPUTER NO. 3
NO.2
FROM CH-400 TOWER
FROM CH-500 TOWER
CH100-CWS
CW BYPASS
NO.3
COMPUTER NO. 4
NO.4 CTR BYPASS
(COOLING TOWER SUPPLY)
NO.2 CH100 CTS
SERVICE BLDG.
TO POWER
REV. NO.1
6"
CIVI
REV. NO.1
SYSTEMS BUILDING
FROM POWER
N.C.
EXIST.
OA HOOD
N.C.
FILTER
SS AX
AX AX
PART OF DDCP
DI DI AI
AI AI
CHILLED WATER PIPING DIAGRAM
CHILLER PLANT VENTILATION CONTROL
REFER TO ADDITIONAL GENERAL NOTES SEE DRAWINGS ZHU-D-CHILR-G002
AND ZHU-D-CHILR-M001.
u lo tt e zhu-d-chilr-m007
2021-06-02T07:01:18-0500
JUAN ROMERO
2021-04-23T07:57:23-0500
Ian Donald Hoover
TO FLOW COMPUTER NO. 2
COOLING TOWER
TO & FROM
14" CTS & CTR
2" BYPASS
1" DRAIN
GENERATOR BYPASS SYSTEM
CHILLER AND DIESEL
GENERATOR
TO AND FROM
6" CTS AND CTR
DRAIN (TYP) CHILLER
TO FLOOR GPM
1 1/2" D 975
TO MAINTAIN 10 GPM
ZHU-D-CHILR-M008
COOLING TOWER PIPING DIAGRAM
u
BUILDING
TOWER SYSTEMS
TO 4" CWS TO
1. CH-200 CHILLED WATER SUPPLY FLOW
3. CH-300 CHILLED WATER SUPPLY FLOW
4. CH-300 COOLING TOWER RETURN FLOW
2. CH-200 COOLING TOWER RETURN FLOW
1. CHILLED WATER SUPPLY HEADER PRIMARY
2. COOLING TOWER RETURN HEADER FLOW
2. CH-400 COOLING TOWER SUPPLY FLOW
3. CH-500 CHILLED WATER SUPPLY FLOW
4. CH-500 COOLING TOWER SUPPLY FLOW
1. CH-400 CHILLED WATER SUPPLY FLOW
1. CH-100 CHILLED WATER SUPPLY FLOW
3. CHILLED WATER SUPPLY HEADER SECONDARY
FLOW (BYPASS)
4. COOLING TOWER WATER BYPASS
1. POWER SERVICE BUILDING CHILLED
WATER SUPPLY FLOW
COMPUTER NO. 5
COMPUTER NO. 4
COMPUTER NO. 3
AIAIAIAIAIAIAIAI
COMPUTER NO. 1
COMPUTER NO. 2
TO FLOW
COMPUTER
A1PSFCV
A0A1
PSA1
DP PD
325 TONS
EVAPORATOR
CONDENSER
AO CTS
CI
VI
AIAI
DP PD
GPM
14"CTS
14"CTR
12"CTS
12"CTR
PDDP
10"CTS
TO CHILLER
CONTROL
PACKAGE (TYP)
AI 325 TONS
09FM
10"CTR
10"CTS
10"CTR
08 CTR
PI PI CTR
FLOW COMPUTER INPUTS
FLOW COMPUTER NO. 1 (EXISTING)
FLOW COMPUTER NO. 2 (EXISTING)
FLOW COMPUTER NO. 3 (NEW)
FLOW COMPUTER NO. 4 (NEW)
2. CH-100 COOLING TOWER RETURN FLOW
FLOW COMPUTER NO. 4 (NEW)
COOLING TOWER WATER - PIPING DIAGRAM
400 AND 500.
WORK DESCRIBED BY CONTRACT DOCUMENTS PERTAINING TO CHILLERS
COMPLETE HYDRONIC SYSTEM IS SHOWN FOR INFORMATION ONLY. ONLY2.
REFER TO ADDITIONAL GENERAL NOTES SEE DRAWINGS ZHU-D-CHILR-G0021.
AND RE-CALIBRATE ALL DEVICES TO A PROVIDE A FULLY OPERATIONAL SYSTEM.
DEVICES TO PERMIT INSTALLATION OF NEW CHILLERS. RE-INSTALL, RECONNECT,
TO THE EXISTING CSI INPUT/OUTPUT CONTROLLERS ARE TO BE RE-USED. REMOVE
EXISTING COOLING TOWER WATER SYSTEM DDCP POINTS WHICH ARE CONNECTED
u lo tt e zhu-d-chilr-m008
2021-06-02T07:01:36-0500
JUAN ROMERO
2021-04-23T07:57:38-0500
Ian Donald Hoover
ZHU-D-CHILR-M009
EQUIPMENT SCHEDULES
u
CHILLER UNIT SCHEDULE
PUMP SCHEDULE
FLOW CONTROL VALVE SCHEDULE
DIFFERENTIAL PRESSURE CONTROL VALVE
EXHAUST FAN SCHEDULE
NO.
YORK YTE3E3C3-CKF
YORK YK4G4RQ4-EJH
TYPE
CENTRIFUGAL
CENTRIFUGAL 325
TONNAGE
MINIMUM MAXIMUM
KW
207 2
NO. OF
PASSES
MAX.
FLOW DATA
MAX.PD
FT.H2O
WATER
IN F OUT F
WATER
18.8
18.8
12.3
12.3
12.3 52
52 44
44 2
PASSES
NO. OF
975 10.4
10.4
10.4
13.7
13.7
FT.H2O
MAX.PD
FLOW DATA
WATER WATER
86 96
96 460
VOLTS
ELECTRIC SERVICE
PHASE
HERTZ
60 18,200
18,200
18,200
16,199
16,199
LBS
WEIGHT
OPERATING
REMARKS
ELECTRIC SERVICE
HERTZPHASEVOLTS
SPEED
RPM
HP
NPSH
FT
HEAD
GPMSERVICE
MODEL
SIZE
KNOWN
ACCEPTABLE
SOURCE
NO.
P-1A
P-1B
P-1C
P-1D
P-1E ALLIS CHALMERS
ALLIS CHALMERS
ALLIS CHALMERS DBL.SUCT."8000" 8x6x17M
DBL.SUCT."8000" 8x6x17M
DBL.SUCT."8000" 8x6x17M CHILLED WATER
CHILLED WATER
CHILLED WATER 975
975 185
185 15.0
15.0
15.0 75
75 1750
1750 480
480 3
3 60
EXISTING PUMP
REMARKSACTUATOR KNOWN ACCEPTABLE SOURCEVALVE KNOWN ACCEPTABLE SOURCEGPMCOEFFICIENT
CV
SIZESERVED
EQUIPMENTNO.
FCV-1A
FCV-1B
FCV-2A
FCV-2B
FCV-3A
FCV-3B
CH-100 8"
8"
8" 2030
2030 975
NELES-JAMESBURY R-SERIES
NELES-JAMESBURY R-SERIES MOTOR OPERATED, MODULATING, LIMITORQUE - LY 1001-VEC-3-MPC-RPF-460/3
MOTOR OPERATED, MODULATING, LIMITORQUE - LY 1001-VEC-3-MPC-RPF-460/3
IN CHILLED WATER LINE 30 SEC RESPONSE
IN COOLING TOWER WATER LINE 30 SEC RESPONSE
CHILLED WATER BYPASS PIPING
KNOWN ACCEPTABLE SOURCE
ACTUATORRESPONSE
TIME
30 SECONDSFLASH FLOW
LINEAR GLOBE WITH
KNOWN
ACCEPTABLE SOURCE
NELES - JAMESBURY G-110
DIFFERENTIAL
PRESSURE
95 PSI150 PSI
WORKING
DESIGNDESIGN
750387
COEFFICIENT
v
DIFFERENTIAL
SETPOINT
50 PSI6"
SIZE
VALVEVALVE
NUMBER
FCV-10
MARK LOCATION
EF-10 MEZZ
SERVES
CFM
9000 3.15
INCH WG
TOTAL SP FAN
RPM
1455 7.5
HP RPM
VOLTS
PH
3 60
HZ
MOTOR DATA
MAXIMUM
OUTLET
VELOCITY
(FPM)
2526 BELT
DRIVE REMARKS
STEEL FAN WITH WHEEL DIAMETER 24-1/2"
KNOWN ACCEPTABLE SOURCE
BASIS OF DESIGN
YORK YK4G4RQ4-EJH
R-134A REFRIGERANT
R-134A REFRIGERANT
EXISTING CHILLER
EXISTING: INFORMATION ONLY
COOK EXISTING: INFORMATION ONLY
REFER TO ADDITIONAL GENERAL NOTES SEE DRAWINGS ZHU-D-CHILR-G002
FCV-4A*
FCV-4B*
FCV-5A*
FCV-5B*
BRAY
BRAY 120V TWO WAY HIGH PERFORMANCE VALVE
120V TWO WAY HIGH PERFORMANCE VALVE
* NEW FLOW CONTROL VALVE PROVIDED AND INSTALLED BY CONTRACTOR.
CH-400*
CH-500*
* NEW CHILLER TO BE PROVIDED BY THE CONTRACTOR.
u lo tt e zhu-d-chilr-m009
2021-06-02T07:01:52-0500
JUAN ROMERO
2021-04-23T07:57:54-0500
Ian Donald Hoover
ZHU-D-CHILR-M010
CONTROL POINT SCHEDULE
u
FIELD INSTALL ALL CONTROL DEVICES AND ACCESSORIES
PROVIDED FROM THE FACTORY WITH THE CHILLERS.
MODIFY OR REPLACE ALL RACEWAYS OR CONDUITS BACK TO
THE NEAREST JUNCTION BOX TO RUN NEW CONTROL WIRING TO
ITS ASSOCIATED LANDING POINT.
PROVIDE REQUIRED STANDS AND SUPPORTS FOR TRANSMITTERS
WITH DISPLAYS (TYPICAL FOR 8 - FLOW METER
TRANSMITTERS).
AFTER CHILLER STARTUP PERFORM A PERFORMANCE
VERIFICATION TEST TO PROOF THAT CHILLER THE CONTROLS
ARE INTEGRATED AND ALL SEQUENCES OF OPERATIONS ARE
FUNCTIONAL.
CHILLERS SHALL BE PROVIDED WITH BACNET CERTIFIED
CONTROLLERS. THE CONTRACTOR SHALL HARDWIRE
ENABLE/DISABLE, TEMPERATURE SETPOINT, AND CHILLER
STATUS SIGNALS TO THE CHILLER CONTROLS. ALL OTHER
CHILLER CONTROL POINTS SHALL BE ON THE BACNET NETWORK.
THE CONTRACTOR SHALL PERFORM A FUNCTIONAL VERIFICATION
TEST (FVT) AND PROVIDE AN FVT REPORT TO THE COR PRIOR
TO DISCONNECT THE EXISTING CONTROLS.
CONTROL POINT SCHEDULE IS INDICATED FOR REFERENCE. ALL
DDC CONTROL PANELS OF THE FACILITY ARE EXISTING. THE
BAS PROGRAMMING IS EXISTING.
PROVIDE ALL ACCESSORIES REQUIRED TO INSTALL NEW CONTROL
DEVICES ON THE WATER PIPING.
THE CONTRACTOR SHALL REPLACE ALL CONTROL DEVICES ON THE
REPLACE ALL THE CONTROL WIRING BACK TO THE SOURCE.
CERTIFIED SCHNEIDER PROGRAMMING ENGINEER SHALL ADD ALL
CHILLER STARTUP STATUS ON THE BAS HOME PAGE, COORDINATE
WITH COR FOR DETAILS.
POINT DESCRIPTION
NETWORK POINT
DDC SYSTEM POINT
(CH-400 & CH-500)
CHILLER ENABLE/DISABLE
CHILLER SET POINT ADJUSTMENT
CHILLER DEMAND LIMIT
CHILLER TROUBLE/FAULT
CHILLER AMPERAGE
CHILLER POWER DEMAND (KW)
CHILLER STATUS
CHILLER CW SUPPLY TEMPERATURE
CHILLER CW RETURN TEMPERATURE
CHILLER CW SUPPLY PRESSURE SWITCH
CHILLER CW RETURN PRESSURE SWITCH
CHILLER CW RETURN FLOW SWITCH
CHILLER CW DIFFERENTIAL PRESSURE
CHILLER CT SUPPLY TEMPERATURE
CHILLER CT RETURN TEMPERATURE
CHILLER CT SUPPLY PRESSURE SWITCH
CHILLER CT RETURN PRESSURE SWITCH
CHILLER CT RETURN FLOW SWITCH
CHILLER CT DIFFERENTIAL PRESSURE
CHILLER CWR FLOW CONTROL VALVE CONTROL
CHILLER CWR FLOW CONTROL VALVE POSITION
CHILLER CTS FLOW CONTROL VALVE CONTROL
CHILLER CTS FLOW CONTROL VALVE POSITION
CHILLER CHILLED WATER FLOW
CHILLER COOLING TOWER WATER FLOW FM
AM
ED
IG
IM
IE
IZ
IZ
40°F
50°F
50°F
60°F
90°F
95°F
60°F
65°F
TYPICAL FOR 2
CONTROL POINT SCHEDULE
HARDWARE FAIL MODE SOFTWARE GRAPHICS NOTESALARM LIMITS
3.
1.
2.
6.
4.
5.
8.
6.
7.
10.
9.
DDC SYSTEM ASSOCIATED TO CHILLERS CH-400 AND CH-500.
DDCP-03 IS ASSOCIATED WITH CH-400 AND CH-500.
u lo tt e zhu-d-chilr-m010
2021-06-02T07:02:09-0500
JUAN ROMERO
2021-04-23T07:58:09-0500
Ian Donald Hoover