Attachment 2_Performance Requirements Summary Table (PRST).pdf

PDF 178 KB Posted

Attached to
Solicitation for Iso Molded Graphite Federal contract opportunity
Solicitation number
SP800025R0003
Issued by
Defense Logistics Agency

About this file

The Performance Requirements Summary Table (PRST) outlines detailed performance requirements for an Iso-statically Molded Synthetic Graphite contract with the Defense Logistics Agency (DLA). The document specifies strict compliance standards for multiple operational aspects, including sample collection, packaging, labeling, documentation, and delivery processes. Key requirements include submitting Certificates of Analysis (COA) per lot, collecting three equivalent samples for each material lot, packaging billets in new cardboard containers, using approved pallets, attaching Safety Data Sheets (SDS), and providing 20 business days' notice before sampling or testing operations.

The performance table mandates 100% compliance across 27 specific performance tasks, with surveillance methods including documentation review, on-site inspections, and verification by the Contracting Officer's Representative (COR). Critical performance areas include material handling, documentation, sampling procedures, packaging specifications, labeling requirements, and delivery protocols. The table emphasizes strict adherence to government specifications, with zero tolerance for deviations and comprehensive documentation requirements for each stage of material processing and delivery.

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation for Iso Molded Graphite, newest first.
File Type Posted
SP800025R0003 Conformed Solicitation.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
SP800025R0003.pdf PDF
Attachment 3_Iso-molded Graphite Government Inspection Report.pdf PDF
Attachment 5 - Past Performance Questionnaire.pdf PDF
Attachment 4_Hammond Depot ESOHMS Orientation Guide - 2023.pdf PDF
Attachment 1_DLA Strategic Materials Depot On-Site Rules.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 to SOW Performance Requirements Summary Table (PRST)

Standard

SOW

Section

Required Service/Task

Action

Minimum Frequency

Acceptable Performance Levels

Methods of Surveillance

Notes

4.1 Submit Certificate of Analysis to the COR

Submit to COR Per Lot 100% 100% Submit Certificate of Analysis to the COR

4.9 Do Not Ship Material Prior to COA Acceptance

Comply During the Entire Contract 100% 100% Do Not Ship Material Prior to CoA Acceptance

4.11 Submit a Testing Plan for Review and Acceptance

Submit to Government

Prior to Any Testing 100% 100% Provide to the Government for Review and Acceptance

4.12 Submit a Sampling Plan for Review and Acceptance

Submit to Government

Prior to Any Sampling 100% 100% Provide to the Government for Review and Acceptance

5.3 Provide Access to the Government During All Sampling Operations

Provide During Performance of All Sampling Operations

100% 100%

5.3

Perform All Sampling and Testing Operations in the Continental United States

(CONUS)

Comply During All Sampling and Testing

5.4

Provide Notice Twenty (20) Business Days Prior to Performing Sampling or Testing Operations

Provide Notice Prior to All Sampling or Testing

Section

Required

Acceptable

Provide Written Summary to the COR Detailing Pending Sampling Operations Twenty

(20) Business Days Prior to Performing Sampling Operations

Provide Prior to Performing All Sampling Operations

Provide to COR

The Contractor Shall NOT Make Changes to the Sampling Plan Without Written Approval from the KO

Satisfy Before and During All Sampling

5.5 The Contractor Shall Comply with All Portions of the Approved Sampling Plan

Comply During All Sampling 100% 100%

Collect Three Equivalent Samples for Each Lot of Material

Collect During All Sampling 100% 100%

The Contractor Shall Ship the Government’s Samples to the COR for Each Lot of Material

Ship to COR After Sampling of Each Lot of Material

Ship to the COR

12.2 Attach a Copy of the Safety Data Sheet (SDS)

Attach One Copy of the SDS to Every Lot

During the Entire Contract 100% 100%

Section

Required

Acceptable

Document Chain of Custody of All Samples

Satisfy During and After All Sampling

6.1 Package all Billets Fully in Approved New Cardboard Packaging

Satisfy During All Packaging Operations

6.2

Use Only Approved Pallets In Accordance With Section 6.2 of the SOW

Satisfy Before and During All Packaging Operations

Palletize All Material In Accordance With Section 6.2 of the SOW

Package Prior to Shipping All

Band/Shrink Wrap All Material In Accordance With Section 6.2 of the SOW

Band/Shrink Wrap All Material

Prior to Shipping All

6.2.3 Attach a Copy of the Safety Data Sheet (SDS) to each Lot of Material

Satisfy During the Entire Contract 100% 100%

Section

Required

Acceptable

7.1 through 7.2

Tag/Label All Packaged Billets

7.3 Attach Three Labels on Every Packaged Billet

7.4 Attach GHS Labels on Every Packaged Billet if Required

7.5 Ensure the SDS Contains the Chemical Name and Concentrations Range

8.1 and 10.1

Deliver All Material to the Delivery Point

10.4

The Contractor Shall NOT Ship Any Material Prior to Acceptance of the COA by the COR

Section

Required

Acceptable

10.4

Schedule All Deliveries a Minimum of Twenty (20) Business Days Prior to delivery with the

COR

Satisfy Prior to All Deliveries 100% 100%

10.4 Receive Approval for All Shipping from the COR

Satisfy Prior to All Shipping 100% 100%

10.7 Abide by All Rules, Laws and Regulations while On-Site at the Delivery Point

Satisfy During the Entire Contract 100% 100%

11.4

Remove All Rejected Material from Government Property within Ninety (90) Calendar Days

Satisfy As Material is Rejected 100% 100%

Note 1) The Government will evaluate the Contractor’s performance by appointing a Contracting Officer’s Representative (COR) to monitor performance and ensure all service(s)/tasks are performed at the identified Acceptable Performance Level(s) (APL) in accordance with (IAW) the Statement of Work (SOW) and this Performance Requirements Summary Table (PRST).

File details come from the government source that posted it. Updated .