Attachment 1 - Section B- Schedule of Supplies and Services.xls
XLS spreadsheet 46 KB Posted
- Attached to
- USCGC WILLIAM TATE FY23 DD
- Solicitation number
- 70Z08523QIBCT0002
About this file
This document contains a pricing schedule for drydock repairs to the USCGC WILLIAM TATE (WLM 560), a 175-foot Buoy Tender Keeper Class cutter. The schedule lists over 60 line items for work including hull plating inspection and preservation, tank cleaning, machinery overhaul, deck covering renewal, and laydays. Pricing and quantities are not provided. The related federal contract opportunity solicitation seeks drydock repairs to the USCGC WILLIAM TATE in accordance with the attached specification from the Department of Homeland Security, United States Coast Guard. The Contractor must furnish all necessary facilities, labor, materials, services, equipment, and supplies to perform the work.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC WILLIAM TATE (WLM-175) DRYDOCK AVAILABILITY FY2023 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating, U/W Body, Inspect | JOB | 1 | $0.00 | |
| D-002 | Hull Plating, U/W Body, Ultrasonic Testing | JOB | 1 | $0.00 | |
| O-003 | U/W Body, Preserve, 100 percent | JOB | 1 | $0.00 | |
| O-004 | U/W Body, Preserve, Partial, Condition A | JOB | 1 | $0.00 | |
| O-005 | U/W Body, Preserve, Partial, Condition B | JOB | 1 | $0.00 | |
| O-006 | U/W Body, Preserve, Partial, Condition C | JOB | 1 | $0.00 | |
| O-007 | Hull Plating Freeboard, Preserve, Partial | JOB | 1 | $0.00 | |
| O-008 | Hull Plating Freeboard, Preserve, 100 Percent | JOB | 1 | $0.00 | |
| O-009 | Hull and Structural Plating, General, 10.2 lbs. Steel, Renew | JOB | 1 | $0.00 | |
| O-010 | Hull and Structural Plating, General, 12.75 lbs. Steel Plate, Renew | JOB | 1 | $0.00 | |
| O-011 | Hull and Structural Plating, General, 15.3 lbs. Steel Plate, Renew | JOB | 1 | $0.00 | |
| O-012 | Hull And Structural Plating, General, 20.4 lbs. Steel Plate, Renew | JOB | 1 | $0.00 | |
| O-013 | Hull and Structural Plating, General, 7.5 lbs., 3/16 in. Steel Plate, Renew | JOB | 1 | $0.00 | |
| O-014 | Hull and Structural Plating, General, 7.65 lbs. Steel Plate, Renew | JOB | 1 | $0.00 | |
| D-015 | Appendages, U/W, Leak Test | JOB | 1 | $0.00 | |
| D-016 | Appendages, U/W, Internal, Preserve | JOB | 1 | $0.00 | |
| D-017 | Chain Lockers, Clean and Inspect | JOB | 1 | $0.00 | |
| D-018 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | JOB | 1 | $0.00 | |
| D-019 | Tanks, MP Fuel Service, Clean and Inspect | JOB | 1 | $0.00 | |
| D-020 | Tanks, Ballast, Clean and Inspect | JOB | 1 | $0.00 | |
| D-021 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | 1 | $0.00 | |
| D-022 | Z-Drive Propulsion Units, Overhaul | JOB | 1 | $0.00 | |
| D-023 | Fathometer Transducer, Renew | JOB | 1 | $0.00 | |
| D-024 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | $0.00 | |
| D-025 | Sea Bay, Clean and Inspect | JOB | 1 | $0.00 | |
| O-026 | Sea Bay, Preserve 100% | JOB | 1 | $0.00 | |
| D-027 | Thruster Unit (General), Overhaul | JOB | 1 | $0.00 | |
| D-028 | Anchor Windlass, Inspect And Service | JOB | 1 | $0.00 | |
| D-029 | Anchor Chains and Ground Tackle, Inspect and Repair | JOB | 1 | $0.00 | |
| O-030 | Chain Locker, Preserve, 100 Percent | JOB | 1 | $0.00 | |
| D-031 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | $0.00 | |
| D-032 | Cathodic Protection, Zinc Anodes, Renew, | JOB | 1 | $0.00 | |
| D-033 | Drydock | JOB | 1 | $0.00 | |
| D-034 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | |
| D-035 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-036 | Machinery Plant Control and Monitoring System, Groom | JOB | 1 | $0.00 | |
| D-037 | Doppler Speed Log, Upgrade | JOB | 1 | $0.00 | |
| D-038 | Main Mast Interior Deck, Preserve | JOB | 1 | $0.00 | |
| D-039 | Bilges, Partial Preserve | JOB | 1 | $0.00 | |
| D-040 | Tanks, Potable Water, Clean and Inspect | JOB | 1 | $0.00 | |
| D-041 | Z-Drive Coolers, Clean and Inspect | JOB | 1 | $0.00 | |
| D-042 | Sea Strainers, Duplex, All Sizes, Overhaul | JOB | 1 | $0.00 | |
| O-043 | Sea Bay, Preserve - Partial | JOB | 1 | $0.00 | |
| D-044 | Potable Water Pneumatic Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| D-045 | Hot Water Accumulator Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| D-046 | Hull Plating Freeboard (Buoy Port Areas), Preserve | JOB | 1 | $0.00 | |
| D-047 | Molded Case Circuit Breakers, Inspect & Test | JOB | 1 | $0.00 | |
| D-048 | Both Button Roller Chocks, Renew | JOB | 1 | $0.00 | |
| O-049 | Tanks, Potable Water, Preserve, Partial, | JOB | 1 | $0.00 | |
| D-050 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | $0.00 | |
| D-051 | Deck Covering, Carpeting, Renew | JOB | 1 | $0.00 | |
| D-052 | Buoy Chain Port Renew | JOB | 1 | $0.00 | |
| D-053 | Grey Water Holding Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| D-054 | Sewage Holding Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| O-055 | Tanks, Grey Water Holding, Preserve, Partial | JOB | 1 | $0.00 | |
| O-056 | Tanks (Sewage Holding), Preserve, 100 percent | JOB | 1 | $0.00 | |
| O-057 | Tanks (Sewage Holding), Preserve, Partial | JOB | 1 | $0.00 | |
| O-058 | Tanks, Grey Water Holding, Preserve, 100 Percent | JOB | 1 | $0.00 | |
| O-059 | Tanks, Potable Water Preserve, 100 Percent | JOB | 1 | $0.00 | |
| D-060 | Decks - Exterior, Preserve, Non-Skid Broadcast Grit System | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 1320 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(11/15/2022) Rev-1 - Page &P of &N
File details come from the government source that posted it. Updated .