ATTACHMENT-2 QUALITY ASSURANCE SURVEILLANCE PLAN.pdf

PDF 94 KB Posted

Attached to
Mobile Document Destruction Services Federal contract opportunity
Solicitation number
SP4705-22-Q-0025
Issued by
Defense Logistics Agency

About this file

This document contains a Quality Assurance Surveillance Plan and related federal contract opportunity for mobile document destruction services. The Quality Assurance Surveillance Plan outlines inspection procedures and acceptable quality levels for contractor work, including a 100% inspection rate for contract requirements. It also defines monetary deductions that will be assessed for deficiencies such as failure to collect containers by a specified time. The related federal contract opportunity is a Request for Quote set aside for small businesses seeking to provide mobile document destruction services. The period of performance includes a 12-month base period and four 12-month option periods. The solicitation does not specify incumbent contractors or pricing terms. The North American Industry Classification System Code is 561990 and the size standard is $14.5M. Responses are due by the date specified in the solicitation, which will be issued by the Defense Logistics Agency.

View the file

Other files for this federal contract opportunity

Other files attached to Mobile Document Destruction Services, newest first.
File Type Posted
SP4705-22-Q-0025 AMENDMENT 0002_Final.pdf PDF
SP4705-22-Q-0025 AMENDMENT 0001_FINAL.pdf PDF
Attachment 3-Schedule B-Mobile Document Destruction.pdf PDF
Attachment 1-PWS-Mobile Document Shredding.pdf PDF
RFQ SP4705-22-Q-0025 Mobile Document Shredder BW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

C.3.2 SURVEILLANCE PLAN. All work and services performed as included in the Statement of

Work for this contract shall be done in accordance with proper collection, shredding and recycling procedures under the terms of this contract. All contractor provided work and services shall be subject to Government inspection and approval, with up to one-hundred (100) percent sampling for each requirement at the option of the Government. The acceptable quality level (AQL) of these specifications and requirements is one-hundred (100) percent.

SURVEILLANCE ACTIVITY CHECKLIST

Safety and Reports

The following checklist is for items which do not require 100% sampling. The items contained on the Checklist and the frequencies of inspections are as follows:

REQUIREMENT FREQUENCY AQL

Safe Operating Practices As Required 0 Defects

Reports As Required 2 days 0 Defects

C.3.2.1 Monetary Adjustments for Inadequate Performance. Nonperformance or failure to satisfactorily accomplish work in accordance with the provisions of this contract, due to the fault of the contractor, shall constitute a deficiency under this contract. All work will be regularly inspected by the COR, and deficiencies will be reported in writing to the contractor. If deficiencies are not corrected in a satisfactory and timely manner monetary deductions will be made on invoices submitted by the contractor. For all fixed-price work, Schedule B, Supplies and Services, monetary deductions will be made from the line items on the applicable monthly invoice(s) for the services, and if necessary, on succeeding monthly invoices. For all on-call work, monetary deductions may be made on the invoice(s) for that work.

C.3.2.1.1 Service Deficiencies: Failure to perform the required services on the days indicated will constitute a deficiency and a QDR will be issued by the COR. The contractor shall take corrective action and correct any deficiencies promptly after notification from the COR. The

Contractor shall be required to provide the QDR (fax copy or hand carry copy) to the COR indicating how the discrepancy occurred, how the discrepancy was corrected and how the

Contractor plan to keep the discrepancy from happening in the future. Deductions from the appropriate monthly invoices for deficiencies will be made as follows:

C.3.2.1.1.1 Failure to collect, empty and return all collection containers by 1530 hours on the date scheduled may result in a 10 percent deduction of the daily price for each day of nonperformance.

C.3.2.1.1.2 Failure to pick up spillage in the vicinity of the shred site may result in a 10 percent deduction.

C.3.2.1.2 Equipment Deficiencies

C.3.2.1.2.2 Government provided collection containers shall be in serviceable condition. The

Contractor shall notify the Government of containers deemed unserviceable.

C.3.2.1.3 The COR is delegated the authority to make determinations as to the existence of a deficiency in performance, and the timeliness to correct a deficiency. The KO will be provided copies of all deficiency notices issued by the COR.

C.3.2.1.4 If the contractor does not comply with all provisions specified herein, the Government reserves the right to correct the deficiency and charge the contractor for all costs incurred.

File details come from the government source that posted it. Updated .