Attachment_2-_Bid_Schedule.pdf
PDF 92 KB Posted
- Attached to
- IRA WILLOW LAKE ELK FENCE
- Solicitation number
- 140L6225Q0006
About this file
This is a bid schedule template from the Bureau of Land Management for the Willow Lake Elk Fence project (Solicitation #140L6225Q0006). The document outlines the line items for contractors to provide pricing for an elk fence construction project.
The bid schedule includes seven specific line items: mobilization (1 LS), elk fence installation (3,000 LF), elk fence stress panels/H-brace (4 EA), elk fence end panels (4 EA), elk fence 5-post corner (1 EA), fence removal (3,500 LF), and 8-foot tall, 14-foot long metal pipe gates (2 EA). The template includes spaces for unit pricing and total cost amounts, along with sections for equipment, labor, materials/supplies, and contract costs. The document indicates the work involves constructing elk fence according to provided drawings and photos, with the template formatted to capture all associated costs for the complete scope of work.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Contract/Project Name Estimator Date
AS 12/5/2024
Item # Description
CONTRACT
Description Unit Quantity Price Cost Amount Mobilization LS 1
LF 3,000
EA 4
Elk Fence End Panels EA 4
EA 1
LF 3,500
EA 2
Total Contract Costs
Notes/Comments Summary Cost Total Equipment
Construct elk fence as shown in drawings and Labor photos. Mat'l/Supplies Contract
TOTAL COST
Bid Schedule
8-Foot Tall, 14-Foot Long Metal Pipe Gate
Elk Fence Installation
Willow Lake Fence
Willow Lake Elk Fence
Elk Fence Stress Panels (H-Brace)
Elk Fence 5-Post Corner Fence Removal
WILLOW LAKE ELK FENCE