Attachment_2-_Bid_Schedule.pdf

PDF 92 KB Posted

Attached to
IRA WILLOW LAKE ELK FENCE
Solicitation number
140L6225Q0006
Issued by

About this file

This is a bid schedule template from the Bureau of Land Management for the Willow Lake Elk Fence project (Solicitation #140L6225Q0006). The document outlines the line items for contractors to provide pricing for an elk fence construction project.

The bid schedule includes seven specific line items: mobilization (1 LS), elk fence installation (3,000 LF), elk fence stress panels/H-brace (4 EA), elk fence end panels (4 EA), elk fence 5-post corner (1 EA), fence removal (3,500 LF), and 8-foot tall, 14-foot long metal pipe gates (2 EA). The template includes spaces for unit pricing and total cost amounts, along with sections for equipment, labor, materials/supplies, and contract costs. The document indicates the work involves constructing elk fence according to provided drawings and photos, with the template formatted to capture all associated costs for the complete scope of work.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Contract/Project Name Estimator Date

AS 12/5/2024

Item # Description

CONTRACT

Description Unit Quantity Price Cost Amount Mobilization LS 1

LF 3,000

EA 4

Elk Fence End Panels EA 4

EA 1

LF 3,500

EA 2

Total Contract Costs

Notes/Comments Summary Cost Total Equipment

Construct elk fence as shown in drawings and Labor photos. Mat'l/Supplies Contract

TOTAL COST

Bid Schedule

8-Foot Tall, 14-Foot Long Metal Pipe Gate

Elk Fence Installation

Willow Lake Fence

Willow Lake Elk Fence

Elk Fence Stress Panels (H-Brace)

Elk Fence 5-Post Corner Fence Removal

WILLOW LAKE ELK FENCE