Attachment 06 Acknowledgment of Stormwater Control Measure (SCM) Maintenance Responsibilities.pdf
PDF 77 KB Posted
- Attached to
- 7840620000, Maintenance, SCM Chester
- Solicitation number
- 6100066478
- Issued by
- Montgomery County, Pennsylvania
About this file
This is an acknowledgment form for Stormwater Control Measure (SCM) maintenance responsibilities issued by the Pennsylvania Department of Transportation (PennDOT) for a maintenance contract in Chester County, District 6-0. The form must be completed and returned to the PennDOT Purchasing Agent within three days of receiving notice of apparent low bidder status. The acknowledgment requires the bidding company to confirm that it has reviewed PennDOT Publication 888—Stormwater Control Measures Maintenance Manual and understands the specifications regarding allowable equipment, SCM types, and maintenance procedures. Additionally, the contractor must designate at least one individual responsible for work crew activity who has reviewed and is familiar with the contents of Publication 888.
The form requires completion with the printed name and signature of the authorized company representative, the date of completion, and the company name. This acknowledgment serves as a prerequisite for contract award and demonstrates the contractor's qualifications and commitment to complying with PennDOT's established maintenance standards and procedures for stormwater control measures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 6- Acknowledgement of Stormwater Control Measure (SCM)
Maintenance Responsibilities
This page is to be completed and returned to the PennDOT Purchasing Agent within 3 days of notice of apparent low bidder status.
Our company has reviewed the current version of PennDOT Publication 888- Stormwater Control
Measures Maintenance Manual and understand the specifics regarding allowable equipment, SCM types, and procedures to conduct SCM Maintenance.
We will have at least one individual who is responsible for the work crew activity who has reviewed and is familiar with PennDOT Publication 888 and its contents.
Completed By Print: __________________________
Completed By Signature:_______________________
Date: _____________
Name of Company: _____________________
File details come from the government source that posted it. Updated .