PDF 8 MB Posted

Attached to
EXT REC | CMD Micro-Set-Aside - CON27-0005 GGP ADA
Solicitation number
SFGOV-0000011975
Issued by
San Francisco County, San Francisco City, California

About this file

This is a cover sheet and construction drawing index for the Golden Gate Park ADA Parking Project (CON27-0005) submitted by the San Francisco Recreation and Parks Department Capital and Planning Division. The project involves modifications to parking infrastructure at Golden Gate Park to comply with ADA accessibility standards. The scope of work includes modifying asphalt curbs and installing three new concrete curb ramps with pedestrian access routes, installing concrete pads for 25 pay stations, painting curbs red and blue, stenciling parking stalls on street surfaces, and installing swinging gates and bollards at two locations. The project will create 26 ADA car parking spaces and 10 ADA van spaces, with two utility boxes requiring reset. The construction drawings are prepared in accordance with the 2025 California Building Code, 2025 San Francisco Building Code, and 2010 ADA Standards for Accessible Design. The 100% submittal package includes 45 detailed landscape architecture sheets with site-specific plans across multiple Golden Gate Park locations, including areas near John F. Kennedy Drive, Martin Luther King Jr. Drive, Nancy Pelosi Drive, and Middle Drive West. A non-mandatory pre-bid meeting is scheduled for Thursday, August 6, 2026, at 10:00 a.m. at the corner of Martin Luther King Drive and Hagiwara Tea Garden Drive, with contact information provided for the project manager.

This is a Micro LBE Set-Aside solicitation with a cost estimate of $550,000 and a Class A contractor license requirement. The project is governed by San Francisco Administrative Code 14B.7(K), requiring the prime contractor to be CMD certified as a Micro-LBE and perform at least 25 percent of the total contract amount. Micro-LBE subcontractors are encouraged to the maximum extent possible, though no LBE subcontracting is mandated. The Neighborhood LBE Pilot Program applies, offering additional bid discounts for firms with principal places of business in Supervisorial District 1 and project zip code 94121. Addendum #1 was posted on August 17, 2026, without changing the due date. Contract Compliance Officer Norbu Dhonyo oversees compliance requirements. All project questions must be submitted by the stated deadline, with additional project details and bidding documentation available through the referenced attachment link.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Original Sheet Size: 36" x 24"

Sheet No.

Drawing Title

Project No.

DAC

Proj. Mgr.

Project

Scale:

Drawn

COVER SHEET

G 0.0

Checked by

49 Van Ness Ave., Suite 1200, San Francisco, CA 94102

NO SCALE

Golden Gate Park - ADA Parking Golden Gate Park San Francisco, CA

LOCATION MAP

PROPERTY INFORMATION

TOTAL NEW CURB RAMPS: 3

TOTAL ADA CAR SPACES: 26

TOTAL ADA VAN SPACES: 10

TOTAL PAY STATIONS: 25

TOTAL UTILITY BOXES TO BE RESET: 2

NOTE: CONTRACTOR TO VERIFY IN FIELD ALL QUANTITIES SHOWN

SCOPE OF WORK

1. MODIFY ASPHALT CURBS, INSTALL CONCRETE CURB RAMPS AND PEDESTRIAN

ACCESS ROUTES NEAR ADA PARKING SPACES AS PER STANDARDS

3. INSTALL CONCRETE PADS FOR PAY STATIONS

4. PAINT CURBS RED AND BLUE

5. STENCIL ON STREET PARKING STALLS

6. INSTALL SWINGING GATE AND BOLLARDS AT 2 LOCATIONS

CODE SUMMARY

2025 CALIFORNIA BUILDING CODE (CBC)

2025 SAN FRANCISCO BUILDING CODE (SFBC)

2010 ADA STANDARDS FOR ACCESSIBLE DESIGN (2010 ADAS)

CAPITAL AND PLANNING DIVISION

100% SUBMITTAL

No. Date Revisions

DATE

Project Location Golden Gate Park San Francisco, CA

JR

JR

SA

LB

Golden Gate Park - ADA Parking

A RECREATION AND PARK DEPARTMENT PROJECT

3/5/26

5/5/26

7/2/26

R1

R2

R3

Drawing Title

Project No.

DAC

Proj. Mgr.

Project

Scale:

Drawn

INDEX SHEET

G 1.0

Checked by

49 Van Ness Ave., Suite 1200, San Francisco, CA 94102

NO SCALE

Golden Gate Park - ADA Parking

Golden Gate Park San Francisco, CA

CAPITAL AND PLANNING DIVISION

100% SUBMITTAL

No. Date Revisions

DATE

JR

JR

SA

LB

3/5/26

5/5/26

7/2/26

R1

R2

R3

SHEET INDEX

GENERAL LANDSCAPE ARCHITECTURE

G 0.0 COVER SHEET

G 1.0 INDEX SHEET

G 2.0 SITE REFERENCE KEY PLAN

G 3.0 DISABILITY ACCESS COORDINATOR (DAC) FORM

G 3.51 DPW ACCESSIBLE PARKING STALL SIGN STANDARDS

L1 P-02 GREAT HIGHWAY

L2 P-01 JOHN F KENNEDY DR

L3 ADA-05A JOHN F KENNEDY DR & 47TH AVE

L4 P-03 GOLF LOT

L5 P-04 BEACH CHALET ATHLETIC FIELD

L6 ADA-09 JOHN F KENNEDY DR & BERNICE RODGERS WAY

L7 ADA-12 JOHN F KENNEDY DR

L8 ADA-13, ADA-15A JOHN F KENNEDY DR & CHAIN OF LAKES DR

L9 P-05 CHAIN OF LAKES DR

L10 P-06 SENIOR CENTER

L11 P-07 JOHN F KENNEDY DR

L12 ADA-21, POLO FIELD NORTH

L13 ADA-74 MIDDLE DRIVE WEST (POLO FIELD SOUTH)

L14 ADA-20A, ADA-20B MIDDLE DR WEST

L15 ADA-22, P-09 JOHN F KENNEDY DR

L16 ADA-27A, ADA-27B JOHN F KENNEDY DR

L17 ADA-26A, ADA-26B, P10 JOHN F KENNEDY DR & 30TH AVE

L18 ADA-28 JOHN F KENNEDY DR

L19 ADA-29A, P11 MARTIN LUTHER KING JR DR

L20 ADA-30, P-12 JOHN F KENNEDY DR

L21 ADA-32 MIDDLE DR WEST & OVERLOOK DR

L22 ADA-39, P13 MARTIN LUTHER KING JR DR & 25TH AVE

L23 ADA-42A JOHN F KENNEDY DR

L24 ADA-43, P-14 JOHN F KENNEDY DR & TRANSVERSE

L25 ADA-45A MIDDLE DR WEST & TRANSVERSE DR

L26 P-15 BLUE HERON LAKE PARKING LOT

L27 ADA-49B BLUE HERON LAKE DR E

L28 ADA-52 MARTIN LUTHER KING JR DR

L29 ADA-53A, ADA-53B, P-16 MARTIN LUTHER KING JR DR

L30 ADA-55, P-17 MARTIN LUTHER KING JR DR & HAGIWARA TEA GARDEN DR

L31 ADA-58 MARTIN LUTHER KING JR DR & BLUE HERON LAKE DR

L32 P-18 MARTIN LUTHER KING JR DR

L33 CR-60, ADA-60 MARTIN LUTHER KING JR DR & 9TH AVE

L34 ADA-62A, ADA-62B, P-19 NANCY PELOSI DR

L35 CR-64, ADA-64, P-20 MARTIN LUTHER KING DR & 7TH AVE

L36 ADA-65A MARTIN LUTHER KING JR DR

L37 ADA-66, P-21 CONSERVATORY DR WEST

L38 ADA-66 ARGUELLO BLVD & CONSERVATORY DR W

L39 P-22 NANCY PELOSI DR & BOWLING GREEN DR

L40 P-23 BOWLING GREEN DR

L41 CR-71, ADA-71A, P-24 ARGUELLO BLVD & KEZAR DR

L42 P-25 MCLAREN LODGE

L43 GATE 1 - POLO FIELD NORTH

L44 GATE 2 - POLO FIELD NORTH

L45 CONSTRUCTION DETAILS

RX-1 DPW ACCESSIBLE STREET CROSSING STANDARD - INDEX

RX-2 STANDARD CURB RAMPS GENERAL NOTES

RX-3 STANDARD CURB RAMP LAYOUT PARAMETERS FOR RAMP NOT PERPENDICULAR TO CURB

RX-4 STANDARD CURB RAMP LAYOUT PARAMETERS FOR RAMP PERPENDICULAR TO CURB

RX-5 STANDARD CURB RAMP PLANS

RX-6 STANDARD CURB RAMPS DETECTABLE WARNING LAYOUT DETAILS AND NOTES

RX-7 ALTERNATE CURB RAMPS MERGED GROOVED BORDER CURB RAMP PLANS

RX-8 ALTERNATE CURB RAMPS WITH CONSTRAINED SIDEWALK WIDTHS

RX-9 ALTERNATE CURB RAMPS MERGED CURB RAMP PLANS

RX-10 ALTERNATE CURB RAMPS SINGLE CURB RAMP PLANS

RX-11

ALTERNATE CURB RAMPS CONSTRAINED T-INTERSECTION RAMPS AND BLENDED

TRANSITION CURB RAMPS

Drawing Title

Project No.

DAC

Proj. Mgr.

Project

Scale:

Drawn

SITE REFERENCE KEY PLAN

G 2.0

Checked by

49 Van Ness Ave., Suite 1200, San Francisco, CA 94102

NO SCALE

Golden Gate Park - ADA Parking

Golden Gate Park San Francisco, CA

CAPITAL AND PLANNING DIVISION

100% SUBMITTAL

No. Date Revisions

DATE

JR

JR

SA

LB

MLK JR DR

MLK JR DR

JFK DR

JFK PROMENADE

STANYAN ST

CONSERVATORY DRFULTON ST FULTON ST FULTON ST

LINCOLN WAY LINCOLN WAY

MLK JR DR

MIDDLE DR

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

N

D

AV

E

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

8T H

A

VE

4T H

A

VE

AR

GU

EL

LO

BL

VD

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

N

D

AV

E

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

8T H

A

VE

4T H

A

VE

TH

A

VE

SU

N

SE

T B

LV

D

JFK PROMENADE

MIDDLE DR W

BLUE HERON LAKE DR

MLK JR DR

TH

A

VE

36TH AVE 30

TH

A

VE

KEZAR DR

JFK DR

JFK DR

NANCY PELOSI DR

TRANSVERSE DR

25TH AVEMLK JR DR

CROSSOVER DR

CHAIN O

F LAKES DR

MLK JR DR

MLK JR DR

JFK DR

JFK PROMENADE

STANYAN ST

CONSERVATORY DR

GGP

POLO FIELD

FULTON ST FULTON ST FULTON ST

LINCOLN WAY LINCOLN WAY

MLK JR DR

MIDDLE DR

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

N

D

AV

E

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

8T H

A

VE

4T H

A

VE

AR

GU

EL

LO

BL

VD

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

N

D

AV

E

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

TH

A

VE

8T H

A

VE

4T H

A

VE

TH

A

VE

SU

N

SE

T B

LV

D

JFK PROMENADE

MIDDLE DR W

BLUE HERON LAKE DR

MLK JR DR

TH

A

VE

36TH AVE 30

TH

A

VE

KEZAR DR

JFK DR

JFK DR

NANCY PELOSI DR

TRANSVERSE DR

25TH AVEMLK JR DR

CROSSOVER DR

CHAIN O

F LAKES DR

YY ZZ AAAA ABABPPHH II JJ KK QQ RR SS TTLL MM XXWWFF GG UU VVNN OOBB CC DD EEAA

3/5/26

5/5/26

6/30/26

R1

R2

R3

Drawing Title

Project No.

DAC

Proj. Mgr.

Project

Scale:

Drawn

DISABILITY ACCESS

COORDINATOR FORM

G 3.0

Checked by

49 Van Ness Ave., Suite 1200, San Francisco, CA 94102

NO SCALE

Golden Gate Park - ADA Parking

Golden Gate Park San Francisco, CA

CAPITAL AND PLANNING DIVISION

100% SUBMITTAL

No. Date Revisions

DATE

JR

JR

SA

LB

Capital and Planning Division 49 South Van Ness Ave., Suite 1220 San Francisco, CA 94102 (628) 652-6600 www.sfrecpark.org

REV 05/14/2026

Kat Anderson, Commission President Daniel Lurie, Mayor Sarah Madland, General Manager

RPD DISABILITY ACCESS COORDINATOR PROJECT REVIEW

Instructions: Complete this form by entering the project name and address. Scan and attach it to the cover sheet of the final RPD project record set. Project plan review approvals and required inspections will be indicated in the appropriate checkboxes.

PROJECT NAME:

Golden Gate Park – ADA Parking

PROJECT ADDRESS:

Golden Gate Park, San Francisco, CA

LEAVE AREA BELOW BLANK – FOR RPD-DAC USE ONLY

PLAN REVIEW - RPD has approved:

Technical Infeasibility / Unreasonable Hardship RPD Outdoor Developed Area Guidelines (ODAG) Exception Document MOD Playground Inventory Form Pre-application / Site Permit review Final Construction Plans

INSPECTIONS - The following RPD-DAC inspections are required:

On-site pre-construction conference Rough framing after rough plumbing and rough electrical installed Signage, including proofs and color samples prior to fabrication Door closer pressure and timing Power door operator testing per ANSI/BHMA A156.19 Playground equipment, surface, and path of travel Final inspection and signoff of project

Additional documents required:

RPD-DAC review by (print name): _____________________________________________

RPD-DAC Signature: _____________________________________ Date: ______________

3/5/26

5/5/26

7/2/26

R1

R2

R3

RPD DISABILITY ACCESS COORDINATOR FORM

G 3.51

CAPITAL AND PLANNING DIVISION

49 South Van Ness Ave., Suite 1200, San Francisco, CA 94103

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

PW

Accessible Parking

Stall Sign Standards

GOLDEN GATE PARK

ADA PARKING

JR

SA

DM

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _7

.a i"

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

10 0 10 205 Feet

N RPD_Facilities Curbs_and_Islands Signage_No_Parking

Pay_Stations

Curb_Ramps Type

Existing Newer Curb Ramp Modify Existing Curb Ramp New Curb Ramp No Curb Ramp

CONSTRUCTION NOTES CONSTRUCTION LEGEND

P-02

GREAT HIGHWAY

GOLDEN GATE PARK

ADA PARKING

JR

SA

DM

Detectable Warning (DW) - Truncated Domes.

Refer to Public Works Accessible Street Crossing Standards:

RX-6, Detail A - Standard Curb Ramps Detectable Warning Layout Details And Notes

Accessible Aisle

Blue painted curb

Recessed curb for accessible aisle. Slope in all directions to be ≤1.7%

Red painted curb

1.

2.

3.

4.

5.

6.

7.

8.

9.

• All measurements to be verified in the field by Contractor

• Contractor to spray paint extents of proposed construction on site for review by Owner

• Cross slope to be ≤1.7%

• Running slope to be ≤4.5%

Post with International Symbol of Accessibility sign. Refer to Public Works Parking Sheet G 3.51, Detail 6 - Accessible Parking Stall Sign.

For Van accessible stalls, see Sheet G 3.51, Detail 9 - Van Accessible Parking Stall Sign

New Asphalt Paving (See Sheet D1.1 for Details)

New Concrete Paving (See Sheet D1.1 for Details)

Landing to be width of ramp and 4’-1” in depth, with slope in all directions to be ≤1.7%

1" = 10'

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _3

.a i"

A

L1

3/5/26

5/5/26

7/2/26

R1

R2

R3

G

RE

A T

H

IG

H W

A Y

BEACH CHALETASPHALT TO BE FIXED NEAR

APRON TO MEET ADA STANDARDS

ASPHALT TO BE FIXED AT LIP

TO MEET ADA STANDARDS

P02 3’-1”

3’-1”

30” min

4’ min ≤1.7%

LEVEL PAYSTATION CONCRETE

PAD: 10” TICK MIN

FILL SEAMS AT PAYSTATION APPROACH

AND REPLACE 2 CONCRETE RECTANGLE

PAVERS ABUTTING CURB RAMP

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

10 0 10 205 Feet

N RPD_Facilities Curbs_and_Islands Signage_No_Parking

Pay_Stations

Curb_Ramps Type

Existing Newer Curb Ramp Modify Existing Curb Ramp New Curb Ramp No Curb Ramp

CONSTRUCTION NOTES CONSTRUCTION LEGEND

P-01

JOHN F KENNEDY DR

GOLDEN GATE PARK

ADA PARKING

JR

SA

DM

Detectable Warning (DW) - Truncated Domes.

Refer to Public Works Accessible Street Crossing Standards:

RX-6, Detail A - Standard Curb Ramps Detectable Warning Layout Details And Notes

Accessible Aisle

Blue painted curb

Recessed curb for accessible aisle. Slope in all directions to be ≤1.7%

Red painted curb

1.

2.

3.

4.

5.

6.

7.

8.

9.

• All measurements to be verified in the field by Contractor

• Contractor to spray paint extents of proposed construction on site for review by Owner

• Cross slope to be ≤1.7%

• Running slope to be ≤4.5%

Post with International Symbol of Accessibility sign. Refer to Public Works Parking Sheet G 3.51, Detail 6 - Accessible Parking Stall Sign.

For Van accessible stalls, see Sheet G 3.51, Detail 9 - Van Accessible Parking Stall Sign

New Asphalt Paving (See Sheet D1.1 for Details)

New Concrete Paving (See Sheet D1.1 for Details)

Landing to be width of ramp and 4’-1” in depth, with slope in all directions to be ≤1.7%

1" = 10'

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _4

.a i"

A

B

L2

3/5/26

5/5/26

R1

R2

R3

03 7/2/26

JOHN F KENNEDY DR

3’-1” 3’-1”

LEVEL PAYSTATION CONCRETE

PAD: 10” THICK MIN

SITE ABUTTING ASPHALT IN LOCATION

WITH 30”X48” AREA <1.7% SLOPE

IN ALL DIRECTIONS

30” min 4’-1” min

≤1.7%

P01

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

10 0 10 205 Feet

N RPD_Facilities Curbs_and_Islands Signage_No_Parking

Pay_Stations

Curb_Ramps Type

Existing Newer Curb Ramp Modify Existing Curb Ramp New Curb Ramp No Curb Ramp

CONSTRUCTION NOTES CONSTRUCTION LEGEND

Detectable Warning (DW) - Truncated Domes.

Refer to Public Works Accessible Street Crossing Standards:

RX-6, Detail A - Standard Curb Ramps Detectable Warning Layout Details And Notes

Accessible Aisle

Blue painted curb

Recessed curb for accessible aisle. Slope in all directions to be ≤1.7%

Red painted curb

1.

2.

3.

4.

5.

6.

7.

8.

9.

• All measurements to be verified in the field by Contractor

• Contractor to spray paint extents of proposed construction on site for review by Owner

• Cross slope to be ≤1.7%

• Running slope to be ≤4.5%

Post with International Symbol of Accessibility sign. Refer to Public Works Parking Sheet G 3.51, Detail 6 - Accessible Parking Stall Sign.

For Van accessible stalls, see Sheet G 3.51, Detail 9 - Van Accessible Parking Stall Sign

New Asphalt Paving (See Sheet D1.1 for Details)

New Concrete Paving (See Sheet D1.1 for Details)

Landing to be width of ramp and 4’-1” in depth, with slope in all directions to be ≤1.7%

ADA-05A

JOHN F KENNEDY DR &

47TH AVE

1" = 10'

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _5

.a i"

B

L3

3/5/26

5/5/26

7/2/26

R1

R2

R3

TH

A

VE

JOHN F KENNEDY DR

ADA-05A

JR

SA

LB

GOLDEN GATE PARK

ADA PARKING

5’-1”

3’-1”

5’-1”

5’-1”

20’-1”

4’-1” m in

4’-1

≤5%

≤1.7%

SEE CONSTRUCTION NOTE 7 & REFER TO PW CURB RAMP DETAIL

RX-11, DETAIL E - LANDSCAPED PATHWAY RETURNED CURB LAYOUT

RECESSED CURB

≤4.5%

SEE CONSTRUCTION NOTE 6

EXACT RAMP LOCATION TO BE FINALIZED ON SITE BASED ON

MOST LEVEL AREA.

LANDING TO BE INCORPORATED WITHIN (E) PATH IF POSSIBLE

≤1.7%

≤1.7% ≤4.5%

≤4.5%

≤1.7%

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

10 0 10 205 Feet

N RPD_Facilities Curbs_and_Islands Signage_No_Parking

Pay_Stations

Curb_Ramps Type

Existing Newer Curb Ramp Modify Existing Curb Ramp New Curb Ramp No Curb Ramp

CONSTRUCTION NOTES CONSTRUCTION LEGEND

P-03

GOLF LOT

GOLDEN GATE PARK

ADA PARKING

JR

SA

LB

Detectable Warning (DW) - Truncated Domes.

Refer to Public Works Accessible Street Crossing Standards:

RX-6, Detail A - Standard Curb Ramps Detectable Warning Layout Details And Notes

Accessible Aisle

Blue painted curb

Recessed curb for accessible aisle. Slope in all directions to be ≤1.7%

Red painted curb

1.

2.

3.

4.

5.

6.

7.

8.

9.

• All measurements to be verified in the field by Contractor

• Contractor to spray paint extents of proposed construction on site for review by Owner

• Cross slope to be ≤1.7%

• Running slope to be ≤4.5%

Post with International Symbol of Accessibility sign. Refer to Public Works Parking Sheet G 3.51, Detail 6 - Accessible Parking Stall Sign.

For Van accessible stalls, see Sheet G 3.51, Detail 9 - Van Accessible Parking Stall Sign

New Asphalt Paving (See Sheet D1.1 for Details)

New Concrete Paving (See Sheet D1.1 for Details)

Landing to be width of ramp and 4’-1” in depth, with slope in all directions to be ≤1.7%

3/5/26

5/5/26

R1

R2

R3

03 7/2/26

1" = 10'

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _6

.a i"

L4

B

GOLF COURSE

3’-1 ”3’-1”

5’-1 ” m in5’-1” min ≤1.7%

P03

LEVEL PAYSTATION CONCRETE

PAD: 10” THICK MIN

SITE ABUTTING ASPHALT IN LOCATION

WITH 5’X5’ AREA <1.7% SLOPE

IN ALL DIRECTIONS

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

10 0 10 205 Feet

N RPD_Facilities Curbs_and_Islands Signage_No_Parking

Pay_Stations

Curb_Ramps Type

Existing Newer Curb Ramp Modify Existing Curb Ramp New Curb Ramp No Curb Ramp

CONSTRUCTION NOTES CONSTRUCTION LEGEND

P-04

BEACH CHALET

ATHLETIC FIELD

GOLDEN GATE PARK

ADA PARKING

JR

SA

LB

3/5/26

5/5/26

R1

R2

R3

Detectable Warning (DW) - Truncated Domes.

Refer to Public Works Accessible Street Crossing Standards:

RX-6, Detail A - Standard Curb Ramps Detectable Warning Layout Details And Notes

Accessible Aisle

Blue painted curb

Recessed curb for accessible aisle. Slope in all directions to be ≤1.7%

Red painted curb

1.

2.

3.

4.

5.

6.

7.

8.

9.

• All measurements to be verified in the field by Contractor

• Contractor to spray paint extents of proposed construction on site for review by Owner

• Cross slope to be ≤1.7%

• Running slope to be ≤4.5%

Post with International Symbol of Accessibility sign. Refer to Public Works Parking Sheet G 3.51, Detail 6 - Accessible Parking Stall Sign.

For Van accessible stalls, see Sheet G 3.51, Detail 9 - Van Accessible Parking Stall Sign

New Asphalt Paving (See Sheet D1.1 for Details)

New Concrete Paving (See Sheet D1.1 for Details)

Landing to be width of ramp and 4’-1” in depth, with slope in all directions to be ≤1.7%

7/2/26

1" = 10'

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _7

.a i"

L5

B

BEACH CHALET ATHLETIC FIELDS

3’-1”

3’-1”

30” min

4’-1” min

≤1.7%P04

LEVEL PAYSTATION CONCRETE

PAD: ABLE TO BORE 8” MIN

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

10 0 10 205 Feet

N RPD_Facilities Curbs_and_Islands Signage_No_Parking

Pay_Stations

Curb_Ramps Type

Existing Newer Curb Ramp Modify Existing Curb Ramp New Curb Ramp No Curb Ramp

CONSTRUCTION NOTES CONSTRUCTION LEGEND

ADA-09

JOHN F KENNEDY DR &

BERNICE RODGERS WAY

Detectable Warning (DW) - Truncated Domes.

Refer to Public Works Accessible Street Crossing Standards:

RX-6, Detail A - Standard Curb Ramps Detectable Warning Layout Details And Notes

Accessible Aisle

Blue painted curb

Recessed curb for accessible aisle. Slope in all directions to be ≤1.7%

Red painted curb

1.

2.

3.

4.

5.

6.

7.

8.

9.

• All measurements to be verified in the field by Contractor

• Contractor to spray paint extents of proposed construction on site for review by Owner

• Cross slope to be ≤1.7%

• Running slope to be ≤4.5%

Post with International Symbol of Accessibility sign. Refer to Public Works Parking Sheet G 3.51, Detail 6 - Accessible Parking Stall Sign.

For Van accessible stalls, see Sheet G 3.51, Detail 9 - Van Accessible Parking Stall Sign

New Asphalt Paving (See Sheet D1.1 for Details)

New Concrete Paving (See Sheet D1.1 for Details)

Landing to be width of ramp and 4’-1” in depth, with slope in all directions to be ≤1.7%

3/5/26

5/5/26

R1

R2

R3

03 7/2/26

1" = 10'

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _8

.a i"

C

L6

JOHN F KENNEDY DR

BERNICE RODGERS W

AY

ADA-09

JR

SA

DM

GOLDEN GATE PARK

ADA PARKING

5’-1”

3’-1”

5’-1”

5’-1”20’-1” ≤4.5%

≤4.5%

≤4.5%

≤1.7%

≤1.7%

≤1.7% RECESSED CURB

4’-1” min

4’-1”

SEE CONSTRUCTION NOTE 7 & REFER TO PW CURB RAMP DETAIL

RX-11, DETAIL E - LANDSCAPED PATHWAY RETURNED CURB LAYOUT

SEE CONSTRUCTION NOTE 6

EXACT RAMP LOCATION TO BE FINALIZED ON SITE BASED ON

MOST LEVEL AREA.

LANDING TO BE INCORPORATED WITHIN (E) PATH IF POSSIBLE

20’-1”

49 South Van Ness Ave., Suite 1200, San Francisco, CA 94103

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

10 0 10 205 Feet

N RPD_Facilities Curbs_and_Islands Signage_No_Parking

Pay_Stations

Curb_Ramps Type

Existing Newer Curb Ramp Modify Existing Curb Ramp New Curb Ramp No Curb Ramp

CONSTRUCTION NOTES CONSTRUCTION LEGEND

ADA-12

JOHN F KENNEDY DR

JR

SA

LB

GOLDEN GATE PARK

ADA PARKING

Detectable Warning (DW) - Truncated Domes.

Refer to Public Works Accessible Street Crossing Standards:

RX-6, Detail A - Standard Curb Ramps Detectable Warning Layout Details And Notes

Accessible Aisle

Blue painted curb

Recessed curb for accessible aisle. Slope in all directions to be ≤1.7%

Red painted curb

1.

2.

3.

4.

5.

6.

7.

8.

9.

• All measurements to be verified in the field by Contractor

• Contractor to spray paint extents of proposed construction on site for review by Owner

• Cross slope to be ≤1.7%

• Running slope to be ≤4.5%

Post with International Symbol of Accessibility sign. Refer to Public Works Parking Sheet G 3.51, Detail 6 - Accessible Parking Stall Sign.

For Van accessible stalls, see Sheet G 3.51, Detail 9 - Van Accessible Parking Stall Sign

New Asphalt Paving (See Sheet D1.1 for Details)

New Concrete Paving (See Sheet D1.1 for Details)

Landing to be width of ramp and 4’-1” in depth, with slope in all directions to be ≤1.7%

3/5/26

5/5/26

R1

R2

R3

03 7/2/26

1" = 10'

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _1

.a i"

L7

JOHN F KENNEDY DR

RESTROOMS

E

LENGTHEN BLUE ZONE, ADJUST SIGN

ADA-12

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

10 0 10 205 Feet

N RPD_Facilities Curbs_and_Islands Signage_No_Parking

Pay_Stations

Curb_Ramps Type

Existing Newer Curb Ramp Modify Existing Curb Ramp New Curb Ramp No Curb Ramp

CONSTRUCTION LEGEND

ADA-13, ADA-15A

JOHN F KENNEDY DR &

CHAIN OF LAKES DR

GOLDEN GATE PARK

ADA PARKING

JR

SA

LB

Detectable Warning (DW) - Truncated Domes.

Refer to Public Works Accessible Street Crossing Standards:

RX-6, Detail A - Standard Curb Ramps Detectable Warning Layout Details And Notes

Accessible Aisle

Blue painted curb

Recessed curb for accessible aisle. Slope in all directions to be ≤1.7%

Red painted curb

1.

2.

3.

4.

5.

6.

7.

8.

9.

• All measurements to be verified in the field by Contractor

• Contractor to spray paint extents of proposed construction on site for review by Owner

• Cross slope to be ≤1.7%

• Running slope to be ≤4.5%

Post with International Symbol of Accessibility sign. Refer to Public Works Parking Sheet G 3.51, Detail 6 - Accessible Parking Stall Sign.

For Van accessible stalls, see Sheet G 3.51, Detail 9 - Van Accessible Parking Stall Sign

New Asphalt Paving (See Sheet D1.1 for Details)

New Concrete Paving (See Sheet D1.1 for Details)

Landing to be width of ramp and 4’-1” in depth, with slope in all directions to be ≤1.7%

3/5/26

5/5/26

R1

R2

R3

03 7/2/26CONSTRUCTION NOTES

1" = 10'

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _1

1.

ai

F

E

L8

JOHN F KENNEDY DR

CH

A

IN

O

F LA

KES D

R

RECESSED CURB

5’-1”

3’-1”

5’-1”

5’-1”

20’-1”

4’-1” min

≤5

≤1 .7

≤4.5%

≤1.7%

≤1.7%

≤1.7%

≤4 .5

≤4 .5

≤1.7%

8’-1”

3’-1”

8’-1”

20’-1” ≤4.5%

≤4.5%

≤4.5%

≤1.7%

≤1.7%

≤1.7%

≤1.7%

RECESSED CURB

8’-1”

DEMOLISH AND REMOVE EXISTING CURB

RAMP

SITE ADA ACCESS AISLE IN FOOTPRINT

4’-1”

4’-1” min

4’-1”

SEE CONSTRUCTION NOTE 7 & REFER TO PW CURB RAMP DETAIL

RX-11, DETAIL E - LANDSCAPED PATHWAY RETURNED CURB LAYOUT

SEE CONSTRUCTION NOTE 7 & REFER TO PW CURB RAMP DETAIL

RX-11, DETAIL E - LANDSCAPED PATHWAY RETURNED CURB LAYOUT

SEE CONSTRUCTION NOTE 6

EXACT RAMP LOCATION TO BE FINALIZED ON SITE BASED ON

MOST LEVEL AREA.

SEE CONSTRUCTION NOTE 6

ADA-15A

ADA-13

N016

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

10 0 10 205 Feet

N RPD_Facilities Curbs_and_Islands Signage_No_Parking

Pay_Stations

Curb_Ramps Type

Existing Newer Curb Ramp Modify Existing Curb Ramp New Curb Ramp No Curb Ramp

CONSTRUCTION NOTES CONSTRUCTION LEGEND

P05P05

CHAIN OF LAKES DRCHAIN OF LAKES DR

GOLDEN GATE PARK

ADA PARKING

JR

SA

LB

3/5/26

5/5/26

R1

R2

R3

Detectable Warning (DW) - Truncated Domes.

Refer to Public Works Accessible Street Crossing Standards:

RX-6, Detail A - Standard Curb Ramps Detectable Warning Layout Details And Notes

Accessible Aisle

Blue painted curb

Recessed curb for accessible aisle. Slope in all directions to be ≤1.7%

Red painted curb

1.

2.

3.

4.

5.

6.

7.

8.

9.

• All measurements to be verified in the field by Contractor

• Contractor to spray paint extents of proposed construction on site for review by Owner

• Cross slope to be ≤1.7%

• Running slope to be ≤4.5%

Post with International Symbol of Accessibility sign. Refer to Public Works Parking Sheet G 3.51, Detail 6 - Accessible Parking Stall Sign.

For Van accessible stalls, see Sheet G 3.51, Detail 9 - Van Accessible Parking Stall Sign

New Asphalt Paving (See Sheet D1.1 for Details)

New Concrete Paving (See Sheet D1.1 for Details)

Landing to be width of ramp and 4’-1” in depth, with slope in all directions to be ≤1.7%

7/2/26

1" = 10'

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _1

2.

ai

L9

F

CH

AI

N O

F

LA

KE

S

DR

N021

3’-1”

3’-1”30” min

4’-1” min

≤1.7% P05

LEVEL PAYSTATION CONCRETE

PAD: 10” THICK MIN

SITE ABUTTING ASPHALT IN LOCATION

WITH 30”X48” AREA <1.7% SLOPE

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

10 0 10 205 Feet

N RPD_Facilities Curbs_and_Islands Signage_No_Parking

Pay_Stations

Curb_Ramps Type

Existing Newer Curb Ramp Modify Existing Curb Ramp New Curb Ramp No Curb Ramp

CONSTRUCTION NOTES CONSTRUCTION LEGEND

P06

SENIOR CENTER

GOLDEN GATE PARK

ADA PARKING

JR

SA

LB

3/5/26

5/5/26

R1

R2

R3

Detectable Warning (DW) - Truncated Domes.

Refer to Public Works Accessible Street Crossing Standards:

RX-6, Detail A - Standard Curb Ramps Detectable Warning Layout Details And Notes

Accessible Aisle

Blue painted curb

Recessed curb for accessible aisle. Slope in all directions to be ≤1.7%

Red painted curb

1.

2.

3.

4.

5.

6.

7.

8.

9.

• All measurements to be verified in the field by Contractor

• Contractor to spray paint extents of proposed construction on site for review by Owner

• Cross slope to be ≤1.7%

• Running slope to be ≤4.5%

Post with International Symbol of Accessibility sign. Refer to Public Works Parking Sheet G 3.51, Detail 6 - Accessible Parking Stall Sign.

For Van accessible stalls, see Sheet G 3.51, Detail 9 - Van Accessible Parking Stall Sign

New Asphalt Paving (See Sheet D1.1 for Details)

New Concrete Paving (See Sheet D1.1 for Details)

Landing to be width of ramp and 4’-1” in depth, with slope in all directions to be ≤1.7%

7/2/26

1" = 10'

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _1

3.

ai

L10

G

H

SENIOR CENTER

N025

3’ -1

3’-1”

30” min

4’-1” min

≤1.7%

LEVEL PAYSTATION CONCRETE

PAD: 10” THICK MIN

SITE ABUTTING ASPHALT IN LOCATION

WITH 30”X48” AREA <1.7% SLOPE

P06

Project

Drawing Title

Sheet No.

Project No.

Checked by

Drawn

DAC

Proj. Mgr.

Scale: 1 INCH = 10 FT

100% SUBMITTAL DATE

No. Date Revisions

10 0 10 205 Feet

N RPD_Facilities Curbs_and_Islands Signage_No_Parking

Pay_Stations

Curb_Ramps Type

Existing Newer Curb Ramp Modify Existing Curb Ramp New Curb Ramp No Curb Ramp

CONSTRUCTION NOTES CONSTRUCTION LEGEND

P07

JOHN F KENNEDY DR

GOLDEN GATE PARK

ADA PARKING

JR

SA

LB

Detectable Warning (DW) - Truncated Domes.

Refer to Public Works Accessible Street Crossing Standards:

RX-6, Detail A - Standard Curb Ramps Detectable Warning Layout Details And Notes RX-11, Sheet Note 6

Accessible Aisle

Blue painted curb

Recessed curb for accessible aisle. Slope in all directions to be ≤1.7%

Red painted curb

1.

2.

3.

4.

5.

6.

7.

8.

9.

• All measurements to be verified in the field by Contractor

• Contractor to spray paint extents of proposed construction on site for review by Owner

• Cross slope to be ≤1.7%

• Running slope to be ≤4.5%

Post with International Symbol of Accessibility sign. Refer to Public Works Parking Sheet G 3.51, Detail 6 - Accessible Parking Stall Sign.

For Van accessible stalls, see Sheet G 3.51, Detail 9 - Van Accessible Parking Stall Sign

New Asphalt Paving (See Sheet D1.1 for Details)

New Concrete Paving (See Sheet D1.1 for Details)

Landing to be width of ramp and 4’-1” in depth, with slope in all directions to be ≤1.7%

3/5/26

5/5/26

7/2/26

R1

R2

R3

1" = 10'

"T

GI

S\

GI

S

Da ta

\P ro je ct s\ Pa rk in g\

GG

P_ Pa id _P ar kin g_ Bi d_ Se t\0 2_

M ap s\ Bi d Se t D ra w in gs \W or kin g Fi le s\

Ill us tra to r F ile s\ 1I

N-

FT

_D et ai le d\

Bi d

Se t_

De ta ils _2

4x

_s he et _1

5.

ai

L11

G

F

JOHN F KENNEDY DR

3’-1”

3’-1”

30” min

4’-1” min≤1.7%

LEVEL PAYSTATION CONCRETE

PAD: 10” THICK MIN

SITE ABUTTING ASPHALT IN LOCATION

WITH 30”X48” AREA <1.7% SLOPE

P07

G0.0 Cover Sheet_GGP Paid Parking.pdf
G1.0 Sheet Index.pdf
G2.0 Site Reference Key Plan.pdf
G3.0 DAC Form.pdf
G 3.51 PW Accessible Parking Stall Sign Standards.pdf
Bid Set_Details_24x36_sheet_1_P02
Bid Set_Details_24x36_sheet_2_P01
Bid Set_Details_24x36_sheet_3_ADA05A
Bid Set_Details_24x36_sheet_4_P03
Bid Set_Details_24x36_sheet_5_P04
Bid Set_Details_24x36_sheet_6_ADA09
Bid Set_Details_24x36_sheet_7_ADA12

File details come from the government source that posted it. Updated .