Attachment 1 - PWS (Redacted).pdf
PDF 475 KB Posted
- Attached to
- Uninterrupped Power Supply (UPS) Battery Replacement Service Federal contract opportunity
- Solicitation number
- FA812525Q0060
About this file
This is a Performance Work Statement (PWS) for Preventive Maintenance (PM) and Battery Replacement services for 76 CMXG Uninterrupted Power Supply (UPS) Systems at the Oklahoma City–Air Logistics Complex (OC-ALC). The contractor will be responsible for performing two preventive maintenance inspections per year and battery replacements according to a specified schedule in Appendix A. Key requirements include inspecting and testing inoperative batteries, removing dead or expired batteries, installing new batteries, and providing a forklift for loading and unloading.
The PWS outlines detailed performance expectations, including submitting PM schedules, providing written service reports within specific timeframes, and responding to equipment malfunctions within one business day (or five business days if overseas). The contractor must have personnel with a minimum of two years of experience on Eaton UPS Systems and comply with various environmental, safety, and security regulations at Tinker Air Force Base. Performance will be assessed against specific thresholds, with 100% compliance expected for tasks such as battery replacement, equipment evaluations, and service reporting.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2 - FA812525Q00600002.pdf | ||
| Attachment 5 - QAs (v28May25).pdf | ||
| Attachment 4 - WD 2015-5315 Rev26.pdf | ||
| Attachment 5 - QAs (v20May25).pdf | ||
| Solicitation Amendment FA812525Q00600001.pdf | ||
| Attachment 3 - Appendix C.pdf | ||
| Attachment 4 - WD 2015-5315 Rev25.pdf | ||
| Solicitation - FA812525Q0060.pdf | ||
| Attachment 2 - Appendix A.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR THE
PREVENTIVE MAINTENANCE (PM) AND BATTERY REPLACEMENT
ON THE
76 CMXG UNINTERRUPTED POWER SUPPLY (UPS) SYSTEM
PREPAIRED BY
OC-ALC/OBCA
April 9, 2025
Section One
Description of Services
1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform Preventive Maintenance (PM) and Battery replacement on Uninterrupted Power Supply (UPS) Systems to include software and components at the the Oklahoma City–Air Logistics Complex (OC-ALC).
The equipment is listed in Appendix A.
1.1.1 The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.
1.2 Requested Services: 76 CMXG request an annual contract for Preventive Maintenance (PM) for the Uninterrupted Power Supply (UPS) Systems every six (6) months and Battery replacement per battery replacement schedule in accordance with Appendix A. This replacement shall be coordinated with the Government Point Of Contact (GPOC) prior to arriving on base.
1.3 Preventive Maintenance (PM): The objective of PM is to protect the equipment capability and investment by removing causes of failure, performing routine maintenance and providing adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all PM’s IAW the OEM specifications. The Contractor shall perform two (2) PM’s per year on each item listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the Government Point of Contact (GPOC) within ten (10) business days after contract award. The Contractor shall notify the GPOC seven (7) business days prior to each scheduled PM visit.
1.3.1 The contractor shall inspect and test any inoperateive batteries as needed during the PM function. The Contractor shall remove any dead or expired batteries and install new batteries. The Contractor shall be responsible for providing a forklift to load and unload batteries.
1.4 Malfunciton and Notification Process: Upon occurrence of an equipment or system malfunction, the COR will contract the Contractor by telephone, email, or fax and provide information below. If the COR notifies the Contracotr via telephone, the COR will provide a written copy of the request by email or fax.
• The equipment identification number (ID3)
• A brief description of the malfunction
• Location of equipment
• Name and telephone of Point of Contract (POC)
1.4.1 Upon notification of the system malfunction, the technician shall arrive on site at the equipment location within one (1) business day or if overseas five (5) business days.
1.5 Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the COR by fax or email no later than (NLT) one (1) business day after the completion of theinspection. As a minimum, the information cited ont eh Estimate Repair Report shall include:
• The equipment ID3
• Date of evaluation
• Description of findings and rcommendations
• Required parts and part numbers (P/N)
• Cost of parts
• Number of parts needed
• Estimated labor hours required to complete the repair
1.5.1 Any recommendations cited shall consider:
• The priority of the requested service
• Available source for obtaining new parts
• The availability of the new parts
• Shipping and delivery schedules of parts
• Other factors which may be peculiar to the specific repair requirement
1.6 Authorizations of Repair Actions: Only the Contracting Officer (CO) can authorize repair actions. The COR will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts.
The Contractor shall demonstrate to the Government SME that the repairs have been completed.
1.6.1 Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the COR, in writing, of the estimated arrival date of th parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The COR will verify the receipt of the parts with the Contractor to ensure the repair is performed in a timely manner.
1.7 Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO. Long lead items greater than five
(5) business days must be identified and provide sufficient documentation supporting the delay.
1.8 Service Report: Immediately upon completion of the maintenance support services and before leaving the OC-ALC, the Contractor shall provide a written Service Report to the Government SME. When necessary the Government SME will forward the service report to the GPOC within two (2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the GPOC. As a minimum, the final service report shall contain the following information:
• name of the company
• requested service date
• contract number
• equipment ID#
• description of services provided
• additional services recommended (if any)
• printed name and signature of technician who performed the services (electronic signatures are acceptable)
• printed name and signature of on-site Government SME or GPOC (electronic signatures are acceptable)
• start and completion dates
• complete breakdown of the labor cost (hours and rate)
• materials and parts used
• details of any other charges
• printed name and signature stating only new parts and materials were used (electronic signatures are acceptable)
• written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order. (electronic signatures are acceptable)
1.9 Quality Assurance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The GPOC will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the CO or GPOC.
1.10 Corrective Action Report (CAR)/Complaint Contractor Response Time: The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or Customer Complaint.
1.11 Maintenance Documentation: The Contractor shall notify the Government Subject Matter Expert (SME) upon completion of each PM/O&A or similar requirement, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.
1.12 Red Tagged Items: Red Tagged items create unsafe conditions for the workplace and are noted by the annotation of a Red X in the Facilities and Equipment Management Web-Based (FEMWEB) system. A Red X indicates the equipment is considered unsafe or unserviceable and will not be used until the unsatisfactory condition is corrected and the Red X is cleared. The Contractor shall not authorize, use or direct equipment to be used until the Red “X” has been properly cleared IAW OC-ALC OI 21-203, Chapter 2.
1.13 Red X Clearance: The Contractor shall ensure the Red X’s are cleared IAW OC-ALC OI 21-203, Chapter 2. The Contractor shall immediately notify the shop supervisor or work leader in any instance where the Contractor clears a Red X in his or her assigned work area.
1.14 Red X Clearance on Equipment: Red X on Equipment will be cleared in FEMWEB by the shop supervisor, work leader, or supervisor’s designee.
1.15 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined IAW Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.237-7023 and 252.237-7024, which is incorporated in full text in the contract. This plan shall be submitted with the Contractor’s proposal.
1.16 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 7:00am -4:00pm. If work hours are required outside the hours stated, the Contractor shall contact the GPOC for approval from the CO.
Upon approval from the CO, the Government Subject Matter Expert (SME) or GPOC must be present with the Contractor.
1.16.1 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.
1.17 Special Qualifications: The Contractor shall provide personnel with the following special qualifications:
• Contractor must provide certification/documentation of minimum two (2) years experience on Eaton UPS Systems.
1.18 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and GPOC, in writing, within ten (10) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently.
1.18.1 The Contractor and Contractor personnel shall be required to identify themselves as contractor personnel by introducing themselves or being introduced as Contractor personnel. The Contractor personnel shall also display distinguishing badges or other visible identification for meetings with Government personnel or while performing work for the OC-ALC on Tinker AFB.
The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.19 Listing of Contractor Employees: The Contractor shall provide an initial listing of names and position titles of employees who will come to Tinker Air Force Base to the GPOC within five
(5) business days after the contract award date. Within ten (10) business days, the Contractor shall also provide an updated listing of personnel to the GPOC when employees affecting the work of this contract change status or position.
1.19.1 The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruction (AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty GPOCs who are providing surveillance on any contracts/sub-contracts awarded to the Contractor. All contract personnel, depending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct themselves in a professional and courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.
1.20 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.
1.20.1 Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Manual (AFMAN) 32-7002, “Environmental Compliance and Pollution Prevention”, Tinker AFB procedures per 'Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Sup to AFMAN32- 7002, “Hazardous Material Management” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.
1.21 Hazardous Material (HAZMAT): If no HAZMAT will be brought on Base or used in performance on this contract, the Contractor shall certify that “No HAZMAT will be brought on Base” or “No HAZMAT Usage” by official correspondence. This Certification shall be provided to the COR within ten (10) business days after award. After the COR has received the Certification, the requirements of this section no longer apply. Appropriate penalties for the Contractor shall be assessed if found in violation of the above Certification.
1.21.1 The Contractor shall comply with applicable federal and military procurement policies IAW OC-ALC Supplement to AFMAN32-7002, “Hazardous Material Management”. The Contractor shall obtain access to the standardized Air Force HAZMAT tracking system and manage HAZMAT within the system or have a government designated HAZMART comply. The Contractor shall establish and reconcile the inventory, print the standardized Air Force HAZMAT tracking system bar code labels, and apply the labels to containers of HAZMAT so that the Occupational Safety and Health Administration (OSHA) compliant labels are not covered. Any failure to comply with proper HAZMAT management procedures shall be reported to the CO and GPOC who will notify 76 MXSG/MXDEU, OC-ALC Environmental and Occupational Health Compliance.
1.22 Safety Data Sheet (SDS) and Labeling: Upon GPOC receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.
1.22.1 The Contractor shall not transport, ship or use any chemicals, materials or substances in the performance of this PWS on Tinker AFB until written approval has been provided by 72
ABW/CEIE, Natural Infrastructure Management (Environmental Compliance).The Contractor shall submit all Safety Data Sheets, (SDSs) to the COR ten (10) calendar days after the contract award date. The Contractor shall receive approval from the COR prior to shipping any chemicals, materials or substances to Tinker AFB. A copy of the manufacturer’s SDS shall accompany the shipment. The Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA), Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure that before shipping to Tinker AFB, IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012), the containers of hazardous chemicals are labeled with the following information: product identifier, signal word, hazard statement(s), precautionary statement(s) pictogram(s), name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The COR will forward all SDS submittals to 72 ABW/CEIE for approval.
A current manufacturer SDS shall be submitted to the COR, if the Contractor changes manufacturer or vendor for any chemicals that were previously approved. The Contractor shall maintain copies of the manufacturers SDSs for all chemicals and the SDSs shall be readily accessible at all times from the Contractor’s personnel, as well as the Government’s employees.
1.23 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the Contractor shall certify “NO Hazardous Waste Generation” by official correspondence. This Certification shall be provided to the COR within ten (10) business days after award. After the COR receives the “No Hazardous Waste Generation” Certification, the requirements of this section no longer apply. Appropriate penalties for the Contractor shall be assessed if found in violation of the above Certification.
1.23.1 The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers IAW TAFB
HWMP.
1.23.2 The Contractor shall be responsible for the Initial Accumulation Point (IAP) within the Contractor assigned space. The IAP shall be under the direct control of the Contractor who generates the waste. Before accumulation begins, the Contractor shall ensure appropriate hazard labels are affixed to government furnished waste containers as specified in 49 Code of Federal Regulation (CFR) 172.400. Management procedures for IAPs include written weekly inspections and reporting. When the container has been filled, the Contractor shall seal the container, mark the Certified Filled Date on the container label using an indelible pen, place the container at a designated pick up location, and call the Hazardous Waste Management Facility (HWMF) at 734- 3285 for pick-up service. The Contractor shall ensure the HWMF picks up the container within three (3) calendar days after the Certified Filled Date. If container is not picked up within three (3) calendar days, Contractor shall notify the GPOC who will notify 76 MXSG/MXDEU, OC-ALC Environmental Engineering Section.
1.23.3 The Contractor shall perform written weekly inspections using Tinker AFB IMT Form 487, Initial Accumulation Point Management Aid. Weekly denotes once per working week. The Contractor shall submit Tinker AFB IMT Form 487 on a monthly basis to the GPOC no later than the third (3rd) day of the month following the reporting period. If the third (3rd) day of the month is a weekend or holiday, the logs are required by the last business day 'PRIOR' to the third (3rd).
The GPOC will forward the form(s) to the UEC no later than the fourth (4th) day of the following month or the first (1st) subsequent business day. Contractor shall maintain a signed copy of the form(s) on site for one (1) year.
1.24 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the GPOC within ten (10) business days after award. The GPOC will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.
1.25 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the GPOC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:
1.25.1 One (1) copy to the CO, two (2) copies to the GPOC, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:
1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.)
and whether 911 was called and which agencies responded.
1.26 Environmental Training: Upon GPOC receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.
1.26.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements and an annual refresher classes, updates the person on changes to those rules. This training can be obtained through creditable training institutions or companies. All training will be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance).
RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm, http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000, and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the GPOC for approval within ten (10) calendar days after contract award date. Once written approval is received from the GPOC, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the GPOC within thirty (30) calendar days after contract award date. Annual refresher training certificates for the supervisor and employees managing the initial accumulations points (IAPs) shall be provided to the GPOC, within ten (10) calendar days after each option year renewal. The GPOC will forward a copy of the certificates to the UEC.
1.27 OC-ALC Security and OPSEC briefing: All Contractor personnel working on base in the OC-ALC shall be required to read the OC-ALC Security and OPSEC briefings. The COR will ensure the Security and OPSEC briefings are available for review by the Contractor. The Contractor shall provide the COR with a report within five (5) business days after receiving the briefings. The report shall contain the employee’s name and the date of review. These requirements are IAW AFI 16-1404, “Information Security”, Chapter 6, Paragraph 6.2-6.2.3, 6.4-6.4.4.; DoDI
5220.22 “Industrial Security”, Section 9, Paragraph 9.2(6).; AFI 10-701, “Operations Security”, Chapter 4, Paragraph 4.4. and OC-ALC 16-1404, “OC-ALC Security”, Paragraph 7.
1.28 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this PWS.
1.29 Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 prior to performing work in the OC-ALC industrial areas. The MXRIWRS Form 032 is available from the GPOC. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the GPOC within five (5) business days after PM/O&A actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the GPOC of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The GPOC will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the GPOC. The CM shall ensure each employee on the job site receives a briefing from the GPOC about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.
1.30 Privately Owned Motor Vehicles (POV): Contractor Contractor’s personnel shall comply with the directives pertaining to the operation of POVs on Tinker AFB, per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24- 302, in its entirety for the operation of POVs within Tinker AFB.
1.31 Visitors Pass: The Contractor shall contact the GPOC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The GPOC will assign a
1.37 Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.
1.38 Speak Up for Safety Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.
A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act.
Government personnel are empowered to intercede in events that pose imminent danger to personnel or catastrophic damage to property.
1.39 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.
1.40 Training – General (including but not limited to): The Government GPOC will provide training via slides, video, or classroom prior to the Contractor performing work at the OC-ALC.
The Government will be responsible for all approved costs associated with the training identified below. The GPOC will document training on and maintain copies of the completed AF IMT 1151, Training Attendance and Rating, as part of the contract surveillance file. The Government will add or remove training as required per Air Force Regulation.
1.40.1 The Contractor shall contact the GPOC prior to work being performed in order to accomplish the required training or to verify the required training as listed below has been completed:
Contractor Required Courses Course Number Initial Fire Safety and Prevention Training CTESAF0000100SU Refresher Fire Safety and Prevention Training, Computer Based Training (CBT)
CTEMAS0002900CB
OC-ALC Environmental Accountability/Solid Waste Training, CBT MTEMAS9713800BR OC-ALC Human Factors Training, CBT MTEPDV9775100BR Environmental Management Systems (EMS) - General Awareness Training MTEENV9733070BR
ISO 50001 – Energy Management Training Records Management - User Training MLMW0188 Controlled Unclassified Information (CUI) Training 2022BG ZZZ2021CUI OC-ALC/OB Initial Workplace Specific FOD/DOP Briefing MTEMAS0002011BR Lockout/Tagout Initial and Refresher Course for Affected Personnel, CBT
CTEMAS0003001CB
Lockout/Tagout Course for Others, CBT CTEMAS0003002CB Lockout/Tagout Initial Course TE00141 Lockout/Tagout Refresher Course for Authorized Personnel, CBT CTEMAS0003000CB
Section Two
Performance Assessment
The Contractor shall be aware that in the absence of any contract requirement from the Service Summary (SS) does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall ensure the following SS requirements are accomplished:
Service Summary (SS) Table 2-1
SS PERFORMANCE OBJECTIVE PWS
PARA.
PERFORMANCE
THRESHOLD
SS 1
The contractor shall inspect and test any inoperative batteries as needed during the PM function. The Contractor shall remove any dead or expired batteries and install new batteries. The Contractor shall be responsible for providing a forklift to load and unload batteries.
1.3.1 100% Compliance
SS PERFORMANCE OBJECTIVE PWS
PARA.
PERFORMANCE
THRESHOLD
SS 2
Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the COR by fax or email no later than (NLT) one (1) business day after the completion of theinspection. As a minimum, the information cited ont eh Estimate Repair Report shall include:
• The equipment ID3
• Date of evaluation
• Description of findings and rcommendations
• Required parts and part numbers (P/N)
• Cost of parts
• Number of parts needed
• Estimated labor hours required to complete the repair
1.5 100% Compliance
SS 3
Service Report:
Immediately upon completion of the maintenance support services and before leaving the OC-ALC, the Contractor shall provide a written Service Report to the Government SME. When necessary the Government SME will forward the service report to the GPOC within two (2) business days of receipt.
The Contractor shall provide, by fax or email, the final service report within five (5) business days to the GPOC. As a minimum, the final service report shall contain the following information:
• name of the company
• requested service date
• contract number
• equipment ID#
• description of services provided
• additional services recommended (if any)
• printed name and signature of technician who performed the services (electronic signatures are acceptable)
• printed name and signature of on-site Government SME or GPOC (electronic signatures are acceptable)
• start and completion dates
• complete breakdown of the labor cost (hours and rate)
• materials and parts used
• details of any other charges
• printed name and signature stating only new parts and materials were used (electronic signatures are acceptable)
• written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order. (electronic signatures are acceptable)
1.8 100% Compliance
SS PERFORMANCE OBJECTIVE PWS
PARA.
PERFORMANCE
THRESHOLD
SS 4
The Contractor shall not transport, ship or use any chemicals, materials or substances in the performance of this PWS on Tinker AFB until written approval has been provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance).The Contractor shall submit all Safety Data Sheets, (SDSs) to the COR ten (10) calendar days after the contract award date.
The Contractor shall receive approval from the COR prior to shipping any chemicals, materials or substances to Tinker AFB. A copy of the manufacturer’s SDS shall accompany the shipment.
The Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA), Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure that before shipping to Tinker AFB, IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012), the containers of hazardous chemicals are labeled with the following information: product identifier, signal word, hazard statement(s), precautionary statement(s) pictogram(s), name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The COR will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the COR, if the Contractor changes manufacturer or vendor for any chemicals that were previously approved. The Contractor shall maintain copies of the manufacturers SDSs for all chemicals and the SDSs shall be readily accessible at all times from the Contractor’s personnel, as well as the Government’s employees.
1.22.1 100% Compliance
SECTION THREE
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
3.1. Government Furnished Property (GFP).
3.1.1. Government Property Repair/Maintenance (or Similar Requirement) On-Base.
Note: Same as Government Property Incidental to Government Installation or Site.
Not Applicable
3.1.2 GFP – Repair / Maintenance Off-Base
Not Applicable
3.2. Government Furnished Services (GFS) are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB (TAFB), OK:
3.2.1. Security Forces. The Government will provide general on-base security forces’ service.
The security forces’ telephone numbers are 911 for emergencies, 405-734-2000 for crimes in progress and 405-734-3737 for non-emergency calls. The off-base 911 center receives 911 cell phone calls. Cell phone callers need to advise the 911 off-base center they are on TAFB in order to be connected with the on-base 911 center.
3.2.2. Fire Emergency and Routine Services. The Government will provide general on-base fire protection services. The Contractor shall comply with fire prevention rules and regulations enforced by the TAFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters call 405-734-3981 or 405-734-3982 and 405-734-7964 for after hours and weekends. For routine calls to dispatch call 405-734-7964.
3.2.3 Utilities. The Government will provide utility services. These utilities include natural gas, electricity, water, and sewer for the sole purpose of accomplishing this contract. If the contractor requires additional utility services, it shall be the contractor’s responsibility to provide. Contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs.
3.2.4 Postal Distribution. The Government will provide on-base mail distribution, United States Postal Service (USPS) distribution only for official Government mail required under terms of this contract.
3.2.5 Telephone. The Government will provide telephone service consisting of the following Classes of Service. The Contractor shall ensure that the Government provided telephone usage is limited to only official Government business related to the performance of this contract. The Contractor shall furnish their own telephone service provided by local commercial carrier for their use in matters other than official Government business.
NOTE: Only list applicable telephone service(s).
CLASS "A"/ CLASS OF SERVICE "1"
- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls
- Dial "98" for long distance calls
- Dial "94" Defense Switched Network (DSN) calls
- On-base calls
CLASS “D” / CLASS OF SERVICE "2"
- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls
- Dial "94" Defense Switched Network (DSN) calls
- On-base calls
CLASS “G” / CLASS OF SERVICE "3"
- For on-base calls only
CLASS "H" / CLASS OF SERVICE "4"
- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls
- Dial "98" for long distance calls
- On-base calls
*CLASS "F"/ CLASS OF SERVICE "5"
- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls
- On-base calls
3.2.6 Custodial Services. The Government will provide custodial services limited to the extent provided in the Base Custodial Contract(s) for the Government provided facilities.
3.2.7 Refuse Collection. The Government will provide refuse collection services limited to the extent provided in the Base Refuse Collection Contract(s) for the Government provided facilities.
The Government will only allow non-hazardous refuse to be emptied into the nearest authorized refuse dumpster for trash collection. Do not use Government dumpsters to dispose of construction debris.
3.2.8 Insect and Rodent Control. The Base Civil Engineering Entomology will provide service for Government provided facilities.
3.2.9 Grounds Maintenance. The Government will provide grounds maintenance services limited to the extent provided in the Base Grounds Maintenance Contract(s) for the Government provided facilities.
3.2.10 Real Property Maintenance/Repair. The Government will provide maintenance and repair of Real Property in accordance with and compliance with Government procedures. The Contractor shall submit written requests to the Government Contracting Officer Representative (COR) or Government Point of Contract (GPOC) for Real Property maintenance and repairs.
3.2.11 Workspace. The Government will provide access to the equipment and adequate workspace around the equipment.
3.2.12 Local Area Network (LAN).
The Government will provide LAN access and support. Contractor shall comply with all security requirements pertaining to LAN usage and shall ensure that these services are utilized only for official contract matters pertaining to this contract.
3.2.13. Computer Connectivity.
The Government will provide connectivity to the base systems for Government official business based on the number of connections the Government determines are required to perform services for this contract. The Contractor shall ensure that terminated employees network access is removed within 24 clock hours of termination.
3.3. Government Property Incidental to the Government Installation or Site.
Note: Formerly termed Shared Property of the Government.
Not Applicable
3.4 Intangible Government Property. Not Applicable
3.5. Contractor Acquired Property (CAP), Time & Material (T&M), Labor Hour (LH), Cost, or Travel Contract Line Item Numbers (CLINS).
Not Applicable.