Attachment 2 ZHU CHILR Drawing Portfolio.pdf

PDF 4 MB Posted

Attached to
Houston ARTCC, Chiller Replacement Federal contract opportunity
Solicitation number
697DCK-22-R-00401
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This solicitation seeks proposals from small businesses to replace two chillers and optionally provide two additional chillers at an Air Route Traffic Control Center in Houston, Texas. The project size is estimated between $850,000 to $1,300,000. The solicitation is issued by the Federal Aviation Administration Southwestern Region. The NAICS code is 238220 for plumbing, heating, and air conditioning contractors with a small business size standard of $16.5 million. Key dates include an optional site visit on August 10th with RSVP required 48 hours in advance, questions due by August 17th, and proposals due by August 29th.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

TO REMAIN (TYP)

LIMITING FUSES

EXISTING CURRENT

TX

02/05/2021 1706158

ZHU-D-CHILR-E001

02/05/20211706158CHILLER 400 & 500 REPLACEMENT

C O

N S

T R

U

IO

ENGINEERING SERVICES

OPERATIONS

CHILR

FY21

CHILLER 400 & 500 REPLACEMENT

AIR ROUTE TRAFFIC CONTROL CENTERHOUSTON

PROJECT ENGINEER MGR: ENGINEERING - FORT WORTH

z h u -d -c il r-e .d g n

THIS DRAWING PRODUCED ON ASW REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

ESSENTIAL POWER ONE-LINE DIAGRAM

ESSENTIAL BUS SWITCHGEAR (EXISTING)

MCC-B

(EXISTING)

MCC-C

SWBD-EB

MCC-1C

MCC-1B (EXISTING)MCC-1A (EXISTING)MCC-A (EXISTING)

CLF

EXISTING FEEDERS TO REMAIN

GENERAL NOTES:

EXISTING FEEDERS

TO REMAIN

CLF CLF

CLF CLFCLF

IN

D

SPARE

BUS "B"

BUS "A"

K

M

IL

IT

E

F

CHILLER

CH-500

CH-400

CH-300

CH-200

MMMM

G

PUMP P-1A

60HP

PUMP P-1B

60HP 3HP

AHU-11

3HP

EF E-10

ELECTRICAL DEVICES AND EQUIPMENT.

ARE INTENDED ONLY TO INDICATE CONNECTIONS BETWEEN

ROUTE OF CONDUITS ARE SHOWN ARE ILLUSTRATIVE AND3.

SCHEDULES, PRIOR TO DEMOLITION WORK.

BRANCH CIRCUIT CONNECTIONS AND PANEL BOARD

OF ALL ELECTRICAL EQUIPMENT, DEVICES, FEEDERS,

CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS2.

ZHU-D-CHILR-G002.

REFER TO ADDITIONAL GENERAL NOTES SEE DRAWING1.

IS

ESSENTIAL POWER ONE-LINE DIAGRAM - DEMOLITION

NOT TO SCALE

u r-e

/0

/2

:0

P lo tt e d b y

V

-C

A

-E

B

H

8 7 6 5 4 3 2 1

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

REDLINE

APVD

zhu-d-chilr-e001

2021-06-02T07:02:23-0500

JUAN ROMERO

2021-04-23T07:58:23-0500

Ian Donald Hoover

(TYPICAL)

NOTE 2

TO REMAIN (TYP)

LIMITING FUSES

EXISTING CURRENT

ZHU-D-CHILR-E002

ESSENTIAL POWER ONE-LINE DIAGRAM

u r-e

ESSENTIAL BUS SWITCHGEAR (EXISTING)

SWBD-EB

MCC-1B (EXISTING)MCC-1A (EXISTING)MCC-A (EXISTING)

600AT

1600AF

BUS "B"

BUS "A"

W

CH-100

C4

100AF

30AT

200AF

150AT

.1

.6

200A

3P

30A

MM

PUMP P-1B NEW EF-10

PUMP P-1A

PUMP P-1E

EXISTING FEEDERS

TO REMAIN

EXISTING FEEDERS TO REMAIN

ELECTRICAL DEVICES AND EQUIPMENT.

ARE INTENDED ONLY TO INDICATE CONNECTIONS BETWEEN

ROUTE OF CONDUITS ARE SHOWN ARE ILLUSTRATIVE AND3.

ESSENTIAL POWER ONE-LINE DIAGRAM - NEW CONSTRUCTION

u r-e

:1 lo tt e zhu-d-chilr-e002

2021-06-02T07:03:24-0500

JUAN ROMERO

2021-04-23T07:58:35-0500

Ian Donald Hoover

PANEL PP-MOV

FLOW COMPUTER NO.1

FLOW COMPUTER NO.2

PANEL PP-CH

TR-CH TRANSFORMER

TRANSFER SWITCH

PP-MOV

DDC PANEL

DGP'S

HVAC CONTROL PANEL

EF-E10

MCC-1A

MCC-1BMCC-1C

ZHU-D-CHILR-E003

ELECTRICAL FLOOR PLAN - DEMOLITION

u r-e

B-B

A-A

2 3 41

UH-10

CHILLER ROOM

P-1A

P-1B

AHU-11

UH-11

PANEL IKA

IKA-29

IA

L

MCC-A

BETWEEN ELECTRICAL DEVICES AND EQUIPMENT.

AND ARE INTENDED ONLY TO INDICATE CONNECTIONS

ROUTE OF CONDUITS ARE SHOWN ARE ILLUSTRATIVE3.

SCALE: 1/8" = 1'-0"

8' 16'08'

ELECTRICAL FLOOR PLAN - DEMOLITION

FCV-4B

FCV-5B

FCV-5A

FCV-4A

SHEET NOTES:

THE NEW FLOW CONTROL VALVE WILL BE 120V.

DEMOLISH CABLING BACK TO THE POWER PANEL.

DEMOLISH FCV ACTUATOR.

DEMOLISH POWER CABLES.

u r-e

:2 lo tt e zhu-d-chilr-e003

2021-06-02T07:03:45-0500

JUAN ROMERO

2021-04-23T07:58:48-0500

Ian Donald Hoover

UH-10

12 GND IN 3/4"C (TYP.)

3 NO. 12 AND 1 NO.

DDC PANELS

FLOW COMPUTER NO. 4

FLOW COMPUTER NO. 3

LEAK MONITOR

REFRIGERANT

PP-CH-1

PANEL PP-MOV

DDC PANEL

TRANSFER SWITCH

TR-CH TRANSFORMER

PANEL PP-CH

FLOW COMPUTER NO. 2

FLOW COMPUTER NO. 1

2,4,6

HVAC CONTROL PANEL

DURING CONSTRUCTION ONLY

TEMPORARY PARTITION

MCC-1A

MCC-1B

ZHU-D-CHILR-E004

ELECTRICAL FLOOR PLAN

u r-e

EF-10

B-B

1 2 3 4

PP-CH-12,14,16

MCC-A

PANEL IKA

25,27,29

FCV-4A

31,33,35

FCV-5A

32,34,36

FCV-5B

FCV-4B

26,28,30

UH-11M

7,9,11

PP-CH-3

1,3,5

PP-CH-7

20,22,24

37,39,41

FCV-10M

ELECTRICAL FLOOR PLAN - NEW CONSTRUCTION

NEW ACTUATOR.

AT THE CLOSEST EXISTING PANEL TO POWER THE

NEW FLOW CONTROL VALVES SHALL BE 120V. BREAKER5.

CONDUCTORS.

EXISTING COUNTERPOISE USING NO. 4 AWG

ALL NEW CHILLERS SHALL BE CONNECTED TO THE4.

BETWEEN ELECTRICAL DEVICES AND EQUIPMENT.

AND ARE INTENDED ONLY TO INDICATE CONNECTIONS

ROUTE OF CONDUITS ARE SHOWN ARE ILLUSTRATIVE3.

BRANCH CIRCUIT CONNECTIONS AND PANEL BOARDS

u r-e

:3 lo tt e zhu-d-chilr-e004

2021-06-02T07:03:58-0500

JUAN ROMERO

2021-04-23T07:59:02-0500

Ian Donald Hoover

ZHU-D-CHILR-G001

COVER SHEET

u r-g

AVIA

I

TRAT

SI

NI

HOUSTON, TEXAS

AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC)

T OF TRANSPO

T A

IC

OF

STATES

TM

EN

u r-g lo tt e zhu-d-chilr-g001

2021-06-02T06:56:19-0500

JUAN ROMERO

2021-04-23T07:54:11-0500

Ian Donald Hoover

ZHU-D-CHILR-G002

CONSTRUCTION SEQUENCE FY21

DRAWING INDEX, GENERAL NOTES &

u r-g

ELECTRICAL FLOOR PLAN FY21ZHU-D-CHILR-E004

ELECTRICAL FLOOR PLAN - DEMOLITION FY21ZHU-D-CHILR-E003

ESSENTIAL POWER ONE-LINE DIAGRAM FY21ZHU-D-CHILR-E002

ESSENTIAL POWER ONE-LINE DIAGRAM FY21ZHU-D-CHILR-E001

CONTROL POINT SCHEDULE FY21ZHU-D-CHILR-M010

EQUIPMENT SCHEDULES FY21ZHU-D-CHILR-M009

COOLING TOWER PIPING DIAGRAM FY21ZHU-D-CHILR-M008

CHILLER WATER PIPING DIAGRAM FY21ZHU-D-CHILR-M007

CHILLER ROOM SECTIONS FY21ZHU-D-CHILR-M006

PARTIAL CHILLER ROOM PLAN FY21ZHU-D-CHILR-M005

PARTIAL CHILLER ROOM PLAN FY21ZHU-D-CHILR-M004

PARTIAL CHILLER ROOM PLAN FY21ZHU-D-CHILR-M003

PARTIAL CHILLER ROOM PLAN - DEMOLITION FY21ZHU-D-CHILR-M002

MECHANICAL GENERAL NOTES FY21ZHU-D-CHILR-M001

LEGENDS FY21ZHU-D-CHILR-G004

SITE & CONSTRUCTION STAGING PLAN FY21ZHU-D-CHILR-G003

DRAWING INDEX, GENERAL NOTES & CONSTRUCTION SEQUENCE FY21ZHU-D-CHILR-G002

COVER SHEET FY21ZHU-D-CHILR-G001

C.

INSTALLATION OF THE ELECTRICAL SYSTEMS THAT ARE SPECIFIC FOR THE AIR TRAFFIC OPERATIONS.

STANDARD. THE FAA'S ELECTRICAL STANDARDS INCLUDE SPECIFIC REQUIREMENTS FOR GROUNDING, SPLICING, TERMINATION, BONDING, AND

OBTAIN A COPY OF THE FAA'S STANDARDS FOR ELECTRICAL WORK AND SHALL COMPLY WITH ALL THE REQUIREMENTS SET BY THIS

INTERNATIONAL BUILDING CODE, NFPA, ASHRAE, SMACNA, THE NATIONAL INSULATION STANDARD, AND FAA ORDERS. THE CONTRACTOR SHALL

APPLICABLE CODES AND STANDARDS FOR THIS PROJECT INCLUDES AND IS NOT LIMITED TO THE LATEST EDITIONS OF THE

AS A MINIMUM, THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS, CODES, STANDARDS, AND REGULATIONS. 9.

ORDINANCES DURING THE CONSTRUCTION PHASE OF THIS PROJECT.

THE INDUSTRY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MEET ALL FAA ORDERS, FEDERAL, STATES, AND LOCAL CODES AND

THE CONTRACTOR OF THIS PROJECT SHALL BE QUALIFIED AND FULLY KNOWLEDGEABLE OF THE APPLICABLE CODES AND STANDARDS OF 8.

ALL CONSTRUCTION SHALL BE DONE IN A NEAT AND WORKMANLIKE MANNER IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.7.

TRANSFERRED TO THE BUILDING STRUCTURE. COORDINATE WITH THE COR THESE ACTIVITIES IN ADVANCE.

ELECTRIC DEMOLITION OR ROTARY HAMMERS, SCRAPERS, HAMMERING, CHIPPING, OR ANY ACTIVITY THAT PRODUCES VIBRATIONS

THE FAA. NOISY DEMOLITION AND CONSTRUCTION ACTIVITIES INCLUDE AND ARE NOT LIMITED TO ACTIVITIES REQUIRING THE USE OF

OFF-REGULAR LABOR HOURS FOR ALL NOISY DEMOLITION AND CONSTRUCTION ACTIVITIES OF THE PROJECT AT NO ADDITIONAL COST TO

THIS IS AN EXISTING, FULLY OCCUPIED, AND FULLY OPERATIONAL AIR TRAFFIC CONTROL FACILITY. THE CONTRACTOR SHALL SCHEDULE 6.

FROM THE APPROVED COORDINATION DRAWINGS.

INSTALLATION AND SHALL USE THESE TO DICTATE THE FIELD WORK. THE COR SHALL STOP WORK ACTIVITIES IF FIELD WORK DEVIATES

THE ACTUAL FIELD CONDITIONS. THE CONTRACTOR SHALL ENSURE THE COORDINATION DRAWINGS ARE APPROVED BY THE COR PRIOR TO

BUILDING ELEMENTS. INDICATE IN THE COORDINATION DRAWINGS ANY DEVIATION FROM THE DESIGN TO FIT THE NEW INSTALLATION TO

DIMENSIONS, DISTANCES, AND ELEVATIONS THAT RELATE TO THE NEW EQUIPMENT AND COMPONENTS WITHIN THE SPACE AND THE

THE CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS FOR THE APPROVAL OF THE COR. COORDINATION DRAWINGS SHALL INDICATE 5.

ADDITIONAL COST TO THE FAA.

LOCATIONS AND ROUTING OF UTILITIES TO FIT THE CONDITIONS ENCOUNTERED ON SITE ONCE APPROVED BY THE COR AND AT NO

THE CONTRACTOR SHALL BE RESPONSIBLE TO FIELD VERIFY THE EXACT CONDITIONS ON SITE TO ADJUST, OR MODIFY EQUIPMENT 4.

OUTAGES SHALL BE COORDINATED WITH THE COR AT LEAST 10 DAYS IN ADVANCE.

(ENERGIZE) ANY VALVE OR CIRCUIT BREAKER AT ANY TIME. WORK REQUIRING PERMANENT, TEMPORARY, OR PARTIAL ELECTRICAL/WATER

ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS AND VALVES. THE CONTRACTOR SHALL NOT OPEN (DE-ENERGIZE) OR CLOSE 3.

MAY CAUSE ACCIDENTS AND/OR LOSS OF LIFE.

THIS FACILITY IS AN OPERATIONAL AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) AND UNAUTHORIZED OUTAGES OF UTILITY SERVICES

EXTREME CAUTION MUST BE PRACTICED WHEN WORKING ON ANY OF THE BUILDING UTILITIES (ELECTRICAL, MECHANICAL, OR PLUMBING). 2.

PRODUCE AN ACCEPTABLE PRODUCT FOR THE GOVERNMENT.

INFORMATION PROVIDED HERE WITH SITE CONDITIONS, EQUIPMENT AND MATERIAL SUPPLIERS AND WITH ALL PROJECT REQUIREMENTS TO

ENCOUNTERED DURING THE CONSTRUCTION PROCESS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND CONFIRM ALL

THESE CONTRACT DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS TO BE 1.

DRAWING NO. DESCRIPTION

SEQUENCE OF CONSTRUCTION

GENERAL NOTES

A.

PROJECT.

REPLACE SUCH BUILDING ELEMENTS IF DAMAGED THROUGH THE COURSE OF THE

CONTRACTOR'S RESPONSIBILITY TO RESTORE TO ITS ORIGINAL CONDITIONS OR

CONSTRUCTION ACTIVITIES OF THIS PROJECT. IT WILL BE THE

ANY BUILDING COMPONENT THAT WILL CONFLICT OR INTERRUPT THE

THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE, SECURE, AND REINSTALL1.

ROOM 105 PREP FOR CHILLER REPLACEMENT:

DRAWING INDEX

PERSONNEL.

DISASSEMBLED AND REASSEMBLED BY THE CHILLER MANUFACTURER'S SERVICE

SHALL BRING THE CHILLERS IN VIA THE NORTH DOOR WITH THE COMPRESSOR

DUE TO HEIGHT LIMITATIONS CAUSED BY PIPING IN THE CHILLER ROOM, THE CONTRACTOR2.

WITH EXISTING CONDITIONS.

PLANS MUST INCLUDE ELEVATIONS AND ANY MODIFICATIONS NEEDED DUE TO CONFLICTS

SHOWING FABRICATED LENGTH OF PIPING AND PLACEMENT OF EQUIPMENT. THESE

SHALL HAVE AN APPROVED CONSTRUCTION SEQUENCE AND CONSTRUCTION PLANS

ETC.) AND ACCESSORIES APPROVED AND ON SITE. ADDITIONALLY, THE CONTRACTOR

THE CONTRACTOR SHALL HAVE THE CHILLER AND ALL EQUIPMENT (VALVES, PIPING,

BEFORE THE START OF DEMOLITION AND NEW CONSTRUCTION FOR EACH CHILLER,1.

CHILLER 500 REPLACEMENT APPLIES TO JCN 1706223 ONLY.

REPLACEMENT APPLIES TO JCN 1706158 ONLY AND ALL WORK ASSOCIATED WITH

THE CONTRACTOR SHALL BE AWARE THAT ALL WORK ASSOCIATED WITH CHILLER 400

* ORGANIZATION RISK MANAGEMENT (ORM) REQUIRED.

CH-500.

PROCEED WITH SAME SEQUENCE TO PERFORM THE REPLACEMENT OF FLOW CONTROL VALVES ASSOCIATED TO

SEAL WEATHERPROOF ALL JOINTS.2.

PROJECT COMPLETION. DOOR SECURITY DEVICES SHALL BE REINSTALLED.

THE CONTRACTOR SHALL REPLACE THE DOOR, FRAME, AND WALL LOUVERS AT 1.

REPLACE ROOM 105 EXTERIOR DOOR AND LOUVER:E.

PROCEED WITH SAME SEQUENCE TO PERFORM THE REPLACEMENT OF CH-500.

IN THE EVENT OF ANY EQUIPMENT FAILURE OR MALFUNCTION.

RESET THE DURATION TO OPERATE CH-400 FOR ANOTHER 5 CONSECUTIVE DAYS

RUN CH-400 CONTINUOUSLY FOR A 5 CONSECUTIVE DAY PROVING PERIOD.19.

TEST AND BALANCE CONTRACTOR TO CONFIRM WATER FLOWS THROUGH CH-400.18.

PERFORM STARTUP PROCEDURE AND PERFORMANCE VERIFICATION TEST.17.

FAA PERSONNEL SHALL OPEN VALVES AND ENERGIZE CH-400 ELECTRIC CIRCUIT.16.

PRESSURE TEST THE NEW PIPING.15.

WATER FROM THE CHILLER PLANT.

FILL CWS, CWR, CTS, AND CTR PIPING AND VENT ALL AIR. DO NOT USE 14.

CLEAN AND FLUSH NEW PIPING SECTIONS BEFORE STARTING THE NEW CH-400.13.

ELECTRIC POWER, AND CONTROLS.

INSTALL CH-400 ASSOCIATED PIPING, ACCESSORIES, VALVES, INSULATION, 12.

REQUIREMENTS.

CHILLER ANCHORING SHALL COMPLY WITH THE SEISMIC INSTALLATION

BRING NEW CH-400 IN TO ROOM 105 AND INSTALL IN ITS FINAL LOCATION. 11.

UPDATE NEW HOUSEKEEPING PADS FOR CH-400 AS INDICATED IN S102.10.

DEMOLISH THE EXISTING, PIPE SUPPORTS. 9.

WITH CH-400 (REFER TO E001 FOR ELECTRICAL DEMOLITION).

DEMOLISH THE EXISTING ELECTRIC STARTER AND CONDUITS ASSOCIATED 8.

DEMOLISH CH-400. REFER TO M001 FOR MECHANICAL DEMOLITION. 7.

WORK OF THE EQUIPMENT.

RECOVER CH-400 REFRIGERANT AND OIL BEFORE STARTING DEMOLITION 6.

TO THE SOURCE, AND DEMOLISH CONDUITS.

DISCONNECT POWER AND CONTROL DEVICES; REMOVE CABLING BACK 5.

INCLUDED).

BACK TO ISOLATION VALVES (ALL DRAIN AND VENT LINES

DEMOLISH CH-400 ASSOCIATED PIPING AND ACCESSORIES 4.

DRAIN CHILLER AND ASSOCIATED CW AND CT WATER PIPING. 3.

VERIFY THAT ISOLATION VALVES ARE SEALED. 2.

ISOLATION VALVES ON CWS, CWR, CTS, AND CTR LINES.

FAA PERSONNEL SHALL DE-ENERGIZE CH-400 AND CLOSE THE ASSOCIATED 1.

CH-100, CH-200, AND CH-300 ON LINE):

REPLACE CHILLER-400 (CHILLER PLANT SHALL BE OPERATING WITH D.

MIGRATING ON TO THE EXISTING INSULATED PIPING ADJACENT TO THE WORK AREA.

COMPLETED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING CONDENSATION FROM

SPECIFIED INSULATION AND JACKET. DO NOT LEAVE INSULATION WORK UNTIL FURTHER WORK IS

IMMEDIATELY AFTER THE PIPING WORK IS COMPLETED, INSULATE CHILLED WATER PIPING WITH 9.

PRESSURE BUILD UP IN THE CHILLER ASSEMBLY.

TEST OPERATION OF THE NEW FLOW CONTROL VALVES BY EXERCISING THEM AND OBSERVING 8.

FAA PERSONNEL TO OPEN CHILLER ASSOCIATED ISOLATION VALVES AND FLOW CONTROL VALVES.7.

VERIFY THERE ARE NO LEAKS AFTER NEW VALVES ARE INSTALLED.6.

AIR VALVES. USE ONLY AN EXTERNAL SOURCE OF WATER TO FILL THE CHILLER ASSEMBLY.

FILL UP THE CHILLER AND ASSOCIATED PIPING AND PURGE ALL AIR THROUGH THE EXISTING MANUAL 5.

REPLACE EXISTING FLOW CONTROL VALVLES ASSOCIATED TO CH-400.4.

ASSOCIATED PIPING.

DRAIN WATER SYSTEM DOWNSTREAM FROM THE MAIN ISOLATION VALVES AND ALL THE CHILLER'S 3.

CONTRACTOR TO PROCEED WITH REST OF THE WORK.

IF PRESSURE BUILDS UP. ONCE VALVE SEALING IS PROVEN, THE COR SHALL AUTHORIZE THE

LINES TO DROP PRESSURE IN THE CHILLER ASSEMBLY AND CLOSE DRAIN BACK AGAIN TO OBSERVE

VERIFY THAT THE EXISTING ISOLATION VALVES ARE SEALED. CONTRACTOR SHALL PARTIALLY DRAIN 2.

CH-400. ONLY ONE CHILLER SHALL BE SHUT DOWN AT A TIME.

FAA PERSONNEL TO CLOSE EXISTING ISOLATION VALVES IN THE CWS AND CWR PIPING TO ISOLATE 1.

ADD NEW FLOW CONTROL VALVES TO CH-400 AND CH-500:B.

u r-g

:4 lo tt e zhu-d-chilr-g002

2021-06-02T06:56:39-0500

JUAN ROMERO

2021-04-23T07:54:45-0500

Ian Donald Hoover

ZHU-D-CHILR-G003

SITE & CONSTRUCTION STAGING PLAN

u r-g

HOUSTON VICINITY MAP

ZHU ARTCC VICINITY MAP

INTERSTATE

N N

HOU - HOBBY AIRPORT

GREENS RD

45249

J

Y

INTERCONTINENTAL (IAH)

HOUSTON

HARDY TOLL RD

GREENS RD TO U.S. HWY 59

PARKING LOT

LOT

PARKING

CONTRACTOR ACCESS ROUTE

INTERCONTINENTAL

IAH - HOUSTON

ARTCC

ZHU

ARTCC

ZHU

CONSTRUCTION STAGING

LEGEND:

VISITOR PARKING

GUARD HOUSE

OF STAGING AREA.

COR/RE SHALL DETERMINE FINAL LOCATION

SECURITY FENCE. SEE NOTES B.1 AND D.1

REMAIN A MINIMUM OF 25 FT AWAY FROM

DEBRIS AT ALL TIMES. CONTRACTOR MUST

AREA SHALL REMAIN CLEAN AND FREE FROM

CONTRACTOR PARKING AND STAGING. THIS P

FIRE HYDRANT

SUBSTATION

BLDG

POWER SERVICE

UNION

CREDIT

TOWERS

COOLING

X

COMPUTER

HOST

BUILDING "B"

COURTYARD 2

DSR

SUPPORT WING

CONTROLLER

BLDG

NCO

OFFICE

FAA-RE

F.1

PROPERTY LINE

FACILITY/CONSTRUCTION STAGING LAYOUT

SCALE: 1" = 80' - 0"G002

COURTYARD 3

BUILDING "A"

COURTYARD 1

FACILITY WATERWELL

FIRE HYDRANT FIRE HYDRANT

VAULT

METER

J. F. KENNEDY FRONTAGE RD

PROPERTY LINE

IR

SCALE: 1" = 80'

80' 160'080' u r-g

:5 lo tt e zhu-d-chilr-g003

2021-06-02T06:59:31-0500

JUAN ROMERO

2021-04-23T07:54:59-0500

Ian Donald Hoover

LEGENDS

ZHU-D-CHILR-G004

u r-g

TS

PI

TI

FS

FI

FCV

FM

AM

PS

DI

AI

DO

AO

CH

PD

SS

AX

SPA

MCC

PC

A-

DC

DP

SL

SW

COLUMN LINE GRID DESIGNATION

MATCH LINE

BREAK LINES

DEMOLITION

BY CONTRACTOR

DOOR NUMBER

CLOUD TO ENCOMPASS

REVISED AREA

B72

REVISION

EL 00.00'

REVISION DESIGNATION

ROOM/AREA NUMBER

NOTE MARK - SEE PLAN

NOTES ON SHEET

TAKEN OR FIRST REFERENCED

SHEET FROM WHICH DETAIL IS

OR SCHEDULED

DETAIL IS DRAWN

SHEET ON WHICH

DETAIL TITLE REFERENCE

DETAIL NUMBER

ELEVATION SYMBOL

B100

EARTH

CONCRETE

SHEET WHERE SECTION IS CUT

SECTION IS DRAWN

SHEET ON WHICH

SECTION TITLE REFERENCE

SECTION LETTER

SECTION CUT

PARTIAL SECTION CUT

ELEVATION REFERENCE

NORTH ARROW

RETURN OR EXHAUST DUCT (DOWN)

RETURN OR EXHAUST DUCT (UP OR OUT)

SUPPLY DUCT (UP OR OUT)

TURNING VANES

SUPPLY DUCT (DOWN)

VOLUME DAMPER

(FIRST FIGURE IS SIDE SHOWN)

RECTANGULAR DUCT

20X10

VD

M MOTOR OPERATED PARALLEL

BLADE DAMPER

CONNECTION BETWEEN

IDENTIFYING SYMBOL

EQUIPMENT DESIGNATION SYMBOL

HOT TAP FITTING

CAPPED OR PLUGGED PIPE

BLIND FLANGE

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW METER

FLEXIBLE PIPE CONNECTORS

AUTOMATIC AIR VENT

FLOOR DRAIN

AAV

FD

DIFFERENTIAL PRESSURE CONTROL VALVE

PRESSURE REGULATING VALVE

FLOW CONTROL VALVE

SEGMENTED BALL VALVE

TEST AND BALANCING VALVE

CHECK VALVE

BALANCING VALVE

BUTTERFLY VALVE

BALL VALVE

PLUG VALVE

GLOBE VALVE

GATE VALVE

STRAINER W/BLOWDOWN VALVE

UNION

DRAIN LINE

DOMESTIC COLD WATER

CW

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

REFRIGERANT VENTRV

CTR COOLING TOWER WATER RETURN

COOLING TOWER WATER SUPPLYCTS

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

EXISTING PIPING OR EQUIPMENT

TO BE REMOVED

NEW PIPING AND EQUIPMENT INSTALLATION

EXISTING PIPING AND EQUIPMENT INSTALLATION FLOW CONTROL VALVE

DOOR CLOSER

DIFFERENTIAL PRESSURE SWITCH

TEMPERATURE SENSOR

PRESSURE INDICATOR

TEMPERATURE INDICATOR

PRESSURE DIFFERENCE SENSOR

PRESSURE SENSOR

PRESSURE CONTROL SWITCH

FLOW SWITCH

FLOW INDICATOR

AMMETER

HORN

STROBE LIGHT

DIGITAL INPUT TO DDCP

DIGITAL OUTPUT FROM DDCP

ANALOG INPUT TO DDCP

ANALOG OUTPUT FROM DDCP

MOTOR CONTROL CENTER

START-STOP CONTROL

AUXILIARY CONTACT

SET POINT ADJUSTMENT

MANUAL SWITCH

TRANSFORMER

STARTERS AND CONTROLS IN HEAD

MOTOR OPERATED VALVE

PUSHBUTTON

MAGNETIC STARTER, NUMBER INDICATES

STARTER NEMA SIZE

NOTED, +60" AFF UON

DISCONNECT SWITCH NON-FUSED UNLESS OTHERWISE

MOTOR

BRANCH CIRCUIT CONCEALED IN OR BELOW FLOOR

GROUND CONDUCTOR

ARTICLE 250.

SHALL BE SIZED IN ACCORDANCE WITH N.E.C.

1 NEUTRAL AND 1 GROUND WIRE. GROUND WIRES

IF NO LINES ARE INDICATED, PROVIDE 1 PHASE,

SHOWS 3 PHASE, 1 NEUTRAL AND 1 GROUND WIRE).

NUMBER OF CONDUCTORS IN COUNDUIT (SYMBOL

HOME RUN TO PANELBOARD A-. ARROWS INDICATE

NUMBER OF CIRCUITS CROSS LINES INDICATE

BRANCH CIRCUIT

277/480V., 30

DISTRIBUTION PANELBOARD, +72" AFF TO TOP

TO TOP 120/208 V., 30

LIGHTING AND APPLIANCE PANELBOARD, +72" AFF

JUNCTION BOX - CEILING MOUNTED

JUNCTION BOX - WALL MOUNTED

AND INSTALLATION

HEAVY LINES INDICATE NEW EQUIPMENT

AND INSTALLATION

LIGHT LINES INDICATE EXISTING EQUIPMENT

DEMOLISHED EQUIPMENT DEMOLITION CIRCUITS OR EQUIPMENT ON ONE LINE

TRANSFORMERS, TYPE AND SIZE AS NOTED

PRIMARY FUSE AND SWITCH

AIR CIRCUIT BREAKER, 3-POLE, DRAW-OUT TYPE

M - MANUALLY OPERATED, E - ELECTRICALLY OPERATED

1600AF = 1600 AMP FRAME SIZE

800AT = 800 AMP TRIP SETTING

225AT

600AF

100AF

20AT

MOLDED CASE CIRCUIT BREAKER, 3-POLE,

UNLESS OTHERWISE NOTED

20AT = 20 AMP TRIP SETTING

100AF = 100 AMP FRAME SIZE

INDICATES NOMINAL HORSE POWER

MOTOR, THREE PHASE, INDUCTION, NUMBERM

MOTOR SINGLE PHASE, FRACTION INDICATES

NOMINAL HORSE POWER

1/4

AS

HEATER

INSTRUMENT: A=AMMETER, V=VOLTMETER

INSTRUMENT SELECTOR SWITCH:

AS = AMMETER SELECTOR SWITCH,

VS = VOLTMETER SELECTOR SWITCH

CURRENT TRANSFORMER

POTENTIAL TRANSFORMER

GROUND CONNECTION

FUSE CARTRIDGE TYPE

PUSH-BUTTON, MOMENTARY CONTACT, NORMALLY OPEN

PUSH-BUTTON, MOMENTARY CONTACT, NORMALLY CLOSED

DISCONNECT SWITCH, NON-FUSED

MANUAL MOTOR STARTER SWITCH W/THERMAL OVERLOAD

PROTECTION

A HAND - OFF - AUTOMATIC

SELECTOR SWITCH; 3-POSITION:

COIL SYMBOL, " " DENOTES COIL NUMBER

M = MAGNETIC STARTER COIL

C = MAGNETIC CONTRACTOR COIL

R = RELAY OPERATING COIL

TD = TIME DELAY RELAY OPERATING COIL

LOW VOLTAGE WIRE (LESS THAN 120V AC)

BY HVAC CONTROL CONTRACTOR

LINE VOLTAGE WIRING (SCHEMATIC DIAG.)

LIMIT SWITCH

NORMALLY OPEN CONTACT

NORMALLY CLOSED CONTACT

INDICATING LIGHT

R = RED

G = GREEN

A = AMBER

GENERAL LEGEND

SYMBOLS SYMBOLS

MECHANICAL LEGEND ELECTRICAL LEGEND

SYMBOLS

A12

A12

A012

E1

A01

REF

A010

A01

REF 3

A012

REFERENCE PLAN SYMBOLS DIAGRAM SYMBOLS

MATERIALS

NEW AND EXISTING

FOR CONT

SEE DWG A01

u r-g lo tt e zhu-d-chilr-g004

2021-06-02T06:59:47-0500

JUAN ROMERO

2021-04-23T07:55:14-0500

Ian Donald Hoover

ZHU-D-CHILR-M001

MECHANICAL GENERAL NOTES

u r-m

MECHANICAL GENERAL NOTES:

EQUIPMENT TO BE USED WHEN WORKING INSIDE ROOM 105.

PROVIDE ITS PERSONNEL WITH THE REQUIRED PERSONAL PROTECTION

PROVIDE ALTERNATE REFRIGERANT DETECTION IN THE ROOM AND MUST

MONITORING SYSTEM TO BE SHUT DOWN, THE CONTRACTOR SHALL

EVENT THAT WORK INSIDE ROOM 105 REQUIRES THE REFRIGERANT

UNLESS FALSE ALARMS ARE TRIGGERED BY THE CONSTRUCTION. IN THE

ACTIVATED DURING THE CONSTRUCTION ACTIVITIES OF THIS PROJECT

THE REFRIGERANT MONITORING SYSTEM SHALL BE KEPT CONTINUOUSLY

ROOM 105 IS EQUIPPED WITH A REFRIGERANT MONITORING SYSTEM.25.

CHILLER MANUFACTUREER RECOMENDATIONS AND REQUIREMENTS.

CHILLER. THE NEW REFRIGERANT RECOVERY UNIT SHALL COMPLY WITH THE

SHALL PROVIDE A NEW REFRIGERANT RECOVERY UNIT SPECIFIC TO THE NEW

PROVIDE THE COR WITH THE SLIP OF REFRIGERANT RECLAIM. THE CONTRACTOR

BEFORE DEMOLITION AND DELIVER IT TO AN AUTHORIZED RECLAIM CENTER.

THE CONTRACTOR SHALL RECOVER THE EXISTING CHILLERS REFRIGERANT24.

CHILLERS AND ALL PIPING, AND PIPING ACCESSORIES ARE ON SITE.

DEMOLITION WORK SHALL NOT BE ALLOWED TO START UNTIL THE NEW23.

THE COR.

FAA'S CONSTRUCTION STANDARDS APPLICABLE TO THIS PROJECT FROM

AND REQUIREMENTS. THE CONTRACTOR MAY OBTAIN A COPY OF THE

THE WORK MUST FOLLOW SPECS AND THE FAA'S OPERATIONAL STANDARDS

REQUIREMENTS SET FORTH IN THESE DOCUMENTS AND PERFORMANCE OF

ALL MATERIALS, EQUIPMENT AND PRODUCTS MUST MEET ALL THE

IN THE SPECIFICATIONS DOCUMENTS IN ADDITION TO THESE DRAWINGS.

THE CONTRACTOR IS REQUIRED TO FOLLOW ALL REQUIREMENTS STATED22.

GOVERNMENT.

TRIP OR TAKE OFFLINE ANY EQUIPMENT BELONGING TO THE

APPROPRIATE TIME ALLOWANCE TO OPERATE, SHUT DOWN, TURN OFF,

PREMISES. THE CONTRACTOR SHALL REQUEST TO THE COR WITH

TURN OFF, TRIP OR TAKE OFFLINE ANY EQUIPMENT ON THE SITE

THE CONTRACTOR NOR ITS PERSONNEL SHALL OPERATE, SHUT DOWN,21.

PROCEEDING WITH SUCH CHANGES.

NOTIFY THE COR OF ANY DEVIATION FROM THE WORK PLAN BEFORE

WORK ACTIVITIES SHALL NOT BE ALLOWED. THE CONTRACTOR SHALL

WITH 10 DAYS IN ADVANCE WITH THE COR. IMPROVISATION OF THE

ALL UTILITY SERVICE OUTAGES SHALL BE MINIMIZED AND COORDINATED

FOLLOW TO PERFORM CAVITIES COVERED UNDER THIS SCOPE OF WORK.

DESCRIPTIVE WRITE UP OF THE PROCESS THE CONTRACTOR WILL

SHALL SUBMIT IN WRITING, TO THE COR FOR HIS APPROVAL, A

THE CONTRACTOR SHALL PLAN WORK AHEAD OF ITS EXECUTION AND20.

VENTILATION LAYOUT TO THE COR FOR APPROVAL.

ACCORDANCE WITH OSHA AND ACGIH REQUIREMENTS. SUBMIT

EFFECTS TO FACILITY OCCUPANTS OR CONTRACTOR'S PERSONNEL IN

PRODUCTS WHICH MAY CAUSE ACUTE OR CHRONIC HEALTH OR SAFETY

PROVIDE LOCAL VENTILATION OF THE AREA DURING APPLICATION OF19.

MODIFICATIONS OF THE SPACE AT HIS OWN EXPENSE.

INSTALLATION; AND SHALL BE RESPONSIBLE TO MAKE CHANGES AND

FOR APPROVAL WITH NOTIFICATION OF REQUIRED CHANGES PRIOR TO

EQUIPMENT TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR)

THE EQUIPMENT. THE CONTRACTOR SHALL SUBMIT THE PROPOSED

SPECIFICATIONS AND FITS THE EXISTING SPACE AVAILABLE TO HOUSE

ENSURE THE SUBSTITUTION EQUIPMENT CONFORMS TO THE PROJECT'S

AND CONFIGURATION. THE CONTRACTOR SHALL BE RESPONSIBLE TO

THE REQUIREMENTS OF THE LOCATION, EQUIPMENT SIZE, CLEARANCES,

CONTRACTOR'S PRIOR VERIFICATION OF CONFORMANCE ACCORDING TO

NUMBERS. SUBSTITUTION OF SUCH EQUIPMENT WILL REQUIRE THE

SHOWN ARE BASED ON SPECIFIC SCHEDULED MANUFACTURERS AND MODEL

LOCATIONS, SIZES, CLEARANCES AND CONFIGURATIONS OF EQUIPMENT18.

INSIDE OR OUTSIDE THE BUILDING.

CUTTING, TORCHING, MECHANICAL GRINDING, OR WELDING ACTIVITIES

ONLY. HOT WORK PERMITS SHALL BE OBTAINED IN ADVANCE OF

DETERMINED BY COR. HOT WORK PERMITS ARE ONE DAY DURATION

PERFORMED OUTSIDE OF THE FACILITY OR IN A SAFE LOCATION TO BE

WELDING SHALL BE SCHEDULED IN WRITING WITH COR AND SHALL BE17.

SEPARATE GROUND WIRE SHALL BE PROVIDED.

FACILITY STRUCTURAL STEEL SHALL NOT BE USED AS GROUND. A

NO WELDING SHALL BE POWERED FROM FACILITY ELECTRICAL SYSTEM.16.

PENETRATIONS, SUPPORTS, CONCRETE SLABS, ETC. ARE REMOVED.

NEW AND EXISTING CONSTRUCTION WHERE ITEMS SUCH AS PIPES

CONTRACTOR SHALL PATCH, REPAIR AND INFILL SURFACES TO MATCH15.

BEFORE CONTINUING WITH THE PROJECT'S WORK.

BEEN REMOVED AND DISPOSED UNDER THE HAZMAT ABATEMENT PROCESS

THAT ALL COMPONENTS THAT MAY CONTAIN HAZARDOUS MATERIALS HAVE

THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO ENSURE14.

CONDITION REQUIREMENTS SHALL BE 94 DEG F AND 80% HUMIDITY.

CONDITIONS WILL LIKELY BE IN AUGUST AFTER 1400 CST. MINIMUM

CONDITIONS. PER ASHRAE 90.1 ZHU IS IN CLIMATE ZONE 2A. PEAK

CONDITIONS, PERFORM ADDITIONAL PVT DURING NEAR-PEAK SUMMER

PROCEDURES ARE NOT PERFORMED DURING NEAR-PEAK SUMMER

OF OPERATIONS OF THE EQUIPMENT ARE FUNCTIONAL. IF INITIAL PVT

BACNET DDC SYSTEM OF THE BUILDING AND THAT ALL SEQUENCES

EQUIPMENT HAS BEEN FULLY INTEGRATED TO THE EXISTING

ON EACH CHILLER AFTER STARTUP. THE PVT SHALL CONFIRM THE

A PERFORMANCE VERIFICATION TEST (PVT) SHALL BE PERFORMED13.

BALANCING OF THE CHILLERS HYDRONIC SYSTEM (TAB).

THE CONTRACTOR SHALL PROVIDE TESTING, ADJUSTMENT, AND12.

BEST INSTALLATION OF THE HVAC SYSTEM.

STANDARDS, AND INSTALLATION REQUIREMENTS TO ACHIEVE THE

OPERATIONS. CONTRACTOR SHALL FOLLOW ALL CODES AND

EQUIPMENT TO BE INSTALLED AND THEIR SEQUENCE OF

CONTRACTOR SHALL HAVE ADEQUATE EXPERIENCE WITH THE11.

THE EQUIPMENT.

AND ALL ELECTRICAL CONTRACT DOCUMENTS PRIOR TO ORDERING

PART OF THE HVAC EQUIPMENT WITH THE ELECTRICAL CONTRACTOR

CONTRACTOR SHALL COORDINATE VOLTAGE AND PHASE OF EACH10.

CONCRETE PADS AND/OR EXPOSED TO THE ENVIRONMENT.

INCLUDING THE ON-SITE EQUIPMENT ALREADY MOUNTED ON

PROTECTED ADEQUATELY DURING THE CONSTRUCTION PROCESS

SHALL BE RESPONSIBLE TO ENSURE ALL EQUIPMENT HAVE BEEN

EXTERIOR OF THE BUILDING. THE MECHANICAL CONTRACTOR

SECURE THE HVAC EQUIPMENT AND DEVICES TO THE INTERIOR OR

THE MECHANICAL CONTRACTOR SHALL FURNISH, INSTALL, AND9.

BEEN INSTALLED.

THESE ITEMS SHALL HAVE THE APPROVAL OF THE COR BEFORE

PROJECT SITE CONDITIONS. THE LOCATIONS AND HEIGHTS OF

BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE

THE EXACT LOCATIONS AND HEIGHTS NECESSARY TO SECURE THE

NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY.

DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE

THE LOCATIONS AND HEIGHTS OF ALL ITEMS SHOWN ON THESE8.

ADDITIONAL COST TO THE GOVERNMENT.

WITH OTHER TRADES AND EXISTING BUILDING ELEMENTS AT NO

ELECTRICAL. MAKE OFFSETS AND TRANSITIONS TO COORDINATE

COORDINATE PIPING WITH DUCTWORK, STRUCTURAL, PLUMBING AND7.

NO ADDITIONAL COST TO THE GOVERNMENT.

ACTIVITIES OR OUTAGES DURING OFF-REGULAR LABOR HOURS AT

THIS PROJECT. THE CONTRACTOR SHALL SCHEDULE DISRUPTING

SHALL BE PREVENTED OR MINIMIZED DURING THE EXECUTION OF

THE WORK CONSIDERING THESE CONDITIONS. SCHEDULED OUTAGES

OPERATION. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE

PERFORMED WHILE THE BUILDING IS OCCUPIED AND IN FULL

CONSTRUCTION ACTIVITIES OF THIS PROJECT SHALL BE6.

COR IN WRITING AT LEAST 10 DAYS IN ADVANCE.

FACILITY. THE CONTRACTOR SHALL REQUEST OUTAGES TO THE

INTERRUPTIONS TO THE SYSTEM OR TO THE OPERATION OF THE

THE CONTRACTOR IS NOT ALLOWED TO MAKE UNSCHEDULED5.

CORRECT THE DISCREPANCY WITHOUT PRIOR APPROVAL OF THE COR.

DEVELOPED SOLUTION. THE CONTRACTOR SHALL NOT PROCEED TO

COR WHICH DESCRIBES SAID DISCREPANCY AND PRESENT A FULLY

PERFORMANCE. THE CONTRACTOR SHALL SUBMIT A LETTER TO THE

THAT CAN CAUSE A DETRIMENTAL EFFECT ON THE SYSTEM

WRITING, ANY DISCREPANCY WITH THE SYSTEM DESIGN OR MATTER

TRADES; AND SHALL BRING TO THE COR'S ATTENTION, IN

COORDINATE WITH OTHER CONTRACT DOCUMENTS AND WITH OTHER

THE CONTRACTOR SHALL CAREFULLY REVIEW THESE DRAWINGS AND4.

PERFORM PROCEDURES FOLLOWING THE BEST INDUSTRY PRACTICES.

MECHANICAL CODE, AND APPLICABLE FAA ORDERS; AND SHALL

TO THE INTERNATIONAL BUILDING CODE THE INTERNATIONAL

APPLICABLE CODES AND STANDARDS, INCLUDING BUT NOT LIMITED

MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS; AND ALL

THIS AND OTHER CONTRACT DOCUMENTS; WITH ALL EQUIPMENT

THE CONTRACTOR SHALL CONFORM WITH ALL PARAMETERS GIVEN IN3.

TO THE SYSTEMS.

AND MAKE ACCESSIBLE ALL EQUIPMENT AND DEVICES PERTAINING

TRADES AND DISCIPLINES INVOLVED IN THIS PROJECT TO FIT IN

RESPONSIBLE TO COORDINATE ALL WORK ACTIVITIES WITH OTHER

AND CONTROLS. THE MECHANICAL CONTRACTOR SHALL BE

OPERATIONAL WITH ALL NECESSARY EQUIPMENT, APPURTENANCES

THE CONTRACTOR SHALL FURNISH A FINAL SYSTEM, FULLY2.

COMMENCING ANY WORK.

THE DESIGN OF OTHER TRADES BEFORE PREPARING SHOP DRAWINGS, AND

GOVERNMENT. CAREFULLY REVIEW ALL CONTRACT DOCUMENTS AND

TO PRODUCE AN ACCEPTABLE FINAL PRODUCT FOR THE

EQUIPMENT, SUPPLIERS, AND WITH ALL PROJECT REQUIREMENTS

ALL INFORMATION PROVIDED HERE WITH SITE CONDITIONS,

RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND CONFIRM

ENCOUNTERED DURING THE CONSTRUCTION PROCESS. IT IS THE

NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS TO BE

THESE CONTRACT DRAWINGS ARE SCHEMATIC IN NATURE AND ARE1.

u lo tt e zhu-d-chilr-m001

2021-06-02T07:00:00-0500

JUAN ROMERO

2021-04-23T07:55:34-0500

Ian Donald Hoover

2" RV

TO POWER SERVICE BUILDING

4" CWR

4" CWS

10" BF

BF

ZHU-D-CHILR-M002

PARTIAL CHILLER ROOM PLAN - DEMOLITION

u

GENERAL NOTES:321

BB

AA

TW

TS TS

8" CTR

8" CTS

CTS

CTR

6" CWR

6" CWS

8" CWR

12" BF

1A

12" BF

POT FEEDER

MOTOR CONTROL CENTER

MATCH LINE - FOR CONTINUATION SEE DWG M004

SHEET NOTES (FOR CONSTRUCTION SEQUENCE SEE DWG G002)

SCALE: 1/2" = 1'-0"

5'1' 2'01'

PARTIAL CHILLER ROOM PLAN - DEMOLITION

WIRING SHALL BE REMOVED AND REPLACED.

CONTROL SENSORS, TRANSMITTERS AND ASSOCIATED

TO THE ISOLATION VALVES. ALL FLOW CONTROL VALVES,

500 ASSOCIATED PIPING, FITTINGS, AND INSULATION BACK

THE CONTRACTOR SHALL REMOVE THE CHILLER 400 AND4.

REPLACEMENT OF THE EQUIPMENT.

AT ALL TIMES THROUGHOUT THE REMOVAL AND

THE CHILLED WATER PLANT SHALL REMAIN IN OPERATION3.

WRITTEN APPROVAL OF THE COR.

CONTRACTOR SHALL NOT BEGIN WORK UNTIL RECEIVING

FOR CLOSING VALVES AND SHUTTING OFF EQUIPMENT. THE

EXPECTED TIME OF EXECUTION AND REQUIRED REQUEST

SEQUENCE OF DEMOLITION ACTIVITIES WITH THE

COMMENCING WORK. THE WORK PLAN SHALL PROVIDE A

PROVIDE THE COR WITH A DEMOLITION PLAN BEFORE2.

ZHU-D-CHILR-G002 AND ZHU-D-CHILR-M001.

REFER TO ADDITIONAL GENERAL NOTES SEE DRAWINGS1.

NOT USED.

ACCESSORIES AS INDICATED.

AND REMOVE 8" CWR PIPE W/ASSOCIATED

INSTALL HOT TAP FITTING W/BUTTERFLY VALVE

DEMOLISH FLOW CONTROL VALVES (4).

W/ELECTRICAL CONTRACTOR.

COORDINATE CH-400 & CH-500 STARTER REMOVAL

FLANGE ON ISOLATING VALVE.

ISOLATING VALVE & CHILLER. INSTALL BLIND

REMOVE ALL 8" PIPING AND ACCESSORIES BETWEEN

REMOVE CH-400 & CH-500.

REMOVAL WITH CONTROL CONTRACTOR.

COORDINATE CH-400 AND CH-500 HONEYWELL INTERFACE PANELS

NO USED.

REMOVE CABLING ASSOCIATED WITH THE CONTROL DEVICES.

SAND FILTER, PUMPS AND CHEMICAL TREATMENT STATION TO REMAIN.

u lo tt e zhu-d-chilr-m002

2021-06-02T07:00:12-0500

JUAN ROMERO

2021-04-23T07:55:51-0500

Ian Donald Hoover

8" CWS

FOR CLARITY

VALVE NOT SHOWN

3/4"

FOR POT FEEDER

NEW 1" TAP

2"

OF BF (TYP OF 4)

TAP AT THE BOTTOM

PIPE BLOW-DOWN PIPING TO NEAREST FD

TO 1'-6" AFF

14X10 DOWN

16X16

3"RV

8"CTR

AAV (TYP)

1 1/2"

BEAMS

ROOF

EXISTING

1 1/2" 8" CWS

FOR CLARITY

VALVE NOT SHOWN

12" CWR

2"2"

SYSTEMS BUILDING

TO POWER

ZHU-D-CHILR-M003

PARTIAL CHILLER ROOM PLAN

u

S1

SL H SW SW

NOTES: (FOR CONSTRUCTION SEQUENCE SEE DWG M001)

CWS

1E

CWR

UH

4A

AA

BB

1 2 3

4B

5B

M08

TUBE SERVICE

AREA

VD 1

STARTERS

32X16

MATCH LINE - FOR CONTINUATION SEE DWG M004

CURRENT AT ALL TIMES.

TO FABRICATE PIPING. A HOT WORK PERMIT SHALL BE

SHALL HAVE DESIGNATED AREAS AUTHORIZED BY THE COR

PRIOR TO COMMENCING NEW WORK, THE CONTRACTOR2.

INSTALL FLOW METER ON 4" CWS AS INDICATED.

INSTALL NEW PRESSURE INDICATORS ON EXISTING PIPING AS INDICATED.

AND PIPE TO EXISTING FLOOR DRAINS.

INSTALL NEW DRAIN PIPING AT NEW CHILLERS AND NEW PUMPS

COORDINATE THE SOURCE OF CHILLER CONTROLS WITH THE COR.

THE COR.

PRIMED AND PAINTED. COORDINATE THE COLOR SELECTION WITH

ALL CONDENSER WATER PIPING, NEW AND EXISTING, SHALL BE

VALVES.

ACCESSORIES AND APPURTENANCES BACK TO NEW ISOLATION

PROVIDE NEW INSULATED CWS AND CWR PIPING WITH PIPING

THE SPECIFICATIONS. TYPICAL FOR ALL NEW PIPING.

DIRECTION AND AT A MAXIMUM LINEAR DISTANCE ACCORDING TO

A MAXIMUM DISTANCE OF 1 FT FROM EVERY CHANGE OF

PROVIDE NEW HANGERS AND SUPPORTS. PROVIDE PIPE HANGERS

INDICATED.

INSTALL 3" RV PIPE AND CONNECT IT TO THE 6" RV PIPE AS

LOCATE 6" RV AS INDICATED.

AND MAINS.

INSTALL 8" CWR PIPES AND CONNECT THEM TO THE PUMPS

LOCATION WITH THE COR.

WITH EXTERIOR GRADE SEALER. CONFIRM PIPE SIZE AND

RV LINE THROUGH THE PRE-CAST PANEL. SEAL PENETRATION

BORE A HOLE IN THE EXISTING PRE-CAST PANEL. EXTEND THE

REPLACE FLOW CONTROL VALVES (4).

ISOLATING VALVES SHALL BE REMOVED.

WITH BUTTERFLY VALVES AS INDICATED. BLIND FLANGES AT

AND CONNECT THEM TO CHILLERS AND HOT TAP FITTINGS

INSTALL 8" CWS AND CWR PIPES WITH ASSOCIATED ACCESSORIES

AS SHOWN.

REPLACE PNEUMATIC THERMOSTAT AND ELECTRONIC THERMOSTAT

AND CONNECT THEM TO CHILLER AS INDICATED.

INSTALL 8" CTS AND CTR PIPES WITH ASSOCIATED ACCESSORIES

INDICATED.

INSTALL CH-400 AND CH-500 ON THE EXISTING PADS AS

u lo tt e zhu-d-chilr-m003

2021-06-02T07:00:24-0500

JUAN ROMERO

2021-04-23T07:56:08-0500

Ian Donald Hoover

REMOVED

3" RV

DDCP PANELS

REMOVED

8"CWR

8"CWR

8" BFV

2" D

14" CTR

14" CTS

PANELS

DDCP

FROM 10X14

TRANSITION

16 1/2" C.W.R.

OFFSET UP

FITTING

10" STOPPLE

(HCFC-123)

MONITOR SENSOR

UNIT

COIL

FAN

CONCRETE PADS

13'-8" TO 11'-7" BOP

OFFSET DOWN FROM

12" CTR AND CTS

VALVE

BUTTERFLY

10"

PLAN DWG ZHU-D-CHILR-M005

SEE PARTIAL MEZZANINE

FOR CONTINUATION

ZHU-D-CHILR-M004

u

3A

2A

3B

ID

1B

CWR 3

2 1

2B

REFENCE PURPOSES ONLY.

THIS IS A CONTINUATION DRAWING, INCLUDED FOR1.

MATCH LINE - FOR CONTINUATION SEE DWG. M003

2"D 2"D

6" BFV

6" RV

D D

2"D

1 1/2" D

MATCH LINE - FOR CONTINUATION SEE DWG. M005

u lo tt e zhu-d-chilr-m004

2021-06-02T07:00:35-0500

JUAN ROMERO

2021-04-23T07:56:26-0500

Ian Donald Hoover

FLOW COMPUTER NO. 2

FLOW COMPUTER NO. 1 NO.3

FLOW COMPUTER

NO.5

NO.4

1 1/2" D

3/4" D

12" CWS

8" CTR 10" CTR

10" CTS

10X14

6" BYPASS

6" HOT TAP

6" HOT TAP

WITH BF

12" BFV

CHILLER PLANT SPACE

(HCFC-123)

SENSOR

MONITOR

34"X16"

10"x10"

19"X27"

PENTHOUSE

EXHAUST AIR

TO 34"X34" AT

TRANSITION

HVAC PANEL

SENSOR 18"AFF (HCFC-123)

REFRIGERANT MONITOR

STROBE LIGHT

HFC-123 ALARM

EXHAUST SWITCH

SWITCH AND EMERGENCY

HCFC-123 ALARM SILENCE

LIGHT AND HORN

HCFC-123 ALARM STROBE

ZHU-D-CHILR-M005

u

32 1

M005

M005

SL

SL SW

SWH

CWS PD

TS 10

FCVPITI

11CWS

FCY

EF

AHU

DCU-21FIELD GEAR PANELDCU-20

12" CWR8" CWS

MATCH LINE - FOR CONTINUATION SEE DWG M006

EF-10 IS PART OF THE

HCFC-123 EMERGENCY

EXHAUST SYSTEM

CCMS ROOM

114A

REFERENCE PURPOSES ONLY.

THIS IS A CONTINUATION DRAWING, INCLUDED FOR1.

PARTIAL PLAN

PARTIAL MEZZANINE PLAN

u lo tt e zhu-d-chilr-m005

2021-06-02T07:00:51-0500

JUAN ROMERO

2021-04-23T07:56:42-0500

Ian Donald Hoover

STRAINER

UP TO STRAINER

2" DRAIN PIPE

SIESMIC RESTRAINT

ISOLATORS (TYP)

NEOPRENE PAD VIBRATION

SIESMIC RESTRAINT SIESMIC RESTRAINT

10" CWR

6" GATE VALVE

6"-4" REDUCER

STRAINER

2" D 2" D

FOR SERVICING CHILLER (TYP)

DISCONNECTING PIPING

PROVIDE COUPLING FOR

IN RV (TYP FOR 5)

PRESSURE RELIEF VALVES

PROVIDE SPRING OPERATED

SIESMIC RESTRAINT

SEE DETAIL E/M006

PIPE SUPPORT (TYP)

INSULATION

PIPE SADDLE

WELDED

ANGLE

MINIMUM ROD

1/2" DIA.

MORE PIPES

FOR 2 OR

PIPE

CLEVIS HANGER

PRE-ENGINEERED

MINIMUM ROD

1/2" DIA.

SADDLE

SHEET PIPE

GALVANIZED

18 GAUGE

ZHU-D-CHILR-M006

CHILLER ROOM SECTIONS

u

PD CTS

TS CTR

16x32

PI21

TYP

FLOOR SLAB

FLOOR SLAB

REQUIREMENTS.

APPROVED FOR THIS PROJECT. REFER TO SPECIFICATION SECTION 23 07 19 FOR THE SUBMITTAL

THESE PLATES TO SUBMIT THEIR PROPOSED METHOD OF INSTALLATION OF THE INSULATION PRODUCTS

MICA NATIONAL COMMERCIAL AND INDUSTRIAL INSULATION STANDARDS. THE CONTRACTOR SHALL USE

THE CONTRACTOR SHALL SUBMIT FOR APPROVAL OF THE COR THE INSULATION PLATES FROM THE

SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT".

ACCORDANCE TO SPECIFICATIONS 23 05 48, "VIBRATION AND

PROVIDE SEISMIC RESTRAINTS TO PIPE HANGER SUPPORTS IN 7.

ALWAYS USE PIPE SADDLES TO PROTECT PIPE INSULATION.6.

PIPE HANGER SELECTIONS AND APPLICATIONS.

COMPLY WITH PROJECT SPECIFICATIONS AND MSS-SP-69 FOR

BRIDGE TO HAVE NOT MORE THAN A 1/8 INCH DEFLECTION.

FOR MULTIPLE PIPES USE TRAPEZE HANGER. DESIGN TRAPEZE 5.

AND MSS-SP-58 FOR REQUIREMENTS.

EQUIPMENT MAY BE SUBJECTED. REFER TO PROJECT SPECIFICATIONS

DYNAMIC LOADING TO WHICH THE PIPING AND ASSOCIATED

CONCRETE INSERTS CAPABLE OF WITHSTANDING ALL STATIC AND

CONNECT HANGER RODS TO CONCRETE CEILING BY USE OF 4.

(WITHOUT INSULATION AND SADDLES.)

HANGERS ARE ALSO TYPICAL FOR UNINSULATED PIPING 3.

RATINGS OF MSS-SP-58 BUT NOT LESS THAN 1/2 INCH DIAMETER.

HANGER RODS DIAMETER SHALL BE PER SELECTION AND LOAD 2.

STRENGTH OF NOT LESS THAN 3,300 PSI.

PIPING INSULATION SHALL BE FOAM GLASS WITH A COMPRESSIVE 1.

AND MINIMUM LENGTH OF 9"

BE 3 TIMES THE PIPE DIA. SIZE

LENGTH OF PIPE SADDLE SHALL

DETAIL NOTES

VAPOR STOP CONSTRUCTION IS REQUIRED ON CHILLED WATER PIPING

PVC JACKET IN ACCORDANCE WITH SPECIFICATIONS

BUTT JOINT OVERLAP SEALED

WIRE, TAPE, OR BANDS TO SECURE INSULATION

LONGITUDINAL OVERLAP ON FIELD-APPLIED JACKETING

RIGID INSULATION AS SPECIFIED

PIPE

DETAIL NOTES

CHILLER SECTION (REF)

SCALE: 1/2" = 1'-0"M006

CHILLER WATER PIPING INSULATION DETAIL

M006

SINGLE & MULTIPLE PIPING SUPPORTS DETAILS

M006 u

:1 lo tt e zhu-d-chilr-m006

2021-06-02T07:01:04-0500

JUAN ROMERO

2021-04-23T07:57:01-0500

Ian Donald Hoover

CONTROL PANEL

STARTER

1 1/2" (TYP)

(TYP)

3"

6" RV TO EXTERIOR

IN-LINE WITH DISK

PRESSURE RELIEF

FROM CTR HEADER

FLOW METERS

GENERATOR BYPASS

FROM CHILLER AND

EXISTING TEMPERATURE SENSOR RELOCATED

EXISTING FLOW METER RELOCATED

PLUG VALVE

STRAINER (TYP)

TEST AND BALANCE VALVE (TYP)

5#COMPUTER

TO FLOW

10 GPM

TO MAINTAIN

CHECK VALVE (TYP)

BYPASS

BUILDING

SYSTEMS

POWER

TO

4"

MEZZANINE

LOCATED ON

CHILLER PLANT SPACE

MONITOR PANEL

REFRIGERANT LEAK

LOCATIONS.

M04 AND M06 FOR

SWITCHES. SEE DWGS.

EMERGENCY EXHAUST

CHILLER PLANT

ZHU-D-CHILR-M007

CHILLER WATER PIPING DIAGRAM

u

SPASPA

PI DP

TSTI

PI CWS

1E

P PI

PIPI

5A

PDPI

DPPI TI TS

PDPI

TI TS AI

4AFCV

4A

DPPI

TS AI

SPA SPA

PI PD

PI DP TI TS

AI FM

TS AI

CWS07

FM TS

FCV FM

TI PI

PI CWR

PD TS

27 PI

1C

1D

NO.1

975 GPM

PIPI

EF

SW

SW TS HS

AIAIAIAI

FLOW

COMPUTER NO. 5

PI PD

TI TS AI

PI DP TI TS

SPA SPA

AX SS AM

VICI

SSAX AM

1.

2. COMPLETE HYDRONIC SYSTEM IS SHOWN FOR INFORMATION ONLY. ONLY

WORK DESCRIBED BY CONTRACT DOCUMENTS PERTAINING TO CHILLERS

400 AND 500.

EXISTING CHILLED WATER SYSTEM DDCP POINTS WHICH ARE CONNECTED TO THE

EXISTING CSI INPUT/OUTPUT CONTROLLERS SHALL BE RE-USED AS INDICATED TO

PROVIDE THE POINTS AS SHOWN. REMOVE DEVICES TO PERMIT INSTALLATION OF

NEW CHILLERS. INSTALL NEW SENSORS, RECONNECT, AND

RE-CALIBRATE ALL DEVICES TO A PROVIDE A FULLY OPERATIONAL SYSTEM.

COORDINATE LOCATIONS OF OUTDOOR AIR TEMPERATURE AND HUMIDITY SENSORS

WITH COR.

TO FLOOR DRAIN (TYP)

DI DO

3/4" D TO FLOOR DRAIN

FEEDER

CHEMICAL

1"

1"

CI VI

5A

CONTROL PACKAGE

TO CHILLER

AOAO

FLOOR DRAIN (TYP)

THE NEAREST

2" DRAIN TO

AO AO

AI AI

VICI

AOAO

AI AI AI AI

WATER FLOW METER

FROM CH-300 TOWER

FROM CH-200 TOWERNO.2

COMPUTER NO. 1NO.3

NO.1CH200-CWS

CH300-CWS

NO.2

COMPUTER NO. 2

NO.3

CH400-CWS

CH500-CWS

NO.3 NO.1

COMPUTER NO. 3

NO.2

FROM CH-400 TOWER

FROM CH-500 TOWER

CH100-CWS

CW BYPASS

NO.3

COMPUTER NO. 4

NO.4 CTR BYPASS

(COOLING TOWER SUPPLY)

NO.2 CH100 CTS

SERVICE BLDG.

TO POWER

REV. NO.1

6"

CIVI

REV. NO.1

SYSTEMS BUILDING

FROM POWER

N.C.

EXIST.

OA HOOD

N.C.

FILTER

SS AX

AX AX

PART OF DDCP

DI DI AI

AI AI

CHILLED WATER PIPING DIAGRAM

CHILLER PLANT VENTILATION CONTROL

REFER TO ADDITIONAL GENERAL NOTES SEE DRAWINGS ZHU-D-CHILR-G002

AND ZHU-D-CHILR-M001.

u lo tt e zhu-d-chilr-m007

2021-06-02T07:01:18-0500

JUAN ROMERO

2021-04-23T07:57:23-0500

Ian Donald Hoover

TO FLOW COMPUTER NO. 2

COOLING TOWER

TO & FROM

14" CTS & CTR

2" BYPASS

1" DRAIN

GENERATOR BYPASS SYSTEM

CHILLER AND DIESEL

GENERATOR

TO AND FROM

6" CTS AND CTR

DRAIN (TYP) CHILLER

TO FLOOR GPM

1 1/2" D 975

TO MAINTAIN 10 GPM

ZHU-D-CHILR-M008

COOLING TOWER PIPING DIAGRAM

u

BUILDING

TOWER SYSTEMS

TO 4" CWS TO

1. CH-200 CHILLED WATER SUPPLY FLOW

3. CH-300 CHILLED WATER SUPPLY FLOW

4. CH-300 COOLING TOWER RETURN FLOW

2. CH-200 COOLING TOWER RETURN FLOW

1. CHILLED WATER SUPPLY HEADER PRIMARY

2. COOLING TOWER RETURN HEADER FLOW

2. CH-400 COOLING TOWER SUPPLY FLOW

3. CH-500 CHILLED WATER SUPPLY FLOW

4. CH-500 COOLING TOWER SUPPLY FLOW

1. CH-400 CHILLED WATER SUPPLY FLOW

1. CH-100 CHILLED WATER SUPPLY FLOW

3. CHILLED WATER SUPPLY HEADER SECONDARY

FLOW (BYPASS)

4. COOLING TOWER WATER BYPASS

1. POWER SERVICE BUILDING CHILLED

WATER SUPPLY FLOW

COMPUTER NO. 5

COMPUTER NO. 4

COMPUTER NO. 3

AIAIAIAIAIAIAIAI

COMPUTER NO. 1

COMPUTER NO. 2

TO FLOW

COMPUTER

A1PSFCV

A0A1

PSA1

DP PD

325 TONS

EVAPORATOR

CONDENSER

AO CTS

CI

VI

AIAI

DP PD

GPM

14"CTS

14"CTR

12"CTS

12"CTR

PDDP

10"CTS

TO CHILLER

CONTROL

PACKAGE (TYP)

AI 325 TONS

09FM

10"CTR

10"CTS

10"CTR

08 CTR

PI PI CTR

FLOW COMPUTER INPUTS

FLOW COMPUTER NO. 1 (EXISTING)

FLOW COMPUTER NO. 2 (EXISTING)

FLOW COMPUTER NO. 3 (NEW)

FLOW COMPUTER NO. 4 (NEW)

2. CH-100 COOLING TOWER RETURN FLOW

FLOW COMPUTER NO. 4 (NEW)

COOLING TOWER WATER - PIPING DIAGRAM

400 AND 500.

WORK DESCRIBED BY CONTRACT DOCUMENTS PERTAINING TO CHILLERS

COMPLETE HYDRONIC SYSTEM IS SHOWN FOR INFORMATION ONLY. ONLY2.

REFER TO ADDITIONAL GENERAL NOTES SEE DRAWINGS ZHU-D-CHILR-G0021.

AND RE-CALIBRATE ALL DEVICES TO A PROVIDE A FULLY OPERATIONAL SYSTEM.

DEVICES TO PERMIT INSTALLATION OF NEW CHILLERS. RE-INSTALL, RECONNECT,

TO THE EXISTING CSI INPUT/OUTPUT CONTROLLERS ARE TO BE RE-USED. REMOVE

EXISTING COOLING TOWER WATER SYSTEM DDCP POINTS WHICH ARE CONNECTED

u lo tt e zhu-d-chilr-m008

2021-06-02T07:01:36-0500

JUAN ROMERO

2021-04-23T07:57:38-0500

Ian Donald Hoover

ZHU-D-CHILR-M009

EQUIPMENT SCHEDULES

u

CHILLER UNIT SCHEDULE

PUMP SCHEDULE

FLOW CONTROL VALVE SCHEDULE

DIFFERENTIAL PRESSURE CONTROL VALVE

EXHAUST FAN SCHEDULE

NO.

YORK YTE3E3C3-CKF

YORK YK4G4RQ4-EJH

TYPE

CENTRIFUGAL

CENTRIFUGAL 325

TONNAGE

MINIMUM MAXIMUM

KW

207 2

NO. OF

PASSES

MAX.

FLOW DATA

MAX.PD

FT.H2O

WATER

IN F OUT F

WATER

18.8

18.8

12.3

12.3

12.3 52

52 44

44 2

PASSES

NO. OF

975 10.4

10.4

10.4

13.7

13.7

FT.H2O

MAX.PD

FLOW DATA

WATER WATER

86 96

96 460

VOLTS

ELECTRIC SERVICE

PHASE

HERTZ

60 18,200

18,200

18,200

16,199

16,199

LBS

WEIGHT

OPERATING

REMARKS

ELECTRIC SERVICE

HERTZPHASEVOLTS

SPEED

RPM

HP

NPSH

FT

HEAD

GPMSERVICE

MODEL

SIZE

KNOWN

ACCEPTABLE

SOURCE

NO.

P-1A

P-1B

P-1C

P-1D

P-1E ALLIS CHALMERS

ALLIS CHALMERS

ALLIS CHALMERS DBL.SUCT."8000" 8x6x17M

DBL.SUCT."8000" 8x6x17M

DBL.SUCT."8000" 8x6x17M CHILLED WATER

CHILLED WATER

CHILLED WATER 975

975 185

185 15.0

15.0

15.0 75

75 1750

1750 480

480 3

3 60

EXISTING PUMP

REMARKSACTUATOR KNOWN ACCEPTABLE SOURCEVALVE KNOWN ACCEPTABLE SOURCEGPMCOEFFICIENT

CV

SIZESERVED

EQUIPMENTNO.

FCV-1A

FCV-1B

FCV-2A

FCV-2B

FCV-3A

FCV-3B

CH-100 8"

8"

8" 2030

2030 975

NELES-JAMESBURY R-SERIES

NELES-JAMESBURY R-SERIES MOTOR OPERATED, MODULATING, LIMITORQUE - LY 1001-VEC-3-MPC-RPF-460/3

MOTOR OPERATED, MODULATING, LIMITORQUE - LY 1001-VEC-3-MPC-RPF-460/3

IN CHILLED WATER LINE 30 SEC RESPONSE

IN COOLING TOWER WATER LINE 30 SEC RESPONSE

CHILLED WATER BYPASS PIPING

KNOWN ACCEPTABLE SOURCE

ACTUATORRESPONSE

TIME

30 SECONDSFLASH FLOW

LINEAR GLOBE WITH

KNOWN

ACCEPTABLE SOURCE

NELES - JAMESBURY G-110

DIFFERENTIAL

PRESSURE

95 PSI150 PSI

WORKING

DESIGNDESIGN

750387

COEFFICIENT

v

DIFFERENTIAL

SETPOINT

50 PSI6"

SIZE

VALVEVALVE

NUMBER

FCV-10

MARK LOCATION

EF-10 MEZZ

SERVES

CFM

9000 3.15

INCH WG

TOTAL SP FAN

RPM

1455 7.5

HP RPM

VOLTS

PH

3 60

HZ

MOTOR DATA

MAXIMUM

OUTLET

VELOCITY

(FPM)

2526 BELT

DRIVE REMARKS

STEEL FAN WITH WHEEL DIAMETER 24-1/2"

KNOWN ACCEPTABLE SOURCE

BASIS OF DESIGN

YORK YK4G4RQ4-EJH

R-134A REFRIGERANT

R-134A REFRIGERANT

EXISTING CHILLER

EXISTING: INFORMATION ONLY

COOK EXISTING: INFORMATION ONLY

REFER TO ADDITIONAL GENERAL NOTES SEE DRAWINGS ZHU-D-CHILR-G002

FCV-4A*

FCV-4B*

FCV-5A*

FCV-5B*

BRAY

BRAY 120V TWO WAY HIGH PERFORMANCE VALVE

120V TWO WAY HIGH PERFORMANCE VALVE

* NEW FLOW CONTROL VALVE PROVIDED AND INSTALLED BY CONTRACTOR.

CH-400*

CH-500*

* NEW CHILLER TO BE PROVIDED BY THE CONTRACTOR.

u lo tt e zhu-d-chilr-m009

2021-06-02T07:01:52-0500

JUAN ROMERO

2021-04-23T07:57:54-0500

Ian Donald Hoover

ZHU-D-CHILR-M010

CONTROL POINT SCHEDULE

u

FIELD INSTALL ALL CONTROL DEVICES AND ACCESSORIES

PROVIDED FROM THE FACTORY WITH THE CHILLERS.

MODIFY OR REPLACE ALL RACEWAYS OR CONDUITS BACK TO

THE NEAREST JUNCTION BOX TO RUN NEW CONTROL WIRING TO

ITS ASSOCIATED LANDING POINT.

PROVIDE REQUIRED STANDS AND SUPPORTS FOR TRANSMITTERS

WITH DISPLAYS (TYPICAL FOR 8 - FLOW METER

TRANSMITTERS).

AFTER CHILLER STARTUP PERFORM A PERFORMANCE

VERIFICATION TEST TO PROOF THAT CHILLER THE CONTROLS

ARE INTEGRATED AND ALL SEQUENCES OF OPERATIONS ARE

FUNCTIONAL.

CHILLERS SHALL BE PROVIDED WITH BACNET CERTIFIED

CONTROLLERS. THE CONTRACTOR SHALL HARDWIRE

ENABLE/DISABLE, TEMPERATURE SETPOINT, AND CHILLER

STATUS SIGNALS TO THE CHILLER CONTROLS. ALL OTHER

CHILLER CONTROL POINTS SHALL BE ON THE BACNET NETWORK.

THE CONTRACTOR SHALL PERFORM A FUNCTIONAL VERIFICATION

TEST (FVT) AND PROVIDE AN FVT REPORT TO THE COR PRIOR

TO DISCONNECT THE EXISTING CONTROLS.

CONTROL POINT SCHEDULE IS INDICATED FOR REFERENCE. ALL

DDC CONTROL PANELS OF THE FACILITY ARE EXISTING. THE

BAS PROGRAMMING IS EXISTING.

PROVIDE ALL ACCESSORIES REQUIRED TO INSTALL NEW CONTROL

DEVICES ON THE WATER PIPING.

THE CONTRACTOR SHALL REPLACE ALL CONTROL DEVICES ON THE

REPLACE ALL THE CONTROL WIRING BACK TO THE SOURCE.

CERTIFIED SCHNEIDER PROGRAMMING ENGINEER SHALL ADD ALL

CHILLER STARTUP STATUS ON THE BAS HOME PAGE, COORDINATE

WITH COR FOR DETAILS.

POINT DESCRIPTION

NETWORK POINT

DDC SYSTEM POINT

(CH-400 & CH-500)

CHILLER ENABLE/DISABLE

CHILLER SET POINT ADJUSTMENT

CHILLER DEMAND LIMIT

CHILLER TROUBLE/FAULT

CHILLER AMPERAGE

CHILLER POWER DEMAND (KW)

CHILLER STATUS

CHILLER CW SUPPLY TEMPERATURE

CHILLER CW RETURN TEMPERATURE

CHILLER CW SUPPLY PRESSURE SWITCH

CHILLER CW RETURN PRESSURE SWITCH

CHILLER CW RETURN FLOW SWITCH

CHILLER CW DIFFERENTIAL PRESSURE

CHILLER CT SUPPLY TEMPERATURE

CHILLER CT RETURN TEMPERATURE

CHILLER CT SUPPLY PRESSURE SWITCH

CHILLER CT RETURN PRESSURE SWITCH

CHILLER CT RETURN FLOW SWITCH

CHILLER CT DIFFERENTIAL PRESSURE

CHILLER CWR FLOW CONTROL VALVE CONTROL

CHILLER CWR FLOW CONTROL VALVE POSITION

CHILLER CTS FLOW CONTROL VALVE CONTROL

CHILLER CTS FLOW CONTROL VALVE POSITION

CHILLER CHILLED WATER FLOW

CHILLER COOLING TOWER WATER FLOW FM

AM

ED

IG

IM

IE

IZ

IZ

40°F

50°F

50°F

60°F

90°F

95°F

60°F

65°F

TYPICAL FOR 2

CONTROL POINT SCHEDULE

HARDWARE FAIL MODE SOFTWARE GRAPHICS NOTESALARM LIMITS

3.

1.

2.

6.

4.

5.

8.

6.

7.

10.

9.

DDC SYSTEM ASSOCIATED TO CHILLERS CH-400 AND CH-500.

DDCP-03 IS ASSOCIATED WITH CH-400 AND CH-500.

u lo tt e zhu-d-chilr-m010

2021-06-02T07:02:09-0500

JUAN ROMERO

2021-04-23T07:58:09-0500

Ian Donald Hoover

File details come from the government source that posted it. Updated .