Attachment 06 Acknowledgment of Stormwater Control Measure (SCM) Maintenance Responsibilities.pdf
PDF 77 KB Posted
- Attached to
- 7840630000, Maintenance, SCM Delaware
- Solicitation number
- 6100066487
- Issued by
- Delaware County, Pennsylvania
About this file
This is an acknowledgment form for Stormwater Control Measure (SCM) maintenance responsibilities issued by the Pennsylvania Department of Transportation (PennDOT) for a maintenance contract in Delaware County, District 6-0. The form must be completed and returned to the PennDOT Purchasing Agent within three days of the bidder receiving notice of apparent low bidder status. The contractor is required to perform routine maintenance of Stormwater Control Measures in Delaware County as specified in the attached Specifications and Statement of Work. The acknowledgment confirms that the contractor's company has reviewed PennDOT Publication 888—Stormwater Control Measures Maintenance Manual and understands the requirements regarding allowable equipment, SCM types, and maintenance procedures.
The form requires that at least one individual responsible for the work crew has reviewed and is familiar with PennDOT Publication 888 and its contents. The acknowledgment must be signed and dated by an authorized company representative and include the company name, print name, signature, and date of completion. This document serves as a prerequisite commitment from the apparent low bidder demonstrating capability and understanding of the technical and operational requirements for SCM maintenance work before contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 6- Acknowledgement of Stormwater Control Measure (SCM)
Maintenance Responsibilities
This page is to be completed and returned to the PennDOT Purchasing Agent within 3 days of notice of apparent low bidder status.
Our company has reviewed the current version of PennDOT Publication 888- Stormwater Control
Measures Maintenance Manual and understand the specifics regarding allowable equipment, SCM types, and procedures to conduct SCM Maintenance.
We will have at least one individual who is responsible for the work crew activity who has reviewed and is familiar with PennDOT Publication 888 and its contents.
Completed By Print: __________________________
Completed By Signature:_______________________
Date: _____________
Name of Company: _____________________
File details come from the government source that posted it. Updated .