Attachment 2 QASP.pdf
PDF 169 KB Posted
- Attached to
- COBRATF Training Operations and Support Services Federal contract opportunity
- Solicitation number
- 70FA2020R00000004
About this file
This document includes a Quality Assurance Surveillance Plan (QASP) and Performance Requirements Summary (PRS) for training operations and support services for the Chemical, Ordnance, Biological, Radiological Training Facility (COBRATF) located in Anniston, Alabama. The QASP provides metrics and evaluation methods for project management, training operations support, laboratory support, air monitoring operations, quality management system support, industrial hygiene and safety management, and personal protective equipment laundry operations. Performance standards include completion of tasks with fewer than a specified number of deficiencies per quarter. Surveillance methods involve random sampling, 100% inspection, periodic checks, and customer input. The PRS outlines performance metrics, standards, and monitoring methods for each task listed in the Performance Work Statement. This federal contract opportunity notice is for the related training operations and support services requirement. Proposals are due by April 16, 2020. The anticipated 11-month base period of performance begins January 15, 2021. This competitive set-aside is for small businesses only. The incumbent contractor is TET Consulting and Business Management Services.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CDP COBRATF Training Operations and Support Services
Attachment 2
Quality Assurance Surveillance Plan
QUALITY ASSURANCE SURVEILLANCE PLAN
TRAINING OPERATIONS AND SUPPORT SERVICES
FOR THE
CHEMICAL, ORDNANCE, BIOLOGICAL,
RADIOLOGICAL TRAINING FACILITY (COBRATF)
September 6, 2019
1. INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) has been developed as a means to evaluate Contractor performance while implementing the Performance Work Statement (PWS). It is designed to provide an effective surveillance method for monitoring and evaluating the Contractor’s performance for the requirements listed in the PWS.
The Contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved. In this contract, the quality control program is the driver for service quality. The Contractor is required to develop a comprehensive program of inspections and monitoring actions. The major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved after contract award provides the measures needed to lead the Contractor to success. Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a quality program.
This QASP is not intended to interfere with the Contractor's status as an ‘independent contractor' under the law, nor is it intended in any way to supplant the Contractor's responsibility for the day-to-day control and management of its own personnel and other resources for which it is ultimately responsible.
2. OBJECTIVE
This plan provides a quality surveillance strategy for training operations and support services to be performed at the Department of Homeland Security (DHS)/Federal Emergency Management Agency (FEMA)/Center for Domestic Preparedness (CDP), Chemical, Ordnance, Biological, Radiological Training Facility (COBRATF) located at Anniston, Alabama. The primary intent of the plan is to provide a basis for the Contracting Officer’s Representative (COR) evaluation of performance quality. Oversight of Contractor performance will assure quality performance. The plan will also afford the COR and Contracting Officer a productive mechanism to preclude major deficiencies in performance and annual contractor past performance evaluations as well as aid in determination for exercising of contract options.
3. PERFORMANCE INDICATORS (MEASURES)
Surveillance of contractor performance will be performed by the appointed COR and the Contracting Officer based on the surveillance methodologies identified in the Performance Requirements Summary (PRS). The following primary task areas of the contract will be the basis from which all surveillance will originate:
3.1 Project Management
3.2 Training Operations Support
3.3 Laboratory Support
3.4 Air Monitoring Operations
3.5 Quality Management System (QMS) Support
3.6 Industrial Hygiene and Safety Management
3.7 Personal Clothing and Equipment (PC&E)
4. EVALUATION METHODS
The COR’s effort will primarily be focused on verification and monitoring of the Contractor’s performance. The Government will use a variety of surveillance methods and techniques to validate the contractor’s compliance. The COR, assisted by other Government representatives, will perform evaluations based on each of the indicators identified in section 3 of this plan. The methods of surveillance listed in section 6 will be used in the administration of this QASP.
5. PERFORMANCE REQUIREMENT SUMMARY (PRS)
5.1 Lists the specific section in the PWS that the government will evaluate. The absence of any contract requirement from the PRS shall not detract from its enforceability or limit the rights or remedies of the government under any other provision of the contract.
5.2 Lists the service to be performed.
5.3 Lists the standard of performance for each specific service.
5.4 Lists the surveillance methods the government will use to evaluate the contractors performance in meeting the requirements of the contract.
6. SURVEILLANCE METHODS
6.1 The Government’s quality assurance procedures are based in part on attribute sampling of the recurring critical products/services of the contract using the concepts of
ANSI/ASQC Z1.4 sampling procedures and tables for inspection by attributes.
6.2 The Random Sampling method will be used for recurring service output items (daily, weekly, monthly, quarterly, semiannually, annually or as required) as determined necessary to assure a sufficient evaluation of contractor performance.
6.3 The 100% Inspection method will be used for those tasks that occur infrequently and cannot be randomly sampled because the required sample size for a small lot may exceed the lot size. Also, the tasks may have a stringent performance requirement where safety or health may be a concern.
6.4 Periodic surveillance. Sometimes called sampling, consists of the evaluation of tasks selected on other than 100 percent or random sample basis. It is appropriate for tasks that occur infrequently and where 100 percent inspection is neither required nor practicable. A predetermined plan for inspecting part of the work is established using subjective judgment and analysis of agency resources to decide what work to inspect and how frequently to inspect it.
There will be periodic surveillance of output items as determined necessary to assure sufficient evaluation of contractor’s performance.
6.5 Customer complaints/Input. This is not a primary method, but it is a valuable supplement to more systematic methods. For example, in a case where random sampling indicates unsatisfactory service, customer complaints can be used as substantiating evidence. In certain situations where customers can be relied on to complain consistently when the quality of performance is poor, e.g., support services, building services; customer surveys and customer complaints may be a primary surveillance method.
FEMA CENTER FOR DOMESTIC PREPAREDNESS (CDP)/COBRA TRAINING FACILITY (COBRATF), TRAINING
OPERATIONS AND MAINTENANCE SUPPORT
PERFORMANCE REQUIREMENTS SUMMARY (PRS)
PERFORMANCE WORK
STATEMENT (PWS) TASKS
METRIC
TYPE
PERFORMANCE STANDARD/
ACCEPTABLE QUALITY LEVELS (AQL)
MONITORING
METHOD
1.9 Written minutes of PEM are
prepared, signed by PM and delivered to the COR within 5 working days for review and approval.
Quality
Written minutes are complete and accurate 91-95% of the time with 5% or less requiring rework.
100% Inspection
4.0-5.0 Government Furnished Property/Equipment/Facilities and Contractor Furnished Property
Quality/
Timeliness
Reports received are complete and accurate, property and facilities are maintained in accordance with the requirements of the contract with no more than one non-conformance per quarter
100% Report inspection, periodic for all other requirements.
6.0 Management of work effort and
Quality Control System (QCS) requirements.
Ensure adequate and timely completion of services through sound business management practices. QCS fully documents all requirements, initiatives, and updates as necessary to meet program requirements.
No more than one contract discrepancy per quarter.
Periodic Inspection
6.1 A written notification of any non-
compliance shall be provided by the contractor to the COR within 24 hours of discovery.
Timeliness
No more than one late report per quarter.
100% Inspection COR records the date/time each report is received.
PERFORMANCE STANDARD/
ACCEPTABLE QUALITY
LEVELS (AQL)
MONITORING METHOD
6.1.1 Quality Control Inspection
System
All inspections are document and complete, and accurate 91-95% of the time with 5% or less requiring rework
100% Report Inspection
7.1 Training Operations
Support
Quality/Timeliness
No more than three contract discrepancies per quarter for all of the functional requirements of these sections, combined.
Random and Periodic
7.1.13 Safety Control Operations
Quality No more than two contract discrepancies per quarter for all of the
7.1.14 Site Respiratory Protection
Program
Quality/Timeliness No more than three contract
7.2 Laboratory Support
No more than two contract discrepancies per quarter for all of the
7.3 Air Monitoring Operation
No more than two contract requirements of this section
7.4 Quality Management System (QMS)
Support
Quality/Timeliness No more than three contract discrepancies per quarter for all of the requirements of this section
PERFORMANCE STANDARD/
ACCEPTABLE QUALITY
LEVELS (AQL)
MONITORING METHOD
7.5 Industrial Hygiene and Safety
Management
All requirements met without any contract discrepancies per quarter
100% report inspection, periodic for all other requirements
7.6 Personal Clothing and Equipment
(PC&E) Laundry Operations
Quality/Timeliness No more than two contract discrepancies per quarter for all of the requirements of this section Random and Periodic
8.1 Monthly Technical Progress Reports
shall be submitted to the COR by the tenth (10) day of the Month Quality/Timeliness
95% on time and inclusive of all required information.
100% Report Inspection
8.2 Monthly Financial Reports shall be
submitted to the COR by the tenth (10) day of the Month Quality/Timeliness
95% on time and inclusive of all required information.
100% Report Inspection
Notes:
1. Positive or negative performance will be documented in the contractor performance assessment report system (CPARS) database.
2. Noncompliance to contract standards will be corrected at no cost to the Government.
Notification: The contractor shall respond in writing to the Contracting Officer, to all notifications of failure to meet acceptable quality levels within 5 days of issuance by the Contracting Officer. The contractor’s response shall include the corrective action taken to rectify the problem and the proposed measure to preclude the recurrence of the problem.
File details come from the government source that posted it. Updated .