This cost proposal package includes details for the Old North Church Crypt Restoration project in Boston, Massachusetts. The project involves restoring the crypt located under the Old North Church, a National Historic Site operated by the National Park Service.
The cost proposal provides line item estimates for various elements of the construction work. It includes cost summaries for foundations, basement construction, interior construction, HVAC, electrical, and selective demolition. For each line item, the proposal lists the work descriptions, quantities, and cost estimates for materials, labor, equipment, and total costs. Foundations work is estimated at $0 since no work is required. Many other items like interior finishes and conveying systems are also estimated at $0. The total estimated cost of construction according to the proposal is $151,067.
The related federal contract opportunity is a solicitation from the National Park Service for the Old North Church Crypt Restoration project. The solicitation number is 140P2122R0004 and involves restoration of the crypt located under the Old North Church in Boston, Massachusetts, which is a National Historic Site.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Cost Summary
| Project: | Old North Church Crypt Restoration |
| Park: | Boston National Historical Park |
| Park Alpha: | BOST |
| PMIS Number: | 232488 |
| BASIC REQUIREMENT | Total Direct Costs | ||
| A10 | Foundations | $ - 0 | |
| A20 | Basement Construction | $ - 0 | |
| C10 | Interior Construction | $ - 0 | |
| C30 | Interior Finishes | $ - 0 | |
| D30 | HVAC | $ - 0 | |
| D50 | Electrical | $ - 0 | |
| F20 | Selective Building Demolition | $ - 0 | |
| Total Direct Construction Costs | $ - 0 | ||
| General Conditions | $ - 0 | ||
| Subtotal NET Construction Cost | $ - 0 | ||
| Bonds & Permitting & Insurance | 0.00% | $ - 0 | |
| Overhead | 0.00% | $ - 0 | |
| Profit | 0.00% | $ - 0 | |
| Subtotal Bonds, Permit, O&H | $ - 0 | ||
| Total Cost of Basic Requirement | $ - 0 |
&"Arial,Bold"&6
&16COST PROPOSAL
&8&F &A Page &P of &N &8Print Date: &D, &T
Bid Item 2 Summary
| Project: | ERROR:#REF! | Estimate By: | ERROR:#REF! |
| Park: | ERROR:#REF! | Date: | ERROR:#REF! |
| Park Alpha: | ERROR:#REF! | Reviewed By: | |
| PMIS Number: | ERROR:#REF! | Date: |
| Bid Item Number | Asset / Project Element / Description | Size/Count | Units |
| BID ITEM 2 | ERROR:#REF! | 1,145 | SF |
| Item No. | WBS | Description | Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Direct Cost/Unit | Total Direct Costs | NET Cost/Unit | Total NET Costs |
| 1 | A10 | Foundations | $ 1.47 | $ 1,684 | $ 12.35 | $ 14,143.25 | $ 0.87 | $ 1,000.00 | $ 15 | $ 16,827 | ERROR:#REF! | ERROR:#REF! |
| 2 | A20 | Basement Construction | $ 2.06 | $ 2,355 | $ 34.98 | $ 40,048.00 | $ 6.81 | $ 7,797.00 | $ 44 | $ 50,200 | ERROR:#REF! | ERROR:#REF! |
| 3 | B10 | Superstructure | ERROR:#REF! | ERROR:#REF! | ||||||||
| 4 | B20 | Exterior Enclosure | ERROR:#REF! | ERROR:#REF! | ||||||||
| 5 | B30 | Roofing | ERROR:#REF! | ERROR:#REF! | ||||||||
| 6 | C10 | Interior Construction | $ 4.45 | $ 5,100 | $ 33.14 | $ 37,950.00 | $ 3.23 | $ 3,700.00 | $ 41 | $ 46,750 | ERROR:#REF! | ERROR:#REF! |
| 7 | C20 | Stairs | ERROR:#REF! | ERROR:#REF! | ||||||||
| 8 | C30 | Interior Finishes | $ 0.55 | $ 625 | $ 1.58 | $ 1,812.50 | $ 0.05 | $ 62.50 | $ 2 | $ 2,500 | ERROR:#REF! | ERROR:#REF! |
| 9 | D10 | Conveying Systems | ERROR:#REF! | ERROR:#REF! | ||||||||
| 10 | D20 | Plumbing Systems | ERROR:#REF! | $ 2,750 | ERROR:#REF! | $ 7,350.00 | ERROR:#REF! | $ - 0 | ERROR:#REF! | $ 10,100 | ERROR:#REF! | ERROR:#REF! |
| 11 | D30 | HVAC | ERROR:#REF! | ERROR:#REF! | ||||||||
| 12 | D40 | Fire Protection | ERROR:#REF! | ERROR:#REF! | ||||||||
| 13 | D50 | Electrical | $ 0.44 | $ 500 | $ 0.87 | $ 1,000.00 | $ - 0 | $ - 0 | $ 1 | $ 1,500 | ERROR:#REF! | ERROR:#REF! |
| 14 | E10 | Equipment | ERROR:#REF! | ERROR:#REF! | ||||||||
| 15 | E20 | Furnishings | ERROR:#REF! | ERROR:#REF! | ||||||||
| 16 | F10 | Special Construction | ERROR:#REF! | ERROR:#REF! | ||||||||
| 17 | F20 | Selective Building Demolition | $ 1.00 | $ 1,150 | $ 14.34 | $ 16,415.00 | $ 4.91 | $ 5,625.00 | $ 20 | $ 23,190 | ERROR:#REF! | ERROR:#REF! |
| 18 | G10 | Site Preparation | ERROR:#REF! | ERROR:#REF! | ||||||||
| 19 | G20 | Site Improvements | ERROR:#REF! | ERROR:#REF! | ||||||||
| 20 | G30 | Site Mechanical Utilities | ERROR:#REF! | ERROR:#REF! | ||||||||
| 21 | G40 | Site Electrical Utilities | ERROR:#REF! | ERROR:#REF! | ||||||||
| 22 | G50 | Other Site Construction | ERROR:#REF! | ERROR:#REF! | ||||||||
| 23 | XX | Special Use - 1 | ERROR:#REF! | ERROR:#REF! | ||||||||
| 24 | XX | Special Use - 2 | ERROR:#REF! | ERROR:#REF! | ||||||||
| 25 | XX | Special Use - 3 | ERROR:#REF! | ERROR:#REF! | ||||||||
| Subtotal Direct Construction Costs | ERROR:#REF! | $ 14,164 | ERROR:#REF! | $ 118,718.75 | ERROR:#REF! | $ 18,184.50 | ERROR:#REF! | $151,067 | ERROR:#REF! | ERROR:#REF! | ||
| Total Value of Government Furnished Property (GFP) Inc. in Direct Cost . | $0 | $0 | $0 | $ - 0 | $0 | In most cases GFP is normally zero - see footnote- | ||||||
| Direct Cost Subtotal without GFP . | $14,164 | $118,719 | $18,185 | $151,067 | ||||||||
| Design Contingency | ERROR:#REF! | ERROR:#REF! | ||||||||||
| Total Direct Construction Costs | ERROR:#REF! | |||||||||||
| Standard General Conditions | ERROR:#REF! | Applied to Total Direct Construction Cost less GFP | ERROR:#REF! | |||||||||
| Government General Conditions | ERROR:#REF! | Applied to Total Direct Construction Cost less GFP | ERROR:#REF! | |||||||||
| Subtotal NET Construction Cost | ERROR:#REF! | |||||||||||
| Overhead | ERROR:#REF! | ERROR:#REF! | ||||||||||
| Profit | ERROR:#REF! | ERROR:#REF! | ||||||||||
| Estimated NET Construction Cost | ERROR:#REF! | |||||||||||
| Contracting Method Adjustment | ERROR:#REF! | ERROR:#REF! | ||||||||||
| Inflation Escalation | ERROR:#REF! | Months | Annual Rate = | ERROR:#REF! | Inc. Bonds & CMA | ERROR:#REF! | ||||||
| Total Estimated NET Cost of Construction | ERROR:#REF! |
&"Arial,Bold"United States Department of the Interior National Park Service Class A Construction Cost Estimate&4 &"Arial,Regular" &"Arial,Bold"&13BID ITEM COST SUMMARY
&6&F &A Page &P of &N &6Print Date: &D, &T
GFP costs only apply when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other adjustment factors or O&P markup have been applied.
A10 Foundations
| Project: | Old North Church Crypt Restoration |
| Park: | Boston National Historical Park |
| Park Alpha: | BOST |
| PMIS: | 232488 |
Summary Item: A10 Foundations
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| A1010 | STANDARD FOUNDATIONS | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | STANDARD FOUNDATIONS | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| A1020 | SPECIAL FOUNDATIONS | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | SPECIAL FOUNDATIONS | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| A1030 | SLAB ON GRADE | |||||||||||
| Basic | 03.30.00 | Furnish concrete material (incl. waste) | 4 | cy | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 03.22.00 | Furnish & install wire mesh reinforcement | 217 | sf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 03.30.00 | Place & finish 5" slab on grade | 217 | sf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 03.30.00 | Allowance for details at tie-in of new to existing | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 03.30.00 | Concrete steps at landing (2 steps) | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 07.26.00 | Vapor barrier below slab | 217 | sf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 03.30.00 | Concrete pump | 1 | day | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 03.30.00 | Supervision/foreman | 2 | day | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 31.23.00 | Allowance for sump pump pit | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
SUBTOTAL SLAB ON GRADE $0 $0 $0 $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ||
| Summary Item: | A10 | Foundations | |||||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||||
| Basic Requirement | $0 | ||||||||||||
| $0.00 | |||||||||||||
| $0.00 |
A10 Foundations $0
&"Arial,Bold"
COST PROPOSAL
&6&F, &A &9&P of &N &6&D &T
A20 Basement
| Project: | Old North Church Crypt Restoration |
| Park: | Boston National Historical Park |
| Park Alpha: | BOST |
| PMIS: | 232488 |
Summary Item: A20 Basement
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| A2010 | BASEMENT EXCAVATION | |||||||||||
| Basic | 31.23.00 | Hand digging, loosening of soils and feeding vac truck | 16 | cy | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 31.23.00 | Vacuum truck and operator for soil removal | 16 | cy | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 31.23.00 | Trucking of soils (multiple small loads due to slow productivity within basement) | 16 | cy | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 31.23.00 | Compact subgrade for slab on grade | 217 | sf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 31.23.00 | 6" gravel base below slab on grade | 4 | cy | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 31.23.00 | Supervision/foreman | 6 | day | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 02.61.00 | Allowance for soil disposal fees | 25 | ton | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 31.23.00 | Dewatering allowance | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 01.74.00 | Progress cleaning & site maintenance | 6 | day | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 01.35.00 | Archaelogical supervision | 28 | day | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
SUBTOTAL BASEMENT EXCAVATION $0 $0 $0 $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| A2020 | BASEMENT WALLS | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASEMENT WALLS | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ||
| Summary Item: | A20 | Basement | |||||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||||
| Basic Requirement | $0 | ||||||||||||
| $0 | |||||||||||||
| $0 |
A20 Basement $0
&6&F, &A &9&P of &N &6&D &T
Item 1-B10 Superstructure
| Project: | ERROR:#REF! | Estimate By: | ERROR:#REF! |
| Park: | ERROR:#REF! | Date: | ERROR:#REF! |
| Park Alpha: | ERROR:#REF! | Reviewed By: | |
| PMIS: | ERROR:#REF! | Date: |
Summary Item: ERROR:#REF! ERROR:#REF! Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| B1010 | FLOOR CONSTRUCTION | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | FLOOR CONSTRUCTION | 1000 | ERROR:#REF! | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| B1020 | ROOF CONSTRUCTION | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | ROOF CONSTRUCTION | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ||
| Summary Item: | ERROR:#REF! | ERROR:#REF! | |||||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost |
ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! $0 ERROR:#REF! $0 ERROR:#REF! $0 ERROR:#REF! $0
&11Class A Construction Cost Estimate&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
Bid Item 3 Summary
| Project: | ERROR:#REF! | Estimate By: | ERROR:#REF! |
| Park: | ERROR:#REF! | Date: | ERROR:#REF! |
| Park Alpha: | ERROR:#REF! | Reviewed By: | |
| PMIS Number: | ERROR:#REF! | Date: |
| Bid Item Number | Asset / Project Element / Description | Size/Count | Units |
| BID ITEM 3 | ERROR:#REF! | 1,145 | SF |
| Item No. | WBS | Description | Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Direct Cost/Unit | Total Direct Costs | NET Cost/Unit | Total NET Costs |
| 1 | A10 | Foundations | ERROR:#REF! | ERROR:#REF! | ||||||||
| 2 | A20 | Basement Construction | ERROR:#REF! | ERROR:#REF! | ||||||||
| 3 | B10 | Superstructure | ERROR:#REF! | ERROR:#REF! | ||||||||
| 4 | B20 | Exterior Enclosure | ERROR:#REF! | ERROR:#REF! | ||||||||
| 5 | B30 | Roofing | ERROR:#REF! | ERROR:#REF! | ||||||||
| 6 | C10 | Interior Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! |
| 7 | C20 | Stairs | ERROR:#REF! | ERROR:#REF! | ||||||||
| 8 | C30 | Interior Finishes | ERROR:#REF! | ERROR:#REF! | ||||||||
| 9 | D10 | Conveying Systems | ERROR:#REF! | ERROR:#REF! | ||||||||
| 10 | D20 | Plumbing Systems | ERROR:#REF! | ERROR:#REF! | ||||||||
| 11 | D30 | HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! |
| 12 | D40 | Fire Protection | ERROR:#REF! | ERROR:#REF! | ||||||||
| 13 | D50 | Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! |
| 14 | E10 | Equipment | ERROR:#REF! | ERROR:#REF! | ||||||||
| 15 | E20 | Furnishings | ERROR:#REF! | ERROR:#REF! | ||||||||
| 16 | F10 | Special Construction | ERROR:#REF! | ERROR:#REF! | ||||||||
| 17 | F20 | Selective Building Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! |
| 18 | G10 | Site Preparation | ERROR:#REF! | ERROR:#REF! | ||||||||
| 19 | G20 | Site Improvements | ERROR:#REF! | ERROR:#REF! | ||||||||
| 20 | G30 | Site Mechanical Utilities | ERROR:#REF! | ERROR:#REF! | ||||||||
| 21 | G40 | Site Electrical Utilities | ERROR:#REF! | ERROR:#REF! | ||||||||
| 22 | G50 | Other Site Construction | ERROR:#REF! | ERROR:#REF! | ||||||||
| 23 | XX | Special Use - 1 | ERROR:#REF! | ERROR:#REF! | ||||||||
| 24 | XX | Special Use - 2 | ERROR:#REF! | ERROR:#REF! | ||||||||
| 25 | XX | Special Use - 3 | ERROR:#REF! | ERROR:#REF! | ||||||||
| Subtotal Direct Construction Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0 | ERROR:#REF! | ERROR:#REF! | ||
| Total Value of Government Furnished Property (GFP) Inc. in Direct Cost . | $0 | $0 | $0 | $ - 0 | $0 | In most cases GFP is normally zero - see footnote- | ||||||
| Direct Cost Subtotal without GFP . | $0 | $0 | $0 | $0 | ||||||||
| Design Contingency | ERROR:#REF! | ERROR:#REF! | ||||||||||
| Total Direct Construction Costs | ERROR:#REF! | |||||||||||
| Standard General Conditions | ERROR:#REF! | Applied to Total Direct Construction Cost less GFP | ERROR:#REF! | |||||||||
| Government General Conditions | ERROR:#REF! | Applied to Total Direct Construction Cost less GFP | ERROR:#REF! | |||||||||
| Subtotal NET Construction Cost | ERROR:#REF! | |||||||||||
| Overhead | ERROR:#REF! | ERROR:#REF! | ||||||||||
| Profit | ERROR:#REF! | ERROR:#REF! | ||||||||||
| Estimated NET Construction Cost | ERROR:#REF! | |||||||||||
| Contracting Method Adjustment | ERROR:#REF! | ERROR:#REF! | ||||||||||
| Inflation Escalation | ERROR:#REF! | Months | Annual Rate = | ERROR:#REF! | Inc. Bonds & CMA | ERROR:#REF! | ||||||
| Total Estimated NET Cost of Construction | ERROR:#REF! |
Class A Construction Cost Estimate&4 &"Arial,Regular" &"Arial,Bold"&13BID ITEM COST SUMMARY
&6&F &A Page &P of &N &6Print Date: &D, &T
GFP costs only apply when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other adjustment factors or O&P markup have been applied.
Item 1-B30 Roofing
| Project: | ERROR:#REF! | Estimate By: | ERROR:#REF! |
| Park: | ERROR:#REF! | Date: | ERROR:#REF! |
| Park Alpha: | ERROR:#REF! | Reviewed By: | |
| PMIS: | ERROR:#REF! | Date: |
Summary Item: ERROR:#REF! ERROR:#REF! Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| B3010 | ROOF COVERINGS | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | ROOF COVERINGS | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| B3020 | ROOF OPENINGS | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | ROOF OPENINGS | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ||
| Summary Item: | ERROR:#REF! | ERROR:#REF! | |||||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost |
ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! $0 ERROR:#REF! $0 ERROR:#REF! $0 ERROR:#REF! $0
&11Class A Construction Cost Estimate&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
C10 Interior Construct.
| Project: | Old North Church Crypt Restoration |
| Park: | Boston National Historical Park |
| Park Alpha: | BOST |
| PMIS: | 232488 |
Summary Item: C10 Interior Construction
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| C1010 | INTERIOR PARTITIONS | |||||||||||
| Basic | 04.01.00 | B1 - Replace missing or deteriorated brick | 193 | ea | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.01.00 | B2 - Repoint area of open or deteriorated mortar joints | 183 | sf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.01.00 | B3 - Repoint open or deteriorated mortar joint | 28 | lf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.01.00 | B4 - Remove hard portland cement and replace with softer mortar mix | 17 | sf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.01.00 | Allowance to clean/restore newly exposed brick & stone walls (below current slab level) | 107 | sf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.01.00 | Repoint 25% of new exposed brick at lowered slab | 26.75 | sf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.01.00 | Replace 25% of new exposed brick at lowered slab | 26.75 | sf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.05.00 | Allowance for misc. masonry cutting & patching for new work | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.05.00 | Allowance for misc. masonry cutting & patching for new HVAC/elec work | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 06.20.00 | Allowance for misc. carpentry cutting & patching for new work | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 06.20.00 | Allowance for misc. carpentry cutting & patching for new HVAC/elec work | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 01.74.00 | Progress cleaning & site maintenance | 6 | day | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 01.74.00 | Dumpsters for misc. construction debris | 2 | ea | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| $ - 0 | $0 | |||||||||||
| SUBTOTAL | INTERIOR PARTITIONS | $0 | $0 | $0 | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||
| C1020 | INTERIOR DOORS |
| Basic | 06.01.20 | Submittals, mobilizations & coordination with historical consultant | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 06.01.20 | Remove stucco, metal mesh & lath from wood doors | 14 | ea | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 06.01.20 | Remove and label (14) wood doors, install temp enclosures | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 06.01.20 | Transportation of tomb doors for offsite restoration | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 05.50.00 | Allowance for hinge replacement (per schedule) | 11 | ea | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 05.50.00 | Allowance for hinge restoration | 14 | ea | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 05.50.00 | Allowance for additional hinge replacement - no cost change for replacement in lieu of restoration | 6 | ea | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 06.01.20 | Reinstall (15) wood doors | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 06.01.20 | Secure wood doors with 3 security screws - included with door reinstallation | 15 | ea | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 06.01.20 | Remove loose material with a brush and vacuum | 4 | ea | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 06.01.20 | Allowance to repair splits in wood (tomb door NE4) | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.01.00 | Allowance to repair crack through stone door (tomb door NE6, WE1) | 2 | ea | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.01.00 | Gently clean stone surface to remove dust and soiling | 8 | ea | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.01.00 | Repair 1 sf of deteriorated plaster (tomb door SE1) | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 06.01.20 | Remove & reinstall slate and wood plaque (tomb door SE6) | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.01.00 | Remove paint & cement splatter from stone door (tomb door WE2) | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 06.01.20 | Remove & reinstall slate plaque, including stainless steel brackets coated matte black (tomb door SI7) | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 09.90.00 | Seal doors | 15 | ea | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
SUBTOTAL INTERIOR DOORS $0 $0 $0 $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| C1030 | FITTINGS | |||||||||||
| Basic | 05.50.00 | Railing at one side of short interior ramp | 14 | lf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
SUBTOTAL FITTINGS $0 $0 $0 $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ||
| Summary Item: | C10 | Interior Construction | |||||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||||
| Basic Requirement | $0 | ||||||||||||
| Option 1 | $0 | ||||||||||||
| Option 2 | $0 |
C10 Interior Construction $0
&6&F, &A &9&P of &N &6&D &T
Item 1-C20 Stairs
| Project: | ERROR:#REF! | Estimate By: | ERROR:#REF! |
| Park: | ERROR:#REF! | Date: | ERROR:#REF! |
| Park Alpha: | ERROR:#REF! | Reviewed By: | |
| PMIS: | ERROR:#REF! | Date: |
Summary Item: ERROR:#REF! ERROR:#REF! Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| C2010 | STAIR CONSTRUCTION | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | STAIR CONSTRUCTION | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| C2020 | STAIR FINISHES | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | STAIR FINISHES | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||||
| BASE CODE | BASE ELEMENT | ||||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | BASE ELEMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ||
| Summary Item: | ERROR:#REF! | ERROR:#REF! | |||||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost |
ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! $0 ERROR:#REF! $0 ERROR:#REF! $0 ERROR:#REF! $0
&11Class A Construction Cost Estimate&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
C30 Interior Finishes
| Project: | Old North Church Crypt Restoration |
| Park: | Boston National Historical Park |
| Park Alpha: | BOST |
| PMIS: | 232488 |
Summary Item: C30 Interior Finishes
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| C3010 | WALL FINISHES | |||||||||||
| Basic | 04.01.00 | M1 - Scrape rusted ferrous element to bare metal and coat with rust inhibiting paint | 17 | sf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 04.01.00 | Gently clean all walls | 2485 | sf | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Basic | 01.56.00 | Temp dust protection/enclosures | 1 | ls | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
SUBTOTAL WALL FINISHES $0 $0 $0 $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| C3020 | FLOOR FINISHES | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | FLOOR FINISHES | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| C3030 | CEILING FINISHES | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | CEILING FINISHES | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 | ERROR:#REF! | $0 |
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||||
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| MF-2004 Code | Description | 0 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |