Attachment 06 Acknowledgment of Stormwater Control Measure (SCM) Maintenance Responsibilities.pdf

PDF 77 KB Posted

Attached to
7840620000, Maintenance, SCM Chester
Solicitation number
6100066478
Issued by
Montgomery County, Pennsylvania

About this file

This is an acknowledgment form for Stormwater Control Measure (SCM) maintenance responsibilities issued by the Pennsylvania Department of Transportation (PennDOT) for a maintenance contract in Chester County, District 6-0. The form must be completed and returned to the PennDOT Purchasing Agent within three days of receiving notice of apparent low bidder status. The acknowledgment requires the bidding company to confirm that it has reviewed PennDOT Publication 888—Stormwater Control Measures Maintenance Manual and understands the specifications regarding allowable equipment, SCM types, and maintenance procedures. Additionally, the contractor must designate at least one individual responsible for work crew activity who has reviewed and is familiar with the contents of Publication 888.

The form requires completion with the printed name and signature of the authorized company representative, the date of completion, and the company name. This acknowledgment serves as a prerequisite for contract award and demonstrates the contractor's qualifications and commitment to complying with PennDOT's established maintenance standards and procedures for stormwater control measures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6- Acknowledgement of Stormwater Control Measure (SCM)

Maintenance Responsibilities

This page is to be completed and returned to the PennDOT Purchasing Agent within 3 days of notice of apparent low bidder status.

Our company has reviewed the current version of PennDOT Publication 888- Stormwater Control

Measures Maintenance Manual and understand the specifics regarding allowable equipment, SCM types, and procedures to conduct SCM Maintenance.

We will have at least one individual who is responsible for the work crew activity who has reviewed and is familiar with PennDOT Publication 888 and its contents.

Completed By Print: __________________________

Completed By Signature:_______________________

Date: _____________

Name of Company: _____________________

File details come from the government source that posted it. Updated .