Attachment 2 Cost Sheets.docx

DOCX document 22 KB Posted

Attached to
Captain Jack Mill Superfund Site O & M
Solicitation number
RFP FAAA 2026000184 3
Issued by
Boulder County, Denver City, Colorado

About this file

This is a Cost/Rate Sheets attachment for the Captain Jack Mill Superfund Site Operations and Maintenance Project, a state and local environmental remediation contract. The project encompasses eight primary tasks spanning from May 1, 2026, through April 30, 2027, including project planning, environmental data collection and management, operation of permanent and temporary water treatment systems, site-wide maintenance, technical support, and transition services. Task 1 requires development of multiple planning documents including a master schedule, sampling and analysis plan, standard operating procedures, health and safety plan, operations and maintenance plan, data management plan, emergency action plan, and transition plan. Task 2 involves 12 months of environmental sampling and master database maintenance, while Task 3 addresses operation of permanent water treatment systems and sludge removal. The project also includes optimization work, temporary water treatment plant operations with mobilization and demobilization fees, site-wide maintenance activities including surface remedy and infrastructure maintenance, snow removal, and non-routine expenses.

The contract structure combines fixed-price labor rates with cost-reimbursable provisions for supplies and materials, with actual quantities purchased reimbursable upon documentation. Contractor labor rates are provided for twenty-four position categories, including principal, project manager, senior and staff-level consultants, engineers and scientists, health and safety officers, quality assurance/quality control personnel, administrative support, and drafters, with separate hourly and overtime rates specified. The cost sheets establish that all quantities listed are estimated only, and contractors must submit firm labor and material rate offers as part of their RFP response. The budget template allows for itemized pricing across all eight tasks, with individual line items for each service component and a final project total calculation.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 Cost / Rate Sheets

These cost schedules shall be completed and returned as a part of the response to the Request for Proposals (RFP).

The quantities contained in the schedules are estimated quantities only. Contractor shall be reimbursed for actual quantities purchased. Documentation of purchases must be provided.

Labor and material rates are to be considered firm offers.

The contract will be a combination of a fixed price agreement for labor and cost reimbursable for supplies and materials.

Captain Jack Mill Superfund Site Operations and Maintenance

Project Budget

May 1, 2026 - April 30, 2027

Item
Description of Services
Quantity
Unit
Unit Price
Budget Total
Task 1
Project Planning
1.1
Contract Master Schedule
1
Each
1.2
Sampling and Analysis Plan / Quality Assurance Project Plan
1
Each
1.3
Standard Operating Procedures
1
Each
1.4
Health and Safety Plan
1
Each
1.5
Operations and Maintenance Plan
1
Each
1.6
Data Management Plan
1
Each
1.7
Emergency Action Plan
1
Each
1.8
Transition Plan
1
Each

Project Planning Subtotal:

Task 2
Environmental Data
2.1
Environmental Sampling
12
Month
2.2
Master Database Maintenance
12
Month

Environmental Data Subtotal:

Task 3
Operation of Permanent Water Treatment Systems
3.1
Operate Permanent Water Treatment Systems
12
Month
3.2
Sludge Removal
1
Each

Operations Subtotal:

Task 4
Optimization
4.1
Optimization Work Plan
1
Each
4.2
Optimization Support
1
Lump Sum

Optimization Subtotal:

Task 5
Operation of Temporary Water Treatment Plant
5.1
Mobilization and Demobilization Fees
2
Each
5.2
Monthly Rental and Operations
12
Month

Operation of Temporary Water Treatment Plant Subtotal:

Task 6
Site Wide Maintenance
6.1
Maintenance of Surface Remedy
1
Annual
6.2
Maintenance of Permanent Site Infrastructure
1
Annual
6.3
Snow Removal
1
Annual
6.4
Non-Routine Expenses
1
Lump Sum

Site Wide Maintenance Subtotal:

Task 7
Technical Support
7.1
Monthly Status Reports
12
Month
7.2
Annual Report
1
Annual
7.3
Technical Support
1
Lump Sum

Technical Support Subtotal:

Task 8
Transition Services
8.1
Transition Services
1
Lump Sum

Transition Services Subtotal:

Project Total:

Captain Jack Mill Superfund Site Operations and Maintenance

Project Labor Rates

May 1, 2026 - April 30, 2027

Item
Title
Hourly Rate
Overtime Rate
1
Principal
2
Project Manager
3
Senior Consultant
4
Health and Safety Officer
5
Quality Assurance / Quality Control Officer
6
Senior Engineer / Scientist
7
Project Engineer / Scientist
8
Staff Engineer / Scientist
9
Engineer in Training
10
Senior Drafter
11
Drafter
12
Senior Administrative Support
13
Administrative Support

File details come from the government source that posted it. Updated .