Attachment 12-Past_Performance_Information_Citations_-_Unique_Areas.pdf
PDF 49 KB Posted
- Attached to
- Space Coast Multiple Award Construction Contract (SCMACC) Federal contract opportunity
- Solicitation number
- FA252120R0009
About this file
This document contains a draft solicitation for the Space Coast Multiple Award Construction Contract. The solicitation seeks proposals for maintenance, repair, and minor military construction projects to be performed at Cape Canaveral Air Force Station, Patrick Air Force Base, Kennedy Space Center, and the Jonathan Dickinson Missile Tracking Annex in Florida. Work will include tasks such as asbestos abatement, HVAC renovation, utility installation, electrical work, plumbing, land clearing, waste water treatment plant upgrades, paving, mold remediation, historic preservation, and hurricane response. Construction management will be required to accomplish projects simultaneously while accounting for customer mission requirements. The Air Force Space Command, Naval Ordinance Test Unit, Air Force Technical Applications Center, NASA, and other tenant units will utilize the multiple award IDIQ contracts for construction projects at the listed locations in Florida.
View the file
Other files for this federal contract opportunity
Show all 50
Space Coast Multiple Award Construction Contract (SCMACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 12 - Past Performance Information Citations -- Unique Areas Space Coast Multiple Award Construction Contract (SCMACC)
RFP # FA252120R0009
Identify the "unique areas" within each past performance information citation. You may select multiple "unique areas" per citation. If a particular citation does not contain a "unique area," select "Other." For Phase One only information contained within the offeror's past performance citations will be evaluated for unique areas. Phase One will be evaluated on a pass or fail basis. Only offerors that pass Phase One will be considered for Phase Two. See Section M, C., c., ii. Relevancy, for further details.
Citation 1:
Past Performance Information Citation Title:
Asbestos and hazardous metal management/abatement HVAC renovation and controls Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are constrained by customer mission requirements Other:________________________________________________________________________________
Citation 2:
Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are
Other: _______________________________________________________________________________
Citation 3:
Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are
Citation 4:
Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are
Citation 5:
Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are
Other: ______________________________________________________________________________
Citation 6:
Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are
Other: ______________________________________________________________________________
Attachment 12 - Past Performance Information Citations -- Unique Areas Space Coast Multiple Award Construction Contract (SCMACC)
File details come from the government source that posted it. Updated .