Attachment_1__Specificatons_04-09-2021_Rev_12-01-2021.pdf

PDF 10 MB Posted

Attached to
OLD NORTH CHURCH CRYPT RESTORATION
Solicitation number
140P2122R0004
Issued by

About this file

This document provides details for a federal solicitation to restore the crypt of the Old North Church in Boston, Massachusetts. The National Park Service is seeking contractors to restore and repair the crypt located beneath the Old North Church. Bids are due by April 9, 2021 with revisions received through December 1, 2021. The solicitation number is 140P2122R0004. Contractors should have experience restoring historic structures and working on projects requiring preservation of original architectural features. The selected contractor will stabilize the walls, repair damage from water intrusion, and restore the crypt's interior finishes while complying with historic preservation standards.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OLD NORTH CHURCH CRYPT

193 SALEM STREET, BOSTON MA

CRYPT RESTORATION

BOSTON NATIONAL HISTORICAL PARK

PMIS NO. 232488

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

HISTORIC PRESERVATION TRAINING CENTER

April 9, 2021 Revised: May 5, 2021

Revised: December 1, 2021

221346PMIS NO. 221346<Insert Park and PM

091015

00 01 10 - 1

TABLE OF CONTENTS

SECTION 00 00 10 - TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work

01 26 01 01 27 00

Contract Modification Procedures Definition of Contract Line Items

01 31 00 Project Management & Coordination

01 32 16 Construction Schedule

01 32 33 Photographic Documentation

01 33 23 Submittal Procedures

01 35 23 Safety Requirements 01 35 50 Natural and Cultural Resource Protection

01 35 91 Historic Preservation Treatment Procedures

01 40 00 Quality Requirements

01 42 00 Reference Standards

01 50 00 Temporary Facilities and Controls

01 57 19.11 Indoor Air Quality Management

01 57 19.12 Noise and Acoustics Management

01 57 23 Temporary Storm Water Pollution Prevention

01 67 00 Product Requirements

01 73 29 Cutting and Patching

01 73 40 Execution

01 74 19 Construction Waste Management and Disposal

01 77 00 Closeout Procedures

01 78 23 Operation and Maintenance Data 01 79 00 Demonstration and Training

DIVISION 02 - EXISTING CONDITIONS

024100 Demolition

DIVISION 03 - CONCRETE

033000 Cast-In-Place Concrete

DIVISION 04 - MASONRY

040120 Masonry Restoration

042000 Unit Masonry

DIVISION 05 - METALS

055000 Metal Fabrications

DIVISION 06 - WOOD, PLASTICS AND COMPOSITES

061000 Rough Carpentry

BOST 232488

221346PMIS NO. 221346<Insert Park and PM

091015

00 01 10 - 2

TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

079200 Joint Sealants

DIVISION 08 – OPENINGS

081400 Wood Doors and Frames

087100 Door Hardware

DIVISION 20 - RESERVED

200000 Common Mechanical/Electrical Requirements

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

230500 Common Work Results For HVAC

230513 Common Motor Requirements For HVAC Equipment

230529 Hangers And Supports For HVAC Piping And Equipment 230593 Testing, Adjusting, And Balancing For HVAC 233416 Centrifugal HVAC Fans

DIVISION 26 - ELECTRICAL

260500 Common Work Results For Electrical 260519 Low-Voltage Electrical Power Conductors And Cables

260529 Hangers And Supports For Electrical Systems

260533 Raceway And Boxes For Electrical Systems

260553 Identification For Electrical Systems

262726 Wiring Devices 262816 Enclosed Switches And Circuit Breakers 265100 Interior Lighting

DIVISION 32 – EXTERIOR IMPROVEMENTS

321300 Excavation & Fill for Utilities

DIVISION 33 – UTILITIES

334000 Storm Drainage Utilities

END OF TABLE OF CONTENTS

01 11 00 - 1

SUMMARY OF WORK

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Work phases.

3. Work under other contracts.

4. Government Furnished Materials.

5. Contractor use of premises.

6. Public use of site.

7. Occupancy requirements for buildings.

8. Work Restrictions.

9. Special Construction Requirements.

10. Soils Investigation Report.

11. Additional Reports.

12. Conflicts within Documents

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: Boston National Historical Park, The Old North Church, 193 Salem Street, Boston, MA 02129

B. The Work consists of the following:

1. Restoration of the crypt in the basement of the Old North Church including repair/replacement of deteriorated brick, mortar, and restoration/replacement of tomb doors and hardware.

2. Accessibility improvements to the crypt – Remove existing interior concrete walkway, lower floor, and install new accessible path of travel,

3. HVAC Improvements for humidity control

4. Electrical improvements including: relocate panelboard, install conduit for HVAC improvements, install new exterior GFCI outlet.

5. Installation of Sump Pump

6. Install accessible handrails at existing interior columbarium

7. Contract Option 1: Construct new exterior accessible exterior ramp with handrails and construct exterior drainage improvements. Remove existing door and construct new accessible wood door.

8. Contract Option 2: Relocate existing ticket booth, disconnect and remove electrical connection at

Old North Church, level ticket booth in new location and install new electrical service.

C. Background: The Old North Church is a National Historic Landmark and identified in the Park’s enabling legislation. Historic Landmark status is given for the Church’s association with the American Revolution. The Church is a Boston site where citizens and patriots first debated American’s liberty and struggled for that cause. Basement guided tours are very popular and an important element of the Old North Church visitor experience. The basement crypts contain remains of soldiers who died at the Battle of Bunker Hill. The crypts also contain the remains of the USS Constitution’s first captain. It should be noted that for purposes of this Contract, Old North Foundation, 193 Salem Street, Boston, MA 02113 is referred to as the Owner.

01 11 00 - 2

A. The Work shall be conducted in one phase in the following order, with each phase substantially complete before beginning the next phase:

1. Phase one: Restore the crypt and make accessibility improvements. The remaining work shall be substantially complete and ready for occupancy at time of Substantial Completion.

1.3 WORK UNDER OTHER CONTRACTS

A. Prior to commencement of this contract the Old North Foundation will relocate oil tanks, move radiators, and install a new HVAC system. No other work will be completed outside the subject project.

1.4 GOVERNMENT-FURNISHED MATERIALS

A. Government-Furnished Products: Not applicable.

1.5 CONTRACTOR USE OF SITE

A. General: The Old North Church will continue to be occupied by staff and visited by the public throughout the duration of the project. The Contractor shall, at all times, conduct their operations to ensure the least inconvenience to the public and staff. The crypt will be closed to visitors for the duration of construction activities. Contractor shall have limited use of the courtyard for construction operations and staging. Exterior brick pathway and courtyard lining the Freedom Trail will be closed to pedestrian traffic for the duration of construction activities. Limited temporary closures of adjacent pathways will be permitted, upon specific approval of Contracting Officer.

Contractor shall provide no less than 72 hour advanced notice to Contracting Officer.

Closures of adjacent pathways shall be temporary lasting no longer than 24 hours.

B. Limits: Contractor shall confine constructions operations to the Church Crypt. Limited use of exterior pathways/courtyardses to the church crypt and lower courtyard adjacent to the crypt will be available for contractor staging with Contracting Officer’s approval.

Contractor shall not disurb areas outside the limits of disturbance and beyond areas in which work is indicated. The contractor will need to traverse property owned by the City of Boston Parks Department to access the crypt from the street. Contractor shall be responsible for securing all construction permitting required by the City of Boston.

Contractor shall be responsible for securing any special permits required by the City of Boston for use/access across city owned property.

C. Storage of Materials: Confine storage of materials to the crypt or staging area at rear courtyard.

1.6 REQUIREMENTS

A. Regulatory:

1. The work of this contract shall comply with industry standards and applicable laws and regulations of authorities having jurisdiction, including but not limited to:

a. State and local building code requirements and permitting.

b. Health and safety regulations, including all OSHA requirements.

B. Preservation of Cultural Resources:

1.2 WORK PHASES

01 11 00 - 3

1. The Old North Church is designated as a local and National Historical Landmark. This honor is only given to sites with the greatest historic significance.

2. All work shall prevent adverse effects including damage to historic materials and finishes within and adjacent to the project site. The contractor shall protect the Old North Church building fabric, material contents, and surrounding courtyard and pathways.

3. Contractor shall undertake and execute all work in the most sensitive manner possible using the most conservative treatment approaches.

4. All work shall comply with the Secretary of the Interior’s Standards for the Treatment of Historic Properties and shall follow the Guidelines for the Management of Archeological Resources.

C. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, including repairing or replacing damaged trees and plants, at no additional expense to the Government.

2. Provide temporary barriers in coordination with Contracting Officer to protect existing trees and plants and critical root zones within the tree canopy drip-line. Protected areas shall not be used for material/equipment storage.

3. Do not remove, injure, or destroy trees or other plants without prior written approval.

Consult with Contracting Officer prior to removing roots and branches that interfere with construction.

4. Do not fasten ropes, cables, or guys to existing trees.

5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage to roots, trunk, and canopy.

D. Salvaged Materials:

1. All salvaged materials will remain the property of the Owner and be turned over to the

Contracting Officer upon substantial completion.

2. Contractor shall maintain property control records for material or equipment designated as salvaged in the construction documents.

3. Salvaged materials shall be stored by Contractor in a secure location and protected from exposure to sun/heat/moisture and other sources of direct or indirect damage.

E. Driveways and Entrances: Keep driveways, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

1.7 OCCUPANCY REQUIRMENTS FOR BUILIDINGS

A. Existing Buildings

1. Partial Government Occupancy: The Owner will occupy the premises during entire

01 11 00 - 4 construction period, with the exception of areas under construction. Cooperate with Owner and Government during construction operations to minimize conflicts and impacts to owner’s on-site operations and facilitate Government usage. Perform the Work so as not to interfere with the Government’s operations. Maintain existing exits, unless otherwise indicated.

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the Contracting Officer (CO).

1.8 CONDUCT OF OPERATIONS

A. At all times the contractor shall conduct their operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

B. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

1.9 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 6:00 a.m. to 4:00 p.m., Monday through Friday, except when otherwise indicated.

1. Early Morning Hours: All external noisy activity shall not begin until 9:00am

2. Hours for loud work shall be limited, and take place no earlier than 9:00AM.

B. Weekend and Holiday Work: Work on Saturdays, Federal holidays, or at night may not be performed without prior written consent from the Contracting Officer. Submit requests 72 hours in advance of the work to the Contracting Officer. Sunday work is prohibited.

C. Existing Utilities

1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

D. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Contracting Officer’s written permission.

3. Hours for Utility Shutdowns: Shutdowns limited in nature during normal business hours, between 9:00 AM and 6:00PM, to limit disruption.

E. Nonsmoking Building: Smoking is prohibited within the building or within 25 feet of

01 11 00 - 5 entrances, operable windows, or outdoor air intakes.

1.10 SPECIAL CONSTRUCTION REQUIREMENTS

A. Archaeological Monitoring: See Specification Section 01 35 50 NATURAL AND

CULTURAL RESOURCES PROTECTION

1.11 SOILS INVESTIGATION REPORT

A. Soils Report: None.

1.12 ADDITIONAL REPORTS

A. Copies of all reports and correspondence are available as attachments to the solicitation:

1. A report entitled Old North Church: Crypt Conditions Survey, July 2017 has been prepared by Building Conservation Associates.

2. A report entitled Completion Memo, Intensive (Locational) Archeological Survey of the

Old North Crypt, April 2017, has been prepared by Joseph Bagley, City of Boston archeologist.

3. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.

B. Copies of referenced documents are available online.

1. Secretary of the Interior’s Standards for the Treatment of Historic Properites, National Park Service. https://www.nps.gov/tps/standards.htm

2. NPS-28, Cultural Resource Management Guideline, National Park Service, June 11, 1998.

https://www.nps.gov/parkhistory/online_books/nps28/28contents.htm

1.13 CONFLICTS WITHIN DOCUMENTS

A. The construction documents are complementary. If there is any conflict within the documents, the Contractor shall submit in writing for a Contracting Officer decision.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

BOST 232488

https://www.nps.gov/tps/standards.htm https://www.nps.gov/parkhistory/online_books/nps28/28contents.htm

01 26 01 - 1

CONTRACT MODIFICATION PROCEDURES

SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with

Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

01 26 01 - 2

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

9. Personal vehicles i.e. Superintendent Pickup trucks

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums, such as:

1) Social Security

2) Medicare

3) Workers Compensation– Policy and company calculation to be made available.

4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.

01 26 01 - 3

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement.

Contractor may utilize the government provided Contractor Estimate

01 26 01 - 4

Form, or their own form, provided that it contains the same information and level of detail as the Gov’t provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter.

Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work.

Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. U.S. Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)

01 26 01 - 5

b. Construction Blue Book

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals.

Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.

Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:

Overhead ....................... 10% Profit ....................... 10%

2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

If contractors form a partnership, then the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to part 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.

3. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

4. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

01 26 01 - 6

PART 2 - PRODUCTS

PART 3 - EXECUTION

END OF SECTION 012601

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

01 27 00 - 1

DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1

3.2

LIST OF CONTRACT LINE ITEMS

The work of the basic requirements as outlined in the Construction Drawings and Specifications includes:

- Restoration of the crypt in the basement of the Old North Church including repair/replacement of deteriorated brick, mortar, and restoration/replacement of tomb doors and hardware.

- Accessibility improvements to the crypt – Remove existing interior concrete walkway, lower floor, and install new accessible path of travel.

- HVAC Improvements for humidity control.

- Electrical improvements including: relocate panelboard, install conduit for HVAC improvements, install new exterior GFCI outlet.

- Installation of sump pump.

- Install accessible handrails at existing interior columbarium.

Measurement for payment will be on a percent complete basis. Payment will be made at the contract lump sum price.

A. Option No. 01 – INSTALL EXTERIOR ACCESSIBLE RAMP, RAILINGS, AND DRAINAGE

IMPROVEMENTS

1. Measurement for payment will be on a percent complete basis.

2. Payment will be made at the contract lump sum price.

B. Option No. 02 – RELOCATE TICKET BOOTH - DISCONNECT ELECTRICAL SERVICE

AND INSTALL NEW SERVICE ONCE RELOCATED.

1. Measurement for payment will be on a percent complete basis.

2. Payment will be made at the contract lump sum price.

END OF SECTION 01 27 00

LIST OF OPTIONS

01 31 00 - 8

PROJECT MANAGEMENT AND COORDINATION

SECTION 01 31 00 – PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Definitions

2. Construction Coordination.

3. Submittals

4. Coordination Drawings.

5. Requests for Information (RFIs).

6. NPS SharePoint Project Website.

7. Project meetings.

8. Environmental Coordination.

9. Permits

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

1.2 DEFINITIONS

A. Agency with Jurisdiction: An Agency that has been granted legal authority over a location, action, or resource. This authority includes the ability to issue a permit or other legal permission document. These entities include, but are not limited to the National Park Service, the City of Boston, and The Old North Foundation.

B. Construction Permits – Contractor Provided: Permits obtained by the Contractor based on the means and methods to conduct work.

C. Contracting Officer/CO: The NPS entity with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.

D. Contractor/Prime Contractor: Contractor responsible for the furnishing of all other contractors for the project as delegated by the Contracting Officer and responsible for the integration of all work into a unified whole meeting all of the standards that pertain to the conservation and restoration of a significant work of art/cultural property.

E. Historic Masonry Contractor: Masonry restoration contractor, furnished by the Prime Contractor, responsible for all aspects of masonry conservation and repair at the Old North Church subject to qualifications as specified herein and approved by the Contracting Officer.

F. Historic Carpenter: Carpenter, furnished by the Prime Contractor, responsible for all aspects of repair and replacement of historic wood building elements at the Old North Church subject to the qualificiations specified herein and approved by the Contracting Officer.

G. Restoration: The reconstruction of the aesthetic appearance of a building element, using all applicable standards including the Secretary of the Interior Standards. See Section 013591 for an expanded definition.

01 31 00 - 9

1.3 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. No work shall be installed without first coordinating the location and installation of the work between and among the Contractor and all Subcontractors. Notify the Contracting Officer of congested and problem areas prior to installation of work or preparation of Shop Drawings and do not proceed with installation in problem areas until instructed by the Contracting Officer.

2. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

3. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

4. Make adequate provisions to accommodate items scheduled for later installation.

5. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

6. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Permit requirements.

7. Pre-installation conferences.

8. Project closeout activities.

9. Commissioning activities.

1.4 SUBMITTALS

A. Division 01 documents: The following items shall be submitted and approved prior to the Preconstruction Conference being scheduled:

1. Letter designating Project Superintendent.

2. A list of Subcontractors for this project (must be same as in proposal). Written statemetns from subcontractors certifying compliance with applicable labor standard clauses.

3. Satisfactory evidence of liability insurance coverage and workman’s compensation for the

01 31 00 - 10

Contractor and all subcontractors.

4. Construction Schedule.

5. A comprehensive breakdown of Schedule of Values.

6. Copies of OSHA 510 Certification for Jobsite Superintendent and OSHA 10 Hour

Certification for all other Jobsite Personnel.

7. Accident Prevention Plan including Hazard Communication Plan.

8. Work Sequence Plan – Plan shall identify the sequence of work to be completed including decommissioning, demolition, existing equipment removal, new equipment installation, and startup and functional testing.

9. Quality Control Plan.

10. Historic Preservation Treatment Plan.

11. Site/Landscape Protection Plan

12. Fire Prevention Program.

13. IAG Management Plan.

14. Waste Management Plan.

15. Under-An-Acre Pollution Prevention Plan (UPPP)

16. Comprehensive Site Layout Plan.

17. Fence Installation Plan.

18. Traffic Control Plan.

19. Pet Control Methods.

20. Submittal Register.

21. List of Required Construction Permits. Permits as required from the Boston Landmarks

Commission, the Boston Arts Commission, the City of Boston, and any other agency having jurisdiction over the Old North Church or site in general. Include the following information for each permit.

a. Name of Permit.

b. The Agencies with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

22. Contractor’s Commissioning Plan

B. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.

1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

b. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to the Contracting Officer (CO) for resolution of such conflicts.

c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.

d. Show location and size of access doors required for access to concealed dampers, valves, and other controls.

e. Indicate required installation sequences.

01 31 00 - 11

2. Sheet Size: At least 8-1/2 by 11 inches (215 by 280 mm) but no larger than 30 by 40 inches (750 by 1000 mm).

3. Number of Copies: Submit two opaque copies of each submittal. Contracting Officer will return one copy.

4. Refer to individual Sections for Coordination Drawing requirements for Work in those Section

C. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work. Show locations of visible ceiling-mounted devices relative to acoustical ceiling grid. Supplement plan drawings with section drawings where required to adequately represent the Work.

2. Plenum Space: Indicate subframing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within ceiling plenum to accommodate layout of light fixtures indicated on Drawings. Indicate areas of conflict between light fixtures and other components.

3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.

4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.

5. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items.

6. Mechanical and Plumbing Work: Show the following:

a. Sizes and bottom elevations of ductwork, piping, and conduit runs, including insulation, bracing, flanges, and support systems.

b. Dimensions of major components, such as dampers, valves, diffusers, access doors, cleanouts and electrical distribution equipment.

c. Fire-rated enclosures around ductwork.

7. Electrical Work: Show the following:

a. Runs of vertical and horizontal conduit 1-1/4 inches (32 mm) in diameter and larger.

b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire-alarm locations.

c. Panel board, switch board, switchgear, transformer, busway, generator, and motor control center locations.

d. Location of pull boxes and junction boxes, dimensioned from column center lines.

8. Fire-Protection System: Show the following:

a. Locations of standpipes, mains piping, branch lines, pipe drops, and sprinkler heads.

9. Review: Contracting Officer (CO) will review coordination drawings to confirm that the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If CO determines that coordination drawings are not being

01 31 00 - 12 prepared in sufficient scope or detail, or are otherwise deficient, CO will so inform Contractor, who shall make changes as directed and resubmit.

10. Coordination D r a w i n g Prints: Prepare coordination drawing prints according to requirements in Section 01 33 23 "Submittal Procedures."

D. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:

1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.

2. File Preparation Format: AutoCad.dwg,.operating in Microsoft Windows operating system.

3. File Submittal Format: Submit or post coordination drawing files using Portable Document Format (PDF) file format.

4. Contracting Officer (CO) will furnish Contractor one set of digital data files (AutoCad.dwg) of Drawings for use in preparing coordination digital data files.

a. CO makes no representations as to the accuracy or completeness of digital data files as they relate to Drawings.

b. Digital Data Software Program: Drawings are available in AutoCad.dwg.

E. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.

1. Letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan.

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

8. Waste Management Plan.

9. Quality Control Plan.

10. Temporary Storm Water Pollution Prevention Plan (SWPP or UPPP).

11. Indoor Air Quality (IAQ) Management Plan.

12. Contractors Commissioning Plan.

13. Historic Preservation Treatment Plan.

14. Site Laydown/Protection Plan

15. List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

F. All items listed must be provided to the Contracting Officer before the Pre-Construction Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.

01 31 00 - 13

1.5 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI form via email.

1. CO will not respond to RFIs submitted by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Field dimensions and conditions, as appropriate.

7. Contractor’s suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

8. Contractor's signature.

9. Requested date for response.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Form: Complete the RFI Form and email to NPS Contracting Officer and Contracting Officer’s Representative. RFI Form is attached.

D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond.

CO will determine the critical nature of each RFI and issue a response accordingly.

1. The following are not considered to be RFIs and will receive no action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract

Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Architect's and Contracting Officer’s (or any other agent having reviewing authority) actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.

3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

01 31 00 - 14

1.6 PROJECT COMMUNICATIONS

A. The Contractor is to use email for communication throughout the contract period. Email will be used for the following functions:

1. Project directory.

2. Project correspondence.

3. Meeting agendas and minutes.

4. Contract modifications forms and logs.

5. RFI form and processing.

6. Task and issue management.

7. Photo documentation.

8. Baseline schedule, schedule updates and calendar management.

9. Submittal form and processing.

10. Payment coordination documentation.

11. Drawing and specification document hosting, viewing, and updating.

12. Online document collaboration.

13. Reminder and tracking functions.

14. Archiving functions.

15. Notification of submittal and RFI statuses and current responsible party.

16. Permits and addendums

1.7 PROJECT MEETINGS

A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor and all associated partners of the Government (Government Representatives). The meeting agenda will include the following as a minimum:

1. Roles & Responsibilities/ Lines of Authority.

2. Old North Church rules and regulations.

3. Reference Materials.

4. Jobsite Safety/Accident Prevention Program.

5. Resolution of comments on required Division 01 documents.

6. Coordination of Subcontractors.

7. Labor law application.

8. Modifications.

9. Payments to Contractor.

10. Payroll reports.

11. Contract time.

12. Liquidated damages.

13. Contractor Performance Evaluation.

14. Display of Hotline posters.

15. Notice to proceed.

16. Correspondence procedures.

17. NPS HPTC SharePoint Project website.

18. Acceptance/rejection of work.

19. Progress meetings.

20. Submittal procedures.

21. NPS Final Accessibility Inspection.

22. Environmental requirements.

23. Permit requirements.

24. As-constructed drawings/operation and maintenance (O&M) manuals.

01 31 00 - 15

25. Saturday, Sunday, holiday and night work.

26. Reference materials.

27. Value engineering.

B. Progress Meetings: The Contracting Officer will schedule weekly meetings with the Contractor.

1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:

a. Approval of minutes of previous meetings.

b. Safety

c. Submittal status.

d. Review of off-site fabrication and delivery schedules.

e. Requests for information (RFI) and other issues.

f. Contract Modifications.

g. Work in progress and two-week projection.

h. Inspections of work in progress and projected (Special inspections, accessibility etc.).

i. Construction Schedule update.

j. Status of Project Record Drawings and O&M manuals.

k. Other business relating to work.

l. Permit requirements.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise CO of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents.

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Sustainable design requirements.

i. Review of mockups.

j. Possible conflicts.

k. Compatibility requirements.

01 31 00 - 16

l. Time schedules.

m. Weather limitations.

n. Manufacturer's written instructions.

o. Warranty requirements.

p. Compatibility of materials.

q. Acceptability of substrates.

r. Temporary facilities and controls.

s. Space and access limitations.

t. Regulations of agency(ies) with jurisdiction.

u. Testing and inspecting…