Attachment 1 - Statement of Work.docx

DOCX document 17 KB Posted

Attached to
Lincoln NF Roof Rehabilitation - TPO Recover System
Solicitation number
127EAX26Q0010
Issued by

About this file

This is a Statement of Work (SOW) for roof rehabilitation services at USDA Forest Service facilities located in Lincoln National Forest, Ruidoso, New Mexico. The project involves installing Thermoplastic Polyolefin (TPO) roof recover systems over seven existing buildings with metal and flat tar/built-up roofs, covering approximately 15,849 square feet total. The contractor must furnish all labor, materials, equipment, supervision, and incidentals necessary to complete the work, including full replacement of gutters and downspouts with corrosion-resistant materials. Work scope includes inspecting and preparing existing roof systems, installing manufacturer-approved TPO recovery boards and membranes with heat-welded seams, installing TPO flashing at all penetrations and transitions, and coordinating around two buildings with existing rooftop solar panel systems by either performing work around them or temporarily removing and reinstalling them without additional cost to the Government.

The performance period is 160 calendar days from Notice to Proceed. Contractor quality control requirements include submitting product data and installation details prior to mobilization, with the Contracting Officer's Representative conducting inspections at preparation completion, recovery layer installation, and final membrane/gutter/solar coordination stages. Any work not meeting contract requirements must be corrected at no additional cost to the Government. Required deliverables include a project schedule, manufacturer product data, as-built roof and gutter layouts, and final completion documentation. All work must comply with TPO manufacturer requirements, applicable ASTM standards, USDA Forest Service construction standards, and all applicable OSHA regulations and Forest Service safety requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Project Title: Roof Rehabilitation – TPO Recover Systems Agency: U.S. Department of Agriculture (USDA), Forest Service Forest: Lincoln National Forest Location: Ruidoso, New Mexico

1.0 PROJECT OBJECTIVE

The objective of this project is to rehabilitate existing roofing systems at USDA Forest Service facilities by installing Thermoplastic Polyolefin (TPO) roof recover systems over existing metal and flat (tar/built-up) roofs, along with full replacement of gutters and downspouts.

The work shall extend roof service life, improve watertight integrity, and integrate with existing building systems, two roofs have current solar panels established, while minimizing disruption to Forest Service operations.

The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to complete the work.

2.0 SCOPE OF WORK

2.1 GENERAL REQUIREMENTS

A. This project is a roof recover installation. Existing roofing systems shall remain in place except where localized removal is required to correct unsound conditions.

B. The Contractor shall verify that existing roof systems are structurally sound and suitable for installation of a TPO recover system prior to installation.

C. All work shall comply with:

TPO manufacturer requirements Applicable ASTM standards USDA Forest Service construction standards

2.2 EXISTING ROOF PREPARATION AND REPAIRS

A. Metal Roofs The Contractor shall:

Inspect metal roofs for corrosion, loose panels, failed fasteners, damaged seams, and penetrations.

Remove and replace severely rusted or deteriorated metal panels where necessary.

Remove surface rust and apply corrosion-inhibiting primer.

Tighten all loose fasteners and replace missing or damaged fasteners with corrosion-resistant materials.

Clean roof surfaces and prepare seams, ridges, and penetrations for recovery system installation.

B. Flat / Tar (Built-Up) Roofs The Contractor shall:

Clean roof surfaces of debris, dirt, and loose material.

Inspect existing built-up roofing (BUR) for blisters, cracks, and soft areas.

Perform localized patching or repairs as required to provide a smooth, stable substrate suitable for TPO installation.

Ensure positive drainage prior to installation of recover components.

2.3 TPO RECOVER SYSTEM INSTALLATION

The Contractor shall install a manufacturer-approved TPO recover roofing system over all prepared roof surfaces, including:

Recovery Board / Separation Layer Install approved recovery board, insulation, or separation layer as required by the TPO manufacturer to provide a continuous substrate.

TPO Membrane Installation Install a fully adhered TPO membrane over all roof areas.

Heat-weld all seams to form a continuous watertight assembly.

Flashing and Detailing Install TPO flashing at all penetrations, walls, curbs, parapets, and transitions.

Integrate roof system with existing roof edges, drains, and penetrations.

2.4 GUTTERS AND DOWNSPOUTS

A. Remove and replace all existing gutters and downspouts on buildings included in this contract.

B. New gutters and downspouts shall be corrosion-resistant, properly sized, and securely attached.

C. Downspouts shall discharge away from building foundations and coordinate with existing drainage.

2.5 SOLAR PANEL COORDINATION

A. Some buildings include existing rooftop solar panel systems.

B. The Contractor shall:

Perform roofing work around existing solar panels, or Temporarily remove and reinstall solar panels as required to complete roofing work.

C. Solar panels shall be:

Protected from damage Reinstalled in original configuration Fully operational upon project completion

D. Damage to solar equipment caused by Contractor operations shall be corrected at no additional cost to the Government.

3.0 BUILDINGS INCLUDED

No.BuildingExisting Roof TypeApprox. Roof Area (SF)
1Smokey Bear Ranger District OfficeMetal4,648
2Smokey Bear Ranger Small OfficeMetal916
3Smokey Bear Ranger District Recreation BuildingMetal456
4Smokey Bear Ranger District Fire Operations BuildingMetal4,125
5Smokey Bear Ranger District Tanker BayMetal2,400
6Smokey Bear Ranger HouseFlat / Tar (BUR)1,704
7Smokey Bear Seasonal HousingFlat / Tar (BUR)1,600

Estimated Total Roof Area: ~15,849 SF

4.0 GOVERNMENT-FURNISHED PROPERTY

The Government will provide site access and coordination through the Contracting Officer’s Representative (COR).

No materials or equipment will be furnished by the Government.

5.0 QUALITY CONTROL AND INSPECTION

A. Contractor shall submit product data and installation details prior to mobilization.

B. The COR may inspect work at the following stages:

Completion of roof preparation Installation of recovery layers Final membrane, gutter, and solar coordination completion

C. Work not meeting contract requirements shall be corrected at no additional cost to the Government.

6.0 DELIVERABLES

Project schedule Manufacturer product data As-built roof and gutter layouts Final completion documentation

7.0 PERFORMANCE PERIOD

Work shall be completed within 160 calendar days from Notice to Proceed (NTP).

8.0 SAFETY REQUIREMENTS

The Contractor shall comply with all applicable OSHA regulations and Forest Service safety requirements, including fall protection and coordination around occupied facilities.

9.0 DATA RIGHTS

All documentation produced under this contract shall become the property of the U.S. Forest Service.