Attachment 1 - JLSQ192007_ADAL B107 G-ASNT_Final Drawings.pdf
PDF 11 MB Posted
- Solicitation number
- W50S91-22-B-0002
- Issued by
-
Department of the Army National Guard
About this file
This document provides details on a federal contract opportunity issued by the Department of the Army National Guard. The 171st Air Refueling Wing intends to award a single firm fixed-price contract valued between $1,000,000 and $5,000,000 for construction services at building B107. The work includes relocating a back-up generator, constructing an addition for storage and fixed equipment, replacing exterior doors, installing fire suppression and detection systems, and repairing and upgrading existing building systems including drywall, utilities, lighting, HVAC and painting. The North American Industry Classification System code for this work is 236220. The small business size standard is $39.5 million average annual revenue. Interested contractors are to attend a pre-bid conference on August 15th and site visit, with bids due by September 2nd. The contract completion period is 365 calendar days after notice to proceed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SITE
C o n t r a c t D r a w i n g s F o r I N D E X O F D R A W I N G S
INDEX OF DRAWINGS
SHEET # DESCRIPTION
B-3 ISSUED FOR BID
ADAL B107 G-ASNT
PITTSBURGH
INTERNATIONAL
AIRPORT
Project No. JLSQ192007 Contract No. W912KC20F0026
Date: 11/19/2021
00- GENERAL (G)
G-000 COVER SHEET
G-001 CODE ANALYSIS
G-002 CODE COMPLIANCE SITE PLAN
G-003 LIFE SAFETY PLAN
01- DEMOLITION
D-100 OVERALL DEMOLITION PLAN
D-101 DEMOLITION PLAN
02- CIVIL (C)
C-001 EXISTING CONDITIONS PLAN
C-100 SITE PLAN
C-101 DETAILS
08 - STRUCTURAL (S)
S-100 STRUCTURAL NOTES
S-101 FOUNDATION / ROOF FRAMING PLAN
S-501 CONCRETE AND FOUNDATION DETAILS
S-502 CONCRETE AND FOUNDATION DETAILS II
S-503 MASONRY DETAILS
S-504 STEEL AND METAL DECK DETAILS
S-505 STAIR DETAILS
S-506 WALL SECTIONS
09 - ARCHITECTURAL (A)
A-001 LEGEND AND SYMBOLS
A-002 TYPICAL ABA DETAILS
A-100 OVERALL PLAN
A-101 FIRST FLOOR PLAN
A-102 ROOF PLAN
A-103 FURNITURE PLAN
A-201 EXTERIOR ELEVATIONS
A-301 BUILDING SECTIONS
A-302 WALL SECTIONS
A-400 INTERIOR ELEVATIONS
A-501 PARTITION TYPES AND DETAILS
A-502 ROOF DETAILS
A-505 ROOF DETAILS
A-506 DOOR DETAILS
A-601 SCHEDULES
13 - MECHANICAL HVAC (M)
MD-101 HVAC DEMO PLAN
M-101 PLAN
M-201 SCHEDULES
M-301 DETAILS
15 - FIRE PROTECTION (F)
F-001 FIRE PROTECTION NOTES AND LEGEND
FAD-101 FIRE ALARM DEMOLITION PLAN
F-101 FIRE PROTECTION PLAN
FA-101 FIRE ALARM PLAN
F-501 FIRE PROTECTION DETAILS
FA-501 FIRE ALARM DETAILS
FA-502 FIRE ALARM RISER DIAGRAM AND MATRIX
16 - ELECTRICAL (E)
BI
M
://1
1_ Pa
AN
G_
AD
AL
_B
7_
/10
_B
7_
A.
rvt
/1 9/
:4
9:
A M
ED101 DEMOLITION PLAN
ED102 COMMUNICATIONS DEMOLITION PLAN
E-101 ELECTRICAL SITE PLAN
E-102 POWER PLAN
E-103 ROOF POWER AND LIGHTING PLAN
E-104 LIGHTING PLAN
E-105 COMMUNICATIONS PLAN
E-501 LIGHTNING PROTECTION DETAILS
E-502 COMMUNICATIONS DETAILS
E-601 ONE LINE DIAGRAM
E-602 PANEL SCHEDULES
INDEX OF DRAWINGS
SHEET # DESCRIPTION
01- DEMOLITION
D-100 OVERALL DEMOLITION PLAN 11/19/2021
D-101 DEMOLITION PLAN 11/19/2021
02- CIVIL (C)
C-001 EXISTING CONDITIONS PLAN 11/19/2021
C-100 SITE PLAN 11/19/2021
C-101 DETAILS 11/19/2021
08 - STRUCTURAL (S)
S-100 STRUCTURAL NOTES 11/19/2021
S-101 FOUNDATION / ROOF FRAMING PLAN 11/19/2021
S-501 CONCRETE AND FOUNDATION DETAILS 11/19/2021
S-502 CONCRETE AND FOUNDATION DETAILS II 11/19/2021
S-503 MASONRY DETAILS 11/19/2021
S-504 STEEL AND METAL DECK DETAILS 11/19/2021
S-505 STAIR DETAILS 11/19/2021
S-506 WALL SECTIONS 11/19/2021
09 - ARCHITECTURAL (A)
A-001 LEGEND AND SYMBOLS 11/19/2021
A-002 TYPICAL ABA DETAILS 11/19/2021
A-100 OVERALL PLAN 11/19/2021
A-101 FIRST FLOOR PLAN 11/19/2021
A-102 ROOF PLAN 11/19/2021
A-103 FURNITURE PLAN 11/19/2021
A-201 EXTERIOR ELEVATIONS 11/19/2021
A-301 BUILDING SECTIONS 11/19/2021
A-302 WALL SECTIONS 11/19/2021
A-400 INTERIOR ELEVATIONS 11/19/2021
A-501 PARTITION TYPES AND DETAILS 11/19/2021
A-502 ROOF DETAILS 11/19/2021
A-505 ROOF DETAILS 11/19/2021
A-506 DOOR DETAILS 11/19/2021
A-601 SCHEDULES 11/19/2021
13 - MECHANICAL HVAC (M)
MD-101 HVAC DEMO PLAN 11/19/2021
M-101 PLAN 01/07/2022
M-201 SCHEDULES 11/19/2021
M-301 DETAILS 11/19/2021
15 - FIRE PROTECTION (F)
F-001 FIRE PROTECTION NOTES AND LEGEND 11/19/2021
FAD-101 FIRE ALARM DEMOLITION PLAN 11/19/2021
F-101 FIRE PROTECTION PLAN 11/19/2021
FA-101 FIRE ALARM PLAN 11/19/2021
F-501 FIRE PROTECTION DETAILS 11/19/2021
FA-501 FIRE ALARM DETAILS 11/19/2021
FA-502 FIRE ALARM RISER DIAGRAM AND MATRIX 11/19/2021
16 - ELECTRICAL (E)
00-GENERAL
G-000 COVER SHEET 11/19/2021
G-001 CODE ANALYSIS 11/19/2021
G-002 CODE COMPLIANCE SITE PLAN 11/19/2021
G-003 LIFE SAFETY PLAN 11/19/2021
ED101 DEMOLITION PLAN 11/19/2021
ED102 COMMUNICATIONS DEMOLITION PLAN 11/19/2021
E-101 ELECTRICAL SITE PLAN 11/19/2021
E-102 POWER PLAN 11/19/2021
E-103 ROOF POWER AND LIGHTING PLAN 11/19/2021
E-104 LIGHTING PLAN 11/19/2021
E-105 COMMUNICATIONS PLAN 11/19/2021
E-501 LIGHTNING PROTECTION DETAILS 11/19/2021
E-502 COMMUNICATIONS DETAILS 11/19/2021
E-601 ONE LINE DIAGRAM 11/19/2021
E-602 PANEL SCHEDULES 11/19/2021
ISSUE DATE
ISSUE DATE DESCRIPTION
B-1 03/26/2021 ISSUED FOR REVIEW
B-2 9/24/2021 ISSUED FOR REVIEW
B-3 11/19/2021 ISSUED FOR CONSTRUCTION
%%32 %%32
R E
F
SEE D-101
FOR
DEMOLITION
SCOPE
REMOVE EXISTING CEILING TILES AND STORE FOR REUSE. ALL
DIFFUSERS, ELECTRICAL AND EXISTING EQUIPMENT IS TO
REMAIN.
AT ALL AREAS:
MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, MISCELLANEOUS
EQUIPMENT, AND ALL CONTROLS AND ACCESSORIES BELOW THE
CEILING LEVEL TO REMAIN IN PLACE. ALL DUCTOWORK,
INSULATION, FLEXIBLE DUCTWORK, REGISTERS, DIFFUSERS,
EXHAUST FANS, CONTROL WIRING, LIGHTING, CONDUITS AND ANY
ASSOCIATED ITEMS ABOVE THE CEILING LEVEL SHALL REMAIN IN
PLACE AND BE REUSED TO THE GREATEST EXTENT
POSSIBLE. WHEN REMOVAL IS REQUIRED, DISCONNECT FROM
THE ASSOCIATED SYSTEMS BELOW THE CEILING LEVEL AND
REINSTALL IN THE EXACT LOCATION AS REQUIRED. WHEN REUSE
IS NOT POSSIBLE, PROVIDE EXACT REPLACEMENT MATCHING
EXISTING AND REINSTALL IN THE EXACT LOCATION AS
REQUIRED. CONTRACTOR TO VERIFY EXTENT OF WORK.
REMOVE ENTIRE CEILING SYSTEM AND GRID AND REPLACE WITH
NEW GRID AND CEILING TILES. ALL DIFFUSERS, ELECTRICAL AND
EXISTING EQUIPMENT INSTALLED IN GRID SHALL BE
TEMPORARILY SUPPORTED FOR REINSTALLATION INTO NEW
GRID. SALVAGE TILES IN GOOD CONDITION TO USE AS
REPLACEMENT TILES IN OTHER AREAS.
NO WORK
EXISTING GYPSUM BOARD CEILING TO REMAIN. PATCH AND
REPAINT CEILING AS REQUIRED FOR SPRINKLER INSTALLATION.
REMOVE CEILING SYSTEM AND GRID AS REQUIRED FOR
ELECTRICAL CONDUIT INSTALLATION. ALL DIFFUSERS,
ELECTRICAL AND EXISTING EQUIPMENT INSTALLED IN GRID SHALL
BE TEMPORARILY SUPPORTED FOR REINSTALLATION INTO NEW
GRID. SUPPLY NEW CEILING TILES IN ENTIRE AREA SHOWN.
SALVAGE TILES IN GOOD CONDITION AND TURN IN TO
GOVERNMENT TO USE AS REPLACEMENT TILES IN OTHER AREAS.
EXISTING GYPSUM BOARD CEILING TO REMAIN. PATCH AND
REPAINT CEILING AS REQUIRED FOR ELECTRICAL CONDUIT
INSTALLATION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
1/16" = 1'-0"B
IM
/1
P a A
N G
A
D A
L B
/1
B
A
.r v t
/2
/2
:5 :4
P
M
D-100
JLSQ192007
C. QUIROZ
10239241_B107_A.rvt
OVERALL DEMOLITION PLAN
ADAL B107 G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
1/16" = 1'-0"
OVERALL DEMOLITION PLAN
B-1 03/26/2021 ISSUED FOR REVIEW
B-2 9/24/2021 ISSUED FOR REVIEW
B-3 11/19/2021 FINAL DESIGN SUBMITTAL
ISSUE DATE DESCRIPTION
B-1 03/26/2021 ISSUED FOR REVIEW
T
C
D
E
F
6 7 8 9 10 11
E-A
3'-4"
4"
D11
/4 "D1
D2
D5
D5
D5
D10D10
D9D9
D2
D3D3
D1
D4
D10D10
D5D5
SRC ROOM
CAT ROOM
MECHANICAL
ADMIN
AREA
WCP
ROOM
KIT
161A
LAT
161B
D5D5
D5D5
D2
D11
TELECOM
EX-160
D10D10
D10D10
D10D10
D10D10
D10D12
D13D13
40'-2 3/4"
/8
/8
/2
13'-3 1/8" 15'-9 1/8"
18'-3 7/8"
/4
REMOVE EXISTING
GENERATOR ENCLOSURE UP
TO EXISTING FACILITY.
DEMOLISH EXISTING
BOLLARD
DEMOLISH GATES IN THEIR
ENTIRETY
EXISTING DOOR TO BE
DEMOLISHED
EXISTING DOOR TO REMAIN
EXISTING LIGHT TO BE
DEMOLISHED
EXISTING LIGHT TO BE
DEMOLISHED
EXISTING WALL
EXISTING DOOR
EXISTING
ACCESS
FLOORING
WALL TO BE
DEMOLISHED
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
As indicatedB
IM
/1
P a A
N G
A
D A
L B
/1
B
A
.r v t
/1
/2
:4 :2
A
M
D-101
JLSQ192007
C. QUIROZ
10239241_B107_A.rvt
DEMOLITION PLAN
ADAL B107 G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
1/8" = 1'-0"
PARTIAL DEMOLITION PLAN
KEYNOTES
D1 DEMOLISH PORTION OF WALL. DEMOLISH
TO INCLUDE ALL FINISHES, STRUCTURE,
AND ASSOCIATED HARDWARE. ALL WALL
RETURNS NOT SCHEDULED FOR A NEW
DOOR SHALL HAVE FINISHED RETURNS
D2 DEMOLISH DOOR, FRAME AND ALL
ASSOCIATED HARDWARE.
D3 REMOVE PLUMBING FIXTURES. REFER
TO PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION
D4 REMOVE PORTION OF EXTERIOR CAVITY
MASONRY CAVITY WALL. LOCATE
OPENING TO ALIGN WITH MASONRY
JOINTS. PATCH CMU AS REQUIRED
AFTER DEMOLITION. SEE STRUCTURAL
FOR NEW LINTEL
D5 REMOVE FLOOR FINISHES AND RAISED
ACCESS PANELS. EXISTING RAISED
ACCESS FLOORING STRUCTURE TO
REMAIN
D9 REMOVE CONCRETE SLAB AND MASONRY
SCREEN WALLS IN THEIR ENTIRETY
D10 REMOVE SUSPENDED CEILING IN ITS
ENTIRETY INCLUDING CEILING PANELS
GRID AND ALL ASSOCIATED HARDWARE
D11 REMOVE EXISTING ALUMINUM WINDOWS
IN THERE ENTIRETY.
D12 REMOVE EXISTING TILE FLOORING IN ITS
ENTIRETY.
D13 REMOVE EXISTING CARPETING.
1/16" = 1'-0"
EXISTING ENCLOSURE
NOT TO SCALE
DEMOLITION LEGEND
B-1 03/26/2021 ISSUED FOR REVIEW
B-2 9/24/2021 ISSUED FOR REVIEW
B-3 11/19/2021 FINAL DESIGN SUBMITTAL
ISSUE DATE DESCRIPTION
B-1 03/26/2021 ISSUED FOR REVIEW
GENERAL
G1. SCOPE
THE NOTES ON THIS SHEET AND THE STANDARD STRUCTURAL DETAILS ARE GENERAL AND
APPLY TO THE ENTIRE PROJECT WHETHER SPECIFICALLY CALLED OUT OR NOT, EXCEPT
WHERE THERE ARE SPECIFIC INDICATIONS TO THE CONTRARY ON STRUCTURAL SHEETS. IF
THERE ARE QUESTIONS, THEY SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER AND
ANSWERED IN WRITING PRIOR TO CONSTRUCTION.
G2. APPLICABLE SPECIFICATIONS AND CODES
A. ANGETL 15-01-01 SUSTAINABLE DESIGN, DEVELOPMENT AND RESOURCE CONSERVATION
B. 2018 INTERNATIONAL BUILDING CODE
C. UFC 1-200-01 DOD BUILDING CODE GENERAL REQUIREMENTS
D. UFC 3-301-01 STRUCTURAL ENGINEERING
E. ASCE 7-16 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
F. ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
G. ACI 530-13 BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES
H. AISC MANUAL FOR STEEL CONSTRUCTION, 15TH EDITION
I. AISI S100-16 NORTH AMERICAN SPECIFICATION FOR THE DESIGN OF COLD FORMED STEEL STRUCTURAL MEMBERS
J. GASNT SYSTEM FOOTPRINT REVISION 7
G3. DESIGN CRITERIA
1. APPLIES TO ALL STRUCTURES (UNO)
A. DEAD LOAD:
1. ACTUAL TRIBUTARY STRUCTURE WEIGHT
2. SUPERIMPOSED DEAD LOAD:
a. APA AND ACU ROOF UNITS: 33 PSF
B. LIVE LOAD:
1. STORAGE ROOM (LIGHT): 150 PSF
2. ROOF LIVE LOAD (NON-REDUCIBLE): 20 PSF
3. PLATFORM LIVE LOAD (ELEVATED): 60 PSF
C. WIND:
1. BASIC WIND SPEED: 110 MPH
2. EXPOSURE: B
3. IMPORTANCE FACTOR: 1.0
4. DIRECTIONALITY FACTOR: 0.85
5. STRUCTURE IS ENCLOSED
6. RISK CATEGORY: ll
D. SEISMIC:
1. ABOVE GRADE, NON WATER BEARING STRUCTURES:
a. SEISMIC DESIGN CATEGORY: B
b. SITE CLASS: D
c. SPECTRAL RESPONSE ACCELERATION, SS: 0.1121G
d. SPECTRAL RESPONSE ACCELERATION, S1: 0.0529G
e. SPECTRAL RESPONSE CO-EFFICIENT, SDS: 0.120
f. SPECTRAL RESPONSE CO-EFFICIENT, SD1: 0.085
g. BASE SEISMIC FORCE RESISTING SYSTEM: MASONRY SHEAR WALLS
h. SEISMIC RESPONSE MODIFICATION FACTOR: 2.0
i. IMPORTANCE FACTOR: 1.25
E. SNOW LOAD:
1. GROUND SNOW LOAD = 25 PSF
2. FLAT ROOF SNOW LOAD = 22 PSF (NOT INCLUDING DRIFT)
3. EXPOSURE FACTOR = B
4. IMPORTANCE FACTOR = 1.10
5. THERMAL FACTOR = 1.0
6. FROST DEPTH: 38"
G4. THE FOLLOWING GEOTECHNICAL REPORT WAS DEVELOPED FOR THE ADJACENT STRUCTURE
AND IS THE BASIS OF THIS STRUCTURAL DESIGN:
GEOTECHNICAL FIRM NAME: GEOMECHANICS, INC.
REPORT DATE: JULY 2001
SOIL BEARING PRESSURE = 2000 PSF
G5. SAFETY
SAFETY AND STRUCTURE STABILITY DURING CONSTRUCTION ARE THE SOLE RESPONSIBILITY
OF THE CONTRACTOR. STRUCTURES HAVE BEEN DESIGNED TO RESIST THE DESIGN LIVE
LOADS ONLY AS A COMPLETED STRUCTURE.
G6. OPENINGS
OPENINGS FOR PIPES, DUCTS, CONDUITS, ETC. ARE NOT ALL SHOWN ON THE
STRUCTURAL DRAWINGS. COORDINATE AND PROVIDE OPENINGS AS REQUIRED TO
ACCOMMODATE ALL WORK SHOWN OR SPECIFIED IN THE CONTRACT DOCUMENTS AND
OTHERWISE REQUIRED FOR THE FURNISHING OF A FUNCTIONALLY COMPLETE PROJECT.
REINFORCE AROUND OPENINGS PER STANDARD STRUCTURAL DETAILS UNLESS OTHERWISE
SHOWN.
G7. SPECIAL INSPECTIONS
SPECIAL INSPECTIONS ARE REQUIRED IN ACCORDANCE WITH CHAPTER 17
OF THE IBC 2018. THE CONTRACTOR SHALL HIRE A 3RD PARTY INSPECTOR
RESPONSIBLE TO THE GOVT TO COMPLETE THESE INSPECTIONS.
THE CONTRACTOR SHALL PROVIDE FOR FULL ACCESS TO THE WORK
BY THE SPECIAL INSPECTOR AND SHALL PROVIDE FOR THESE INSPECTIONS IN HIS
CONSTRUCTION SCHEDULE IN ACCORDANCE WITH THE SPECIFICATIONS. A SPECIAL
INSPECTION PLAN WILL BE SUBMITTED UNDER SEPARATE COVER WITH THE PERMIT
APPLICATION. THE SPECIAL INSPECTION PROGRAM AND STATEMENT OF SPECIAL
INSPECTIONS SHALL BE IN ACCORDANCE WITH SECTION 1704.3.
G8. STANDARD DETAILS
THE STANDARD DETAILS DEPICT TYPICAL DETAILING TO BE USED ON THIS PROJECT. IF
CONDITIONS ARE NOT EXPLICITLY SHOWN ON THE DRAWINGS THEY SHALL BE MADE
SIMILAR TO THE STANDARD DETAILS. OBTAIN APPROVAL OF GOVT IN WRITING FOR
SIMILAR CONDITIONS PRIOR TO CONSTRUCTION.
G9. THE CONTACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS OF EXISTING
CONSTRUCTION AS REQUIRED TO COORDINATE NEW CONSTRUCTION. SUBMIT REQUIRED
CHANGES FOR APPROVAL.
G10. CONTRACTOR TO SUBMIT FOR REVIEW ALL EQUIPMENT SIZES, OPERATING WEIGHTS,
VIBRATION FORCES, SUPPORT LOCATIONS, ALONG WITH ANY FLOOR OPENINGS, NOTCHES,
AND RECESSES REQUIRED BY SUCH EQUIPMENT. CONCRETE SUPPORT PADS AND/OR
FRAMING REQUIRED TO SUPPORT SAID EQUIPMENT SHALL NOT BE FABRICATED AND
PLACED UNTIL THE CONCRETE SUPPORT PADS AND/OR FRAMING IS APPROVED TO
SUPPORT THE EQUIPMENT.
CONCRETE
C1. DESIGN STRENGTHS:
F'c = 4000 PSI Fy = 60,000 PSI
C2. CONCRETE COVER
UNLESS OTHERWISE NOTED, PROVIDE CONCRETE COVER FOR REINFORCING AS FOLLOWS:
CONCRETE DEPOSITED AGAINST EARTH: 3"
TIE REINFORCING AT COLS & PILASTERS: 1½"
ALL OTHER: 2"
SEE DRAWINGS FOR EXCEPTIONS
C3. SEE SPECIFICATIONS FOR REINFORCING PLACEMENT REQUIREMENTS.
C4. REFER TO OTHER DISCIPLINE DRAWINGS PRIOR TO CONSTRUCTION FOR EMBEDDED ITEMS
AND PENETRATIONS NOT SHOWN ON STRUCTURAL DRAWINGS. AS REQUIRED TO
ACCOMMODATE ALL WORK SHOWN OR SPECIFIED IN THE CONTRACT DOCUMENTS AND
OTHERWISE REQUIRED FOR THE FURNISHING OF A FUNCTIONALLY COMPLETE PROJECT.
REINFORCE AROUND OPENINGS PER STANDARD STRUCTURAL DETAILS UNLESS OTHERWISE
SHOWN.
C5. PROVIDE 3/4" CHAMFERS AT ALL EXPOSED EDGES AND 1/2" CHAMFERS AT JOINTS AS
SHOWN. NOT ALL CHAMFERS MAY BE SHOWN ON DRAWINGS.
C6. FIELD ADJUST REINFORCING AT OPENINGS AND EMBEDDED ITEMS AS INDICATED.
C7. ANCHOR BOLTS NOT SPECIFIED BY ENGINEER SHALL BE DESIGNED AND CERTIFIED BY A
REGISTERED PROFESSIONAL ENGINEER IN PENNSYLVANIA, RETAINED BY THE CONTRACTOR, IN ACCORDANCE
WITH APPLICABLE PROJECT AND CODE REQUIREMENTS. SUBMIT AS A SHOP DRAWING FOR
REVIEW AND APPROVAL BY THE ENGINEER. COORDINATE LOCATION, SIZE AND EMBEDMENT
PRIOR TO CASTING CONCRETE.
C8. ABSOLUTELY NO WELDING OF REINFORCING BARS OR TORCHING TO BEND REINFORCING
BARS SHALL BE ALLOWED WITHOUT SPECIFIC APPROVAL FROM THE GOVT IAW TAB D.
C9. CONTRACTOR SHALL SUBMIT A CONCRETE PLACEMENT PLAN {PER SPECIFICATION 03311}
IDENTIFYING JOINT TYPES, JOINT LOCATIONS AND CONCRETE PLACEMENT SEQUENCE.
C10. ALL CAST IN PLACE AND POST-INSTALLED ANCHORS INDICATED IN THE STRUCTURAL
DOCUMENTS SHALL COMPLY WITH APPENDIX D OF ACI 318 AND CHAPTER 19 OF THE
IBC. ALL EXPANSION AND ADHESIVE ANCHORS SHALL HAVE THE ICC REPORT SHOWING
EQUIVALENT LOAD CAPACITY. SUBMIT AND INSTALL PER THE ICC EVALUATION REPORT.
MASONRY
M1. DESIGN STRENGTHS:
F'm= 2000 PSI
Fy = 60,000 PSI
M2. GROUT FOR FILLING MASONRY CAVITIES TO BE COARSE GROUT UNO, MAXIMUM COARSE
AGGREGATE SIZE IS 3/8 INCH.
M3. GROUT POURS SHALL NOT EXCEED 4 FEET IN HEIGHT UNLESS CLEANOUTS ARE
PROVIDED IN THE BOTTOM COURSE OF THE CELL(S) TO BE GROUTED AND WRITTEN
PERMISSION IS OBTAINED FOR HIGH LIFT GROUTING.
M4. RESTRICTED BAR ANCHORAGE:
IN CASES WHERE REINFORCING BARS CANNOT BE EXTENDED AS FAR AS REQUIRED, THE
BARS SHALL EXTEND AS FAR AS POSSIBLE AND END IN STANDARD HOOK. SHOW ON
SHOP DRAWINGS AND HIGHLIGHT WITH A BOX TO BRING TO ENGINEER'S ATTENTION.
M5. ANCHOR BOLTS:
ALL EXPANSION AND ADHESIVE ANCHORS SHALL HAVE THE ICC REPORT SHOWING
EQUIVALENT LOAD CAPACITY. SUBMIT AND INSTALL PER THE ICC EVALUATION REPORT.
M6. IF BOND BEAMS AT INTERSECTING WALLS ARE SHOWN ON THE DRAWINGS TO MEET AT
DIFFERENT ELEVATIONS, EXTEND REIFORCING OF BOTH BOND BEAMS AROUND
INTERSECTING CORNER NOT LESS THAN 4 FEET IN EACH DIRECTION.
M7. LINTEL BLOCKS SHALL NOT BE USED AS BOND BEAM BLOCKS EXCEPT AT OPENINGS
WHERE BOND BEAMS AND LINTELS COINCIDE.
STEEL
S1. DESIGN STRENGTHS:
WIDE FLANGE AND TEES: Fy=50 KSI PIPES: Fy=35 KSI STAINLESS STEEL: Fy=33 KSI HSS SECTIONS: Fy=46 KSI ALL OTHER PLATES AND SHAPES: Fy=36 KSI
S2. DIMENSIONS:
TO CENTERLINES OF COLUMNS AND BEAMS, TOP SURFACES OF BEAMS AND TUBES AND
BACKS OF CHANNELS AND ANGLES UNO.
S3. ELEVATIONS:
TOP OF STEEL REFERS TO TOP SURFACE OF MEMBER OR FLANGE UNO.
S4. WHEN FILLET WELD SIZE IS NOT INDICATED, PROVIDE MAXIMUM WELD SIZE BASED ON
MATERIAL THICKNESS IN ACCORDANCE WITH AISC SPECIFICATIONS.
S5. ALL BOLTED STRUCTURAL CONNECTIONS ARE BEARING TYPE CONNECTIONS UNLESS
OTHERWISE SPECIFIED TO BE SLIP-CRITICAL. PROVIDE LOAD INDICATING WASHERS AT
SLIP-CRITICAL CONNECTIONS.
S6. CONFORM TO AISC 360, STEEL CONSTRUCTION MANUAL AND AISC 341, SEISMIC DESIGN
MANUAL.
S7. ALL EXPOSED STEEL SHALL BE GALVANIZED, UNLESS NOTED OTHERWISE.
STEEL DECK:
SD1. THE DESIGN, FABRICATION, AND ERECTION OF METAL DECKING SHALL BE IN
ACCORDANCE WITH THE CURRENT EDITION OF THE SDI SPECIFICATIONS AND THE SDI
DIAPHRAGM MANUAL
SD2. STEEL ROOF DECK IS 1-1/2 INCH X 20 GAUGE AS SHOWN ON THE PLANS DESIGNED FOR THE DEAD, LIVE AND SNOW LOADS INDICATED.
SD3. STEEL ROOF DECK IS TO BE A STRUCTURAL DIAPHRAGM AND SHALL BE FASTENED AS
SHOWN ON THE DRAWINGS; SHALL BE CONNECTED TO THE STRUCTURE AS
INDICATED IN THE METAL DECK SCHEDULE ;SHALL BE CONNECTED TO THE
STRUCTURE AS INDICATED IN THE SPECIFICATIONS.
SD4. THE PLANS INDICATE DECK SPAN DIRECTION.
SD5. SUSPENDED CEILINGS, LIGHT FIXTURES, DUCTS, AND OTHER UTILITIES SHALL NOT BE
SUPPORTED FROM THE STEEL DECK.
SPECIAL INSPECTIONS:
SD1. SPECIAL INSPECTIONS SHALL BE PROVIDED FOR THE FOLLOWING WORK IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE, CHAPTER 17. CONTRACTOR SHALL NOTIFY AND ACCOMODATE THE APPLICABLE INSPECTOR DURING APPROPRIATE PHASES OF THE WORK AS REEQUIRED FOR EACH TYPE OF INSPECTION. INSPECTION SHALL CONSIST OF VISUAL OBSERVATION OF THE WORK OUTLINED BELOW AND TESTING AS INDICATED BELOW OR IN SPECIFICATIONS.
CONCRETE WORK (NOT INCLUDING SITEWORK CONCRETE)
INSPECT TAKING OF SPECIMENS: CONCRETE CYLINDERS, AIR ENTRAINMENT AND SLUMP.......PERIODIC INSPECT PLACEMENT OF REINFORCED CONCRETE..........................................................................PERIODIC INSPECT PLACING OF FOUNDATION CONCRETE................................................................................PERIODIC
ANCHOR BOLTS INSTALLED IN CONCRETE
PRE-CONCRETE PLACEMENT INSPECTION
INSPECT PLACEMENT OF CONCRETE...................................................................................................PERIODIC
REINFORCING STEEL
INSPECT REINFORCING STEEL PRIOR TO CLOSING FORMS OR DELIVERY OF CONCRETE...........PERIODIC
STRUCTURAL STEEL
MATERIAL VERIFICATION OF HIGH STRENGTH BOLTS.........................................................................PERIODIC INSPECTION OF HIGH STRENGTH BOLTS...............................................................................................PERIODIC MATERIAL VERIFICATION OF STRUCTURAL STEEL...............................................................................PERIODIC INSPECTION OF HIGH STRENGTH BOLTS...............................................................................................PERIODIC
MASONRY
MATERIAL VERIFICATION OF MASONRY..................................................................................................PERIODIC INSPECT PLACEMENT OF REINFORCED MASONRY...............................................................................PERIODIC
SUBGRADE
INSPECT EXISTING SUBSURFACE CONDITIONS DURING FILL PLACEMENT AND LOAD BEARING
REQUIREMENTS..........................................................................................................................................CONTINUOUS
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
3/4" = 1'-0"B
IM
/1
P a A
N G
A
D A
L B
/1
B
S
.r v t
/2
/2
:1
:2
P
M
S-100 10239241
C. QUIROZ
10239241_B107_S.RVT
STRUCTURAL NOTES
ADAL B107 FOR G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
11/19/21 ISSUED FOR CONSTRUCTIONB-3
ML-1
W12X40
ML-1
TO MASONRY WALL EL = 120'-0"
TYPICAL
OPENING FOR ROOF HATCH
W12X26
5'-0" 5'-0" 5'-0" 5'-0" 6'-2"
D
E
E-A
W14X22
S-504
/8
/4
/8
25'-11"
MCJ MCJ
MCJ MCJ
S-504
L X
X
/4
L X
X
/4
W12X26W12X26
S-504
TO MASONRY WALL
EL = 116'-8"
W12X26W12X26W12X26
T Y
P
SEE NOTE 8
W12X22
W12X22
FACE OF STONE VENEER
1'-3" , FIELD VERIFY
1" 25'-1 5/8"
8 3/8"
S-506
S-506
S-505
DOOR STOOP
APPROACH SLAB
EXISTING BUILDING FOUNDATION
S-501
D
E
E-A
S-501
S-501
CJ
CJ
C J
C J
C J
CJ
TO
P O
F E X
IS
TIN
G
FTG
E
L = 97'-4"
FIELD
V
ER
IFY
F .V
TO
P O
F E X
IS
TIN
G
FTG
L = 97'-4"
FIELD
V
ER
IFY
TOP OF EXISTING
FTG EL = 98'-4"
FIELD VERIFY
TOP OF EXISTING
FTG EL = 96'-4"
FIELD VERIFY
TOP OF EXISTING
FTG EL = 97'-4"
FIELD VERIFY
TOP OF EXISTING
FTG EL = 97'-4"
FIELD VERIFY
TO
P O
F C O
N C R
ETE
W
ALL
E L
= 9 7' -4
25'-11"
SIM
S-501
S-502
S-502
S-502
S-502
S-502
D
E
E-A
W X
W X
W X
W12X45
W12X45
12'-0" 7'-0"
W X
W X
4'-6"
SEE
NOTE 7
SEE
NOTE 5
SEE NOTE 6
SEE
NOTE 8
8'-0" 7'-4"
PLATFORM SHALL BE 18-30" IN HEIGHT WITH
A VERTICAL CLEARANCE BETWEEN BOS
STEEL AND TOS ROOF OF 18" (MIN) FOR
WORKER ACCESS.
SEE NOTE 1, TYP
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
1/8" = 1'-0"B
IM
/1
P a A
N G
A
D A
L B
/1
B
S
.r v t
/2
/2
:1
:2
P
M
S-101 10239241
C. QUIROZ
10239241_B107_S.RVT
FOUNDATION / ROOF FRAMING PLAN
ADAL B107 FOR G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
1/8" = 1'-0"
ROOF FRAMING PLAN
ROOF FRAMING NOTES:
1. TOS STEEL FRAMING EL = 116'-0" UNO
2. LOAD BEARING CMU WALLS ARE TO BE 10" THK.
3. ML-1 - (SEE DRAWING 1/S-503 FOR LINTEL AT OPENING DETAIL AND MASONRY LINTEL
REINFORCEMENT SCHEDULE).
4. MCJ = MASONRY CONTROL JOINT, SEE DETAIL 3/S-503.
5. FOR ROOF DECK CONNECTIONS, REFER TO SHEET S-504.
6. W14X22 (GALVANIZED) COLUMNS -SEE PLATFORM FRAMING PLAN FOR LOCATIONS.
7. FOR BEAM BEARING DETAILS ON CMU, SEE 5/S-504.
8. COORDINATE STEEL FRAMING CONNECTION TO ROOF STRUCTURE WITH CRANE
SUPPLIED. PROVIDE 1 OR TWO W12X26 BEAMS AS REQUIRED FOR MOUNTING OF CRANE.
9. FOR STAIR LANDING, SEE DRAWING 8/S-505.
1/8" = 1'-0"
SLAB AND FOUNDATION PLAN
FOUNDATION NOTES:
1. SLAB-ON-GRADE IS TO BE 8" THK, W/ #6@12" OC T&B EW.
2. ADDITIONAL REINFORCEMENT IS TO BE PLACED AT SLAB EDGES AND
OPENINGS (SEE DETAIL 4/S-501).
3. ARCH FINISH FLOOR EL 100'-0" = CIVIL FINISH FLOOR EL = 1111.67.
4. SLAB-ON-GRADE DESIGNED TO CARRY THE FOLLOWING LOADING:
A. WEIGHT OF THE PALLETS AND THE EQUIPMENT ON EACH PALLET: 3500
LBS
B. UNIFORM LIVE LOAD: 150 PSF
5. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING FOUNDATIONS
AND INFORM GOVT OF ANY DISCREPENCIES BETWEEN THE CONDITIONS
IN THE FIELD AND THE CONTRACT DOCUMENTS
6. TOS FOUNDATION WALL EL = 99'-4".
7. TOS FOOTING EL = 97'-4" TO MATCH THE EXISTING BUILDING (SEE NOTE 5).
8. PROVIDE 12" OF COMPACTED ENGINEERED FILL BELOW SLAB.
9. FOR TYPICAL SLAB ON GRADE JOINTS, SEE DRAWING 5/S-501.
LEGEND:
SPAN DIRECTION OF ROOF DECK
11/19/21 ISSUED FOR CONSTRUCTION
1/8" = 1'-0"
PLATFORM FRAMING PLAN
PLATFORM FRAMING NOTES:
1. ALL STEEL COLUMNS ARE TO BE W14X22 GALVANIZED UNO. ALL STEEL FRAMING
MEMBERS SHALL ALSO BE GALVANIZED.
2. FINAL PLATFORM IS TO BE DESIGNED FOR THE FOLLOWING LOADS:
A. DEAD LOAD = 500 LBS
B. LIVE LOAD = 60 PSF
C. SNOW LOAD = 22 PSF
D. WIND LOAD = 32 PSF (PLUS 20 PSF UPLIFT)
E. SEE NOTE 9 FOR OTHER REQUIREMENTS
3. FINAL DESIGN AND LOADS SHALL BE SUBMITTED FOR APPROVAL BY GOVT.
4. TOP OF GRATING EL = 119'-5".
5. GRATING: 19W4 5/16x1 GALVANIZED.
6. STAIR STRINGERS ARE MC10X8.4 GALVANIZED.
7. PLATE 3/4x3'-0"x3'-0" (GALVANIZED). COORDINATE HOLE SIZE AND LOCATIONS IN
PLATE FOR MOUNTING EQUIPMENT.
8. DAVIT CRANE
9. RESONANCE FREQUENCY FOR PLATFORM FRAMING SHALL BE 25 HZ (MIN) WITH A
ROTATIONAL STIFFNESS OF 2.7E-8 RAD/IN-LB (MAX). SEE GASNT FOOTPRINT REV 7
FOR MORE.
10.MAIN PLATFORM FRAMING HAS BEEN DESIGNED TO MEET THE REQUIREMENTS IN
NOTES 2 AND 9. CONTRACTORS FINAL COMPLETED PLATFORM DESIGN SHALL ALSO
MEET THESE REQUIREMENTS.
B-3
W
X 26W
X
W
X
W
X
6" CONCRETE SLAB
W/ #4@16 EW CENTERED
GRANULAR FILL TYP
#4@12 EW EF
3 SIDES TYP
FOR FOUNDATION
REINFORCING-
SEE SECTIONS
4" #5@12
30"
30"
RIGID
INSULATION
SEE ARCH
#4 x 3'-4"@16
FULL WIDTH
OF SLAB
EXPANSION
JOINT
SEE CIVIL
2"
SLOPE VARIES
SEE CIVIL
1/2" COMPRESSIBLE
FILLER & SEALANT
WALL OPENING
NOTCH AS REQD
TO CLEAR STOOP
3/4"1'-0"
1/4"
1/8"
SEE PLAN
SEE PLANS
C L R
C L R
SLOPE
SEE CIVIL
#5@8 TOP
#7@8 BOTTOM
COMPACTED
GRANULAR BASE
SEE SECTIONS FOR
WALL & SLAB REINF
#4@12 x 2'-0"
CENTERED ON CJ
FULL WIDTH OF
SLAB (AT DOOR
OPENINGS ONLY)
EXPANSION JOINT
SEE CIVIL
CONC SLAB WHERE
SHOWN ON PLAN
3/8" COMPRESSIBLE JOINT
MATERIAL W/ SEALANT.
LOCATE UNDER SILL
#7@8 BOTTOM
"6
CMU WALL BEYOND
SLAB ON GRADE
#3
CONCRETE REINFORCING LAP SPLICE SCHEDULE
BAR
SIZE
#4
#5
#6
3" 1'-4" 1'-6"
VERTICAL OTHER
LAPS FOR BARS SPACED GREATER
THAN MIN BAR SPACING
1'-4" 1'-6"
VERTICAL OTHER
LAPS FOR BARS SPACED LESS THAN MIN
BAR SPACING
1'-7"
1'-11"
2'-4"
2'-0"
2'-6"
3'-0"
1'-8"
2'-7"
3'-8"
2'-2"
3'-4"
4'-9"
NOTES:
1. ALL REBAR SPLICE LENGTHS SHALL BE AS SHOWN UNDER HEADING "VERTICAL" EXCEPT IF SPLICED BARS ARE HORIZONTAL BARS WITH 12" OR MORE CONCRETE BELOW. THEN SPLICE LENGTH SHALL BE AS SHOWN UNDER
HEADING "OTHER".
2. *AT SPLICES THE BAR SPACING IS THE CENTER TO CENTER DISTANCE BETWEEN ADJACENT REBAR.
3. ALL SPLICES SHALL BE CONTACT SPLICES AND WIRED TOGETHER.
4. NO WELDED OR MECH SPLICES ARE PERMITTED UNLESS INDICATED OTHERWISE.
5. UNLESS OTHERWISE SHOWN, SPLICES FOR BOTTOM REINF BARS IN BEAM AND SLABS SHALL BE CENTERED OVER THE SUPPORTS. SPLICES FOR TOP REINFORCING BARS SHALL BE LOCATED ON THE CENTERLINE OF SPAN.
MINIMUM LAP SPLICE LENGTHS F'c = 4000 psi
MIN BAR
SPACING
#7 3'-6" 4'-6" 4'-11" 6'-5"
#8 4'-7" 5'-11" 6'-6" 8'-6"
#9 5'-9" 7'-6" 8'-3" 10'-9"
#10 7'-4" 9'-6" 10'-6" 13'-7"
#11 9'-0" 11'-8" 12'-10" 16'-8"
3"
3"
4"
4"
4"
4 1/2"
5"
5 5/8"
2 - #4 x 2'-0" LONG
2" BELOW SURFACE
SLAB EDGE
INTERNAL CORNER
DISCONTINUOUS JOINT INTERSECTION
2 - #4 x 2'-0" LONG
2" BELOW SURFACE
2"
2"
CJ
AT EXPOSED FLOORS,
1/4" WIDE x 1/2" DEEP
GROOVE W/ SEALANT
C L R
'T
T /2
STOP SLAB REINF
2" FROM JOINT TYP
3/4" DIA SMOOTH DOWELS x
1'-4" LONG @ 1'-6" OC (PAINT
AND OIL ONE END)
BUTT JOINT
SAWCUT 1/4" WIDE AT EXPOSED
FLOORS AND 1/8" WIDE ELSEWHERE,
STOP 2/3 OF SLAB REINF EACH SIDE OF
JOINT
C L R
'T
AT EXPOSED FLOORS
JOINT FILLER AND SEALANT
CONSTRUCTION JOINT (CJ, DCJ)
CONTROL (CONTRACTION) JOINT (CJ)
NOTES:
1. AT CONTRACTORS OPTION, CONSTRUCTION JOINTS MAY BE
SUBSTITUTED FOR CONTROL JOINTS.
2. LOCATE DCJ IN SLAB ON GRADE WHERE SPECIFIED ON PLANS.
T /4
1/2" EXP JOINT (1/2" RECESS)
NOTES:
1. TOS FOUNDATION WALL SHALL BE SET 8" (ONE CMU COURSE) BELOW
FINISHED GRADE.
#5 @ 18" OC
10" CMU WALL
4" BRICK VENEER
#5 @ 12" OC EF
FULLY GROUT ONE
COURSE BELOW
FINISHED GRADE
SLAB ON GRADE
4 - #5 CONT EQ SPACED
5'-4"
TOS CONCRETE WALL
EL = 99'-4"
TOS NEW FOOTING
EL = 97'-4" (UNO)
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
As indicatedB
IM
/1
P a A
N G
A
D A
L B
/1
B
S
.r v t
/2
/2
:1
:2
P
M
S-501 10239241
C. QUIROZ
10239241_B107_S.RVT
CONCRETE AND FOUNDATION DETAILS
ADAL B107 FOR G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
S-101 12" = 1'-0"
1 TYPICAL DOOR STOOP
S-101 12" = 1'-0"
2 TYPICAL APPROACH SLAB
12" = 1'-0"
3 CONCRETE LAP SPLICE SCHEDULE
3/4" = 1'-0"
4 TYPICAL SLAB ON GRADE REINFORCING
3/4" = 1'-0"
5 TYPICAL SLAB ON GRADE JOINTS
S-101 3/4" = 1'-0"
6 TYPICAL FOUNDATION SECTION
11/19/21 ISSUED FOR CONSTRUCTIONB-3
1'-0"
#5 @ 12" OC EF
ENGINEERED FILL
SLAB ON GRADE - SEE PLAN
1/2" EXPANSION JOINT FILLER MATERIAL
#6 DOWELL BAR @ 12" OC - EPOXY
INTO EXISTING FOOTING (6" EMBED)
#6 @ 9" OC
FULLY GROUT ONE COURSE BELOW
FINISHED GRADE
10" CMU WALL
1" COMPRESSIBLE FILLER
MATERIAL
TOS EXISTING FOOTING
SEE PLAN/FIELD VERIFY
REINFORCING TO MATCH
NEW CMU WALL ABOVE
EXISTING CONCRETE
WALL - FIELD VERIFY
LOCATION
CONTRACTOR SHALL
FIELD VERIFY VENEER
AND CONCRETE WALL
BELOW ARE FLUSH -
NOTIFY CONTRACTING
OFFICER IF NOT
(F
IE
L
D V
E R
IF
Y
1'-0"
#5 @ 12" OC EF
ENGINEERED FILL
SLAB ON GRADE - SEE PLAN
1/2" EXPANSION JOINT FILLER MATERIAL
FULLY GROUT ONE COURSE BELOW FINISHED GRADE
10" CMU WALL
1" COMPRESSIBLE FILLER
MATERIAL
2'-4" (VIF)
(V
IF
EXISTING CONCRETE
WALL - VIF LOCATION
MASONRY DOWEL TO MATCH SIZE
AND SPACING OF CMU WALL
EXISTING FOOTING
EXISTING CONCRETE
WALL - VIF LOCATION
1'-0"
#5 @ 12" OC EF
ENGINEERED FILL
SLAB ON GRADE - SEE PLAN
1/2" EXPANSION JOINT FILLER MATERIAL
FULLY GROUT ONE COURSE BELOW FINISHED GRADE
10" CMU WALL
3 - #5 CONT
TOS FOOTING
EL = SEE PLAN
2'-0"
(V
IF
NEW FOOTING
#6 CONT REINFORCING
#6 DOWEL BAR TO MATCH SPACING OF
FOOTING REINFORCING - EPOXY INTO
EXISTING FOOTING (6" EMBED)
EPOXY #5 VERTICAL INTO
EXISTING FOOTING (4"
EMBED)
EXISTING FOOTING
#5 VERTICAL
BARS, EACH FACE
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
As indicatedB
IM
/1
P a A
N G
A
D A
L B
/1
B
S
.r v t
/2
/2
:1
:2
P
M
S-502 10239241
C. QUIROZ
10239241_B107_S.RVT
CONCRETE AND FOUNDATION DETAILS II
ADAL B107 FOR G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
11/19/21 ISSUED FOR CONSTRUCTION
S-101 1" = 1'-0"
1 SECTION AT EXISTING CONTINUOUS FOOTING
S-101 3/4" = 1'-0"
2 SECTION AT EXISTING FOOTING
S-101 3/4" = 1'-0"
3 INTERIOR FOUNDATION WALL SECTION
S-101 1/2" = 1'-0"
4 NEW FOOTING TO EXISTING FOOTING CONNECTION DETAIL
B-3
ML-1
MASONRY LINTEL REINFORCEMENT SCHEDULE
MARK
0'-0" THROUGH 3'-4"
"W"
2 - #3
"R" "L"
8"
"H" STIRRUPS REMARKS
- -12"
"R
B A
R
/4
C L
R T
O
A N
D G
R O
U T
S O
L
ID
"H
F
IL
L H
E A
D J
O
IN
T S
O P
E N
IN
G
W A
L L A
B O
V E
O P
E N
IN
G
"R"
TYPICAL WALL
REINFORCING BARS
TOP LINTEL BARS
WHEN SCHEDULED
STIRRUPS (WHEN
SCHEDULED) WITH
180° HOOK EA END
SEE PLAN
BOND BEAM, SEE SCHEDULE
FOR TYP BAR SIZE, QUANTITY,
AND SPACNG
T Y
P
"H
TYP
"L" "W"
LINTEL AT OPENING
GROUT LINTEL, TYP
SEE SCHEDULE AND NOTE 2
TYP
"L"
TERMINATE BOND
BEAM AT OPENINGS
SEE DRAWINGS FOR TYP VERT
REINF BARS SIZE AND SPACING
TERMINATE BOND BEAM AND
JOINT REINF EACH SIDE OF
MCJ EXCEPT AS NOTED
CONTINUE BOND BEAM REINF
THROUGH MCJ AT TOP OF WALL AND
INTERMEDIATE FRAMING/ FLOORS
"R"
"R"
SEE TYPICAL DETAIL FOR VERT
REINF AT JAMB OF OPENINGS
DOWELS IN FOUNDATION W/ STD
HOOKS AT ALL VERTICAL BARS,
SEE NOTE 4
#4 CONT AT TOP OF FOOTING OR IN
A BOND BEAM AT FLOOR LEVEL
O P
E N
IN
G
F O
U N
D A
T
IO
N M
A S
O N
R Y
B L O
C K
W A
L L
L A
P
WALL ELEVATION
NOTES:
1. ONLY LINTEL GROUT IS SHOWN. GROUT SOLID ALL REINFORCED CELLS.
SEE CMU WALL REINFORCING SCHEDULE.
2. WHERE OTHER DRAWING DETAILS INDICATE SOLID MASONRY SILL, PLACE BOND
BEAM REINF IN FIRST COURSE BELOW SOLID CMU.
3. PROVIDE BOND BEAM AT ALL ELEVATED FLOORS WITH SAME REINFORCING AS
TOP OF WALL, UNO
4. STRAIGHT BARS EMBEDDED ONE CONCRETE LAP LENGTH INTO CONC
FOUNDATION MAY BE USED AT CONTRACTOR'S OPTION.
5. LINTEL REINFORCING AND BARS PASSING THROUGH "H" SHALL NOT BE SPLICED.
6. SHORE LINTEL MINIMUM 7 DAYS AFTER GROUTING OR UNTIL GROUT ATTAINS FULL
DESIGN STRENGTH.
NOTES:
1. OPENINGS 8" OR LESS WIDE MAY OCCUR WITHOUT LINTEL REINFORCING AS LONG AS
NO REINFORCINGS IS INTERUPTED.
2. ML-1 TO BE USED ONLY AT NON-LOAD BEARING SITUATIONS, UNO
3. SEE DRAWINGS FOR LINTEL TYPES. WHERE LINTEL TYPES ARE NOT SHOWN, PROVIDE
LINTELS FROM THE ABOVE SCHEDULE BASED ON THICKNESS OF WALL AND MAX
CLEAR OPENING WIDTH AND VERIFY LINTEL TYPE WITH ENGINEER PRIOR TO
CONSTRUCTION.
MCJ, WHERE
NOTED ON PLANS,
TYP
CORNER INTERSECTION
LAP LENGTH
ONE CORNER BAR
SAME SIZE AS BOND
BEAM BARS
CORNER VERTS
(WHEN SCHEDULED)
CORNER VERT
L A
P L
E N
G T
H
STD 90° HOOK, TYP
TERMINATE
INTERMEDIATE HORIZ
REINF AT ALL MCJ'S
SPECIFIED
INTERSECTION
VERTS, SEE
SCHEDULE
JAMB OR END OF WALL MASONRY CONTROL JOINT (MCJ)
ROOF BOND BEAM
REINFORCING SHOWN
JAMB VERTS,
SEE SCHEDULE
PROVIDE HAIRPINS SIZED
TO MATCH WALL REINF.
LAP TO HORIZ WHERE
INDICATED ON PLAN
PROVIDE HAIRPINS SIZED
TO MATCH WALL REINF.
LAP TO HORIZ WHERE
INDICATED ON PLAN
MCJ FULL HEIGHT
HORIZ REBAR CONTINUOUS
THROUGH MCJ AT ROOF LEVEL
BOND BEAM (SHOWN) &
DISCONTINUOUS AT MCJ AND
ALL OTHER REINFORCED
ELEMENTS SUCH AS LINTELS
AND INTERMEDIATE BOND
BEAMS (NOT SHOWN)
L A
P L
E N
G T
H
MCJ VERTS, SEE
SCHEDULE
VERTS (WHEN
SCHEDULED)
RAKE OUT MORTAR AND
APPLY SEALANT, TYP EA
FACE, UNO
NOTES:
1. FOR REINFORCING, SEE CMU WALL REINFORCING SCHEDULE.
2. INDICATES LOCATION OF VERTICAL BARS AT CENTERLINE OF WALL, UNO IN SCHEDULE.
3. EXTEND MCJ FULL HEIGHT OF MASONRY BOND BEAM.
4. LIMIT DISTANCE BETWEEN MCJ TO MAX 24'-0".
SEE DRAWINGS FOR LOCATIONS.
5. HORIZONTAL JOINT REINFORCING NOT SHOWN.
6. MODIFY BAR CONFIGURATION SHOWN AS REQUIRED WHERE TWO VERTICAL REINFORCING BARS
ARE SHOWN ON THE SCHEDULE.
7. SEE ARCHITECTURAL DRAWINGS FOR MCJ DETAILS AND REMAINDER OF JOINT DETAILS.
OPTION "A"
MASONRY CONTROL
JOINT (SASH) BLOCK
CONTROL JOINT
KEY AS SPECIFIED
PROVIDE REINFORCING EACH SIDE OF
MCJ IN WALLS WITH REINFORCEMENT
PER CMU REINFORCING SCHEDULE
BUILDING PAPER ONE
SIDE AND GROUT FULL
OPTION "B"
NOTE:
1. PROVIDE REBAR POSITIONERS BY DUROWALL OR EQUAL
AS REQUIRED TO PLACE REINFORCING AS DETAILED
V E
R T
IC
A
L
REINFORCING LOCATION
VERTICAL BARS
JAMBS
CORNERS / INTERSECTIONS
MCJ
CMU WALL REINFORCING SCHEDULE
10" WALL THICKNESS
#5@24" OC SINGLE CENTERED
1 - #5 SINGLE CENTERED EA SIDE
3 - #5 SINGLE CENTERED
1 - #5 SINGLE CENTERED EA SIDE
H O
R
IZ
O N
T A
L
TOP OF WALL BOND BEAMS
HORIZ JOINT REINF
BELOW OPENINGS
LINTELS
INTERMEDIATE BOND BEAMS
2 - #5 CONTINUOUS
9 GAGE WIRE, JOINT REINF AT 16" VERT
SPACING BETWEEN BOND BEAMS
1 - #5
SEE CMU LINTEL REINF. SCHEDULE
NA
NOTES:
1. PROVIDE REINFORCING NOTE FOR ALL MASONRY WALLS UNLES NOTED
OTHERWISE ON PLAN.
2. MAINTAIN MINIMUM 3"x3" CONTINUOUS VERTICAL CELL AT EACH REBAR. PLACE
WALLS TO MAXIMUM 4'-0" HEIGHT BEFORE GROUTING.
3. PLACE REBAR IN WALL WITH LAP SPLICE LENGTH PER MASONRY REINFORCING
SPLICE TABLE.
4. GROUT ONLY THE CELLS WITH REINFORCING IN SCHEDULE. LOCATE ONE
VERTICAL RUN OF REINFORCEMENT AT ALL CORNERS AND EACH SIDE OF ALL MCJ'S.
5. PROVIDE WIRE REBAR POSITIONERS TO HOLD BARS IN PLACE.
6. STOP GROUT POUR 1/2" BELOW TOP OF COURSE AT EACH GROUT LIFT.
REMARKS
E Q
E Q
SINGLE CENTERED
SEE NOTE 5
#4
MASONRY REINFORCING SPLICE TABLE
BAR
SIZE
#5
#6
#7
2'-1"
BAR @ CL
6" BLOCK
3'-3"
2'-1" 2'-7"
BAR @ CL BAR @ EDGE
8" BLOCK
2'-1" 2'-5"
BAR @ CL BAR @ EDGE
10" BLOCK
2'-1" 2'-4"
BAR @ CL BAR @ EDGE
12" BLOCK
2'-7"
4'-9"
6'-7"
4'-0"
8'-2"
2'-7"
4'-4"
5'-1"
2'-7"
4'-4"
5'-1"
3'-10"
7'-8"
10'-5"
3'-7"
7'-3"
9'-10"
WHEN REQUIRED SPLICE LENGTH EXCEEDS 4'-8" - USE MECHANICAL TENSION SPLICES
WITH LOW LIFT GROUTING.
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
As indicatedB
IM
/1
P a A
N G
A
D A
L B
/1
B
S
.r v t
/2
/2
:1
:2
P
M
S-503 10239241
C. QUIROZ
10239241_B107_S.RVT
MASONRY DETAILS
ADAL B107 FOR G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
1 1/2" = 1'-0"
1 MASONRY WALL REINFORCING
3/4" = 1'-0"
2 CMU WALL REINFORCING
3/4" = 1'-0"
3 CMU WALL REINFORCING II
11/19/21 ISSUED FOR CONSTRUCTION
12" = 1'-0"
4 CMU SPLICE TABLE
NOTES:
1. DIAPHRAGM PERIMETER SHALL BE ATTACHED WITH MOST STRINGENT AT POINTS
PARALLEL OR POINTS PERPENDICULAR AS APPLICABLE PER SCHEDULE
2. WELDING SHALL BE 5/8"∅ PUDDLE WELD. SPACING AS INDICATED PER SCHEDULE
3. SEE TABLE FOR ATTACHMENT SCHEDULE.
METAL DECK SCHEDULE
TYPE
ATTACHMENT
AT SUPPORTS
PERPENDICULAR
TO FLUTES
ATTACHMENT
AT SUPPORTS
PARALLEL TO
FLUTES
ATTACHMENT
AT SIDELAPS
REMARKS
A
36/7:
7-3/4"∅ PER
36" WIDE SHEET
5/8"∅ WELD @
6"OC
5/8" ∅
WELD AT
1/3, 2/3 POINTS
USE UNLESS NOTED ON
PLANS
S H
E E
T W
ID
T
H
DIAPHRAGM
PERIMETER
S P
A C
IN
G
W
W
E L
D S
/7
ATTACHMENT AT
SIDELAP
℄ OF STL JOIST, BEAM
OR DECK BRG ON WALL
DECK
SIDELAPS
DIAPHRAGM
PERIMETER
ATTACHMENT AT
PERPENDICULAR SUPPORT
METAL
DECK SPAN
ATTACHMENT AT
PARALLEL SUPPORT
DECK BRG EL
SEE PLANS
L 3 X 3 X 1/4 CONT W/
3/4" DIA EXP BOLT
@ 2'-0 OC W/ 5"
MIN EMBEDMENT
METAL DECK
GROUT CELLS MIN 6"
AROUND EXP BOLTS
5/8
REFER TO
2/S-504
BRICK VENEER
STEEL BEAM
TOP OR BOTTOM
PLATE WHERE
REQD
BEARING PL 1/4X7X0'-7"
UNO ON PLANS
1" NON-SHRINK GROUT MIN
UNO
8" BRG
DECK ABOVE
NOT SHOWN
FILL ALL SHADED
CELLS WITH
GROUT
NOTES:
1. STOP PLATE AT EDGE OF OPENING AT VENEER.
UNO
2'-0"
U N
O
2-3/4" DIA x 1'-3" HEADED
ANCHOR BOLTS AND
WASHERS
#3 x 2'-6" W/ STD 180 DEG
HOOK
@ EACH
BOLT .
PROVIDE 3" LONG
SLOTTED
HOLES IN BEAM
FLANGE
FINGER TIGHTEN NUTS
AND
UPSET THREADS, TYP
UNO
CL
BEAM TO BEAM
CONNECTION SCHEDULE
BOLTED CONNECTION
NOTES:
1.BOLTS ARE 3/4" DIA A325N BOLTS. HOLES ARE 7/8" DIA IN SUPPORT
MEMBER AND 7/8" x 1" HORIZONTAL SHORT SLOTS IN ANGLES.STEEL BEAM
BEAM
SIZE
MIN # OF
BOLTS
MIN ANGLE
LENGTH (L)
W12, W14 3
L 4 X 3 X 3/8" (MIN 9" LENGTH)
/2
S E
E S
C H
E D
N O
O
F B
O L T
S
O C
/2
1/2" 3"
L
A N
G L E
L E
N G
T H
1 1/2" 1 1/2"
EA
SIDE
1/8 1 1/2
REFER TO 2/S-504
5/8
METAL
DECK
BOND BEAM (IF APPLICABLE)
BEARING PL 3/8x7x0'-7"
W/1/2"∅x6" HEADED STUD
CENTERED AT {SPACING,
SEE DESIGNER NOTES}
TOS EL
SEE PLAN
W16X57 (GALV)
9/16
3/4" THK BRG PLATE X
16" LONG (GALV)
STEEL BEAM
BEARING PL 1/4X7X0'-7"
UNO ON PLANS
1" NON-SHRINK GROUT MIN
MASONRY
ABOVE NOT
SHOWN
FILL ALL SHADED
CELLS WITH
GROUT
NOTES:
1. PROVIDE BEAM POCKET AND GROUT FULL AFTER BEAM IS
IN PLACE.
2-3/4" DIA x 1'-3" HEADED
ANCHOR BOLTS AND
WASHERS
PROVIDE 3" LONG
SLOTTED
HOLES IN BEAM
FLANGE
FINGER TIGHTEN NUTS
AND
UPSET THREADS, TYP
UNO
U N
O
TYP
1'-4" MIN
PERPENDICULAR
CONNECTION
3 1/2"
2"
1 1/2"
"D
/4
/4
W SHAPE
5/16"
5/16"
1/4"5/16"
1/4"5/16"
1/4"5/16"
1/4"3
3W14
W12
2W10
2W8
W16
W18
PLATE "T"
5/16" 1/4"
1/4"
SINGLE PLATE BEAM CONNECTION SCHEDULE 3/4" DIA BOLTS
BEAM WEB
"N" ROWS @
3" OC
"A"
S E
E N
O T
E
NOTES:
1. ALL BOLTS SHALL BE 3/4" DIA A325-N UNLESS NOTED OTHERWISE.
2. PROVIDE MINIMUM NUMBER OF BOLT ROWS "N" SHOWN AS THE TYPICAL CONN.
INCREASE NUMBER OF ROWS AND / OR BOLT DIA IF INDICATED ON PLANS.
3. USE STANDARD OR SHORT HORIZONTAL SLOTTED HOLES AS REQUIRED.
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
As indicatedB
IM
/1
P a A
N G
A
D A
L B
/1
B
S
.r v t
/2
/2
:1
:2
P
M
S-504 10239241
C. QUIROZ
10239241_B107_S.RVT
STEEL AND METAL DECK DETAILS
ADAL B107 FOR G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
1/2" = 1'-0"
1 METAL DECK SCHEDULE
1/2" = 1'-0"
2 TYPICAL METAL DECK CONNECTIONS
S-101 1" = 1'-0"
4 TYPICAL METAL DECK TO CMU
1" = 1'-0"
5 TYPICAL STEEL BEAM BEARING AT CMU
11/19/21 ISSUED FOR CONSTRUCTION
1" = 1'-0"
6 BEAM TO BEAM CONNECTION
S-101 1 1/2" = 1'-0"
3 METAL DECK BEARING AT CMU WALL
S-101 1" = 1'-0"
7 STEEL LINTEL AT OVERHEAD DOOR
1" = 1'-0"
9 STEEL BEARING ON CMU
1" = 1'-0"
8 SINGLE PLATE CONNECTION TO BEAM
EQ EQ
SEE NOTE 1
DAVIT CRANE
THREADED ROD - SIZE AND
SPACING SHALL BE COORD
WITH CRANE SUPPLIER
PL 3/4" THK
3/4" A325N BOLTS @ 8" OC
W14 BEAM, TYP
3" (TYP)
NOTES:
1. DISTANCE BETWEEN FRAMING TO
BE DETERMINED WITH CRANE
SUPPLIER
TOS STEEL
EL = SEE PLAN
REMOVABLE GUARDRAIL - TO BE
DESIGNED BY CONTRACTOR
SLEEVE SIZED TO INSERT
GUARDRAIL
PL 3/8X8X8 WITH 4 - 5/8 DIA BOLTS
EPOXY INTO GROUT (4" EMBED)
GROUT BLOCK BELOW PLATE
TOS MASONRY WALL
EL = SEE PLAN
1/4"
GRATING (GALV)
TOS GRATING
EL = SEE PLAN
SEE PLATE CONNECTION DETAIL
HSS 4X4 (GALV)
PL 3/8X6X8 WITH 4-3/4" A325N BOLTS
W12 BEAM
3/8" STIFFENER PLATE ON EACH
SIDE OF W12 UNDER HSS 4X4
C12X20.7 STRINGER
C12X20.7 STRINGER
C12X20.7 STRINGER
C12X20.7 STRINGER H
S
S X
X
/8
H S
S X
X
/8
HSS12X2X3/8
HSS12X2X3/8
3/16
STRINGER TO
ANGLE
L3X3X1/4 CLIP ANGLE
C12 STRINGER
METAL PAN STAIRS W/ CONC
L5X3X3/8XCONT - LOCATE AT
FACE OF BLOCKING
TOS STEEL
EL = SEE PLAN
CURB AND BLOCKING FOR ROOF
HATCH - SEE 2/A-102
BOTTOM OF LANDING
EL = 108'-4"
C12 STRINGER
METAL PAN STAIRS WITH
CONCRETE
METAL PAN STAIRS WITH
CONCRETE
C12 STRINGER
METAL PAN STAIRS WITH
CONCRETE
CMU WALL
HSS 12X2X3/8, TYP
3/4" DIAM EXPAN BOLT AT
12" OC (5" EMBED)
3/16"
3/16" 2-12
TYP
FINISH FLOOR
EL = SEE PLAN
METAL PAN STAIRS
WITH CONCRETE
C12 STRINGER
L3X3X1/4X0'-5"
W/2-5/8" DIA
EXPN ANCHORS
HANDRAIL,
REFER ARCH'L.
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
As indicatedB
IM
/1
P a A
N G
A
D A
L B
/1
B
S
.r v t
/2
/2
:1
:2
P
M
S-505 10239241
C. QUIROZ
10239241_B107_S.RVT
STAIR DETAILS
ADAL B107 FOR G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
11/19/21 ISSUED FOR CONSTRUCTION
1/2" = 1'-0"
1 DAVIT CRANE DETAIL
1" = 1'-0"
2 REMOVABLE GUARDRAIL DETAIL
1" = 1'-0"
3 PLATFORM CONNECTION DETAIL
1/2" = 1'-0"
4 STAIR FRAMING PLAN
S-101 3/4" = 1'-0"
5 STAIR FRAMING DETAIL I
1/2" = 1'-0"
6 STAIR FRAMING DETAIL II
1/2" = 1'-0"
7 STAIR FRAMING DETAIL III
NOTES:
1. PROVIDE TWO 4' LONG SECTIONS OF REMOVABLE
GUARDRAIL TO COVER 8' OPENING.
2. GUARDRAILS, MOUNTING SLEEVE TO BE HOT
DIPPED GALVANIZED. PROVIDE WEEP HOLES AT
TOP OF MOUNTING SLEEVE.
TOS STEEL
EL = SEE PLAN
TOS ROOF
EL = 116.96'
W14 BEAM
SEE DETAIL 4/S-504
FOR DECK ANGLE
CONNECTION DETAIL
TOS MASONRY WALL
EL = SEE PLAN
SEE NOTE 1
NOTES:
1. HATCH OPENING SIZE SHALL BE COORDINATED WITH HATCH SUPPLIER.
1" COMPRESSIBLE
FILLER MATERIAL
CURB AND BLOCKING FOR
ROOF HATCH - SEE ARCH
3/16" 2 - 12
TYP
L3X3X3/8
CONT AT
OPENINS
ROOF DECK - SEE PLANSEXISTING STRUCTURE ADJACENT TOS EXIS ROOF
EL = 116.96'
ROOF DECK - SEE PLANS
W14 BEAM - SEE ROOF FRAMING PLAN
TOS STEEL FRAMING
EL = SEE PLAN
10" CMU WALL
1" COMPRESSIBLE FILLER MATERIAL
(FIELD VERIFY)
EXISTING STRUCTURE ADJACENT
SEE DETAIL 4/S-504
FOR DECK ANGLE
CONNECTION DETAIL
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
As indicatedB
IM
/1
P a A
N G
A
D A
L B
/1
B
S
.r v t
/2
/2
:1
:2
P
M
S-506 10239241
C. QUIROZ
10239241_B107_S.RVT
WALL SECTIONS
ADAL B107 FOR G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
11/19/21 ISSUED FOR CONSTRUCTION
S-101 3/4" = 1'-0"
1 SECTION OF NEW WALL TO ADJACENT STRUCTURE
S-101 1" = 1'-0"
2 NEW WALL TO ADJACENT EXISTING STRUCTURE
X
X
XXX
X
ROOM
NAME
XX-XX
EQUIPMENT IDENTIFICATION
ALTERNATIVE 2
ALTERNATIVE 1
PIPING
GENERAL NOTES:
SHEET TYPE DESIGNATOR
DISCIPLINE DESIGNATOR & DISCIPLINE ORDER
AREA DESIGNATION
EXAMPLE
ARCHITECTURAL
KEY NOTE DESIGNATION
PLAN TITLE
SECTION CUT MARKER
DETAIL MARKER
MULTIPLE ELEVATION OR PHOTO MARKER
DETAIL MARKER
SECTION TITLE
ELEVATION TITLE
DETAIL TITLE
FULL BUILDING SECTION CUT MARKER
1/4" = 1'-0"
X
XXX 3/8" = 1'-0"
XXX
XXXXXX
X
XXX 1/4" = 1'-0"
X
XXX
X
XXX 3" = 1'-0"
A
EQUIPMENT NUMBER
PUMP 23
INDICATES PUMP
EXAMPLEFIGURE
PUMP 23
BUILDING 20
INDICATES PUMP
EXAMPLEFIGURE
36"LINE SIZE
PLANT EFFLUENTSERVICE
EXAMPLE36"-PLEFIGURE
NPWP2023
NPWP-23
GRAVITY THICKENER ARCHITECTURAL SECTION, DRAWING 01
GENERAL (SYMBOLS, LEGENDS)
PLANS
ELEVATIONS
SECTIONS
LARGE SCALE VIEWS
DETAILS
SCHEDULES AND DIAGRAMS
PROFILES
3D REPRESENTATIONS
GENERAL
SURVEYING/MAPPING
DEMOLITION
CIVIL
MULTI-DISCIPLINE
STRUCTURAL
ARCHITECTURAL
PROCESS
MECHANICAL (HVAC)
PLUMBING
ELECTRICAL
INSTRUMENTATION
TO BE EDITED ON AN A PROJECT BASIS. TO BE DETERMINED BY
THE PROJECT MANAGER, THEN ADDED TO THE GENERAL
LEGEND.
EXAMPLE:
01 BUILDING OR AREA NAME
02 BUILDING OR AREA NAME
03 BUILDING OR AREA NAME
G V X C U S A D M P E Y
SERVICE
ABBREVIATION
EQUIPMENT
ABBREVIATION
BUILDING
OR
STRUCTURE
NUMBER
EQUIPMENT NUMBER
INDICATES
NON-POTABLE WATER
INDICATES
NON-POTABLE WATER
SERVICE
ABBREVIATION
EQUIPMENT
ABBREVIATION
KEY NOTE NUMBER
LOUVER
WINDOW TYPE
WALL TYPE
COLUMN GRID LINE
ROOM NUMBER
DOOR NUMBER
ACCESSORY, FURNITURE,
AND MISCELLANEOUS
EQUIPMENT IDENTIFIER
ARROW INDICATES
DIRECTION OF PLAN
NORTH
4-HOUR FIRE RATED WALL
3-HOUR FIRE RATED WALL
2-HOUR FIRE RATED WALL
1-HOUR FIRE RATED WALL
COLUMN GRID LINE/CENTERLINE
FOR REFERENCING DETAILS BOUND IN
SPECIFICATIONS OR SEPARATE VOLUME.
SHEET WHERE SECTION
IS LOCATED
SHEET WHERE SECTION
VIEW IS FIRST CUT *
SHEET WHERE DETAIL
IS LOCATED *
ELEVATION
IDENTIFICATION NUMBER
SHEET WHERE POINT OF VIEW
MARKER CAN BE FOUND *
* EXCEPTIONS WHERE THE SHEET NUMBER IS REPLACED BY A DASH (-).
1) FOR COMMON DETAILS, SECTIONS, ELEVATIONS OR DETAILS
THAT ARE CUT OR CALLED OUT ON MULTIPLE SHEETS.
2) SECTIONS, ELEVATIONS OR DETAILS THAT ARE LOCATED ON THE
SAME SHEET THEY ARE CUT OR CALLED OUT ON.
ARROW INDICATES POINT OF
VIEW ELEVATION
INDICATES SHEET WHERE
ELEVATION IS LOCATED
FOR REFERENCING DETAILS INCLUDED IN DRAWING SET.
X
XX
X
SECTION LETTER
FLAG INDICATES DIRECTION
OF SECTION CUT
SECTION LETTER
DETAIL NUMBER
SHEET WHERE DETAIL
IS LOCATED *
DETAIL NUMBER
ELEVATION NUMBER
SHEET WHERE
SECTION IS LOCATED
SECTION LETTER
TARGET ELEVATION
ARROW INDICATES
DIRECTION OF SECTION
CUT
IDENTIFICATION SYMBOLOGY SHEET NAMING CONVENTION
GENERAL LINE SYMBOLOGY
GENERAL SYMBOLOGY
PLAN
SECTION
DETAIL
ELEVATIONX
XXX
X
XXX
MATERIALS IN PLAN/SECTION
RIPRAP (PLAN AND/OR SECTION)
WEEP JOINT MORTAR
PROTECTION SYSTEM (SECTION)
SOD (SECTION)
FILTER POINT MAT (PLAN)
GRATING (PLAN)
PARTICLE BOARD (SECTION)
ORIENTED STRAND BOARD (SECTION)
GLULAM LUMBER (SECTION)
FINISHED WOOD (SECTION)
BRICK MASONRY (PLAN AND/OR SECTION)
ACOUSTICAL CEILING TILE (SECTION)
PLYWOOD (SMALL-SCALE SECTION)
GROUT (SECTION)
ASPHALT (LARGE-SCALE SECTION)
DEMOLITION (PLAN AND/OR SECTION)
CONCRETE (PLAN AND/OR SECTION)
GRANULAR FILL (SECTION)
EARTH (SECTION)
GRATING (SECTION)
CHECKERED PLATE (PLAN)
BATT INSULATION (SECTION)
WOOD - CONTINUOUS (SECTION)
METAL (SECTION)
RIGID INSULATION (SECTION)
WOOD - BLOCKING (SECTION)
PLYWOOD (LARGE-SCALE SECTION)
GYPSUM BOARD (SECTION)
SAND (SECTION)
CONCRETE MASONRY (PLAN
AND/OR SECTION)
PRECAST CONCRETE (PLAN
AND/OR SECTION)
ASPHALT (PLAN OR SMALL-SCALE SECTION)
X
XXX BUILDING OR AREA 02
SHEET TYPE DESIGNATOR
SHEET NUMBER
DISCIPLINE DESIGNATOR
BUILDING OR AREA DESIGNATION
EXAMPLE
0 2
A
0 1
0 2 A 3 0 1
ARCHITECTURA
L
SECTIONS
SHEET 01
SINGLE ELEVATION OR PHOTO MARKER
X
XXX
X
XXX
ARROW INDICATES
POINT OF VIEW
SHEET WHERE ELEVATION
IS LOCATED *
INTERIOR EXTERIOR
ELEVATION NUMBER
NORTH ARROW
THIS IS A STANDARD SHEET SHOWING
COMMON SYMBOLOGY. ALL SYMBOLS ARE
NOT NECESSARILY USED ON THIS PROJECT.
SCREENING OR SHADING OF WORK IS USED
TO INDICATE EXISTING COMPONENTS OR TO
DE-EMPHASIZE PROPOSED IMPROVEMENTS TO
HIGHLIGHT SELECTED TRADE WORK. REFER
TO CONTEXT OF EACH SHEET FOR USAGE.
1.
2.
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
12" = 1'-0"B
IM
/1
P a A
N G
A
D A
L B
/1
B
A
.r v t
/1
/2
:4 :0
A
M
A-001
JLSQ192007
C. QUIROZ
10239241_B107_A.rvt
LEGEND AND SYMBOLS
ADAL B107 G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
B-1 03/26/2021 ISSUED FOR REVIEW
B-2 9/24/2021 ISSUED FOR REVIEW
B-3 11/19/2021 FINAL DESIGN SUBMITTAL
ISSUE DATE DESCRIPTION
B-1 03/26/2021 ISSUED FOR REVIEW
M
X
(TA-3)
MIRROR
(TA-7)
SOAP DISPENSER
(TA-5)
ELECT HAND
DRYER
M
IN
(TA-8)
TOILET PAPER
HOLDER
(TA-6)
SANITARY NAPKIN
DISPOSAL
M A
X
SEE INT ELEV
M A
X
LIGHT SWITCH,
CARD READER,
THERMOSTAT
FIRE
CABINET
FIRE
EXTINGUISHER
W/ CABINET
AED
(AUTOMATED
EXTERNAL
DEFIBRILATOR)
ADA SKIRT
DOWN TO 27"
M
IN
FRONT SIDE
4" MAX.
(TA-4)
PAPER TOWEL DISPENSER /
WASTE RECEPTABLE
M A
X
(TA-16)
COAT HOOK
M A
X
FIRE
EXTINGUISHER
ON WALL HOOK
M A
X
303.2 - VERTICAL
CHANGE IN LEVEL
M a x
/4
303.3 - BEVELED
CHANGE IN LEVEL
/4
/4
/2
303.2 VERTICAL
CHANGES IN LEVEL OF 1/4 INCH (6.4 MM) HIGH
MAXIMUM SHALL BE PERMITTED TO BE VERTICAL.
4" Max.
307.2 LIMITS OF
PROTRUDING OBJECTS
307.1 GENERAL
PROTRUDING OBJECTS SHALL COMPLY WITH 307.
307.2 PROTRUSION LIMITS
OBJECTS WITH LEADING EDGES MORE THAN 27 INCHES (685 MM) AND
NOT MORE THAN 80 INCHES (2030 MM) ABOVE THE FINISH FLOOR OR
GROUND SHALL PROTRUDE 4 INCHES (100 MM) MAXIMUM HORIZONTALLY
INTO THE CIRCULATION PATH.
EXCEPTION: HANDRAILS SHALL BE PERMITTED TO PROTRUDE 4 1/2
INCHES (115 MM) MAXIMUM.
1'-0" Min.
FRONT
APPROACH,
PULL SIDE
M in
Min.
1'-6"
FRONT
APPROACH,
PUSH SIDE
404.2.4.1 MANEUVERING CLEARANCES AT MANUAL
SWINGING DOORS AND GATES
NOTE: MAX. FORCE TO OPEN DOOR 5LBS
MIRROR
(TA-3)
SOAP DISPENSER
(TA-7)
ELECT HAND
DRYER (TA-4)
M
IN
TOILET PAPER
HOLDER (TA-8)
SANITARY NAPKIN
DISPOSAL(TA-6)
M A
X
M A
X
7"
3'-6" 1'-0" 6" 3'-0"
1'-6"1'-4"~
/2
M
IN
~ 9"
" M
A X
H .C
S T
D . 2
M A
X
MIN.
WATER CLOSET SIDE WALL
1 1/2" DIA.
GRAB BAR
WITH 1 1/2" GAP
FROM WALL
WATER CLOSET BACK WALL URINAL
H .C
TOILET PAPER
MOUNTING AREA
(ALSO TYPICAL AT
ALL STANDARD
NON-HANDICAP
STALLS)
S T
D
LAVATORY OR VANITY SINK
M
IN
OFFSET WASTE-
ALL EXPOSED
PIPING SHALL
HAVE INSULATION
BARRIER
ACCESSIBLE
SINK BOWL 6
1/2" DEEP
TYPICAL TOILET FIXTURES AND ACCESSORIES MOUNTING HEIGHTS
TYPICAL PLUMBING FIXTURES AND ACCESSORIES MOUNTING HEIGHTS
COUNTER
WHERE
OCCURS
M A
X
SEE INT ELEV
TA-2 TA-1
6" MIN1'-3"
WASTE
RECEPTACLE
FRP
WALL
BASE
LIGHT SWITCH,
CARD READER,
THERMOSTAT
FIRE
CABINET
FIRE
EXTINGUISHER
ADA SKIRT
DOWN TO 27"
AED
(AUTOMATED
EXTERNAL
DEFIBRILATOR)
ADA SKIRT
DOWN TO 27"
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
As indicatedB
IM
/1
P a A
N G
A
D A
L B
/1
B
A
.r v t
/1
/2
:4 :0
A
M
A-002
JLSQ192007
C. QUIROZ
10239241_B107_A.rvt
TYPICAL ABA DETAILS
ADAL B107 G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
NOT TO SCALE
1 TYPICAL ABA TOILET FIXTURES AND ACCESSORIES MOUNTING HEIGHTS
NOT TO SCALE
4 CHANGES IN LEVEL
NOT TO SCALE
2 PROTRUDING OBJECTS
NOT TO SCALE
3 DOORS, DOORWAYS AND GATES
NOT TO SCALE
5 TYPICAL ACCESSIBLE HEIGHTS ELEVATIONS
B-1 03/26/2021 ISSUED FOR REVIEW
B-2 9/24/2021 ISSUED FOR REVIEW
B-3 11/19/2021 FINAL DESIGN SUBMITTAL
ISSUE DATE DESCRIPTION
B-1 03/26/2021 ISSUED FOR REVIEW
%%32 %%32
E
F
SEE A-101 FOR
SCOPE
REPLACE ALL CEILING PANELS. EXISTING GRID, LIGHTING,
DIFFUSERS, ETC TO REMAIN IN PLACE. REINSTALL ANY CEILING
MOUNTED EQUIPMENT INTO NEW CEILING PANELS.
AT ALL AREAS:
MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, MISCELLANEOUS
EQUIPMENT, AND ALL CONTROLS AND ACCESSORIES BELOW THE
CEILING LEVEL TO REMAIN IN PLACE. ALL DUCTWORK,
INSULATION, FLEXIBLE DUCTWORK, REGISTERS, DIFFUSERS,
EXHAUST FANS, CONTROL WIRING, LIGHTING, CONDUITS AND ANY
ASSOCIATED ITEMS ABOVE THE CEILING LEVEL SHALL REMAIN IN
PLACE AND BE REUSED TO THE GREATEST EXTENT
POSSIBLE. WHEN REMOVAL IS REQUIRED, DISCONNECT FROM
THE ASSOCIATED SYSTEMS BELOW THE CEILING LEVEL AND
REINSTALL IN THE EXACT LOCATION AS REQUIRED. WHEN REUSE
IS NOT POSSIBLE, PROVIDE EXACT REPLACEMENT MATCHING
EXISTING AND REINSTALL IN THE EXACT LOCATION AS
REQUIRED. CONTRACTOR TO VERIFY EXTENT OF WORK.
NEW CEILING PANELS AND GRID. REINSTALL ALL LIGHTING,
DIFFUSERS, AND EQUIPMENT INTO NEW CEILING IN SIMILAR
POSITION PRIOR TO DEMOLITION.
NO WORK
PATCH AND REPAINT CEILING AS REQUIRED FOR SPRINKLER
INSTALLATION
NEW CEILING PANELS AND GRID. REINSTALL ALL LIGHTING,
DIFFUSERS, AND EQUIPMENT INTO NEW CEILING IN SIMILAR
POSITION PRIOR TO DEMOLITION.
PATCH AND REPAINT CEILING AS REQUIRED FOR ELECTRICAL
CONDUIT INSTALLATION
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. PURPURA
J. JAECKEL
D. SPENCER
I. DENHOLM
Z. SACHSENMAIER
1/16" = 1'-0"B
IM
/1
P a A
N G
A
D A
L B
/1
B
A
.r v t
/2
/2
:1 :1
P
M
A-100
JLSQ192007
C. QUIROZ
10239241_B107_A.rvt
OVERALL PLAN
ADAL B107 G-ASNT
PITTSBURGH INTERNATIONAL AIRPORT
1/16" = 1'-0"
OVERALL PLAN
B-1 03/26/2021 ISSUED FOR REVIEW
B-2 9/24/2021 ISSUED FOR REVIEW
B-3 11/19/2021 FINAL DESIGN SUBMITTAL
ISSUE DATE DESCRIPTION
B-1 03/26/2021 ISSUED FOR REVIEW
F
UP
R E
F .A-201
A-201
C
D
E
F
6 7 8 9 10 11
E-A
SRC ROOM
CAT ROOM
MECHANICAL
ADMIN
AREA
LAT
161B
KIT
161A
WCP
ROOM
IT/GASNT
EQ
CLOSET
A
A-301
A-301
ALIGN
13'-4"
+/- 3'-11"
3'-4" 18'-8"
+/- 6'-8" 10'-1" 7'-8"
EQUIP.
STORAGE
STAIR
A-4006
A
ALIGN
A-302
A
161a
163b
100a
100b
A3
A6A6
A4
A5
A11A11
A-101
/4
A14
A-201
A-501
TYP.
A15
SECURITY
DESK
159a
A-101
B
B
164a
A14
TYP.
A14
TYP.
A26
ENTRY
COMM
ROOM
164a
A-302
PDSC
MEC
SIPR
INC2
A11A11
A11A11
A11A11
A28
A11
A28A28
A27
A29
V
IF
4'-7" 28'-3" VIF
/2
C
D
E
F
6 7 8 9 10 11
E-A
A-301
A-301
ROOF HATCH ABOVE
A-302
KIT
161A
WCP
ROOM
161…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .